CN207844931U - A kind of tower crane counter-jib protection device for installing - Google Patents

A kind of tower crane counter-jib protection device for installing Download PDF

Info

Publication number
CN207844931U
CN207844931U CN201721899983.2U CN201721899983U CN207844931U CN 207844931 U CN207844931 U CN 207844931U CN 201721899983 U CN201721899983 U CN 201721899983U CN 207844931 U CN207844931 U CN 207844931U
Authority
CN
China
Prior art keywords
tower crane
jib
drawstring
hole
arm body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721899983.2U
Other languages
Chinese (zh)
Inventor
时三强
谢昆仑
蔡中鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Zhengda Leasing Ltd By Share Ltd
Original Assignee
Zhengzhou Zhengda Leasing Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Zhengda Leasing Ltd By Share Ltd filed Critical Zhengzhou Zhengda Leasing Ltd By Share Ltd
Priority to CN201721899983.2U priority Critical patent/CN207844931U/en
Application granted granted Critical
Publication of CN207844931U publication Critical patent/CN207844931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of tower crane counter-jib protection device for installing, including tower crane ontology, the bottom end side of tower crane ontology is welded with bottom plate, the top of bottom plate is welded with hoist engine, two first drawstrings and two second drawstrings are wrapped on hoist engine respectively, the top of tower crane ontology is welded with the fixed ring of array distribution, the side of tower crane ontology is equipped with balance arm body, the other end of first drawstring and the second drawstring bypasses corresponding fixed ring bolt knot on the both ends of the both sides side wall of balance arm body respectively, and first drawstring and the second drawstring be located at the both sides of balance arm body, the top both sides bolt of balance arm body has the lifting rope on truck crane.The present apparatus is simple in structure, novel in design, prevents truck crane from going wrong counter-jib the phenomenon that falling, while also can be good at protecting installation personnel, prevent it injured or dropping, highly practical.

Description

A kind of tower crane counter-jib protection device for installing
Technical field
The utility model is related to tower crane counter-jib installation protection technology fields more particularly to a kind of installation of tower crane counter-jib to protect Protection unit.
Background technology
Tower crane is a kind of most common lifting equipment also known as " derrick crane " on construction site, is connect with a section It is long, for hanging the raw material of the constructions such as working reinforcing bar, wood stupefied, concrete, steel pipe.Tower crane is a kind of essential on building site Equipment.
Present tower crane often uses truck crane that counter-jib is lifted installation when installing counter-jib, and tower crane peace is torn open Axis pin and tower crane are fixed on the counter-jib of personnel station, once truck crane goes wrong, installed at the operating personnel of counter-jib It is serious to also result in the phenomenon that counter-jib falls in prodigious danger, it is existing in counter-jib installation process not yet A kind of preferable protective device for being used for installation personnel, when truck crane when something goes wrong, the transience displacement that counter-jib generates, meeting Make installation personnel crank, it is serious it also occur that installation personnel drops counter-jib to the phenomenon that damaging, tumble injury occur The phenomenon that, thus it is proposed that a kind of tower crane counter-jib protection device for installing.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of tower crane counter-jib proposed Protection device for installing.
To achieve the goals above, the utility model uses following technical solution:
The bottom end side of a kind of tower crane counter-jib protection device for installing, including tower crane ontology, tower crane ontology is welded with bottom plate, The top of bottom plate is welded with hoist engine, is wrapped with two first drawstrings and two second drawstrings, tower crane ontology on hoist engine respectively Top be welded with the fixed ring of array distribution, the side of tower crane ontology is equipped with balance arm body, the first drawstring and the second drawstring The other end bypass corresponding fixed ring bolt knot respectively on the both ends of the both sides side wall of balance arm body, and the first drawstring and the Two drawstrings are located at the both sides of balance arm body, and the top both sides bolt for balancing arm body has the lifting rope on truck crane, Balance arm body is fixed with the front apron being vertically arranged, rear baffle and two blocks of side plates close to one end top of tower crane ontology, balances The top both sides of arm body are equipped with protective fence, and two blocks of side plates are bolted on protective fence, and front apron, rear baffle and two Block side plate, which mutually surrounds, forms a rectangular channel, and installation is connected on the side side wall of front apron, rear baffle and two blocks of side plates Plate is respectively and fixedly provided with sponge plate on the side side wall of mounting plate, and the front apron and a side plate are hinged, the top side of front apron Equipped with projection, projection and the top of another side plate are slidably connected, and the top of projection is equipped with bolt, and projection is fixed by bolt On side plate.
Preferably, equally distributed first through hole is offered on the side wall of the front apron, rear baffle and two blocks of side plates With the second through-hole, and first through hole and the second through-hole are vertically arranged and are interconnected, and gag lever post, gag lever post are equipped in first through hole On be socketed with spring, one end of spring is connected on gag lever post, and the other end of spring is connected on the side wall of first through hole, installation Equally distributed mounting rod is respectively and fixedly provided on the side wall of plate, mounting rod is connected in the second through-hole, is opened on the side wall of mounting rod Equipped with bayonet, one end of gag lever post is connected in buckle.
Preferably, one end of the gag lever post is equipped with limited block, and side of the limited block far from gag lever post is equipped with draw ring.
Preferably, first drawstring and the second drawstring are steel wire rope.
Preferably, third through-hole is offered in the projection, the top of side plate offers jack, and bolt is connected to third In through-hole and jack.
Advantageous effect in the utility model:
1, the utility model passes through hoist engine, tower crane ontology, fixed ring, the first drawstring, the second drawstring and balance arm body Setting, counter-jib by truck crane when being installed, adjusting the first drawstring and the second drawstring by hoist engine will balance Arm is held, and prevents truck crane from preventing counter-jib from falling when something goes wrong, and prevent installation personnel when counter-jib is out of control Shield, preferably protects installation personnel and equipment.
2, pass through protective fence, lifting rope, balance arm body, side plate, bolt, projection, front apron, rear baffle, mounting rod, bullet The setting of spring, gag lever post, mounting plate and sponge plate, truck crane go wrong cause counter-jib out of control when, prevent installation personnel Because crank is fallen down, situation on protective fence and injured is collided, further installation personnel is protected, and sponge plate Replacement easy to disassemble saves time and manpower, and the present apparatus is simple in structure, novel in design, prevents truck crane from going wrong balance The phenomenon that arm falls, while also can be good at protecting installation personnel, prevent it injured or dropping, it is highly practical.
Description of the drawings
Fig. 1 be the utility model proposes a kind of tower crane counter-jib protection device for installing mounting structure front view;
Fig. 2 be the utility model proposes a kind of tower crane counter-jib protection device for installing partial structurtes enlarged drawing;
Fig. 3 be the utility model proposes a kind of tower crane counter-jib protection device for installing partial structurtes top plan view.
In figure:It is 1 hoist engine, 2 tower crane ontologies, 3 fixed rings, 4 first drawstrings, 5 second drawstrings, 6 protective fences, 7 lifting ropes, 8 flat Weigh arm body, 9 side plates, 10 bolts, 11 projections, 12 front aprons, 13 rear baffles, 14 mounting rods, 15 springs, 16 gag lever posts, 17 peaces Loading board, 18 sponge plates.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-3, a kind of tower crane counter-jib protection device for installing, including tower crane ontology 2, the bottom end one of tower crane ontology 2 Side is welded with bottom plate, and the top of bottom plate is welded with hoist engine 1, is wrapped with two first drawstrings 4 and two on hoist engine 1 respectively The top of two drawstrings 5, tower crane ontology 2 is welded with the fixed ring 3 of array distribution, and the side of tower crane ontology 2 is equipped with balance arm body 8, the other end of the first drawstring 4 and the second drawstring 5 bypasses 3 bolt knot of corresponding fixed ring in the both sides side of balance arm body 8 respectively On the both ends of wall, and the first drawstring 4 and the second drawstring 5 are located at the both sides of balance arm body 8, balance the top of arm body 8 Both sides bolt has the lifting rope 7 on truck crane, and balance arm body 8 is fixed with close to one end top of tower crane ontology 2 to be set vertically The top both sides of front apron 12, rear baffle 13 and the two blocks of side plates 9 set, balance arm body 8 are equipped with protective fence 6, and two blocks of side plates 9 are logical It crosses bolt to be fixed on protective fence 6, and front apron 12, rear baffle 13 and two blocks of side plates 9 are mutually around one rectangular channel of formation, it is preceding It is connected with mounting plate 17 on the side side wall of baffle 12, rear baffle 13 and two blocks of side plates 9, on the side side wall of mounting plate 17 Be fixed with sponge plate 18, front apron 12 and a side plate 9 are hinged, and the top side of front apron 12 is equipped with projection 11, projection 11 with The top of another side plate 9 is slidably connected, and the top of projection 11 is equipped with bolt 10, and projection 11 is fixed on side plate by bolt 10 On 9, equally distributed first through hole and the second through-hole are offered on the side wall of front apron 12, rear baffle 13 and two blocks of side plates 9, And first through hole and the second through-hole are vertically arranged and are interconnected, and gag lever post 16 is equipped in first through hole, is socketed on gag lever post 16 There are spring 15, one end of spring 15 to be connected on gag lever post 16, the other end of spring 15 is connected on the side wall of first through hole, peace Equally distributed mounting rod 14 is respectively and fixedly provided on the side wall of loading board 17, mounting rod 14 is connected in the second through-hole, mounting rod 14 Bayonet is offered on side wall, one end of gag lever post 16 is connected in buckle, and one end of gag lever post 16 is equipped with limited block, limit Side of the block far from gag lever post 16 is equipped with draw ring, and the first drawstring 4 and the second drawstring 5 are steel wire rope, are opened up in projection 11 There are third through-hole, the top of side plate 9 to offer jack, bolt 10 is connected in third through-hole and jack.
Operation principle:When the utility model is used, being hung to first by the lifting rope 7 on truck crane by arm body 8 is balanced First drawstring 4 and the second drawstring 5 are divided before balance arm body 8 is sling and are fixed on balance wall by designated mounting position first The both sides of ontology 8,1 cooperating of hoist engine while lifting, the first drawstring 4 and the second drawstring 5 are tensed, when balance arm body 8 when being hung to designated mounting position, and the first drawstring 4 and the second drawstring 5 can also tense simultaneously, prevent accident, and counter-jib is out of control, Then installation exercise is carried out by installation personnel, when being installed, installation personnel is climbed first to balance arm body 8, then Installation personnel pulls up bolt 10 first, and front apron 12 is opened, and installation personnel enters installation site, and front apron 12 is closed and incited somebody to action Bolt 10 is inserted into designated position, when truck crane goes wrong, and balance arm body 8 is caused to shake, the sponge plate around installation personnel 18 can protect installation personnel, while the bottom surface of installation site is also equipped with foam-rubber cushion, place installation personnel and fall and hurt, The sponge plate 18 that front apron 12, rear baffle 13 and two side plates 9 are equipped with simultaneously is installed on mounting plate 17, and mounting plate 17 is just In dismounting, draw ring is pulled in dismounting so that gag lever post 16 unclamps, then successively by front apron 12, rear baffle 13 and two sides Mounting plate 17 on plate 9 disassembles, and is then replaced to sponge plate 18, by the mounting rod 14 on mounting plate 17 after more finishing changing It is inserted into corresponding mounting hole, the present apparatus is simple in structure, novel in design, prevents truck crane from going wrong what counter-jib fell Phenomenon, while also can be good at protecting installation personnel, prevent it injured or dropping, it is highly practical.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (5)

1. a kind of tower crane counter-jib protection device for installing, including tower crane ontology(2), which is characterized in that the tower crane ontology(2)'s Bottom end side is welded with bottom plate, and the top of bottom plate is welded with hoist engine(1), hoist engine(1)It is upper to be wrapped with two first drawings respectively Rope(4)With two second drawstrings(5), tower crane ontology(2)Top be welded with the fixed ring of array distribution(3), tower crane ontology(2) Side be equipped with balance arm body(8), the first drawstring(4)With the second drawstring(5)The other end respectively bypass corresponding fixed ring (3)Bolt knot is in balance arm body(8)Both sides side wall both ends on, and the first drawstring(4)With the second drawstring(5)It is located at flat Weigh arm body(8)Both sides, balance arm body(8)Top both sides bolt have the lifting rope on truck crane(7), counter-jib sheet Body(8)Close to tower crane ontology(2)One end top be fixed with the front apron being vertically arranged(12), rear baffle(13)With two blocks of side plates (9), balance arm body(8)Top both sides be equipped with protective fence(6), two blocks of side plates(9)It is bolted on protective fence(6) On, and front apron(12), rear baffle(13)With two blocks of side plates(9)Mutually around one rectangular channel of formation, front apron(12), rear gear Plate(13)With two blocks of side plates(9)Side side wall on be connected with mounting plate(17), mounting plate(17)Side side wall on it is solid Surely there is sponge plate(18), the front apron(12)With a side plate(9)It is hinged, front apron(12)Top side be equipped with projection (11), projection(11)With another side plate(9)Top be slidably connected, and projection(11)Top be equipped with bolt(10), projection (11)Pass through bolt(10)It is fixed on side plate(9)On.
2. a kind of tower crane counter-jib protection device for installing according to claim 1, which is characterized in that the front apron (12), rear baffle(13)With two blocks of side plates(9)Side wall on offer equally distributed first through hole and the second through-hole, and One through-hole and the second through-hole are vertically arranged and are interconnected, and gag lever post is equipped in first through hole(16), gag lever post(16)Upper socket There is spring(15), spring(15)One end be connected to gag lever post(16)On, spring(15)The other end be connected to first through hole On side wall, mounting plate(17)Side wall on be respectively and fixedly provided with equally distributed mounting rod(14), mounting rod(14)It is logical to be connected to second In hole, mounting rod(14)Side wall on offer bayonet, gag lever post(16)One end be connected in buckle.
3. a kind of tower crane counter-jib protection device for installing according to claim 2, which is characterized in that the gag lever post(16) One end be equipped with limited block, limited block is far from gag lever post(16)Side be equipped with draw ring.
4. a kind of tower crane counter-jib protection device for installing according to claim 1, which is characterized in that first drawstring (4)With the second drawstring(5)It is steel wire rope.
5. a kind of tower crane counter-jib protection device for installing according to claim 1, which is characterized in that the projection(11)On Offer third through-hole, side plate(9)Top offer jack, bolt(10)It is connected in third through-hole and jack.
CN201721899983.2U 2017-12-29 2017-12-29 A kind of tower crane counter-jib protection device for installing Active CN207844931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721899983.2U CN207844931U (en) 2017-12-29 2017-12-29 A kind of tower crane counter-jib protection device for installing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721899983.2U CN207844931U (en) 2017-12-29 2017-12-29 A kind of tower crane counter-jib protection device for installing

Publications (1)

Publication Number Publication Date
CN207844931U true CN207844931U (en) 2018-09-11

Family

ID=63420005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721899983.2U Active CN207844931U (en) 2017-12-29 2017-12-29 A kind of tower crane counter-jib protection device for installing

Country Status (1)

Country Link
CN (1) CN207844931U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112374391A (en) * 2020-11-30 2021-02-19 常德市振东机械有限公司 Tower crane is with balance arm protection device of being convenient for installation change

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112374391A (en) * 2020-11-30 2021-02-19 常德市振东机械有限公司 Tower crane is with balance arm protection device of being convenient for installation change

Similar Documents

Publication Publication Date Title
CN107055347B (en) A kind of Tower crane disassembly structures and methods of high-rise installation
CN207844931U (en) A kind of tower crane counter-jib protection device for installing
CN106927356B (en) A kind of crampon for ship shipping
CN108625371A (en) A kind of building piling machine
CN108892060A (en) A kind of crane upper mechanism is from dismantling device, crane and tears method open certainly
CN207484937U (en) A kind of high-altitude hanging basket safety device
CN206625135U (en) A kind of gondola-hanging mechanism
CN207794654U (en) Construction safety device
CN202297067U (en) Aloft operating device
CN212053859U (en) Horizontal overhanging flexible protective net for construction of main structure of building
CN208136737U (en) A kind of novel bridge construction anti-drop device
CN209226401U (en) A kind of hoisting device
CN208430514U (en) A kind of building piling machine
CN208700131U (en) A kind of wind-screening dust-suppressing device for coal mine bridge-type grab ship unloader funnel
CN207347061U (en) A kind of mechanical whole freight weight limit power-off protection apparatus and its ground jack of application
CN209493238U (en) A kind of anti-fall boom
CN208843629U (en) A kind of crane upper mechanism is from dismantling device and crane
CN209025474U (en) Move embedded steel pile casting protective device
CN208398983U (en) A kind of steel scrap weighing device
CN107311060A (en) A kind of mechanical whole freight weight limit power-off protection apparatus and its ground jack of application
CN207618885U (en) Diesel engine lubricant filtering device hoisting tool
CN215756024U (en) Hoist protection device for hoist
CN206035367U (en) Stacker -reclaimer cable drum maintenance device
CN214828485U (en) Crane derrick mast safety device
CN213623048U (en) Hoist engine of safety in production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant