CN207867685U - A kind of monitor terminal of Geological Hazards of debris monitoring system - Google Patents

A kind of monitor terminal of Geological Hazards of debris monitoring system Download PDF

Info

Publication number
CN207867685U
CN207867685U CN201721640234.8U CN201721640234U CN207867685U CN 207867685 U CN207867685 U CN 207867685U CN 201721640234 U CN201721640234 U CN 201721640234U CN 207867685 U CN207867685 U CN 207867685U
Authority
CN
China
Prior art keywords
wall
monitoring
terminal
monitoring system
geological hazards
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721640234.8U
Other languages
Chinese (zh)
Inventor
张铁龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xingda Spacetime Satellite Remote Sensing Application System Integration Co ltd
Original Assignee
Anhui Pan Yue Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Pan Yue Science And Technology Co Ltd filed Critical Anhui Pan Yue Science And Technology Co Ltd
Priority to CN201721640234.8U priority Critical patent/CN207867685U/en
Application granted granted Critical
Publication of CN207867685U publication Critical patent/CN207867685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a kind of monitor terminals of Geological Hazards of debris monitoring system, are related to disaster monitoring system technical field, are mainly made of monitoring room, monitoring host computer, vertical stand, operation console, cabinet, solar panel, wind power generation plant etc..The monitor terminal of the Geological Hazards of debris monitoring system of the utility model is powered using solar energy and wind-power electricity generation, mains-supplied is not needed, it solves the problems, such as to power at mountain area difficult, and solar energy and wind-power electricity generation match, there is no the case where being interrupted of powering caused by weather reason, help to ensure that the duration of monitoring host computer work.

Description

A kind of monitor terminal of Geological Hazards of debris monitoring system
Technical field
The utility model is related to disaster monitoring system technical field more particularly to a kind of Geological Hazards of debris monitoring systems Monitor terminal.
Background technology
Every year due to being lost caused by geological disaster up to 20,000,000,000 yuan, geological disaster includes avalanche, landslide, mudstone in China Stream etc., occurs mainly in southwest.It is also transitioned by past artificial tape measure monitoring for the monitoring instrument of landslide, mud-rock flow Instrument monitoring, monitoring instrument also positive precision height, excellent performance, wide adaptation range, high degree of automation direction develop.It is existing Geological disaster instrument monitoring technology is usually all to use remote monitoring, the layout data harvester in monitoring region, in safety Location arrangements monitor terminal.However, if monitor terminal distance detection region is too far, equipment investment is big, transmission request message It is high and easily break down;In the closer location arrangements monitor terminal in distance monitoring region, due to monitoring area be mostly in mountain area, Power supply is more difficult, and sound is big when the generations such as mud-rock flow, is easily impacted to monitoring room.How to design one kind can self-powered and anti- The monitor terminal of the Geological Hazards of debris monitoring system of noise is technical problem to be solved in the utility model.
Utility model content
In view of the deficiencies of the prior art, providing one kind can self-powered and noiseproof mud-rock flow geology calamity for the utility model The monitor terminal of evil monitoring system.
The utility model is realized by following technological means solves above-mentioned technical problem:
A kind of monitor terminal of Geological Hazards of debris monitoring system, including user terminal and reception terminal, the user Terminal includes monitoring room and is mounted on the indoor monitoring host computer of monitoring, and the monitoring host computer includes display and host, the prison Control indoor location has operation console, the display to be mounted on operation console, and the lower part of the operation console is equipped with cabinet, the master Machine and reception terminal are all mounted in cabinet, accumulator are also equipped in the cabinet, the top of the monitoring room is equipped with The top of vertical stand, the vertical stand is equipped with wind transducer, and the top of the vertical stand is equipped with erecting bed, the installation Solar panel is installed on platform, holder is installed between the solar panel and monitoring room, the vertical stand is being pacified Position between dress platform and wind transducer is equipped with electronic circular orbit, is equipped with sliding block on the electronic circular orbit, institute It states and wind power generation plant is installed on sliding block.
Preferably, the monitor terminal of a kind of Geological Hazards of debris monitoring system, the monitoring room are by wall The rectangular fluid chamber surrounded, the wall include inner wall and exterior wall, and cavity, the inner wall installation are provided in exterior wall In cavity, it is both provided with mounting groove on the inner wall and exterior wall, environmental protection is installed between the inner wall and exterior wall Fire-retardant acoustical cotton, the environmental protection flame retardant acoustical cotton are embedded in by mounting groove in inner wall and exterior wall.
Preferably, the monitor terminal of a kind of Geological Hazards of debris monitoring system, the top of the monitoring room is set It is equipped with exhaust tube, the trapezoidal sound-insulating structure in the exhaust tube inside.
Preferably, a kind of monitor terminal of Geological Hazards of debris monitoring system, the reception terminal include Self-organized network communication terminal, mobile communication terminal, satellite communication terminal.
The utility model has the advantage of:The monitor terminal of the Geological Hazards of debris monitoring system of the utility model uses Solar energy and wind-power electricity generation are powered, and do not need mains-supplied, solve the problems, such as to power at mountain area difficult, and solar energy and Wind-power electricity generation matches, and there is no the case where being interrupted of powering caused by weather reason, help to ensure that monitoring host computer work Duration.
Further, the wall of monitoring room is made of inner wall and exterior wall, and environmental protection is installed between inner wall and exterior wall Fire-retardant acoustical cotton helps to prevent monitoring room by noise effect.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model wall.
Specific implementation mode
It is new below in conjunction with this practicality to keep the purpose, technical scheme and advantage of the utility model embodiment clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, the every other embodiment that those of ordinary skill in the art are obtained without creative efforts belong to The range of the utility model protection.
A kind of monitor terminal of Geological Hazards of debris monitoring system, including user terminal and reception terminal 1, the user Terminal includes monitoring room 2 and the monitoring host computer in monitoring room 2, and the monitoring host computer includes display 3 and host 4, institute It states and operation console 5 is installed in monitoring room 2, the display 3 is mounted on operation console 5, and the lower part installation of the operation console 5 is organic Cabinet 6, the host 4 and reception terminal 1 are all mounted in cabinet 6, and accumulator 7, the monitoring are also equipped in the cabinet 6 The top of room 2 is equipped with vertical stand 8, and the top of the vertical stand 8 is equipped with wind transducer 9, the top peace of the vertical stand 8 Equipped with erecting bed 10, solar panel 11 is installed on the erecting bed 10, the solar panel 11 and monitoring room 2 it Between holder 12 is installed, position of the vertical stand 8 between erecting bed 10 and wind transducer 9 is equipped with electronic circular orbit 13, sliding block 14 is installed on the electronic circular orbit 13, wind power generation plant 15 is installed on the sliding block 14.
In rainy weather, wind power generation plant passes through wind-power electricity generation;In calm fine day, solar panel power generation;Most Big degree avoids the occurrence of interruption is powered caused by environmental factor.The Geological Hazards of debris of the utility model is supervised The monitor terminal of control system is powered using solar energy and wind-power electricity generation, does not need mains-supplied, is solved and is powered at mountain area Difficult problem, and solar energy and wind-power electricity generation match, there is no the case where being interrupted of powering caused by weather reason, help In the duration for ensureing monitoring host computer work.
Preferably, the monitoring room 2 is the rectangular fluid chamber surrounded by wall, and the wall includes inner wall 16 and exterior wall Body 17 is provided with cavity in exterior wall 17, and the inner wall 16 is mounted in cavity, on the inner wall 16 and exterior wall 17 all It is provided with mounting groove 18, environmental protection flame retardant acoustical cotton 19, the environmental protection flame retardant are installed between the inner wall 16 and exterior wall 17 Acoustical cotton 19 is embedded in by mounting groove 18 in inner wall 16 and exterior wall 17.
The wall of monitoring room is made of inner wall and exterior wall, and environmental protection flame retardant sound-absorbing is installed between inner wall and exterior wall Cotton helps to prevent monitoring room by noise effect.
Preferably, the top of the monitoring room 2 is provided with exhaust tube 20, the 20 trapezoidal sound insulation knot in inside of the exhaust tube Structure.
Trapezoidal sound-insulating structure, helps to improve the sound insulation value of monitoring room inside exhaust tube.
Preferably, the reception terminal 1 includes self-organized network communication terminal, mobile communication terminal, satellite communication terminal.
It includes self-organized network communication terminal, mobile communication terminal, satellite communication terminal to receive terminal, and it is logical can to carry out ad hoc network Letter, mobile communication and satellite communication.
The monitor terminal of the Geological Hazards of debris monitoring system of the utility model is carried out using solar energy and wind-power electricity generation Power supply, does not need mains-supplied, solves the problems, such as to power at mountain area difficult, and solar energy and wind-power electricity generation match, will not In the presence of the case where being interrupted of powering caused by weather reason, the duration of monitoring host computer work is helped to ensure that;Further, monitoring room Wall be made of inner wall and exterior wall, and between inner wall and exterior wall install environmental protection flame retardant acoustical cotton, help to prevent Monitoring room is by noise effect.
It should be noted that herein, if there are first and second or the like relational terms to be used merely to one A entity or operation with another entity or operate distinguish, without necessarily requiring or implying these entities or operation it Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to Cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or setting Standby intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in the process, method, article or apparatus that includes the element.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to aforementioned reality Example is applied the utility model is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to preceding The technical solution recorded in each embodiment is stated to modify or equivalent replacement of some of the technical features;And these Modification or replacement, the spirit and model of various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution It encloses.

Claims (4)

1. a kind of monitor terminal of Geological Hazards of debris monitoring system, it is characterised in that:Including user terminal and terminal is received, The user terminal includes monitoring room and is mounted on the indoor monitoring host computer of monitoring, and the monitoring host computer includes display and master Machine is equipped with operation console in the monitoring room, and the display is mounted on operation console, and the lower part installation of the operation console is organic Cabinet, the host and receives terminal and is all mounted in cabinet, is also equipped with accumulator in the cabinet, the monitoring room it is upper Portion is equipped with vertical stand, and the top of the vertical stand is equipped with wind transducer, and the top of the vertical stand is equipped with erecting bed, Solar panel is installed on the erecting bed, holder is installed between the solar panel and monitoring room, it is described perpendicular Straight position of the frame between erecting bed and wind transducer is equipped with electronic circular orbit, is equipped on the electronic circular orbit Sliding block is equipped with wind power generation plant on the sliding block.
2. a kind of monitor terminal of Geological Hazards of debris monitoring system according to claim 1, it is characterised in that:It is described Monitoring room is the rectangular fluid chamber surrounded by wall, and the wall includes inner wall and exterior wall, and cavity is provided in exterior wall, The inner wall is mounted in cavity, and mounting groove, the inner wall and exterior wall are both provided on the inner wall and exterior wall Between environmental protection flame retardant acoustical cotton is installed, the environmental protection flame retardant acoustical cotton passes through mounting groove and is embedded in inner wall and exterior wall.
3. a kind of monitor terminal of Geological Hazards of debris monitoring system according to claim 1, it is characterised in that:It is described The top of monitoring room is provided with exhaust tube, the trapezoidal sound-insulating structure in the exhaust tube inside.
4. a kind of monitor terminal of Geological Hazards of debris monitoring system according to claim 1, it is characterised in that:It is described Reception terminal include self-organized network communication terminal, mobile communication terminal, satellite communication terminal.
CN201721640234.8U 2017-11-30 2017-11-30 A kind of monitor terminal of Geological Hazards of debris monitoring system Active CN207867685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721640234.8U CN207867685U (en) 2017-11-30 2017-11-30 A kind of monitor terminal of Geological Hazards of debris monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721640234.8U CN207867685U (en) 2017-11-30 2017-11-30 A kind of monitor terminal of Geological Hazards of debris monitoring system

Publications (1)

Publication Number Publication Date
CN207867685U true CN207867685U (en) 2018-09-14

Family

ID=63467928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721640234.8U Active CN207867685U (en) 2017-11-30 2017-11-30 A kind of monitor terminal of Geological Hazards of debris monitoring system

Country Status (1)

Country Link
CN (1) CN207867685U (en)

Similar Documents

Publication Publication Date Title
EP3738403B1 (en) Failure modeling and management of an aerial light fixture
CN103646514B (en) Debris flow early-warning sensing device, system and method is detected based on wireless self-networking group
CN101493680B (en) Gangue stock digitalization safety monitoring system, method and device
CN207867673U (en) A kind of data acquisition device of Geological Hazards of debris monitoring system
CN106569255A (en) Wireless transmission-based coal mine stope earthquake source monitoring and locating system
CN204731940U (en) A kind of side slope telemetry system based on 433 wireless sensor networks
CN112017419A (en) Building safety monitoring and early warning system and method based on multi-source data
CN201892527U (en) Pipe section joint opening monitoring device for electric power tunnels
CN207867685U (en) A kind of monitor terminal of Geological Hazards of debris monitoring system
CN207939554U (en) A kind of security monitoring integrated machine based on cloud
CN206132131U (en) City piping lane on -line monitoring system based on optical fiber sensing and shimmer monitoring technology
CN203054137U (en) Power transmission line pole tower integrated monitoring system
CN101956566B (en) Dynamic disaster monitoring substation of coal rock
CN215265035U (en) Peripheral earth's surface displacement monitoring and early warning system of strip mine
CN204677236U (en) A kind of Real-Time Monitoring mine landslide system
CN206422443U (en) A kind of box-type substation
CN206431304U (en) A kind of advanced geology for tunnel construction predictor
CN214174083U (en) Multifunctional raise dust monitoring device
CN210038203U (en) Wind-solar complementary remote rainfall evaporation monitoring device
CN206990831U (en) A kind of Tethersonde system monitoring warning device
CN202856625U (en) Power supply
CN203834530U (en) Sensor node used for monitoring displacement of underground substation construction
CN106593504A (en) Underground frequency conversion ventilation system
CN206249385U (en) A kind of billboard supervisory systems
CN214410232U (en) Early warning and forecasting system for instability of front and rear slopes of house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230625

Address after: Building 9, No. 1, Changlin Science and Technology Innovation Town, Changlin Town, Feidong County, Hefei City, Anhui Province, 230000

Patentee after: Anhui Xingda Spacetime Satellite Remote Sensing Application System Integration Co.,Ltd.

Address before: 230000, 3rd floor, expansion plant, No. 57, science Avenue, high tech Zone, Hefei, Anhui Province

Patentee before: ANHUI PANYUE TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right