- CN206001910U CN206001910U CN201620961328.4U CN201620961328U CN206001910U CN 206001910 U CN206001910 U CN 206001910U CN 201620961328 U CN201620961328 U CN 201620961328U CN 206001910 U CN206001910 U CN 206001910U
- Authority
- CN
- China
- Prior art keywords
- furnace
- bell
- top cover
- trapezoidal
- mounting ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The utility model discloses a kind of domatic arch mineral hot furnace bell, bear that weight is little in order to solve plane bell, easy collapse-deformation causes electrode column deflection three-phase electrode unbalanced power, and ponding is back in burner hearth the problem that security incident easily occurs.Specifically include:6 pieces of furnace top covers, 6 pieces of furnace sidewall and central lid constitute the polygon stage body for going to the bottom open;The waist of every piece of adjacent trapezoidal furnace top cover is mutually connected with, per block the upper bottom of trapezoidal furnace top cover all with central lid bolt connection, be spliced into circular stove top case;The mutual bolt connection of the waist of every piece of adjacent trapezoidal furnace sidewall, the bolt connection of going to the bottom of the upper bottom of trapezoidal furnace sidewall and corresponding trapezoidal furnace top cover per block so that central lid is higher than the horizontal level of the first mounting ear 100 millimeters.Beneficial effect includes:The support force of bell is increased, is increased the service life, reduce the shutdown maintenance caused because of electrode deflection in smelting process, it is to avoid ponding flows into the security incident that burner hearth causes.
Description
Technical field
The utility model is related to metallurgy mine thermal furnace technology field, more particularly to a kind of domatic arch mineral hot furnace bell.
Background technology
In conventional mineral hot furnace production and application, the upper capping of bell adopts plane form, because attached in smelting process
Facility weight and own wt are all overstock on bell, if bell self-strength not enough easily causes subsiding for bell, are caused
Bell inner surface weak spot ftractures, and the electrode column for install through bell, supporting by bell will also be glanced off, and cause three-phase current
Voltage is unbalanced.Cleared up if any ponding not in time above bell, ponding can be caused to be back in burner hearth, decompose through high-temperature gasification
Afterwards, easily there is the security incidents such as blast.
Content of the invention
The utility model embodiment provides a kind of domatic arch mineral hot furnace bell, in order to solve to there is plane in prior art
Bell bears weight greatly, easily subsides and causes motor post three-phase current unbalanced, and ponding backflow easily occurs asking for explosion accident
Topic.
The utility model embodiment provides a kind of domatic arch mineral hot furnace bell, including:6 pieces of furnace top covers, 6 pieces of furnace sidewall with
And the polygon stage body for going to the bottom open that central lid is constituted;Wherein, the mutual bolt connection of the waist of every piece of adjacent trapezoidal furnace top cover, per
The upper bottom of the trapezoidal furnace top cover of block all with central lid bolt connection, be spliced into circular stove top case;The waist of every piece of adjacent trapezoidal furnace sidewall
Mutual bolt connection, the bolt connection of going to the bottom of the upper bottom of trapezoidal furnace sidewall and corresponding trapezoidal furnace top cover per block;The trapezoidal stove per block
The upper bottom of side wall arranges the first mounting ear of level, per block trapezoidal furnace top cover go to the bottom setting level and extended line with furnace top cover is in
Second mounting ear of acute angle, the first mounting ear and the second mounting ear are bolted to connection so that central lid is installed than first
The horizontal level of ear is high 100 millimeters.
Preferably, arranging insulating barrier between the first mounting ear and the second mounting ear.
Preferably, the mutually bolted waist of every piece of adjacent trapezoidal furnace top cover installs 2 hangings, every piece of furnace top cover and center
1 hanging is installed at the mutually bolted upper bottom of lid.
Preferably, arranging Explosion-proof cap, dodge gate, the installing hole of electrode column, and feed opening, installing hole and feed opening are set
Back-up ring is all set.
The utility model beneficial effect includes:Furnace cover structure after improvement, increases the support force of bell, effectively prevents stove
Cover because long term high temperature environment using when the sagging deformation for causing.Bell support strength can reduce bell hanging quantity after increasing,
Cost-effective.Prevent when bell deforms, the unbalance stress in bell face, local pressure is excessive to cause sheet material cracking or weak spot
Weld cracking, increases the service life.After three-phase electricity pole is firm, reduce because the blowing out that electrode deflection causes is examined in smelting process
Repair.
Description of the drawings
Fig. 1 is the positive structure diagram of the domatic arch mineral hot furnace bell in the utility model embodiment;
Fig. 2 is the overlooking the structure diagram of the domatic arch mineral hot furnace bell in the utility model embodiment;
Fig. 3 is the mplifying structure schematic diagram of location A in Fig. 1.
Specific embodiment
Bell bearing strength be improved in order to provide, extend bell service life, reduce and deform, because of bell, the stove for causing that subsides
Lid cracking, electrode column deflection cause three-phase electricity pole unbalanced, it is to avoid ponding pours in down a chimney the realization side for causing security incident to burner hearth
Case, the utility model embodiment provide a kind of domatic arch mineral hot furnace bell, new to this practicality below in conjunction with Figure of description
The preferred embodiment of type is illustrated.
Refering to shown in Fig. 1, Fig. 2 and Fig. 3, a kind of domatic arch mineral hot furnace bell, including:6 pieces of furnace top covers, 1,6 pieces of furnace sidewall
22 and central lid constitute the polygon stage body for going to the bottom open;Wherein, the mutual bolt of the waist of every piece of adjacent trapezoidal furnace top cover 1 connects
Connect, per block the upper bottom of trapezoidal furnace top cover 1 all with central lid bolt connection, be spliced into circular stove top case;Every piece of adjacent trapezoidal furnace side
The mutual bolt connection of the waist of wall 2, the bolt connection of going to the bottom of the upper bottom of trapezoidal furnace sidewall 2 and corresponding trapezoidal furnace top cover 1 per block;Per
The upper bottom of the trapezoidal furnace sidewall 2 of block arranges the first mounting ear of level, go to the bottom setting level and the extended line of trapezoidal furnace top cover 1 per block
Second mounting ear at an acute angle with furnace top cover 1, the first mounting ear 11 and the second mounting ear 22 are bolted to connection so that in
Heart lid is higher than the horizontal level of the first mounting ear 100 millimeters.
Wherein, insulating barrier is set between the first mounting ear 11 and the second mounting ear 22.Every piece of adjacent trapezoidal furnace top cover 1 is mutual
Bolted waist installs 2 hangings, and every piece of furnace top cover 1 installs 1 hanging with the mutually bolted upper bottom of central lid.Bell
Upper setting Explosion-proof cap 4, dodge gate 5, the installing hole of electrode column 6, and feed opening 7 is set, installing hole and feed opening 7 all arrange gear
Circle.
The utility model embodiment provides a kind of domatic arch mineral hot furnace bell, by by the upper capping of mineral hot furnace bell
Structure is improved, and the upper capping of original planar structure is changed to domatic design of the center higher than edge 100mm, and by furnace roof
The edge of lid 1 is attached with bolt by respective mounting ear with side cover plate split, is effectively increased holding for bell top surface
Weight intensity, the insulating barrier between two mounting ears are HP-8 hard gold micarex.All add at all above reserved opening of bell
If back-up ring, the cooling water pipe above bell is trickled down if any water and is all trickled to edge naturally in bell, is easy to personnel's cleaning to beat
Sweep.After six 1 burst of the domatic furnace top cover connections of upper lid, six side pyramid structures are formed, can consolidated fixes three-phase electricity
Pole, makes three-phase electrode intercolumniation be always held at spacing, substantially increases the unbalanced factor of three-phase in smelting process.
In sum, the furnace cover structure after the improvement that the utility model embodiment is provided, increases the support force of bell, has
Effect prevent bell because long term high temperature environment using when the sagging deformation for causing.Bell support strength can reduce bell after increasing and hang
Quantity is hung, cost-effective.Prevent when bell deforms, the unbalance stress in bell face, local pressure is excessive cause sheet material cracking or
The weld cracking of weak spot, increases the service life.After three-phase electricity pole is firm, reduce because electrode deflection causes in smelting process
Shutdown maintenance.
Obviously, those skilled in the art can carry out various changes and modification without deviating from this practicality to the utility model
New spirit and scope.So, if of the present utility model these modification and modification belong to the utility model claim and
Within the scope of its equivalent technologies, then the utility model is also intended to comprising these changes and modification.
Claims (4)
1. a kind of domatic arch mineral hot furnace bell, it is characterised in that include:6 pieces of furnace top covers, 6 pieces of furnace sidewall and central lid structure
The polygon stage body for going to the bottom open for becoming;Wherein, the mutual bolt connection of the waist of every piece of adjacent trapezoidal furnace top cover, the trapezoidal furnace roof per block
Lid upper bottom all with central lid bolt connection, be spliced into circular stove top case;The mutual bolt of the waist of every piece of adjacent trapezoidal furnace sidewall connects
Connect, the bolt connection of going to the bottom of the upper bottom of trapezoidal furnace sidewall and corresponding trapezoidal furnace top cover per block;The upper bottom of trapezoidal furnace sidewall per block
First mounting ear of setting level, go to the bottom setting level and the extended line of trapezoidal furnace top cover are at an acute angle with furnace top cover per block second
Mounting ear, the first mounting ear and the second mounting ear are bolted to connection so that central lid is than the horizontal position of the first mounting ear
Put high 100 millimeters.
2. domatic arch mineral hot furnace bell as claimed in claim 1, it is characterised in that the first mounting ear and the second mounting ear it
Between arrange insulating barrier.
3. domatic arch mineral hot furnace bell as claimed in claim 1, it is characterised in that the mutual spiral shell of every piece of adjacent trapezoidal furnace top cover
Tether the waist for connecing and 2 hangings are installed, every piece of furnace top cover installs 1 hanging with the mutually bolted upper bottom of central lid.
4. domatic arch mineral hot furnace bell as claimed in claim 1, it is characterised in that Explosion-proof cap, dodge gate, electrode column are set
Installing hole, and feed opening is set, installing hole and feed opening all arrange back-up ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620961328.4U CN206001910U (en) | 2016-08-28 | 2016-08-28 | A kind of domatic arch mineral hot furnace bell |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620961328.4U CN206001910U (en) | 2016-08-28 | 2016-08-28 | A kind of domatic arch mineral hot furnace bell |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206001910U true CN206001910U (en) | 2017-03-08 |
Family
ID=58198423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620961328.4U Active CN206001910U (en) | 2016-08-28 | 2016-08-28 | A kind of domatic arch mineral hot furnace bell |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206001910U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107289779A (en) * | 2017-08-16 | 2017-10-24 | 肇庆市宏华电子科技有限公司 | Elevator electrical furnace top plate and elevator electrical furnace |
CN107314688A (en) * | 2017-08-15 | 2017-11-03 | 董洪维 | A kind of mineral hot furnace open hearth lid |
-
2016
- 2016-08-28 CN CN201620961328.4U patent/CN206001910U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107314688A (en) * | 2017-08-15 | 2017-11-03 | 董洪维 | A kind of mineral hot furnace open hearth lid |
CN107289779A (en) * | 2017-08-16 | 2017-10-24 | 肇庆市宏华电子科技有限公司 | Elevator electrical furnace top plate and elevator electrical furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206001910U (en) | A kind of domatic arch mineral hot furnace bell | |
CN100516246C (en) | Heat treatment of large-circular piece welling heat-treating furnace and wind-forced generating tower drum flange | |
CN201003059Y (en) | Lower suspension tilting converter | |
CN201406414Y (en) | Two-stage type gas furnace changed from single-stage type | |
CN203687617U (en) | High-temperature furnace with outstanding heat insulation function and furnace cover thereof | |
CN201819559U (en) | Furnace lid of electric furnace | |
CN102659109B (en) | Polycrystalline silicon reduction furnace | |
CN202017827U (en) | Dedicated tube for tank cover of corrosion-resistant electric heating concentration tank | |
CN208093412U (en) | A kind of switch mechanism case waterproof cover | |
CN203785452U (en) | Furnace top structure of large-sized arc-shaped porous high-temperature electric furnace | |
CN202145092U (en) | Air-cooled framework furnace lid with hanger brick | |
CN214095479U (en) | Insulation protection titanium slag smelting direct current electric arc furnace | |
CN103791720B (en) | Large arch-shaped porous high-temperature electric furnace top structure | |
CN205576205U (en) | Vacuum tank structure for RH | |
CN203642663U (en) | Shaft furnace anti-collision furnace wall and shaft furnace | |
CN205295500U (en) | Electrolytic bath | |
CN216245570U (en) | Steel skeleton flat furnace cover of submerged arc furnace | |
CN209217970U (en) | Easy-to-mount Split type three-phase bridge philcotron | |
CN207845161U (en) | A kind of sealing device for yellow phosphorus roasting smelting furnace wall electrode | |
CN208396334U (en) | A kind of pitched roof construction safety enclosing pedestal | |
CN107990710A (en) | A kind of safety-type smelting furnace | |
CN202947492U (en) | Large electric furnace airtight smoke helmet | |
CN109423313B (en) | Method for transforming dry quenching furnace shell | |
CN216282681U (en) | Emergency explosion-proof argon filling system of electric arc furnace | |
CN211921418U (en) | Water seal tank for dry quenching furnace mouth |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |