- CN207845161U CN207845161U CN201721895471.9U CN201721895471U CN207845161U CN 207845161 U CN207845161 U CN 207845161U CN 201721895471 U CN201721895471 U CN 201721895471U CN 207845161 U CN207845161 U CN 207845161U
- Authority
- CN
- China
- Prior art keywords
- sealing
- yellow phosphorus
- smelting furnace
- electrode
- sealing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The utility model provides a kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode, including sealing flange, at least one seal box and multiple sealing drums, yellow phosphorus, which roasts, is equipped with electrode in smelting furnace, yellow phosphorus roasting smelts furnace outer wall and is equipped with pivot flange seat, electrode is stretched out by pivot flange seat, sealing flange is covered on the outside of pivot flange seat, multiple sealing drums cover composite electrode and are fixedly connected with sealing flange with stacking gradually, filler is filled between two sealing drums of arbitrary neighborhood, seal box fitting pivot flange seat is simultaneously fixedly connected with yellow phosphorus roasting smelting furnace outer wall, seal is filled in seal box;Using the technical solution of the utility model, escape furnace gas is prevented to generate chemical reaction with air from the root cause, avoid the pernicious gas in furnace gas, carbon monoxide and phosphorus pentoxide etc., which are lighted, generates serious consequence, effectively prevent the generation of phosphoric acid, service life of equipment is extended, sealing performance is improved, ensure that the normal production order.
Description
Technical field
The utility model belongs to phosphorus ore production technology equipment technology field, more particularly to a kind of for yellow phosphorus roasting smelting furnace
The sealing device of wall electrode.
Background technology
Phosphorus production is the technological operation carried out under the conditions of 49~198Pa of micro-positive pressure, i.e. 6~20mm water column pressures.For
Ensure that yellow phosphorus roasts smelting furnace performance number, needs often to lift electrode to supplement sacrificial electrode, adjusting electric load, stove in order to prevent
Gas escapes pollution wasted air raw material from electrode hole, must be sealed to flange base surrounding, existing sealing device is usually
Multiple sealing drums are set in flange base surrounding, then water is filled between these sealing barrels, are glossed over a fault using such Ah
Device is referred to as water sealing device, when using this water sealing device, when furnace gas is escaped from electrode hole peripheral clearance and is gone out, due to
Contain partially charged particle in furnace gas, these charged particles are contacted with water, and unpurified water has conductive capability, easy tos produce fire
Flower, and the burning point of the gases such as CO, P2O5 in stove is relatively low, is easily ignited, and many adverse consequences are brought to phosphorus production, has
The actual bodily harm to operating employee is even caused, and makes the semi-finished product " P2 O 5 " of yellow phosphorus in stove that can be lost in from stomata, and is produced
Phenomena such as life injures the dense smoke of human body, while being accompanied by and burning, and burn into damages periphery electromechanical equipment, reduces yellow phosphorus
The rate of recovery, enterprise's production cost is increased, further, since reacting with air after furnace gas leakage, in water tight enclosure bottom set
Portion periphery can generate some phosphoric acid, corrode flange base and bell is let out to reduce the service life that yellow phosphorus bakes smelting furnace
Maintenance down also have to be carried out when leaking serious, influences the normal production order, is rebuffed since electrode often tilts, and makes its electrode
The water sealing device support base periphery in outside and water seal often by electric current breakdown, short circuit, phosphorus furnace transformer also therefore by
Different degrees of impact and damage.
Utility model content
In order to solve the above technical problems, the utility model provide it is a kind of for yellow phosphorus roasting smelting furnace wall electrode it is close
Seal apparatus.
The utility model is achieved by the following technical programs.
The utility model provides a kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode, includes mainly Sealing Method
Blue disk, at least one seal box and multiple sealing drums, yellow phosphorus roast and are equipped with electrode in smelting furnace, and yellow phosphorus roasting is smelted on furnace outer wall
Equipped with pivot flange seat, the electrode is stretched out by the pivot flange seat, and the sealing flange is covered on the pivot flange
Seat outside, the multiple sealing drum stack gradually electrode described in ground fitting and are fixedly connected with the sealing flange, arbitrary phase
Be filled with filler between adjacent two sealing drums, pivot flange seat described in the seal box fitting and with outside yellow phosphorus roasting smelting furnace
Wall is fixedly connected, and seal is filled in the seal box.
The filler is water.
The seal is silica flour sand.
The seal box is hollow form cylindrical shape.
The seal box wall thickness is 3mm to 6mm.
The seal box height is 250mm to 300mm.
The seal box is bolted by the first symmetrical babinet of shape and the second babinet use.
Gap is not less than 8mm between first babinet and second babinet connection junction.
It is additionally provided with felt pad between the sealing flange and pivot flange seat connection junction.
The material of the felt pad is asbestos.
The beneficial effects of the utility model are:Using the technical solution of the utility model, uses water-stop and sand is close
The mode being combined is sealed, water-stop mode is for being sealed electrode excircle, and sand sealing means are mainly used for electrode
Bottom pivot flange seat is sealed, since sandstone itself has preferable insulation performance, and pivot flange seat and sealing flange
Corresponding felt pad also is provided between disk, though stove its from yellow phosphorus roast smelting furnace in escape when, due to asbestos insulation pad
It is insulator with sandstone seal, prevents escape furnace gas to generate chemical reaction with air from the root cause, avoid in furnace gas
Pernicious gas, carbon monoxide and phosphorus pentoxide etc., which are lighted, generates serious consequence, also prevents the generation of phosphoric acid, effectively protects
Production equipment has been protected, the service life of production equipment has been extended, effectively increases sealing performance, has prevented furnace gas leakage etc. and has asked
Topic, improves the operating environment of employee and equipment, alleviates staff labor intensity, ensure that the normal production order of enterprise, have
Conducive to raising Business Economic Benefit.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the front view of the utility model seal box;
Fig. 3 is the vertical view of the utility model seal box.
In figure:1- sealing flanges, 2- seal boxs, 3- sealing drums, 4- yellow phosphorus roast smelting furnace, 5- pivot flange seats, 6-
Filler, 7- seals, the first babinets of 8-, the second babinets of 9-, 10- bolts, 11- electrodes, 12- felt pads.
Specific implementation mode
Be described further below the technical solution of the utility model, but claimed range be not limited to it is described.
As shown in Figure 1, Figure 2, Figure 3 shows, the utility model provides a kind of sealing for yellow phosphorus roasting smelting furnace wall electrode
Device, including sealing flange 1, at least one seal box 2 and multiple sealing drums 3, yellow phosphorus, which roasts, is equipped with electrode in smelting furnace 4
11, yellow phosphorus roasts 4 outer wall of smelting furnace and is equipped with pivot flange seat 5, and electrode 11 is stretched out by pivot flange seat 5, and sealing flange 1 covers
Together in 5 outside of pivot flange seat, multiple sealing drums 3 cover composite electrode 11 and are fixedly connected with sealing flange 1, appointed with stacking gradually
It anticipates and is filled with filler 6 between two neighboring sealing drum 3,2 fitting pivot flange seat 5 of seal box simultaneously roasts smelting furnace 4 with yellow phosphorus
Outer wall is fixedly connected, and seal 7 is filled in seal box 2.
Using the technical solution of the utility model, uses water-stop and sand seals the mode being combined, water-stop mode
For being sealed to electrode excircle, and sand sealing means are mainly used for being sealed electrode base pivot flange seat, by
There is preferable insulation performance in sandstone itself, and also be provided with corresponding felt pad between pivot flange seat and sealing flange,
Even if stove its from yellow phosphorus roast smelting furnace in escape when, since asbestos insulation pad and sandstone seal are insulator, from
It prevents escape furnace gas to generate chemical reaction with air in root, avoids the pernicious gas in furnace gas, carbon monoxide and five oxygen
Change two phosphorus etc. and light and generate serious consequence, also prevent the generation of phosphoric acid, effective protection production equipment extends production and sets
Standby service life the problems such as effectively increasing sealing performance, prevented furnace gas leakage, improves the operation ring of employee and equipment
Border alleviates staff labor intensity, ensure that the normal production order of enterprise, is conducive to improve Business Economic Benefit.
Further, filler 6 is water.
Further, seal 7 is silica flour sand.Using seal 7 made of this material, on the one hand have good
Insulation performance, on the other hand, can high temperature resistant, when furnace body be under hot environment, make pivot flange seat and sealing flange it
Between the service life of felt pad extended, avoid aging, avoid the variation of expanded by heating rate or contract on cooling rate, because
And fundamentally avoid furnace gas leakage.
Further, as shown in Figure 2 and Figure 3, seal box 2 is hollow form cylindrical shape.
Further, 2 wall thickness of seal box is 3mm to 6mm.
Further, 2 height of seal box is 250mm to 300mm.
Further, seal box 2 connected using bolt 10 by the first symmetrical babinet 8 of shape and the second babinet 9 and
At.
Further, gap is not less than 8mm between the first babinet 8 and the second babinet 9 connection junction.Seal box 2 is preferred
It is made using the stainless steel plate that thickness is 4mm, bolt 10 it is preferable to use 4, the bolt that specification is M14*50mm, making by seal box 2
It when making, is cut first according to drawing size, cutting plank, the diameter of round sand seal cylinder babinet will be roasted according to every yellow phosphorus
The diameter of used water sealing device determines on electrode used in smelting furnace and electrode periphery, it is preferable that sealing
The diameter of case 2 should be bigger 400mm than water sealing device outer diameter on the outside of electrode, and seal box 2 is about highly 250-300mm, in cylinder type
It after 2 welding fabrication of seal box, is divided into two from centre, cutting is divided into two semicircular bodies, is incited somebody to action in the cut end of two semicircle babinets
Hinge " ear " welding is got on, and entire production process is so far completed, and directly in place to use, combination is installed and used, first before installation
First the bell of the flange support base surrounding of the water sealing device on the outside of electrode is cut off, on the outside of the straight diameter ratio electrode after making it cut off
The flange support base big 100mm of built-in fitting diameter of water sealing device make bell part and the watertight on the outside of electrode by cutting off
The completely separated state of flange support base built-in fitting of seal apparatus.It avoids so in process of production since electrode often inclines
Oblique impact wall, and make water sealing device support base periphery and water seal on the outside of its electrode by electric current breakdown, short circuit, damage phosphorus stove
The generation of Accident of Transformer.
Further, sealing flange 1 and pivot flange seat 5 are additionally provided with felt pad 12 between connecting junction.Further
The material on ground, felt pad 12 is asbestos.On the one hand, asbestos insulation pad 12 has excellent insulation performance, on the other hand also has
Good high temperature resistance has prevented escape furnace gas and air and has reacted situations such as then lighting completely.
Claims (10)
1. a kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode, it is characterised in that:Including sealing flange (1),
At least one seal box (2) and multiple sealing drums (3), yellow phosphorus roast and are equipped with electrode (11) in smelting furnace (4), and yellow phosphorus roasting is smelted
Stove (4) outer wall is equipped with pivot flange seat (5), and the electrode (11) is stretched out by the pivot flange seat (5), the sealing flange
Disk (1) is covered on the outside of the pivot flange seat (5), and the multiple sealing drum (3) stacks gradually electrode (11) described in ground fitting
And be fixedly connected with the sealing flange (1), filler (6) is filled between two sealing drums (3) of arbitrary neighborhood, it is described close
Pivot flange seat (5) described in joint sealing (2) fitting is simultaneously fixedly connected with yellow phosphorus roasting smelting furnace (4) outer wall, in the seal box (2)
Filled with seal (7).
2. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as described in claim 1, it is characterised in that:It is described to fill out
It is water to fill object (6).
3. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as described in claim 1, it is characterised in that:It is described close
It is silica flour sand to seal body (7).
4. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as described in claim 1, it is characterised in that:It is described close
Joint sealing (2) is hollow form cylindrical shape.
5. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as claimed in claim 4, it is characterised in that:It is described close
Joint sealing (2) wall thickness is 3mm to 6mm.
6. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as claimed in claim 4, it is characterised in that:It is described close
Joint sealing (2) height is 250mm to 300mm.
7. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as described in claim 1, it is characterised in that:It is described close
Joint sealing (2) is formed by connecting by symmetrical the first babinet (8) of shape and the second babinet (9) using bolt (10).
8. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as claimed in claim 7, it is characterised in that:Described
Gap is not less than 8mm between one babinet (8) connect junction with second babinet (9).
9. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as described in claim 1, it is characterised in that:It is described close
Envelope ring flange (1), which is connect with pivot flange seat (5) between junction, is additionally provided with felt pad (12).
10. the sealing device for yellow phosphorus roasting smelting furnace wall electrode as claimed in claim 9, it is characterised in that:It is described
The material of felt pad (12) is asbestos.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721895471.9U CN207845161U (en) | 2017-12-29 | 2017-12-29 | A kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721895471.9U CN207845161U (en) | 2017-12-29 | 2017-12-29 | A kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207845161U true CN207845161U (en) | 2018-09-11 |
Family
ID=63419983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721895471.9U Expired - Fee Related CN207845161U (en) | 2017-12-29 | 2017-12-29 | A kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207845161U (en) |
-
2017
- 2017-12-29 CN CN201721895471.9U patent/CN207845161U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105381884B (en) | A kind of electric cleaner and negative electrode are incubated case apparatus | |
CN207845161U (en) | A kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode | |
CN211284488U (en) | Large cover with heat-insulating heating and connecting device for titanium sponge distillation production | |
CN206369469U (en) | Closed titanium slag electric furnace water cooled cover | |
CN206001910U (en) | A kind of domatic arch mineral hot furnace bell | |
CN206146209U (en) | Hot stove electrode sealing device in ore deposit | |
US3835233A (en) | Electrode seals for electric-arc furnaces | |
CN208475953U (en) | Electric stove | |
CN209655824U (en) | A kind of converter watercooled hood | |
CN208475954U (en) | Electric arc furnace | |
CN203530354U (en) | Blast-furnace tuyere-cooler casing based gas leakage prevention device and blast furnace adopting same | |
CN207619493U (en) | A kind of slag cleaning furnace during copper processed | |
CN201864735U (en) | Cooling wall water inlet and outlet pipe protection device | |
CN206947879U (en) | A kind of cable testing bridge | |
CN206843563U (en) | A kind of titanium sponge production reactor | |
CN111139369A (en) | Large cover with heat-insulating heating and connecting device for titanium sponge distillation production | |
CN207815335U (en) | A kind of furnace roof access cover having seal and heat insulating ability | |
CN207006868U (en) | New furnace of calcium carbide blanking column | |
CN211084809U (en) | Safe, environment-friendly, efficient and energy-saving gas smelting furnace | |
CN214371801U (en) | Hot stove collection petticoat pipe in ore deposit for carbide production of long service life and being convenient for change | |
CN215980792U (en) | Sealing adjusting structure of combustion system in hot blast stove | |
CN210146975U (en) | Quick change structure of ladle baking device nozzle protection device | |
CN213019607U (en) | Square separator of boiler | |
CN212158127U (en) | Open type roasting furnace combustion furnace chamber upper surface heat preservation and sealing device | |
CN218820438U (en) | High-temperature combustion hearth |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |