CN103225427A - Plug and fast mounting clean operation room assisted room and mounting technology thereof - Google Patents

Plug and fast mounting clean operation room assisted room and mounting technology thereof Download PDF

Info

Publication number
CN103225427A
CN103225427A CN2013101486667A CN201310148666A CN103225427A CN 103225427 A CN103225427 A CN 103225427A CN 2013101486667 A CN2013101486667 A CN 2013101486667A CN 201310148666 A CN201310148666 A CN 201310148666A CN 103225427 A CN103225427 A CN 103225427A
Authority
CN
China
Prior art keywords
fast
assembling
square tube
room
keel
Prior art date
Application number
CN2013101486667A
Other languages
Chinese (zh)
Inventor
马兆勇
邱磊
马兆川
杨利利
杨四根
艾先英
Original Assignee
苏州通快净化科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 苏州通快净化科技有限公司 filed Critical 苏州通快净化科技有限公司
Priority to CN2013101486667A priority Critical patent/CN103225427A/en
Publication of CN103225427A publication Critical patent/CN103225427A/en

Links

Abstract

The invention discloses a plug and fast mounting clean operation room assisted room. The plug and fast mounting clean operation room assisted room comprises four lower keel pieces arranged on the construction ground and encircled to form a rectangular structure; upper keel pieces are spliced on the lower keel pieces, and the end parts of the upper keel pieces are connected with one another through foot arcs; a vertical square tube is arranged at each end of each foot arc; the upper ends of the vertical square tubes are connected with one another through transverse and longitudinal square tubes to form rectangular boxes; the keel pieces between the vertical square tubes are spliced with one another to form walls of an operation room through a plurality of fast mounting top plates; and the rectangular boxes formed by connecting the transverse and longitudinal square tubes are spliced through a plurality of fast mounting top plates to form the top surface of an operation room. According to the invention, each piece of the plug and fast mounting clean operation room assisted room adopts plug and fast mounting structure; the integral technology quality is very high; during site construction, the mounting pieces only need to be subjected to plug and fast mounting according to the plug and fast mounting and welding-free technology, so that the construction technology of an operation room is simplified; the construction circuit is reduced; and the structure facilitates maintenance and upgrading in the future.

Description

Auxilliary room of a kind of grafting fast-assembling clean operating room and mounting process thereof

Technical field

The present invention relates to medical surgery room finishing field, relate in particular to auxilliary room of a kind of grafting fast-assembling clean operating room and mounting process thereof.

Background technology

At present, the specialized factory of domestic design and construction purification operating room is more, and design and construction technology are different, mainly are field Welding formula and traditional pin-connected panel.Wherein the field Welding formula is because the process characteristic of secondary operations such as necessary field Welding, it is yielding to present installation component, installation accuracy is lower, fixing difficult adjustment of welding, characteristics such as the difficult grasp of in-situ spraying technology, the installation that causes purifying operating room is difficulty, difficult quality guarantee, not easy care and replacing.Traditional pin-connected panel operating room is half assembly unit operating room, and wherein parts such as keel need field Welding, and wallboard is an assembled structure, because the part assembly unit presents welding keel planeness and requires height, assembling process requires high, be difficult to characteristics such as grasp, cause construction quality to be difficult to guarantee at last.

Summary of the invention

Technical problem to be solved by this invention is, provide a kind of technology quality height, human factor to the influence of product quality less, upgrading is convenient, auxilliary room of the fast-assembling clean operating room of pegging graft fast and accurately and mounting process thereof are installed.

In order to solve the problems of the technologies described above, the present invention is achieved by the following technical solutions:

A kind of grafting fast-assembling clean operating room is assisted the room, comprise that four are arranged on the lower keel spare that building floor surrounds rectangular configuration, be plugged with keel on the lower keel spare, last keel is by being arranged on the screw mechanism adjustment level in the lower keel spare, described going up between each end of keel by the lower margin circular arc dovetail, the two ends of described each lower margin circular arc respectively are provided with a vertical square tube, connect into rectangle frame by horizontal and vertical square tube between each vertical square tube upper end; Be spliced into the operating room metope by some blocks of fast-assembling wallboards on the last keel between the described vertical square tube, fixedly connected with connecting key by fixture behind the wallboard between every block of fast-assembling wallboard, be spliced into the operating room end face by some fast-assembling top boards between the rectangle frame that horizontal and vertical square tube connects into, and fixedly connected with construction ceiling by the furred ceiling hanging hook assembly all in every fast-assembling top board top; Connect by arc plate between described operating room metope and the operating room end face, be connected by bulb between the adjacent arc plate end.

Preferably, be connected by angle connector between described horizontal and vertical square tube and the vertical square tube, and fix with the staking nut that is arranged in the square tube by the set bolt that is arranged on the angle connector.

Preferably, described vertical square tube top is connected with building floor with construction ceiling respectively by angle connector with the bottom, and fix, and pass through rivet between described angle connector and the vertical square tube by being arranged on swell fixture on the angle connector and construction ceiling and building floor.

Preferably, described splicing is connected by the top board fixture between the fast-assembling top board of horizontal and vertical square tube inboard and square tube.

Preferably, described furred ceiling hanging hook assembly is made of connection box, threaded rod and hook, connection box is arranged on the threaded rod top, hook is arranged on the threaded rod bottom, all fix between connection box and hook and the threaded rod by locking nut and spring shim, wherein the connection box top is provided with the swell fixture that is connected with construction ceiling, and hook is connected with described fast-assembling top board.

Preferably, the arc radius R of described bulb and arc plate is 50mm~350mm.

The auxilliary room of a kind of grafting fast-assembling clean operating room mounting process may further comprise the steps:

A, at first to the ground snap the line: before the snap the line, cleaning and ground grading are confirmed ground flat degree within 3mm/2m, do not have shelling, play the powder phenomenon; Determine the benchmark line of ink marker then, eject vertical guideline, determine, guarantee that operating room and unwrapping wire benchmark are horizontal vertically flat with Pythagorean theorem; Then verification operating room diagonal error≤± 3mm; According to the unwrapping wire drawing, eject the metope line of ink marker and the keel line of ink marker and determine the square tube position then;

B, according to figure paper size and the keel line of ink marker and square tube position, vertical vertical square tube is installed, with setscrew, angle connector and angle connector, being fixed on building floor and the construction ceiling perpendicular to ground direction square tube; Lower keel spare is fixed on the building floor with setscrew according to designing requirement then; Insert downwards and go up keel, regulate levelling bolt, make keel part level, smooth; Be connected with hold-down screw according to designing requirement with angle connector according to designing requirement then and be installed on staking nut in the square tube, be connected and fixed horizontal square tube;

C, according to designing requirement with rivet bulb, arc plate and lower margin circular arc;

D, in last keel sword groove, insert connecting key, insert the fast-assembling wallboard downwards, fixture behind fast-assembling wallboard upper rear portion riveted and fixed wallboard, be fixed on grafting fast-assembling plate top, in grafting fast-assembling plate sidewall aluminum alloy frame skeleton groove, insert connecting key, prepare to connect next and open grafting fast-assembling plate;

E, install the remaining parts of furred ceiling hanging hook assembly except that setscrew in advance, at construction ceiling fixed expansion screw, connect and install furred ceiling hanging hook assembly parts in advance, finish the installation of furred ceiling hanging hook assembly according to the designing requirement position; According to designing requirement the fast-assembling top board is raised to level altitude, hook in top board fixture, the furred ceiling hanging hook assembly is colluded in the fast-assembling top board sidewall aluminium alloy plate frame skeleton internal groove, and with rivet top board fixture riveted and fixed on square tube, in the sidewall aluminium alloy plate frame skeleton inner groovy of fast-assembling top board, insert connecting key, prepare to connect next and open the fast-assembling top board.

Compared with prior art, usefulness of the present invention is: each parts of the auxilliary room of this grafting fast-assembling clean operating room are the grafting quick fixation structure, cooperate advantages of simplicity and high efficiency grafting fast-assembling not have the welding mounting process, make the auxilliary room of whole grafting fast-assembling clean operating room all over products finish in factory, owing to be to process on the professional production streamline, the integrated artistic technical quality is high; Only needing when constructing does not at the scene have the installation of pegging graft of welding mounting process to installation component by the grafting fast-assembling, simplified the construction technology of operating room, shortened construction period, lower to the requirement of field worker level, reduced the influence of human factor greatly to product quality; And this structure make later maintenance and the upgrading extremely convenient.

Description of drawings:

Fig. 1 is the present invention's auxilliary room of fast-assembling clean operating room structural representation of pegging graft;

Fig. 2 is the auxilliary room of grafting fast-assembling clean operating room vertical view;

Fig. 3 is the structure sectional view of A-A among Fig. 2;

Fig. 4 is the auxilliary room of no vertical, horizontal square tube keel structural representation;

Fig. 5 is the auxilliary room of no vertical, horizontal square tube keel vertical view;

Fig. 6 is the structure sectional view of B-B among Fig. 5;

Fig. 7 is auxilliary room arc plate of grafting fast-assembling clean operating room and bulb mounting structure schematic diagram;

Fig. 8 is the auxilliary room of grafting fast-assembling clean operating room fast-assembling wallboard mounting structure schematic diagram;

Fig. 9 is the auxilliary room of the lifting clean operating room fast-assembling top board mounting structure schematic diagram of pegging graft;

Figure 10 is the auxilliary room fast-assembling wallboard of grafting fast-assembling clean operating room and fast-assembling wallboard or fast-assembling top board and fast-assembling top board mounting connection structure schematic diagram;

Figure 11 is the partial enlarged drawing of a among Fig. 1;

Figure 12 is the partial enlarged drawing of b among Fig. 1;

Figure 13 is the partial enlarged drawing of c among Fig. 1;

Figure 14 is a furred ceiling hanging hook assembly structural representation.

Among the figure: 1, square tube; 2, staking nut; 3, hold-down screw; 4, swell fixture; 5, rivet; 6,7, angle connector; 8, lower keel spare; 9, go up keel; 10, lower margin circular arc; 11, fixture behind the wallboard; 12, bulb; 13, arc plate; 14, connecting key; 15, fast-assembling wallboard; 16, fast-assembling top board; 17, top board fixture; 18, furred ceiling hanging hook assembly; 181, connection box; 182, threaded rod; 183, locking nut; 184, spring shim; 185, hook; 19, construction ceiling; 20, building floor.

The specific embodiment:

Describe the present invention below in conjunction with the drawings and specific embodiments.

Fig. 1 Fig. 2 and a kind of grafting fast-assembling clean operating room shown in Figure 3 are assisted the room, comprise some lower keel spares 8 that are arranged on building floor, be plugged with keel 9 on the lower keel spare 8, last keel 9 can be by being arranged on the accurately adjustment level of screw mechanism in the lower keel spare 8, form integral level basic and the ground material installing space and the border in the auxilliary room of installation fast-assembling wallboard 15 and whole grafting fast-assembling clean operating room, for follow-up fast-assembling wallboard 15 and ground material installation facilitate; Described going up between keel 9 each end is connected by lower margin circular arc 10, and the two ends of described each lower margin circular arc 10 respectively are provided with a vertical square tube 1, connect into rectangle frame by horizontal and vertical square tube 1 between each vertical square tube 1 upper end; As shown in Figure 8, be spliced into the operating room metope by some blocks of fast-assembling wallboards 15 on the last keel 9 between the described vertical square tube 1, fixedly connected with connecting key 14 as shown in figure 13 by fixture 11 behind the wallboard between every block of fast-assembling wallboard 15; As shown in Figure 9, be spliced into the operating room end face by some fast-assembling top boards 16 between the rectangle frame that horizontal and vertical square tube 1 connects into, and fixedly connected with construction ceiling 19 by furred ceiling hanging hook assembly 18 all in every fast-assembling top board 16 tops; As shown in figure 14, described furred ceiling hanging hook assembly 18 is by connection box 181, threaded rod 182 and link up with 185 and constitute, connection box 181 is arranged on threaded rod 182 tops, hook 185 is arranged on threaded rod 182 bottoms, connection box 181 and link up with 185 and threaded rod 182 between all fixing by locking nut 183 and spring shim 184, wherein connection box 181 tops are provided with the swell fixture 4 that is connected with construction ceiling 19, and hook 185 is connected with described fast-assembling top board 16; As shown in Figure 7, connect by arc plate 13 between described operating room metope and the operating room end face, be connected by bulb 12 between adjacent arc plate 13 ends, the arc radius R of described bulb 12 and arc plate 13 is 50mm~350mm.

As shown in figure 11, be connected by angle connector 7 between described horizontal and vertical square tube 1 and the vertical square tube 1, and fixing by the set bolt 3 that is arranged on the angle connector 7 with the staking nut 2 that is arranged in the square tube 1; As shown in figure 12, described vertical square tube 1 top is connected with building floor 20 with construction ceiling 19 respectively by angle connector 6 with the bottom, and be fixing with construction ceiling 19 and building floor 20, and pass through rivet 5 between described angle connector 6 and the vertical square tube 1 and rivet by the swell fixture 4 that is arranged on the angle connector 6; Described splicing is connected by top board fixture 17 between the fast-assembling top board 16 of horizontal and vertical square tube 1 inboard and square tube.

As Fig. 4, Fig. 5 and shown in Figure 6, according to actual conditions, auxilliary room also can need not vertical, horizontal square tube 1 and corresponding connection; Described fast-assembling wallboard 15 direct fast-assemblings are plugged on the horizontal keel assembly, and form auxilliary room metope by connecting key 14 mutual pegging graft; Shown in fast-assembling top board 16 be lifted on the construction ceiling 19 by furred ceiling hanging hook assembly 18, and peg graft mutually by connecting key 14 and to form auxilliary roof faces, fixedly finish installation after securing member; As shown in figure 10, peg graft mutually by connecting key 3 between grafting fast-assembling wallboard 5 and grafting fast-assembling wallboard 5 or grafting fast-assembling top board 6 and the grafting fast-assembling top board 6.

Its concrete mounting process step is as follows:

A, at first to the ground snap the line: before the snap the line, cleaning and ground grading are confirmed ground flat degree within 3mm/2m, do not have shelling, play the powder phenomenon; Determine the benchmark line of ink marker then, eject vertical guideline, determine, guarantee that operating room and unwrapping wire benchmark are horizontal vertically flat with Pythagorean theorem; Then verification operating room diagonal error≤± 3mm; According to the unwrapping wire drawing, eject the metope line of ink marker and the keel line of ink marker and determine the square tube position then;

B, according to figure paper size and the keel line of ink marker and square tube position, vertical vertical square tube 1 is installed, with setscrew 4, angle connector 6 and angle connector 7, being fixed on building floor 20 and the construction ceiling 19 perpendicular to ground direction square tube; Lower keel spare 8 is fixed on the building floor 20 with setscrew 4 according to designing requirement then; Insert downwards and go up keel 9, regulate levelling bolt, make keel part 9 levels, smooth; Be connected with hold-down screw 3 according to designing requirement with angle connector 6 according to designing requirement then and be installed on staking nut 2 in the square tube, be connected and fixed horizontal square tube 1;

C, according to designing requirement with rivet 5 riveted joint bulb 12, arc plate 13 and lower margin circular arcs 10;

D, in last keel sword 9 grooves, insert connecting key 14, insert fast-assembling wallboard 15 downwards, fixture 11 behind fast-assembling wallboard 15 upper rear portion riveted and fixed wallboards, be fixed on grafting fast-assembling plate 15 tops, in grafting fast-assembling plate 15 sidewall aluminum alloy frame skeleton grooves, insert connecting key 14, prepare to connect next and open grafting fast-assembling plate 15;

E, install the remaining parts of furred ceiling hanging hook assembly 18 except that setscrew 4 in advance, at construction ceiling 19 fixed expansion screws 4, connect and install furred ceiling hanging hook assembly 18 parts in advance, finish the installation of furred ceiling hanging hook assembly 18 according to the designing requirement position; According to designing requirement fast-assembling top board 16 is raised to level altitude, hook 185 in top board fixture 17, the furred ceiling hanging hook assembly 18 is colluded in the fast-assembling top board 16 sidewall aluminium alloy plate frame skeleton internal grooves, and with rivet 5 top board fixture 17 riveted and fixed on square tube 1, in the sidewall aluminium alloy plate frame skeleton inner groovy of fast-assembling top board 16, insert connecting key 14, prepare to connect next and open fast-assembling top board 16.

Each parts of the auxilliary room of this grafting fast-assembling clean operating room are the grafting quick fixation structure, cooperate advantages of simplicity and high efficiency grafting fast-assembling not have the welding mounting process, make the auxilliary room of whole grafting fast-assembling clean operating room all over products finish in factory, owing to be to process on the professional production streamline, the integrated artistic technical quality is high; Only needing when constructing does not at the scene have the installation of pegging graft of welding mounting process to installation component by the grafting fast-assembling, simplified the construction technology of operating room, shortened construction period, lower to the requirement of field worker level, reduced the influence of human factor greatly to product quality; And this structure make later maintenance and the upgrading extremely convenient.

It is emphasized that: above only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment did.

Claims (7)

1. a grafting fast-assembling clean operating room is assisted the room, it is characterized in that, comprise that four are arranged on the lower keel spare (8) that building floor (20) surrounds rectangular configuration, be plugged with keel (9) on the lower keel spare (8), last keel (9) is adjusted level by the screw mechanism that is arranged in the lower keel spare (8), described going up between each end of keel (9) is connected by lower margin circular arc (10), the two ends of described each lower margin circular arc (10) respectively are provided with a vertical square tube (1), connect into rectangle frame by horizontal and vertical square tube (1) between each vertical square tube (1) upper end; Last keel (9) between the described vertical square tube (1) goes up and is spliced into the operating room metope by some blocks of fast-assembling wallboards (15), fixedly connected with connecting key (14) by fixture (11) behind the wallboard between every block of fast-assembling wallboard (15), be spliced into the operating room end face by some fast-assembling top boards (16) between the rectangle frame that horizontal and vertical square tube (1) connects into, and fixedly connected with construction ceiling (19) by furred ceiling hanging hook assembly (18) all in every fast-assembling top board (16) top; Connect by arc plate (13) between described operating room metope and the operating room end face, be connected by bulb (12) between adjacent arc plate (13) end.
2. grafting fast-assembling clean operating room according to claim 1 is assisted the room, it is characterized in that, be connected by angle connector (7) between described horizontal and vertical square tube (1) and the vertical square tube (1), and fixing by the set bolt (3) that is arranged on the angle connector (7) with the staking nut (2) that is arranged in the square tube (1).
3. grafting fast-assembling clean operating room according to claim 1 is assisted the room, it is characterized in that, described vertical square tube (1) top is connected with building floor (20) with construction ceiling (19) respectively by angle connector (6) with the bottom, and be fixing, and pass through rivet (5) between described angle connector (6) and the vertical square tube (1) and rivet by swell fixture (4) and the construction ceiling (19) and the building floor (20) that are arranged on the angle connector (6).
4. grafting fast-assembling clean operating room according to claim 1 is assisted the room, it is characterized in that, described splicing is connected by top board fixture (17) between the inboard fast-assembling top board (16) of horizontal and vertical square tube (1) and square tube.
5. grafting fast-assembling clean operating room according to claim 1 is assisted the room, it is characterized in that, described furred ceiling hanging hook assembly (18) is by connection box (181), threaded rod (182) and hook (185) constitute, connection box (181) is arranged on threaded rod (182) top, hook (185) is arranged on threaded rod (182) bottom, all fixing between connection box (181) and hook (185) and the threaded rod (182) by locking nut (183) and spring shim (184), wherein connection box (181) top is provided with the swell fixture (4) that is connected with construction ceiling (19), and hook (185) is connected with described fast-assembling top board (16).
6. grafting fast-assembling clean operating room according to claim 1 is assisted the room, it is characterized in that, the arc radius R of described bulb (12) and arc plate (13) is 50mm~350mm.
7. the auxilliary room of a grafting fast-assembling clean operating room mounting process is characterized in that, may further comprise the steps:
A, at first to the ground snap the line: before the snap the line, cleaning and ground grading are confirmed ground flat degree within 3mm/2m, do not have shelling, play the powder phenomenon; Determine the benchmark line of ink marker then, eject vertical guideline, determine, guarantee that operating room and unwrapping wire benchmark are horizontal vertically flat with Pythagorean theorem; Then verification operating room diagonal error≤± 3mm; According to the unwrapping wire drawing, eject the metope line of ink marker and the keel line of ink marker and determine the square tube position then;
B, according to figure paper size and the keel line of ink marker and square tube position, vertical vertical square tube (1) is installed, with setscrew (4), angle connector (6) and angle connector (7), being fixed on perpendicular to ground direction square tube on building floor (20) and the construction ceiling (19); Lower keel spare (8) is fixed on the building floor (20) with setscrew (4) according to designing requirement then; Insert downwards and go up keel (9), regulate levelling bolt, make keel part (9) level, smooth; Be connected with hold-down screw (3) according to designing requirement with angle connector (6) according to designing requirement then and be installed on staking nut (2) in the square tube, be connected and fixed horizontal square tube (1);
C, according to designing requirement with rivet (5) riveted joint bulb (12), arc plate (13) and lower margin circular arc (10);
D, in last keel sword (9) groove, insert connecting key (14), insert fast-assembling wallboard (15) downwards, fixture (11) behind fast-assembling wallboard (15) upper rear portion riveted and fixed wallboard, be fixed on grafting fast-assembling plate (15) top, in grafting fast-assembling plate (15) sidewall aluminum alloy frame skeleton groove, insert connecting key (14), prepare to connect next and open grafting fast-assembling plate (15);
E, install the remaining parts of furred ceiling hanging hook assembly (18) except that setscrew (4) in advance, according to the designing requirement position at construction ceiling (19) fixed expansion screw (4), connection installs furred ceiling hanging hook assembly (18) parts in advance, finishes the installation of furred ceiling hanging hook assembly (18); According to designing requirement fast-assembling top board (16) is raised to level altitude, hook (185) in top board fixture (17), the furred ceiling hanging hook assembly (18) is colluded in fast-assembling top board (16) the sidewall aluminium alloy plate frame skeleton internal groove, and with rivet (5) top board fixture (17) riveted and fixed on square tube (1), in the sidewall aluminium alloy plate frame skeleton inner groovy of fast-assembling top board (16), insert connecting key (14), prepare to connect next and open fast-assembling top board (16).
CN2013101486667A 2013-04-26 2013-04-26 Plug and fast mounting clean operation room assisted room and mounting technology thereof CN103225427A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101486667A CN103225427A (en) 2013-04-26 2013-04-26 Plug and fast mounting clean operation room assisted room and mounting technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101486667A CN103225427A (en) 2013-04-26 2013-04-26 Plug and fast mounting clean operation room assisted room and mounting technology thereof

Publications (1)

Publication Number Publication Date
CN103225427A true CN103225427A (en) 2013-07-31

Family

ID=48836049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101486667A CN103225427A (en) 2013-04-26 2013-04-26 Plug and fast mounting clean operation room assisted room and mounting technology thereof

Country Status (1)

Country Link
CN (1) CN103225427A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388389A (en) * 2013-08-08 2013-11-13 无锡汉佳半导体科技有限公司 Operation room inter-wallboard connection assembly
CN105113809A (en) * 2015-08-14 2015-12-02 苏州通快净化科技有限公司 Operating room spliced by tempered glass integrally-mounted wall boards
CN105133872A (en) * 2015-09-28 2015-12-09 天津龙川精工洁净技术发展有限公司 Clean operating room
CN106193312A (en) * 2016-08-31 2016-12-07 佛山市中境净化设备有限公司 A kind of modular surgical room
CN106223458A (en) * 2016-09-26 2016-12-14 王翊 Assembled clean room assembly room and installation method thereof
CN111075193A (en) * 2019-11-26 2020-04-28 广东省建筑装饰工程有限公司 Construction method of assembled medical clean room and structure of assembled medical clean room

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01215350A (en) * 1988-02-22 1989-08-29 Comany Kk Indoor detachable clean room
CN202787489U (en) * 2009-03-30 2013-03-13 李大和 Assembly building structure
CN103061544A (en) * 2013-01-11 2013-04-24 苏州通快净化科技有限公司 Plug fast-installation auxiliary room for clean operating rooms and installation process thereof
CN203238991U (en) * 2013-04-26 2013-10-16 苏州通快净化科技有限公司 Clean operating room auxiliary room capable of being quickly assembled in insertion mode

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01215350A (en) * 1988-02-22 1989-08-29 Comany Kk Indoor detachable clean room
CN202787489U (en) * 2009-03-30 2013-03-13 李大和 Assembly building structure
CN103061544A (en) * 2013-01-11 2013-04-24 苏州通快净化科技有限公司 Plug fast-installation auxiliary room for clean operating rooms and installation process thereof
CN203238991U (en) * 2013-04-26 2013-10-16 苏州通快净化科技有限公司 Clean operating room auxiliary room capable of being quickly assembled in insertion mode

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388389A (en) * 2013-08-08 2013-11-13 无锡汉佳半导体科技有限公司 Operation room inter-wallboard connection assembly
CN105113809A (en) * 2015-08-14 2015-12-02 苏州通快净化科技有限公司 Operating room spliced by tempered glass integrally-mounted wall boards
CN105133872A (en) * 2015-09-28 2015-12-09 天津龙川精工洁净技术发展有限公司 Clean operating room
CN106193312A (en) * 2016-08-31 2016-12-07 佛山市中境净化设备有限公司 A kind of modular surgical room
CN106223458A (en) * 2016-09-26 2016-12-14 王翊 Assembled clean room assembly room and installation method thereof
CN106223458B (en) * 2016-09-26 2018-07-27 王翊 Assembly type clean room assembly room and its installation method
CN111075193A (en) * 2019-11-26 2020-04-28 广东省建筑装饰工程有限公司 Construction method of assembled medical clean room and structure of assembled medical clean room
CN111075193B (en) * 2019-11-26 2020-09-15 广东省建筑装饰工程有限公司 Construction method of assembled medical clean room and structure of assembled medical clean room

Similar Documents

Publication Publication Date Title
AU2012373801B2 (en) Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN104612307B (en) Ceiling system and its construction method
JP4800843B2 (en) Installation method of boiler furnace wall
CN206942035U (en) A kind of metope integration installation structure
CN102704672B (en) Installation construction method for large all-steel formwork at internal corner of shear wall
US20150191922A1 (en) Ergonomic strategy and system for cast construction
CN102936962A (en) Construction method of slanting cantilever steel structure supported by temporary steel frame
CN104775522B (en) A kind of detachable house box
CN201763002U (en) Independent adjustable steel supporting device
CN205348563U (en) Foaming cement composite sheet with forked tail slot type steel limit rib structure
CN105926936A (en) Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system
CN103953119A (en) Three-dimensional adjustable mounting connecting structure of assembled wallboard and laminated beam
CN107355037A (en) Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method
CN103806536A (en) Connecting structure of novel quickly-installed integrated house
CN205444780U (en) General system of hanging futilely of wall of interchangeable surface course material
CN103334587B (en) Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof
CN202370147U (en) Ceiling lamp groove structure of lightgage steel joist framework
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN105421657A (en) Foaming cement composite plates with dovetail groove type steel edge rib structures and connecting method thereof
CN204369372U (en) A kind of lift car
CN104018656A (en) Scaffold construction method for prefabricated outer wall
CN104358410B (en) Anti-arc wall form space orientation control method
KR20120003172A (en) A construction method using module type core structure
CN204112483U (en) Integrated form steel building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130731