CN207863481U - A kind of building construction formwork component - Google Patents
A kind of building construction formwork component Download PDFInfo
- Publication number
- CN207863481U CN207863481U CN201820108959.0U CN201820108959U CN207863481U CN 207863481 U CN207863481 U CN 207863481U CN 201820108959 U CN201820108959 U CN 201820108959U CN 207863481 U CN207863481 U CN 207863481U
- Authority
- CN
- China
- Prior art keywords
- measurement pipe
- pushing block
- blocking portion
- building construction
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of building construction formwork components, it is related to technical field of building construction, its key points of the technical solution are that including reference block, reference block includes metallic plate and measurement pipe, the end face of measurement pipe is concordant with the bottom surface of metallic plate, protective plug is provided in measurement pipe, protective plug includes insertion section and blocking portion, and protective plug is fixedly connected on by Quick connection part in measurement pipe.The utility model solves staff when pouring sometimes accidentally by concreting into measurement pipe, so that concrete solidifies in measurement pipe, so that measuring scale when being stretched into the test of measurement pipe progress roof thickness by staff, concrete in measurement pipe can cause to interfere to measuring scale, so that the problem that the roof thickness low LCL measured of staff is accurate so that staff's concrete in casting concrete will not enter measurement pipe.
Description
Technical field
The utility model is related to technical field of building construction, more particularly to a kind of building construction formwork component.
Background technology
In actual life, the construction of building is generally completed using the mode of template casting concrete, is building roof
When, usually first template is placed, is put by reinforcing bar hog frame, is then being poured, when in order to ensure to pour roof
Roof flush is generally provided with pre-embedded block on roof, measurement pipe is provided on pre-embedded block so that poured in staff
It can there are one for comparing the benchmark of height when concrete so that the surface for the roof that staff pours out is more concordant,
And setting measurement pipe can also make staff that need not open up measured hole on roof again when measuring roof thickness, generally exist
Measurement pipe is still cast in concrete by staff when pouring, and only exposes the opening part of measurement pipe so that work people
Member only needs to stretch into measuring scale into measurement pipe the thickness that can conveniently measure roof.
But staff when pouring sometimes accidentally by concreting into measurement pipe so that concrete is being surveyed
It is solidified in buret so that staff is mixed in measurement pipe when measuring scale to be stretched into the test of measurement pipe progress roof thickness
Solidifying soil can cause to interfere to measuring scale so that the roof thickness low LCL that staff measures is accurate.
Utility model content
The purpose of this utility model is to provide a kind of building construction formwork components, it to existing by being arranged in roof
On reference block on measurement pipe be improved so that in casting concrete on roof, concrete will not enter staff
In measurement pipe.
The above-mentioned purpose of the utility model technical scheme is that:
A kind of building construction formwork component, including the reference block that is arranged on roof, the reference block include metallic plate with
And the measurement pipe of setting on a metal plate, the end face of the measurement pipe is concordant with the bottom surface of metallic plate, is arranged in the measurement pipe
It is useful for the protective plug for preventing concrete from entering measurement pipe, the protective plug includes coordinating and being inserted into inserting for measurement pipe with measurement pipe
Enter portion and the blocking portion for preventing protective plug to be fully inserted into the entirety in measurement pipe more than measurement pipe nozzle one end, it is described anti-
Shield plug is fixedly connected on by Quick connection part in measurement pipe, and the Quick connection part includes that setting deviates from insertion section in blocking portion
Fixed column on one side, the entirety being fixedly connected on the one end of fixed column far from blocking portion in bottle top type installation lid, hinged
Four head clamps being circumferentially equally spaced on blocking portion side, through the screw thread for being opened in installation lid middle position
Hole, the threaded rod being threaded through in threaded hole and four are vertical to be fixedly connected on threaded rod towards equidistant on blocking portion one end
The both ends of the ball rod of arrangement, the head clamp are respectively arranged with latch and pushing block, and the centre position of the head clamp is hinged
On blocking portion, the position of the latch is arranged in the downside of blocking portion, and when ball rod rotates, ball rod carries out pushing block
It pushes.
By using above-mentioned technical proposal, first reference block is placed on floor, then staff pours on floor
Concrete, and the height of concreting is poured as measurement pipe is only exposed sub-fraction close to the position of nozzle, and
Just protective plug is mounted in measurement pipe before pouring so that in casting concrete, concrete will not enter staff
In measurement pipe so that needing the thickness for measuring concreting, when measuring scale is inserted into measurement pipe, do not had in measurement pipe
Concrete causes to interfere to measurement.In addition, when installing protective plug in measurement pipe, first insertion section is inserted into measurement pipe, and
So that blocking portion is contacted with the nozzle of measurement pipe, then staff rotates threaded rod so that is fixedly connected on threaded rod
Ball rod is contacted with pushing block, and when threaded rod rotates so that ball rod continues to push pushing block so that clamping
One end of the connection pushing block of plate moves backward, so that the latch on the head clamp other end is contacted with the outer wall of measurement pipe,
As ball rod pushes out pushing block so that latch is connected in measurement pipe, therefore is mounted in measurement pipe in protective plug
When, it is only necessary to rotate threaded rod, so that it may so that protective plug is clamped in measurement pipe.Protective plug is installed by Quick connection part
In measurement pipe so that staff is more convenient when being loaded and unloaded to protective plug.
The utility model is further arranged to:The whole trapezoidal piece of type of the pushing block, and inclined-plane is arc shaped surface, it is described to push away
The arc shaped surface of motion block is set as towards threaded rod, and by the angle of arc shaped surface when ball rod rotates, and is first contacted with arc shaped surface, then
When being rotated further ball rod, pushing block is pushed.
By using above-mentioned technical proposal, by the arc shaped surface of pushing block towards threaded rod, and the angle of arc shaped surface is set
It is set to when ball rod rotates, is first contacted with arc shaped surface, when being further continued for rotating ball rod, by pushing block to pusher.By that will push away
Motion block is set as trapezoid block type, and inclined-plane is arc surface so that ball rod is more easy when pushing pushing block.
The utility model is further arranged to:Fixed column on the blocking portion was set as four and in blocking portion upper edge week
To being equally spaced.
By using above-mentioned technical proposal so that installation lid is more secured when being fixedly connected on blocking portion.
The utility model is further arranged to:The installation, which is covered between head clamp, is equipped with spring, and the one of the spring
End is mounted on installation and covers, and the other end is connected to head clamp in the one side of pushing block, and measurement pipe is not installed in protective plug
When upper, spring is in equilibrium state, when ball rod pushes pushing block, spring-compressed.
By using above-mentioned technical proposal, staff needs to remove protective plug, and ball rod is turned to leave and is pushed away
When motion block, the spring that is connect with head clamp is by head clamp pushed home so that staff is gone again protective plug takes out of service
Confirm whether latch detaches with measurement pipe so that staff to remove work more convenient.
The utility model is further arranged to:It is provided with and coordinates with ball rod and for preventing ball rod on the pushing block
Limiting groove beyond pushing block.
By using above-mentioned technical proposal, in order to prevent when ball rod and pushing block contact, staff in order to enable
Connection between latch and measurement pipe more fastens and firmly excessive so that ball rod exceeds pushing block, is made to Quick connection part
At damage, coordinates with ball rod so being provided on pushing block and for preventing ball rod from exceeding the limiting groove of pushing block, make
Staff when ball rod to be turned to the bottom of limiting groove, be restricted the blocking of slot so that ball rod without departing from
Pushing block.
The utility model is further arranged to:The one end of the threaded rod far from ball rod is provided with rotating handles.
By using above-mentioned technical proposal so that staff is more convenient when rotating threaded rod.
The utility model is further arranged to:It is fixedly connected with seal ring in the measurement pipe, is poured in staff mixed
When solidifying soil, the height of seal ring is set above concrete layer.
By using above-mentioned technical proposal, in concrete setting, since the temperature around measurement pipe is different from concrete
And measure pipe surface smoother so that concrete defective tightness when being connect with measurement pipe, it is easy to there is certain gap,
In rainy days, rainwater can flow into this gap along the outer wall of measurement pipe, and then flow into floor so that the structure in floor
It is impregnated, the intensity of floor may be impacted by rainwater, rainwater enters along gap in floor in order to prevent, is surveying
Seal ring is fixedly connected on buret so that rainwater along measurement pipe outer wall when flowing downward when rainy, by seal ring
Blocking so that rainwater along seal ring table away from measure pipe outer wall direction flow away so that rainwater will not enter seam
Gap, and seal ring welds together with measurement pipe so that and what is connected between seal ring and measurement pipe is more securely and more tight
It is close.
The utility model is further arranged to:Be provided with saw-tooth ring on the outer wall of the measurement pipe, the saw-tooth ring it is oblique
Facing towards side of the measurement pipe far from metallic plate.
By using above-mentioned technical proposal, in order to enable concrete and the gap smaller between pipe outer wall is measured, connection
More closely, in the more difficult inflow concrete layer of rainwater, it is provided with saw-tooth ring on the outer wall of measurement pipe, and saw-tooth ring
Inclined-plane is towards side of the measurement pipe far from metallic plate.Therefore by concreting when on floor, in concrete and measurement pipe
Saw-tooth ring be connected so that the gap between concrete and measurement pipe becomes tortuous, both so that rainwater is not easily accessed seam
In gap, but also what is connected between measurement pipe and concrete is more secured.
In conclusion the utility model has the advantages that:
1, by installing protective plug in measurement pipe so that concrete will not enter measurement pipe;
2, by Quick connection part by protective plug be mounted on measurement pipe on so that staff when installing protective plug more
It is convenient and efficient;
3, pass through and seal ring and saw-tooth ring be set in measurement pipe so that rainwater will not enter measuring cylinder and concrete layer it
Between gap in.
Description of the drawings
Fig. 1 is that the schematic diagram in roof is arranged in reference block in embodiment 1;
Fig. 2 is the schematic diagram of measurement pipe installation protective plug in embodiment 1;
Fig. 3 is the schematic diagram of measurement pipe removal installation lid in embodiment 1;
Fig. 4 is the explosive view of measurement pipe installation protective plug in embodiment 1.
In figure, 1, roof;2, reference block;21, metallic plate;22, measurement pipe;3, protective plug;31, insertion section;32, stop
Portion;4, Quick connection part;41, fixed column;42, installation lid;43, head clamp;44, threaded hole;45, threaded rod;46, ball rod;
47, latch;48, pushing block;49, spring;410, limiting groove;411, rotating handles;5, seal ring;6, saw-tooth ring.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:A kind of building construction formwork component, as shown in Figure 1, including the reference block 2 being arranged on roof 1, base
Quasi- block 2 includes metallic plate 21 and the measurement pipe 22 being arranged on metallic plate 21, wherein the end face of measurement pipe 22 and metallic plate 21
Bottom surface it is concordant.
As shown in Figure 2 and Figure 3, building construction formwork component further includes being arranged in measurement pipe 22 for preventing staff
Concrete enters the protective plug 3 in measurement pipe 22 when casting concrete, and protective plug 3 includes coordinating and being inserted into measure with measurement pipe 22
Insertion section 31 in pipe 22 and the blocking portion 32 for preventing protective plug 3 to be fully inserted into measurement pipe 22, and blocking portion 32
Whole nozzle one end for being more than measurement pipe 22 so that when protective plug 3 is inserted into measurement pipe 22, insertion section 31 enters measurement pipe
22, the lid of blocking portion 32 is located in measurement pipe 22, so that protective plug 3 will not be fully inserted into measurement pipe 22.
As shown in Fig. 2, in order to enable protective plug 3 can either connect closer with measurement pipe 22, work can also be convenient for
Personnel are plugged in measurement pipe 22 so that the work that pours of staff is more convenient, between protective plug 3 and measurement pipe 22
It is provided with Quick connection part 4.
As described in Figure 4, Quick connection part 4 includes the fixed column 41 being arranged in blocking portion 32 in 31 one side of insertion section,
The one end of fixed column 41 far from blocking portion 32 be fixedly connected with it is whole be in bottle top type installation lid 42, here provided with four along
The fixed column 41 that blocking portion 32 is circumferentially equally spaced so that installation lid 42 installed on blocking portion 32 it is more secured, and
Hinged there are four the head clamp 43 being circumferentially equally spaced on the side of blocking portion 32, the both ends of head clamp 43 are respectively arranged with
Latch 47 and pushing block 48, the whole trapezoidal piece of type of pushing block 48, and inclined-plane is arc shaped surface.In addition, the interposition of head clamp 43
It sets and is hinged on blocking portion 32, the position of latch 47 is arranged in downside.
The centre position of installation lid 42 is threaded with threaded rod 45, spiral shell through threaded hole 44 is offered in threaded hole 44
One end of rasp bar 45 is vertically fixedly connected with ball rod 46, and ball rod 46 here is set as four and is equidistantly fixedly connected on
One end of threaded rod 45.
By the arc shaped surface of pushing block 48 towards threaded rod 45, and the angle of arc shaped surface is set as rotating in ball rod 46
When, it first contacts with arc shaped surface, when being further continued for rotation ball rod 46, pushing block 48 is pushed.
When in use, first reference block 2 is placed on floor, then staff's casting concrete on floor, and
The height of concreting is poured for measurement pipe 22 is only exposed sub-fraction close to the position of nozzle, and before pouring
Just protective plug 3 is mounted in measurement pipe 22 so that for staff in casting concrete, concrete will not enter measurement pipe 22
In so that it, will not in measurement pipe 22 in the thickness for needing to measure concreting, and when measuring scale is inserted into measurement pipe 22
There is concrete to cause to interfere to measurement.In addition, when installing protective plug 3 in measurement pipe 22, measurement pipe is first inserted into insertion section 31
In 22, and blocking portion 32 is contacted with the nozzle of measurement pipe 22, then staff rotates threaded rod 45 so that fixed to connect
The ball rod 46 being connected on threaded rod 45 is contacted with pushing block 48, and when threaded rod 45 rotates so that ball rod 46 continues
Pushing block 48 is pushed so that one end of the connection pushing block 48 of head clamp 43 moves backward, so that head clamp 43
Latch 47 on the other end is contacted with the outer wall of measurement pipe 22, as ball rod 46 pushes out pushing block 48 so that latch
47 are connected in measurement pipe 22, therefore when protective plug 3 is mounted in measurement pipe 22, it is only necessary to rotate threaded rod 45, so that it may with
So that protective plug 3 is clamped in measurement pipe 22.Protective plug 3 is mounted in measurement pipe 22 by Quick connection part 4 so that work
Personnel are more convenient when being loaded and unloaded to protective plug 3.
As shown in figure 4, being equipped with spring 49 between installation lid 42 and head clamp 43, one end of spring 49 is mounted on installation
On lid 42, the other end is connected to head clamp 43 in the one side of pushing block 48, and is not installed at measurement pipe 22 in protective plug 3
When upper, spring 49 is in equilibrium state, and when ball rod 46 pushes pushing block 48, spring 49 compresses so that staff needs
Protective plug 3 is removed, and ball rod 46 is turned to the spring 49 that when leaving pushing block 48, is connect with head clamp 43 by head clamp
Pushed home so that staff goes to confirm whether latch 47 detaches with measurement pipe 22 again protective plug 3 takes out of service so that
Staff to remove work more convenient.
As shown in figure 3, in order to prevent when ball rod 46 and pushing block 48 contact, staff in order to enable latch 47 with
Connection between measurement pipe 22 more fastens and firmly excessive so that ball rod 46 exceeds pushing block 48, is made to Quick connection part 4
At damage, coordinate with ball rod 46 and for preventing ball rod 46 from exceeding the limit of pushing block 48 so being provided on pushing block 48
Slot 410 processed so that staff is restricted the blocking of slot 410 when ball rod 46 to be turned to the bottom of limiting groove 410,
So that ball rod 46 is without departing from pushing block 48.
In order to enable staff is more convenient when rotating ball rod 46, in the one end of threaded rod 45 far from ball rod 46
It is provided with rotating handles 411.
As shown in Fig. 2, in concrete setting, since the temperature around measurement pipe 22 is different from concrete and measurement pipe 22
Surface smoother so that concrete defective tightness when being connect with measurement pipe 22, it is easy to certain gap occur, in wet weather
It when, rainwater can flow into this gap along the outer wall of measurement pipe 22, and then flow into floor so that structure in floor by
The immersion of rainwater may impact the intensity of floor, and rainwater enters along gap in floor in order to prevent, in measurement pipe
Seal ring 5 is fixedly connected on 22, and seal ring 5 welds together with measurement pipe 22 so that seal ring 5 and measurement pipe 22 it
Between connect more securely and more closely.In staff's casting concrete, the height of seal ring 5 is set above coagulation
Soil layer.
Be equipped in measurement pipe 22 after seal ring 5, staff by concreting on floor, and seal ring
5 position is higher than concrete layer so that rainwater along 22 outer wall of measurement pipe when flowing downward when rainy, by seal ring 5
Blocking so that rainwater along seal ring 5 table away from 22 outer wall of measurement pipe direction flow away so that rainwater will not enter
Gap, and can generally be set at work with one the contact position of concrete and 22 outer wall of measurement pipe in staff
Grade, and it is slightly above other positions close to the position of 22 outer wall of measurement pipe so that rainwater will not enter seam in flowing
In gap.
As shown in Fig. 2, in order to enable gap smaller between 22 outer wall of concrete and measurement pipe, connection more closely,
In the more difficult inflow concrete layer of rainwater, saw-tooth ring 6, and the inclined-plane of saw-tooth ring 6 are provided on the outer wall of measurement pipe 22
Towards side of the measurement pipe 22 far from metallic plate 21.Therefore by concreting when on floor, concrete and measurement pipe 22
On saw-tooth ring 6 be connected so that the gap between concrete and measurement pipe 22 becomes tortuous, both so that rainwater be not easy into
Enter in gap, but also what is connected between measurement pipe 22 and concrete is more secured.
The application method of the utility model is:First reference block 2 is placed on floor, then staff pours on floor
Concrete is built, and the height of concreting is poured as measurement pipe 22 is only exposed sub-fraction close to the position of nozzle,
And just protective plug 3 is mounted in measurement pipe 22 before pouring so that for staff in casting concrete, concrete is not
Can enter measurement pipe 22 in so that need measure concreting thickness, and by measuring scale be inserted into measurement pipe 22 in when,
Concrete is not had in measurement pipe 22 measurement is caused to interfere.In addition, when installing protective plug 3 in measurement pipe 22, will first be inserted into
Portion 31 is inserted into measurement pipe 22, and blocking portion 32 is contacted with the nozzle of measurement pipe 22, and then staff rotates screw thread
Bar 45 so that the ball rod 46 being fixedly connected on threaded rod 45 is contacted with pushing block 48, and when threaded rod 45 rotates, is made
Ball rod 46 is obtained to continue to push pushing block 48 so that one end of the connection pushing block 48 of head clamp 43 moves backward, into
And so that the latch 47 on 43 other end of head clamp is contacted with the outer wall of measurement pipe 22, as ball rod 46 is outside by pushing block 48
It pushes so that latch 47 is connected in measurement pipe 22, therefore when protective plug 3 is mounted in measurement pipe 22, it is only necessary to rotate spiral shell
Rasp bar 45, so that it may so that protective plug 3 is clamped in measurement pipe 22.Protective plug 3 is mounted on measurement pipe by Quick connection part 4
On 22 so that staff is more convenient when being loaded and unloaded to protective plug 3.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as all being protected by Patent Law in the right of the utility model.
Claims (8)
1. a kind of building construction formwork component, it is characterised in that:Including being arranged in roof(1)On reference block(2), the benchmark
Block(2)Including metallic plate(21)And it is arranged in metallic plate(21)On measurement pipe(22), the measurement pipe(22)End face with
Metallic plate(21)Bottom surface it is concordant, the measurement pipe(22)On be provided with for preventing concrete from entering measurement pipe(22)Protection
Plug(3), the protective plug(3)Including with measurement pipe(22)Cooperation and insertion measurement pipe(22)Insertion section(31)And for preventing
Only protective plug(3)It is fully inserted into measurement pipe(22)In entirety be more than measurement pipe(22)The blocking portion of nozzle one end(32), described
Protective plug(3)Pass through Quick connection part(4)It is fixedly connected on measurement pipe(22)On, the Quick connection part(4)Exist including setting
Blocking portion(32)Away from insertion section(31)Fixed column on one side(41), be fixedly connected on fixed column(41)Far from blocking portion(32)
One end on entirety be in bottle top type installation lid(42), be hinged on blocking portion(32)Four on side circumferentially equidistant cloth
The head clamp set(43), through be opened in installation lid(42)The threaded hole of middle position(44), be threaded through threaded hole(44)In
Threaded rod(45)And four be vertically fixedly connected on threaded rod(45)Towards blocking portion(32)Being equally spaced on one end
Ball rod(46), the head clamp(43)Both ends be respectively arranged with latch(47)And pushing block(48), the head clamp
(43)Centre position be hinged on blocking portion(32)On, the latch(47)Position be arranged in blocking portion(32)Downside,
Ball rod(46)When rotation, ball rod(46)To pushing block(48)It is pushed.
2. a kind of building construction formwork component according to claim 1, it is characterised in that:The pushing block(48)It is in integrally
Trapezoid block type, and inclined-plane is arc shaped surface, the pushing block(48)Arc shaped surface towards threaded rod(45), and by the angle of arc shaped surface
It is set as in ball rod(46)It when rotation, is first contacted with arc shaped surface, is further continued for rotation ball rod(46)When, by pushing block(48)It pushes away
It is dynamic.
3. a kind of building construction formwork component according to claim 2, it is characterised in that:The blocking portion(32)On consolidate
Fixed column(41)It is set as four and in blocking portion(32)On be circumferentially equally spaced.
4. a kind of building construction formwork component according to claim 3, it is characterised in that:The installation lid(42)With clamping
Plate(43)Between spring is installed(49), the spring(49)One end be mounted on installation cover(42)On, the other end is connected to card
Tight plate(43)Away from pushing block(48)One side on, in protective plug(3)It is not installed at measurement pipe(22)When upper, spring(49)It is in
Equilibrium state, in ball rod(46)Push pushing block(48)When, spring(49)Compression.
5. a kind of building construction formwork component according to claim 4, it is characterised in that:The pushing block(48)Upper setting
Have and ball rod(46)Coordinate and for preventing ball rod(46)Beyond pushing block(48)Limiting groove(410).
6. a kind of building construction formwork component according to claim 5, it is characterised in that:The threaded rod(45)Far from ball
Head rod(46)One end be provided with rotating handles(411).
7. a kind of building construction formwork component according to claim 6, it is characterised in that:The measurement pipe(22)Upper fixation
It is connected with seal ring(5), in staff's casting concrete, seal ring(5)Height be set above concrete layer.
8. a kind of building construction formwork component according to claim 7, it is characterised in that:The measurement pipe(22)Outer wall
On be provided with saw-tooth ring(6), the saw-tooth ring(6)Inclined-plane towards measurement pipe(22)Far from metallic plate(21)Side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820108959.0U CN207863481U (en) | 2018-01-22 | 2018-01-22 | A kind of building construction formwork component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820108959.0U CN207863481U (en) | 2018-01-22 | 2018-01-22 | A kind of building construction formwork component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207863481U true CN207863481U (en) | 2018-09-14 |
Family
ID=63462939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820108959.0U Active CN207863481U (en) | 2018-01-22 | 2018-01-22 | A kind of building construction formwork component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207863481U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111271521A (en) * | 2020-01-20 | 2020-06-12 | 中利建设集团有限公司 | Fixing structure of concrete pumping pipe |
-
2018
- 2018-01-22 CN CN201820108959.0U patent/CN207863481U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111271521A (en) * | 2020-01-20 | 2020-06-12 | 中利建设集团有限公司 | Fixing structure of concrete pumping pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107035141B (en) | A kind of mold method of floor slab back casting band | |
CN207863481U (en) | A kind of building construction formwork component | |
CN202141447U (en) | Surface strain gauge mounting support and protecting device combination for steel structure | |
CN211735685U (en) | Concrete road surface rain sewage well lid mounting structure | |
CN206784951U (en) | A kind of concreting floorslab thickness control device | |
CN110984397A (en) | Self-adjusting building embedded part and embedding method thereof | |
CN103388398B (en) | Easily mounting or dismounting anchor and fixing means | |
CN208857808U (en) | The protective device of inclinometer pipe | |
CN207991907U (en) | Device for precast concrete test block | |
CN201224888Y (en) | Large-scale bolt construction built-in steel sleeve | |
CN204982672U (en) | Bridge bent cap die block anti -leakage device | |
JPH0813608A (en) | Construction method of thin-walled precast concrete post and guide form | |
CN207863491U (en) | Building construction formwork component | |
CN106284985A (en) | A kind of Formwork Installation Method of reserved post-cast strip | |
CN205840321U (en) | There is the concrete-pouring template of overview function | |
CN212513003U (en) | Auxiliary fixing device of inclinometer tube | |
CN220100229U (en) | Post-pouring belt ponding prevention structure | |
CN209718157U (en) | Arc service sleeve auxiliary locator | |
CN111678763A (en) | Rapid detection template and detection method for concrete pouring compactness of closed space | |
CN207863480U (en) | A kind of building construction formwork component being arranged in roof | |
CN218003432U (en) | Road pavement concrete compactness detection device | |
JPS5872786A (en) | Buried piping | |
CN218541522U (en) | Protection of floor preformed hole hangs mould device | |
CN218436992U (en) | Connecting device for underground continuous wall and concrete member steel bars | |
CN213933505U (en) | Road surface road bed performance detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |