CN207846646U - Base of frame component - Google Patents

Base of frame component Download PDF

Info

Publication number
CN207846646U
CN207846646U CN201721906009.4U CN201721906009U CN207846646U CN 207846646 U CN207846646 U CN 207846646U CN 201721906009 U CN201721906009 U CN 201721906009U CN 207846646 U CN207846646 U CN 207846646U
Authority
CN
China
Prior art keywords
baffle
base
short tube
fixing groove
frame component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721906009.4U
Other languages
Chinese (zh)
Inventor
潘�清
周东珊
余广
王金泉
钟诚
王骝
尤陈刚
黄慧
王倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201721906009.4U priority Critical patent/CN207846646U/en
Application granted granted Critical
Publication of CN207846646U publication Critical patent/CN207846646U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of base of frame component, including:Locating part has fixing groove thereon;Interconnecting piece, including tie-beam, the tie-beam are connected in the fixing groove;Fixing piece is set to the bottom of the fixing groove, and the bottom of the fixing groove is fixed on flooring.It is fixedly connected with portion by locating part so that the simpler stabilization of fixed form of interconnecting piece, it is easily operated.

Description

Base of frame component
Technical field
The utility model is related to technical field of buildings, and in particular to a kind of base of frame component.
Background technology
In fitting up indoors at present, traditional finishing mode needs a large amount of manpower and materials, while the construction period is long, therefore Assembled decoration method comes into being.Assembled decoration method is exactly the making that all finishing elements are completed in factory, is then transported Transport to in-site installation.This mode can shorten the construction period, and reduce the generation of decoration garbage.
It is building for frame that assembled, which is fitted up most basic, and it is that entire assembled finishing is stablized that whether base of frame is firm The basis that can stablize.Frame is generally built using steel pipe, and the bottom of frame is the framework of a shape changeable, and the framework includes The bottom square tube placed along shingle nail, the fixed form of common bottom square tube are that bottom square tube is fixed to interior using screw Bottom surface on, it is this that difficulty is brought to the installation of framework using the fixed mode of screw.
Invention content
The problem of the utility model aims to solve the problem that framework is adopted in the prior art and is screwed, is not easy to the installation of framework.
To solve the above problems, the utility model provides a kind of base of frame component, including:
Locating part has fixing groove thereon;
Interconnecting piece, including tie-beam, the tie-beam are connected in the fixing groove;
Fixing piece is set to the bottom of the fixing groove, and the bottom of the fixing groove is fixed on flooring.
Optionally, in said frame base assemblies:
The locating part is multiple, and completion upper thread of multiple locating parts along the flooring is uniformly distributed;
The interconnecting piece is framework, and the shape of the framework is identical as the completion shape of upper thread, the side of the framework After edge is corresponding with the completion edge of upper thread, it is fixed in the fixing groove of each locating part.
Optionally, in said frame base assemblies, the locating part includes the first baffle and second baffle being vertically arranged And horizontally disposed bottom plate, wherein:
The both ends of the bottom plate connect to form institute with the bottom end of the bottom end of the first baffle and the second baffle respectively State fixing groove;
The fixing piece is nail, and the bottom plate is fixed on by the nail on the flooring.
Optionally, in said frame base assemblies, the locating part further includes that the third baffle being vertically arranged and level are set The top plate set, wherein:
The first baffle and the third baffle are located at the both sides of the second baffle, the both ends of the top plate respectively with The top of the second baffle is connected with the top of the third baffle.
Optionally, in said frame base assemblies:
The height of the first baffle is more than the height of the second baffle.
Optionally, in said frame base assemblies:
The framework, is formed by connecting by square tube and corner brace, and the corner brace is used for two square tubes of the framework corner Connection;
The tie-beam is the square tube, and the fixing groove is adapted to the square tube.
Optionally, in said frame base assemblies:
The corner brace, including the first short tube connected vertically and the second short tube, two sides of the framework corner Pipe is socketed on respectively on first short tube and second short tube.
Optionally, in said frame base assemblies:
The corner brace further includes third short tube, and the third short tube is perpendicular to first short tube and the second short tube institute The plane of composition, one end are fixed on the junction of first short tube and second short tube, and the other end is described for connecting The other parts of frame.
Optionally, in said frame base assemblies:
The section of the square tube is with shape identical with the section of junction of three short tubes in the corner brace and greatly It is small.
Base of frame component described in the utility model, including locating part, interconnecting piece and fixing piece, wherein locating part have Fixing groove, and fixing groove is adapted to clamping with the tie-beam of interconnecting piece, the bottom of the fixing groove of the fixing piece is solid by fixing piece Due on flooring, the interconnecting piece is fixed on by the fixing groove of the locating part on flooring, solid by locating part The mode for determining interconnecting piece is more simple, is easily assembled the installation that personnel realize framework.Said frame base assemblies are suitable for interior Assembled finishing in, all components are produced in factory industry metaplasia, only need simply to be installed at finishing scene, live Rapid construction is realized without the too many construction time without masterful technique worker, and avoids traditional fitment operation The messy situation in scene.
Description of the drawings
Fig. 1 is the structural schematic diagram of the base of frame component described in the utility model embodiment.
Fig. 2 is the structural schematic diagram of the locating part of the base of frame component described in the utility model embodiment.
Fig. 3 is the structural schematic diagram of the corner of the framework of the base of frame component described in the utility model embodiment.
Fig. 4 is the structural schematic diagram of the corner brace of the framework of the base of frame component described in the utility model embodiment.
Specific implementation mode
The utility model embodiment is further illustrated below in conjunction with attached drawing.It needs in the description of the present invention, Bright is unless specifically defined or limited otherwise, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, can To be to be fixedly connected, may be a detachable connection, or be integrally connected;It can be mechanical connection, can also be electrical connection;It can Can also can be indirectly connected through an intermediary the connection of two component internals to be to be connected directly.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
The present embodiment provides a kind of base of frame components, including locating part, interconnecting piece and fixing piece.Wherein, on locating part With fixing groove;Interconnecting piece includes tie-beam, tie-beam clamping in fixing groove;Fixing piece is set to the bottom of fixing groove, will The bottom of the fixing groove is fixed on flooring.
Base of frame component described in the present embodiment, including locating part, interconnecting piece and fixing piece, wherein locating part have solid Determine slot, and the shape of fixing groove is identical as the transverse shape of the tie-beam of interconnecting piece, suitable for being fixedly connected with portion, locating part The bottom of fixing groove is fixed on by fixing piece on flooring, keeps the fixed form of interconnecting piece more simple.
Specifically, as shown in Figure 1, in some specific embodiments, the locating part 1 is multiple, wherein 1 edge of locating part The completion upper thread of flooring is uniformly distributed, and the fixing piece is nail, and room is fixed in the bottom of the fixing groove by nail On interior ground.And interconnecting piece is framework 2, the shape of framework 2 is identical as the completion shape of upper thread, the edge of the framework 2 After corresponding with the completion edge of upper thread, it is fixed in the fixing groove of each locating part 1.
Steel nail can be used in the nail, and can be squeezed into steel nail on flooring using pneumatic gun.Steel nail is gentle Dynamic rifle is the tool for being commonly used in interior decoration, and it is more convenient to fix locating part 1 by the way of steel nail and pneumatic gun, can Installation difficulty is greatly lowered.
In said frame base assemblies, the locating part 1 has a variety of specific implementations, such as each limit Part 1 includes the first baffle being vertically arranged and second baffle and horizontally disposed bottom plate, wherein the both sides difference of the bottom plate It connect to form the fixing groove with the bottom end of the bottom end of the first baffle and the second baffle, the bottom plate passes through the row Nail is fixed on the flooring.
For another example as shown in Fig. 2, each locating part 1 includes first baffle 11,13 and of second baffle being vertically arranged Third baffle 15 and horizontally disposed bottom plate 12 and top plate 14, the first baffle 11 and the third baffle 15 are located at described The both sides of second baffle 13, the both ends of the bottom plate 12 respectively with the bottom end of the first baffle 11 and the second baffle 13 Bottom end connects to form the fixing groove, the both sides of the top plate 14 respectively with the top of the second baffle 13 and the third gear The top of plate 15 connects.The height of the first baffle 11 can be more than the height of the second baffle 13, the height of second baffle 13 Degree is identical as the height of third baffle 15.In fixed locating part 1, locating part 1 is in the periphery for completing upper thread 3, and third gear Plate 15 is arranged along upper thread 3 is completed.Metal material integrated molding may be used in the locating part 1, and multiple material assembly can also be used It is fixed.When installing shingle nail, framework 2 and top plate 14 can provide holding power for shingle nail, and first baffle 11 is higher than second gear The part of plate 13 can limit the movement of shingle nail, provide positioning for the installation of shingle nail, and can also shingle nail be fixed on first On baffle 11, such as through-hole is opened up on first baffle 11, shingle nail is fixed on first baffle 11 by screw, to realize The fixation of shingle nail.
The framework 2 is formed by connecting by more square tubes and multiple corner braces, and the corner brace is used for 2 corner of the framework two The tie-beam of the connection of square tube, the interconnecting piece is square tube, and square tube is adapted with the fixing groove of locating part 1, can avoid square tube It shakes.As shown in figure 3, the corner brace 21 includes 211 and second short tube 212 of the first short tube connected vertically, in 2 corner of framework Square tube 221 and square tube 222 is socketed on respectively on the first short tube 211 and the second short tube 212 of corner brace, it can be achieved that the company of framework 2 It connects.As shown in figure 4, and corner brace 21 further includes third short tube 213, and third short tube 213 is perpendicular to first short tube 211 and institute The plane that the second short tube 212 is constituted is stated, the company of the first short tube 211 and the second short tube 212 is fixed in one end of third short tube 213 Place is met, the other end straight up, is used for the other parts of connection framework.And the section of the square tube have in the corner brace 21 Three short tubes junction the identical shapes and sizes in section, after corner brace 21 is connect with square tube, the surface of junction is flat Whole beauty, junction can be fixed by countersunk head Self Drilling Screws.
Base of frame component described in any of the above-described embodiment, suitable for indoor assembled finishing, all components are equal It is produced in factory industry metaplasia, only needs simply to be installed at finishing scene, scene is not necessarily to masterful technique worker, without The too many construction time realizes rapid construction, and avoids the messy situation in traditional fitment operation scene.And this implementation Base of frame component described in example is suitable for the indoor region without waterproof requirement, for example, parlor, kitchen and separating dry space from moist space it is dry Area toilet etc..
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it System;Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should Understand:It still can be with technical scheme described in the above embodiments is modified, either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacements, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (9)

1. a kind of base of frame component, which is characterized in that including:
Locating part has fixing groove thereon;
Interconnecting piece, including tie-beam, the tie-beam are connected in the fixing groove;
Fixing piece is set to the bottom of the fixing groove, and the bottom of the fixing groove is fixed on flooring.
2. base of frame component according to claim 1, it is characterised in that:
The locating part is multiple, and completion upper thread of multiple locating parts along the flooring is uniformly distributed;
The interconnecting piece be framework, the shape of the framework is identical with the completion shape of upper thread, the edge of the framework and After the edge for completing upper thread corresponds to, it is fixed in the fixing groove of each locating part.
3. base of frame component according to claim 2, which is characterized in that the locating part includes first be vertically arranged Baffle and second baffle and horizontally disposed bottom plate, wherein:
The both ends of the bottom plate connect respectively with the bottom end of the bottom end of the first baffle and the second baffle to be formed it is described solid Determine slot;
The fixing piece is nail, and the bottom plate is fixed on by the nail on the flooring.
4. base of frame component according to claim 3, which is characterized in that the locating part further includes be vertically arranged Three baffles and horizontally disposed top plate, wherein:
The first baffle and the third baffle are located at the both sides of the second baffle, the both ends of the top plate respectively with it is described The top of second baffle is connected with the top of the third baffle.
5. base of frame component according to claim 4, it is characterised in that:
The height of the first baffle is more than the height of the second baffle.
6. according to claim 2-5 any one of them base of frame components, it is characterised in that:
The framework, is formed by connecting by square tube and corner brace, and the corner brace is used for the company of two square tubes of framework corner It connects;
The tie-beam is the square tube, and the fixing groove is adapted to the square tube.
7. base of frame component according to claim 6, it is characterised in that:
The corner brace, including the first short tube connected vertically and the second short tube, two square tubes point of the framework corner It is not socketed on first short tube and second short tube.
8. base of frame component according to claim 7, it is characterised in that:
The corner brace further includes third short tube, and the third short tube is constituted perpendicular to first short tube and second short tube Plane, one end is fixed on the junction of first short tube and second short tube, and the other end is for connecting the frame Other parts.
9. base of frame component according to claim 8, it is characterised in that:
The section of the square tube has shapes and sizes identical with the section of junction of three short tubes in the corner brace.
CN201721906009.4U 2017-12-30 2017-12-30 Base of frame component Active CN207846646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721906009.4U CN207846646U (en) 2017-12-30 2017-12-30 Base of frame component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721906009.4U CN207846646U (en) 2017-12-30 2017-12-30 Base of frame component

Publications (1)

Publication Number Publication Date
CN207846646U true CN207846646U (en) 2018-09-11

Family

ID=63420084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721906009.4U Active CN207846646U (en) 2017-12-30 2017-12-30 Base of frame component

Country Status (1)

Country Link
CN (1) CN207846646U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403464A (en) * 2018-12-14 2019-03-01 珠海格力电器股份有限公司 Container house

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403464A (en) * 2018-12-14 2019-03-01 珠海格力电器股份有限公司 Container house

Similar Documents

Publication Publication Date Title
CN207846646U (en) Base of frame component
CN108797790A (en) A kind of plug-in type assembly worker-house and construction process
CN103225427A (en) Plug and fast mounting clean operation room assisted room and mounting technology thereof
CN103061544A (en) Plug fast-installation auxiliary room for clean operating rooms and installation process thereof
CN203238991U (en) Clean operating room auxiliary room capable of being quickly assembled in insertion mode
CN106401176A (en) Steel-wood combination roof moldboard framework construction method
CN211666339U (en) Building site is with interim worker's canopy convenient to installation and dismantlement
CN210947293U (en) Leveling support piece for assembly type keel partition wall ground
CN207974408U (en) Whole external corner
CN203716421U (en) Fixing workpiece for erecting shed on container
CN210369894U (en) Adjustable falling plate template support system of assembled
CN203785202U (en) Underfloor fresh air distribution box structure
CN203783095U (en) Wall body tile sticking tool
CN208920386U (en) A kind of dismountable spigot-and-socket air-conditioning outrigger
CN207974293U (en) Be slidably connected corner brace
CN205046670U (en) Under( -)chassis for container house
RU90092U1 (en) Dismountable False Ceiling
CN205776877U (en) The log cabin inner-outer wall drift angle of a kind of heavy timber construction connects seat
CN208533856U (en) A kind of assembled architecture floor
CN115045421B (en) Outdoor glass curtain wall structure and construction method
CN209244401U (en) Quick-assembling enclosure wall
CN215889357U (en) Combined windowsill concrete coping and pouring mold
CN203583814U (en) Multifunctional board structure
KR102618834B1 (en) Modular danggol membrane and rafter assembly
CN209855107U (en) Novel light wallboard mounting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant