CN207863491U - Building construction formwork component - Google Patents

Building construction formwork component Download PDF

Info

Publication number
CN207863491U
CN207863491U CN201820108958.6U CN201820108958U CN207863491U CN 207863491 U CN207863491 U CN 207863491U CN 201820108958 U CN201820108958 U CN 201820108958U CN 207863491 U CN207863491 U CN 207863491U
Authority
CN
China
Prior art keywords
measurement pipe
concrete
building construction
construction formwork
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820108958.6U
Other languages
Chinese (zh)
Inventor
徐立岩
庞建新
陈鑫
蒋高辉
安阳
冯宇飞
肖祜
龙智强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd filed Critical BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN201820108958.6U priority Critical patent/CN207863491U/en
Application granted granted Critical
Publication of CN207863491U publication Critical patent/CN207863491U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of building construction formwork components, it is related to technical field of building construction, its key points of the technical solution are that including the reference block being arranged on floor, reference block includes metallic plate and measurement pipe, the end face of measurement pipe is concordant with the bottom surface of metallic plate, and seal ring is fixedly connected in measurement pipe.The outer wall that the utility model solves the existing measurement pipe being placed on roof is generally upper relatively smooth, in concrete setting, since the temperature around measurement pipe is different from concrete and measures pipe surface smoother, so that concrete defective tightness when being connect with measurement pipe, it is easy to appear certain gaps, in rainy days, rainwater can flow into this gap along the outer wall of measurement pipe, and then it flows into floor, so that the structure in floor is impregnated by rainwater, the problem of intensity of floor may being impacted, so that rainwater will not be flowed into along the outer wall of measurement pipe in floor.

Description

Building construction formwork component
Technical field
The utility model is related to technical field of building construction, more particularly to a kind of building construction formwork component.
Background technology
In actual life, the construction of building is generally completed using the mode of template casting concrete, is building roof When, usually first template is placed, is put by reinforcing bar hog frame, is then being poured, when in order to ensure to pour roof Roof flush is generally provided with pre-embedded block on roof, measurement pipe is provided on pre-embedded block so that poured in staff It can there are one for comparing the benchmark of height when concrete so that the surface for the roof that staff pours out is more concordant, And setting measurement pipe can also make staff that need not open up measured hole on floor again when measuring slab thickness, generally exist Measurement pipe is still cast in concrete by staff when pouring, and only exposes the opening part of measurement pipe so that work people Member only needs to stretch into measuring scale into measurement pipe the thickness that can conveniently measure floor.
But the outer wall of the existing measurement pipe being placed on roof is generally upper relatively smooth, in concrete setting, Since the temperature around measurement pipe is different from concrete and measures pipe surface smoother so that concrete is connect with measurement pipe When defective tightness, it is easy to there is certain gap, in rainy days, rainwater can flow into this seam along the outer wall of measurement pipe Gap, and then flow into floor so that the structure in floor is impregnated by rainwater, may be impacted to the intensity of floor.
Utility model content
The purpose of this utility model is to provide a kind of building construction formwork components, it to existing by being arranged in floor On reference block on measurement pipe be improved so that when concrete and measurement pipe contact, gap smaller between the two, and And connection is more closely.
The above-mentioned purpose of the utility model technical scheme is that:
A kind of building construction formwork component, including the reference block that is arranged on roof, the reference block include metallic plate with And the measurement pipe of setting on a metal plate, the end face of the measurement pipe is concordant with the bottom surface of metallic plate, fixed in the measurement pipe It is connected with for preventing water along the seal ring for measuring gap between pipe outer wall inflow measurement pipe and concrete, is poured in staff When building concrete, the height of seal ring is set above concrete layer.
By using above-mentioned technical proposal, when in use, first reference block is placed on floor, and seal ring is fixed It is connected in measurement pipe, then staff's casting concrete on floor, and the height of concreting is poured as only By measurement pipe close to nozzle position expose sub-fraction, and seal ring be located at concrete layer upside and not with concrete layer Contact so that seal ring will block after concrete setting in the gap occurred with measurement pipe contact position so that rainwater when raining When flowing downward along measurement pipe outer wall, stopped by seal ring so that rainwater is along the table of seal ring away from survey The direction of buret outer wall flows away, and rainwater will not enter gap, and by concrete and can generally be surveyed at work in staff The contact position of buret outer wall is set as with certain slope, and is slightly above other positions close to the position for measuring pipe outer wall, So that rainwater will not enter in gap in flowing.By being fixedly connected with seal ring in measurement pipe so that rainwater will not Enter floor along the gap between measurement pipe and concrete.
The utility model is further arranged to:The mode that the seal ring is connected through a screw thread is fixedly connected on measurement pipe On.
By using above-mentioned technical proposal so that the connection between seal ring and measurement pipe is more convenient, and staff It is also more convenient when needing to replace seal ring.
The utility model is further arranged to:It is provided with sealing strip between the seal ring and measurement pipe.
By using above-mentioned technical proposal so that the connection between measurement pipe and seal ring more closely, and in sealing Water on the upside of ring is stopped by sealing strip, will not flow into screw thread along the outer wall of measurement pipe.
The utility model is further arranged to:The protective plug coordinated with measurement pipe is provided in the measurement pipe.
By using above-mentioned technical proposal, when staff's casting concrete, sometimes accidentally by concreting into In measurement pipe, concrete solidifies in measurement pipe so that measuring scale is being stretched into measurement pipe progress slab thickness by staff When test, the concrete in measurement pipe can cause to interfere to measuring scale so that the slab thickness that staff measures is not accurate enough Really, enter concrete in measurement pipe in order to prevent, the protective plug coordinated with measurement pipe is provided in measurement pipe.
The utility model is further arranged to:It is provided on the protective plug for preventing protective plug to be fully inserted into measurement pipe Blocking portion, the blocking portion integrally be more than protective plug.
By using above-mentioned technical proposal so that protective plug is when in measurement pipe, under the action of blocking portion, prevents Shield plug will not be fully inserted into measurement pipe.
The utility model is further arranged to:The blocking portion is integrally more than nozzle one end of measurement pipe.
By using above-mentioned technical proposal so that when protective plug is inserted into measurement pipe, blocking portion lid is located in measurement pipe, blocking The nozzle of measurement pipe is blocked in portion completely so that rainwater will not flow downward along the outer wall at measurement pipe nozzle
The utility model is further arranged to:The blocking portion is fixedly connected with draw ring in the one side of measurement pipe.
By using above-mentioned technical proposal, when protective plug is mounted in measurement pipe, in order to enable protective plug is convenient for from survey It is extracted in buret, blocking portion is fixedly connected with draw ring in the one side of measurement pipe so that staff is carrying out slab thickness Measurement when, it is only necessary to pull draw ring, can conveniently remove protective plug, then measuring scale is stretched into measurement pipe, from And carry out the measurement of slab thickness.
The utility model is further arranged to:Be provided with saw-tooth ring on the outer wall of the measurement pipe, the saw-tooth ring it is oblique Facing towards side of the measurement pipe far from metallic plate.
By using above-mentioned technical proposal, in order to enable concrete and the gap smaller between pipe outer wall is measured, and coagulation Soil is connect more closely with measurement pipe, and in the more difficult inflow concrete layer of rainwater, saw is provided on the outer wall of measurement pipe Ring gear, and the inclined-plane of saw-tooth ring is towards side of the measurement pipe far from metallic plate.Therefore by concreting when on floor, Concrete is connected with the saw-tooth ring in measurement pipe so that the gap between concrete and measurement pipe becomes tortuous, both makes Rainwater is not easily accessed in gap, but also what is connected between measurement pipe and concrete is more secured.
In conclusion the utility model has the advantages that:
1, by being fixedly connected with seal ring in measurement pipe so that rainwater will not be along between measurement pipe and concrete Gap enters floor;
2, by being provided with protective plug in measurement pipe so that for staff in casting concrete, concrete will not be into Enter measurement pipe;
3, by the way that saw-tooth ring of the inclined-plane towards measurement pipe nozzle is arranged in the junction of measurement pipe and concrete so that coagulation Gap smaller of the soil in solidification between measurement pipe, and gap is bending so that and water is more difficult to enter floor.
Description of the drawings
Fig. 1 is that the schematic diagram in roof is arranged in reference block in embodiment 1;
Fig. 2 is the structure chart that measurement pipe is contacted with concrete in embodiment 1;
Fig. 3 is the enlarged drawing in the portions A in Fig. 2.
In figure, 1, roof;2, reference block;21, metallic plate;22, measurement pipe;3, seal ring;4, sealing strip;5, protective plug; 6, blocking portion;7, draw ring;8, saw-tooth ring.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:A kind of building construction formwork component, as shown in Figure 1, including the reference block 2 being arranged on roof 1, base Quasi- block 2 includes metallic plate 21 and the measurement pipe 22 being arranged on metallic plate 21, wherein the end face of measurement pipe 22 and metallic plate 21 Bottom surface it is concordant.
As shown in Fig. 2, building construction formwork component further includes being arranged in measurement pipe 22 for preventing water along measurement pipe 22 outer walls flow into the seal ring 3 in gap between measurement pipe 22 and concrete.Here the mode that seal ring 3 is connected through a screw thread is solid Surely it is connected in measurement pipe 22, in order to enable the connection between measurement pipe 22 and seal ring 3 is more closely, with reference to Fig. 3, is measuring Sealing strip 4 is provided between pipe 22 and seal ring 3.
As shown in Fig. 2, when in use, first reference block 2 is placed on floor, and seal ring 3 is fixedly connected on survey On buret 22, then staff's casting concrete on floor, and the height of concreting is poured will only to measure Pipe 22 exposes sub-fraction close to the position of nozzle, and seal ring 3 is located at the upside of concrete layer and is not connect with concrete layer It touches so that seal ring 3 will block after concrete setting in the gap occurred with 22 contact position of measurement pipe so that rainwater when raining When flowing downward along 22 outer wall of measurement pipe, by the blocking of seal ring 3 so that rainwater is along the surface of seal ring 3 to remote Direction from 22 outer wall of measurement pipe flows away, and rainwater will not enter gap, and staff at work generally can be by coagulation The contact position of soil and 22 outer wall of measurement pipe is set as with certain slope, and is slightly above close to the position of 22 outer wall of measurement pipe Other positions so that rainwater will not enter in gap in flowing.By being fixedly connected with seal ring 3 in measurement pipe 22, So that rainwater will not enter floor along the gap between measurement pipe 22 and concrete.
In staff's casting concrete, sometimes accidentally by concreting into measurement pipe 22, concrete exists It is solidified in measurement pipe 22 so that measuring scale when being stretched into the test of the progress slab thickness of measurement pipe 22 by staff, measurement pipe Concrete in 22 can cause to interfere to measuring scale so that the slab thickness that staff measures is not accurate enough, in order to prevent Enter concrete in measurement pipe 22, the protective plug 5 coordinated with measurement pipe 22 is provided in measurement pipe 22.And on protective plug 5 It is provided with the blocking portion 6 for preventing protective plug 5 to be fully inserted into measurement pipe 22, the whole pipe for being more than measurement pipe 22 of blocking portion 6 Mouth one end, the lid of blocking portion 6 are located in measurement pipe 22, the nozzle of measurement pipe 22 are blocked completely so that rainwater will not be along measurement Outer wall at 22 nozzle of pipe flows downward.When protective plug 5 is mounted in measurement pipe 22, in order to enable protective plug 5 is convenient for from survey It is extracted in buret 22, blocking portion 6 is fixedly connected with draw ring 7 in the one side of measurement pipe 22 so that staff is carrying out building When the measurement of plate thickness, it is only necessary to pull draw ring 7, can conveniently remove protective plug 5, then measuring scale is stretched into measurement In pipe 22, to carry out the measurement of slab thickness.
As shown in Fig. 2, in order to enable gap smaller between 22 outer wall of concrete and measurement pipe, and concrete and measurement pipe 22 connections more closely, in the more difficult inflow concrete layer of rainwater, are provided with saw-tooth ring 8 on the outer wall of measurement pipe 22, And the inclined-plane of saw-tooth ring 8 is towards side of the measurement pipe 22 far from metallic plate 21.Therefore by concreting when on floor, Concrete is connected with the saw-tooth ring 8 in measurement pipe 22 so that the gap between concrete and measurement pipe 22 becomes tortuous, both So that rainwater is not easily accessed in gap, but also what is connected between measurement pipe 22 and concrete is more secured.
The application method of the utility model is:First reference block 2 is placed on floor, and seal ring 3 is fixedly connected In measurement pipe 22, then staff's casting concrete on floor, and the height of concreting is poured only will Measurement pipe 22 close to nozzle position expose sub-fraction, and seal ring 3 be located at concrete layer upside and not with concrete Layer contact so that seal ring 3 will block after concrete setting in the gap occurred with 22 contact position of measurement pipe so that when raining Rainwater along 22 outer wall of measurement pipe when flowing downward, by the blocking of seal ring 3 so that rainwater along seal ring 3 surface It is flowed away to the direction far from 22 outer wall of measurement pipe, rainwater will not enter gap, and can generally be incited somebody to action at work in staff The contact position of concrete and 22 outer wall of measurement pipe is set as with certain slope, and is omited close to the position of 22 outer wall of measurement pipe Higher than other positions so that rainwater will not enter in gap in flowing.By being fixedly connected with sealing in measurement pipe 22 Ring 3 so that rainwater will not enter floor along the gap between measurement pipe 22 and concrete.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as all being protected by Patent Law in the right of the utility model.

Claims (8)

1. a kind of building construction formwork component, it is characterised in that:Including being arranged in roof(1)On reference block(2), the benchmark Block(2)Including metallic plate(21)And it is arranged in metallic plate(21)On measurement pipe(22), the measurement pipe(22)End face with Metallic plate(21)Bottom surface it is concordant, the measurement pipe(22)On be fixedly connected and be useful for preventing water along measurement pipe(22)Outer wall stream Enter measurement pipe(22)The seal ring in gap between concrete(3), in staff's casting concrete, seal ring(3)Height Degree is set above concrete layer.
2. building construction formwork component according to claim 1, it is characterised in that:The seal ring(3)Connected by screw thread The mode connect is fixedly connected on measurement pipe(22)On.
3. building construction formwork component according to claim 2, it is characterised in that:The seal ring(3)With measurement pipe (22)Between be provided with sealing strip(4).
4. building construction formwork component according to claim 3, it is characterised in that:The measurement pipe(22)On be provided with Measurement pipe(22)The protective plug of cooperation(5).
5. building construction formwork component according to claim 4, it is characterised in that:The protective plug(5)Upper setting is useful In preventing protective plug(5)It is fully inserted into measurement pipe(22)Blocking portion(6), the blocking portion(6)It is whole to be more than protective plug(5).
6. building construction formwork component according to claim 5, it is characterised in that:The blocking portion(6)It is whole to be more than survey Buret(22)Nozzle one end.
7. building construction formwork component according to claim 6, it is characterised in that:The blocking portion(6)Away from measurement pipe (22)One side on be fixedly connected with draw ring(7).
8. building construction formwork component according to claim 7, it is characterised in that:The measurement pipe(22)Outer wall on set It is equipped with saw-tooth ring(8), the saw-tooth ring(8)Inclined-plane towards measurement pipe(22)Far from metallic plate(21)Side.
CN201820108958.6U 2018-01-22 2018-01-22 Building construction formwork component Active CN207863491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820108958.6U CN207863491U (en) 2018-01-22 2018-01-22 Building construction formwork component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820108958.6U CN207863491U (en) 2018-01-22 2018-01-22 Building construction formwork component

Publications (1)

Publication Number Publication Date
CN207863491U true CN207863491U (en) 2018-09-14

Family

ID=63462933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820108958.6U Active CN207863491U (en) 2018-01-22 2018-01-22 Building construction formwork component

Country Status (1)

Country Link
CN (1) CN207863491U (en)

Similar Documents

Publication Publication Date Title
CN106584654A (en) Production process for prefabricated reinforced concrete duct pieces
CN110617083A (en) Real-time intelligent monitoring and alarming construction method for tunnel lining concrete compactness
CN108333109B (en) Concrete structure internal crack monitoring device and method
CN109139051A (en) A kind of tunnel grouting structure and construction
CN207348469U (en) A kind of constructional column pours device
CN207863491U (en) Building construction formwork component
CN111576232B (en) Linear control construction method for precast beam top plate
CN207863480U (en) A kind of building construction formwork component being arranged in roof
CN207863481U (en) A kind of building construction formwork component
CN207363274U (en) The control prospecting tools of superelevation wall column concreting thickness
CN209243781U (en) It is a kind of for underground engineering main body construction seam and post-cast strip waterproof construction
CN210827105U (en) High-speed railway bridge deck system structure based on prefabricated cable groove
CN106013254B (en) A kind of construction method of the concrete works swaging die with skeleton
CN209703563U (en) A kind of cast-in-place well room steel form of circle
CN207920623U (en) A kind of information-based monitoring system of tunnel lining trolley concrete cast
CN216921375U (en) Concrete anti-seepage structure
CN209637234U (en) A kind of concrete floor slab placement concrete thickness caliberating device
CN205421648U (en) A hollow anti device that floats of box for hollow superstructure of cast -in -place concrete
CN209837114U (en) Advanced water stop structure of foundation bottom plate post-cast strip
CN109653252A (en) A kind of cast-in-place well room steel form of circle and construction method
CN208137954U (en) A kind of armpit Angle formwork for structure of the subway construction
CN212872157U (en) Automatic detection device for filling fullness of filling layer under plate type ballastless track plate
CN220365061U (en) Simple post-pouring belt plugging device
CN220100229U (en) Post-pouring belt ponding prevention structure
CN109083193A (en) Airport pipe gallery standard digital template construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant