CN207833325U - The test device and mast switch controller of mast switch controller - Google Patents
The test device and mast switch controller of mast switch controller Download PDFInfo
- Publication number
- CN207833325U CN207833325U CN201721889971.1U CN201721889971U CN207833325U CN 207833325 U CN207833325 U CN 207833325U CN 201721889971 U CN201721889971 U CN 201721889971U CN 207833325 U CN207833325 U CN 207833325U
- Authority
- CN
- China
- Prior art keywords
- switch controller
- signal
- test
- terminal block
- mast switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The utility model is related to a kind of test devices of mast switch controller, including aviation plug, connecting terminal block and test equipment;Wherein, the aviation plug is equipped with signal lead, and the connecting terminal block is equipped with input side and outlet side;The aviation plug is connected to the input side of connecting terminal block by signal lead;The outlet side of the connecting terminal block is connected to the signal testing port of test equipment;The aviation plug draws the test signal of mast switch controller to connecting terminal block for connecting mast switch controller, by signal lead;The connecting terminal block is used to input the test signal that the signal lead is drawn, and the test signal is exported to the corresponding signal test port of test equipment.The test device of above-mentioned mast switch controller so that testing mast switch controller and the mode of connection of test equipment is simplified, and improves testing efficiency, also improves Security of test.A kind of mast switch controller is also provided.
Description
Technical field
The utility model is related to technical field of power systems, more particularly to a kind of test device of mast switch controller
And mast switch controller.
Background technology
In the power system, some power equipments are easy to be damaged and break down during use, need pair
The power equipment of fault zone carries out malfunction elimination test.
By taking on-pole switch as an example, automatic Switching is typically mounted on shaft tower on column, service condition rather harsh, such as
It is subjected to the influence of the extreme climates such as high temperature solarization, lightning current, operation stability is relatively poor, therefore combined circuit power failure work
Make, carries out " three is distant " debugging for automatic Switching on the column to have put into operation, be detection switch performance, find that switch is hidden in advance
The important means of trouble.
When carrying out malfunction elimination test to mast switch controller, traditional technology needs to carry out the signal wire of the controller
Repeatedly plug wiring could be completed to test, and cause testing efficiency low.This technology is typically that operation is carried out near controller,
So staff is needed first to climb up shaft tower, carry out wiring at controller, still, the mounting height of controller is apart from ground one
As more than 3 meters, the form of this working at height can increase difficulty of test, influence testing efficiency.Since the weight of controller is general
In 30kg or more, is tested if removing controller using tool and carrying out on ground, the test of mast switch controller can be caused
Take long, reduction testing efficiency.
Utility model content
Based on this, it is necessary to for the low problem of testing efficiency, provide a kind of test device of mast switch controller and
Mast switch controller.
A kind of test device of mast switch controller, including aviation plug, connecting terminal block and test equipment;Wherein,
The aviation plug is equipped with signal lead, and the connecting terminal block is equipped with input side and outlet side;
The aviation plug is connected to the input side of connecting terminal block by signal lead;The output of the connecting terminal block
Side is connected to the signal testing port of test equipment;
The aviation plug draws the survey of mast switch controller by signal lead for connecting mast switch controller
Trial signal is to connecting terminal block;
The connecting terminal block is used to input the test signal that the signal lead is drawn, and by the test signal export to
The corresponding signal test port of test equipment.
The test device of above-mentioned mast switch controller, aviation plug are connected to the defeated of connecting terminal block by signal lead
Enter side, aviation plug is used to connect mast switch controller and draws the test signal of mast switch controller by signal lead
To connecting terminal block, for the input side of connecting terminal block for inputting the test signal, the outlet side of connecting terminal block is connected to survey
The signal testing port of test instrument, for exporting the test signal to the corresponding signal test port of test equipment.The program
So that the mode of connection of test mast switch controller and test equipment is simplified, testing efficiency is improved, survey is also improved
Try safety.
In one embodiment, the signal lead includes the three-phase voltage for the input side for being respectively connected to connecting terminal block
Lead and three-phase current lead;
Wherein, the three-phase voltage lead is used to draw the three-phase voltage signal of mast switch controller;The three-phase electricity
Stream lead is used to draw the three-phase current signal of mast switch controller.
In one embodiment, the input side of the connecting terminal block is equipped with the test signal class with mast switch controller
The corresponding multiple input port of type;
Each input port is correspondingly connected to three-phase voltage lead and three-phase current lead;
The multiple input port is for inputting different types of test signal.
In one embodiment, the test device of the mast switch controller further include be connected to the signal lead and
Input connecting line between the input side of connecting terminal block;
The input connecting line is used to input the test signal that the signal lead is drawn, and the test signal is transmitted to
The input side of connecting terminal block.
In one embodiment, using insulating tape package connection between input connecting line and the signal lead.
In one embodiment, the test device of the mast switch controller further includes being connected to the connecting terminal block
Outlet side and test equipment between output connecting line;
The output connecting line is used to the test signal of the outlet side of connecting terminal block being transmitted to the corresponding of test equipment
Signal testing port.
In one embodiment, the input connecting line and output connecting line are all made of copper core.
In one embodiment, it is 1.5 to 2.5mm2 copper core that the copper core, which uses section specification limit,.
In one embodiment, the aviation plug is the aviation plug with the type matching of mast switch controller.
In one embodiment, a kind of mast switch controller is also provided, on the aviation socket of the mast switch controller
It is connected with the test device of mast switch controller as described above.
Description of the drawings
Fig. 1 is the structural schematic diagram of the test device of the mast switch controller in one embodiment;
Fig. 2 is the structural schematic diagram of the mast switch controller in one embodiment.
Specific implementation mode
The specific implementation mode of the test device of the mast switch controller of the utility model is carried out below in conjunction with the accompanying drawings
It is described in detail.
In one embodiment, a kind of test device of mast switch controller is provided, with reference to figure 1, Fig. 1 is an implementation
The structural schematic diagram of the test device of mast switch controller in example, a kind of test device of mast switch controller, including
Aviation plug 110, connecting terminal block 120 and test equipment 130;Wherein, the aviation plug 110 is equipped with signal lead, institute
It states connecting terminal block 120 and is equipped with input side 121 and outlet side 122;
The aviation plug 110 is connected to the input side 121 of connecting terminal block 120 by signal lead;The terminals
The outlet side 122 of son row 120 is connected to the signal testing port of test equipment 130;
The aviation plug 110 draws mast switch controller for connecting mast switch controller by signal lead
Test signal to connecting terminal block 120;
The connecting terminal block 120 is used to input the test signal that the signal lead is drawn, and the test signal is defeated
Go out to the corresponding signal test port of test equipment 130.
In the present embodiment, aviation plug 110 is for being attached the test device and mast switch controller
A kind of connector, which can be connected to on-pole switch control by the aviation socket on mast switch controller
Device processed.
In order to improve the wiring efficiency of the test device and mast switch controller, aviation plug 110 generally chooses and column
The aviation plug of the type matching of upper switch controller, such as the controller of a certain producer selects same type
Aviation plug.
Aviation plug 110 is equipped with signal lead, and the effect of the signal lead is to draw the test of mast switch controller
Signal.In use, after aviation plug 110 being connected to the aviation socket of mast switch controller, signal can be passed through
Lead draws the dependence test electric signal of mast switch controller, convenient for being detected experiment to the test signal.
Connecting terminal block 120 is a kind of terminal block can be used for automatization terminal secondary connection, the connecting terminal block 120
On be typically provided input side 121 and outlet side 122, can be equipped with corresponding multiple ends on input side 121 and outlet side 122
Mouthful, such as the signal inputted from the input port 1 of input side 121 can be defeated from the output port 2 of outlet side 122 progress signal
Go out.
The port of the input side 121 of connecting terminal block 120 can be attached with signal lead, be drawn for accessing the signal
The test signal that line is drawn, then the test signal is exported by the corresponding ports of outlet side 122.Because of connecting terminal block
120 wiring is clearly and partition is apparent, so test signal is output and input and can be avoided using connecting terminal block 120
The problems such as short circuit occurs between different test signals.
Test equipment 130 refers to the instrument to mast switch controller progress signal testing, such as can refer to column
Upper switch controller carries out automation and meets the test apparatus for stopping comparing work.
Test equipment 130 generally has multiple signal access ports corresponding with the test signal of mast switch controller.
Each signal port of test equipment 130 in the present embodiment and the corresponding ports of the outlet side 122 of connecting terminal block 120 carry out
Connection receives the test signal exported from connecting terminal block 120, is debugged to mast switch controller.
The test device of the mast switch controller of above-described embodiment, aviation plug 110 is connected to by signal lead to be connect
The input side 121 of line terminals row 120, aviation plug 110 is for connecting mast switch controller and drawing column by signal lead
The test signal of upper switch controller is to connecting terminal block 120, and the input side 121 of connecting terminal block 120 is for inputting the test
The outlet side 122 of signal, connecting terminal block 120 is connected to the signal testing port of test equipment 130, is used for the test signal
It exports to the corresponding signal test port of test equipment 130.The program to test mast switch controller and test equipment 130
The mode of connection be simplified, setting up time can be shortened, improve testing efficiency, also improve Security of test.
In order to improve the efficiency for the signal for testing mast switch controller, in one embodiment, signal lead can wrap
Include the three-phase voltage lead and three-phase current lead of the input side 121 for being respectively connected to connecting terminal block 120;Wherein, described three
Phase voltage lead is used to draw the three-phase voltage signal of mast switch controller;The three-phase current lead is opened for drawing on column
Close the three-phase current signal of controller.
In the present embodiment, signal lead can draw the dependence test signal of mast switch controller, such as three-phase electricity
Signal and three-phase current signal etc. are pressed, and these signals are exported to the input port of the input side 121 of connecting terminal block 120.
Wherein, each leading-out terminal of signal lead can will be surveyed according to the sequence such as sequence of regulation, such as A phase voltages, B phase voltages
Trial signal is consecutively connected to the respective input mouth of the input side 121 of connecting terminal block 120.
In actual use, the test signal type of the mast switch controller of different manufacturers is often different, therefore can be with
For the mast switch controller of common producer, corresponding connecting terminal block is made one by one in advance, so as to improve test effect
Rate.
In one embodiment, the input side 121 of the connecting terminal block 120 is equipped with the survey with mast switch controller
The corresponding multiple input port of trial signal type;Each input port is correspondingly connected to three-phase voltage lead and three-phase current draws
Line;The multiple input port is for inputting different types of test signal.
The present embodiment is mainly to correspond to access multiple surveys by the multiple input port of 120 input side 121 of connecting terminal block
Trial signal, such as the three-phase voltage signal of extraction and three-phase current signal can be accessed respective input in a designated order
Mouthful.The program makes the wiring of signal wire clear and signal partition is apparent, can avoid short circuit etc. occurs between different phases asking
Topic improves testing efficiency and Security of test.
In order to further increase testing efficiency and Security of test, in one embodiment, the pole-mounted switch
The test device of device can also include the input being connected between the signal lead and the input side 121 of connecting terminal block 120
Connecting line;The input connecting line is used to input the test signal that the signal lead is drawn, and the test signal is transmitted to
The input side 121 of connecting terminal block 120.
The present embodiment utilizes input connecting line by the corresponding port of signal lead and the input side 121 of connecting terminal block 120
It is attached, the test signal that signal lead is drawn is transferred to connecting terminal block 120.In actual use, connecting line is inputted
Length can be chosen according to test environment, input the quantity of connecting line then can according to the quantity of signal lead into
Row is chosen.
Using the technical solution of the present embodiment the test device of mast switch controller is mutually fitted from different test environments
It answers, testing efficiency and Security of test can be further increased.
In one embodiment, it inputs between connecting line and signal lead and insulating tape package connection may be used, it can
The problems such as avoiding the electric leakage occurred during the test or short circuit, to improve Security of test.
In one embodiment, the test device of the mast switch controller further includes being connected to the connecting terminal block
Output connecting line between 120 outlet side 122 and test equipment 130;The output connecting line is used for connecting terminal block 120
The test signal of outlet side 122 be transmitted to the corresponding signal test port of test equipment 130.
The present embodiment mainly utilizes output connecting line by the port of the outlet side 122 of connecting terminal block 120 and test equipment
130 corresponding signal test port is attached, and the test signal of the outlet side 122 of connecting terminal block 120 is transmitted to test
Instrument 130 improves testing efficiency.
The connecting line of different size and material may be used as input connecting line and output connecting line, in one embodiment
In, in order to improve adaptability of the test device under different test environments, input connecting line and output connecting line can be adopted
Use copper core.Optionally, it is 1.5 to 2.5mm that section specification limit, which may be used,2Copper core as input connecting line and output
Connecting line.
In one embodiment, a kind of mast switch controller is also provided.With reference to figure 2, Fig. 2 is the column in one embodiment
The structural schematic diagram of upper switch controller is connected with on-pole switch as described above on the aviation socket of the mast switch controller
The test device of controller.
It can generally be equipped with aviation socket on mast switch controller, be mainly to provide one kind in aviation socket in the present embodiment
On be connected with any one above-mentioned embodiment test device mast switch controller.
The mast switch controller provided using the embodiment so that the test signal of controller can be carried out on ground
Debugging operations, convenient working work, avoid shaft tower above and below in debugging process, mitigate the workload of debugging, avoid upper boom operation
Risk, and can remove from and remove the trouble that switch is debugged, testing efficiency is improved, for there was only the controller of binding post, also
The short-circuit risks between difference phase when being pressurizeed with wire clamp are avoided, the safety of debugging has been effectively ensured.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that for the common skill of this field
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
1. a kind of test device of mast switch controller, which is characterized in that including aviation plug (110), connecting terminal block
(120) and test equipment (130);Wherein, the aviation plug (110) is equipped with signal lead, the connecting terminal block (120)
Equipped with input side (121) and outlet side (122);
The aviation plug (110) is connected to the input side (121) of connecting terminal block (120) by signal lead;The wiring
The outlet side (122) of terminal block (120) is connected to the signal testing port of test equipment (130);
The aviation plug (110) draws mast switch controller for connecting mast switch controller, by signal lead
Test signal is to connecting terminal block (120);
The connecting terminal block (120) is used to input the test signal that the signal lead is drawn, and the test signal is exported
To the corresponding signal test port of test equipment (130).
2. the test device of mast switch controller according to claim 1, which is characterized in that the signal lead includes
It is respectively connected to the three-phase voltage lead and three-phase current lead of the input side (121) of connecting terminal block (120);
Wherein, the three-phase voltage lead is used to draw the three-phase voltage signal of mast switch controller;The three-phase current draws
Line is used to draw the three-phase current signal of mast switch controller.
3. the test device of mast switch controller according to claim 2, which is characterized in that the connecting terminal block
(120) input side (121) is equipped with multiple input corresponding with the test signal type of mast switch controller port;
Each input port is correspondingly connected to three-phase voltage lead and three-phase current lead;
The multiple input port is for inputting different types of test signal.
4. the test device of mast switch controller according to claim 1, which is characterized in that further include be connected to it is described
Input connecting line between signal lead and the input side (121) of connecting terminal block (120);
The input connecting line is used to input the test signal that the signal lead is drawn, and the test signal is transmitted to wiring
The input side (121) of terminal block (120).
5. the test device of mast switch controller according to claim 4, which is characterized in that the input connecting line with
Using insulating tape package connection between signal lead.
6. the test device of mast switch controller according to claim 1, which is characterized in that further include be connected to it is described
Output connecting line between the outlet side (122) and test equipment (130) of connecting terminal block (120);
The output connecting line is used to the test signal of the outlet side (122) of connecting terminal block (120) being transmitted to test equipment
(130) corresponding signal test port.
7. according to the test device of claim 4 to 6 any one of them mast switch controller, which is characterized in that described defeated
Enter connecting line and output connecting line is all made of copper core.
8. the test device of mast switch controller according to claim 7, which is characterized in that the copper core, which uses, to be cut
Face specification limit is 1.5 to 2.5mm2Copper core.
9. the test device of mast switch controller according to claim 1, which is characterized in that the aviation plug
(110) it is aviation plug with the type matching of mast switch controller.
10. a kind of mast switch controller, which is characterized in that connection is wanted just like right on the aviation socket of mast switch controller
Seek the test device of 1 to 9 any one of them mast switch controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721889971.1U CN207833325U (en) | 2017-12-27 | 2017-12-27 | The test device and mast switch controller of mast switch controller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721889971.1U CN207833325U (en) | 2017-12-27 | 2017-12-27 | The test device and mast switch controller of mast switch controller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207833325U true CN207833325U (en) | 2018-09-07 |
Family
ID=63390595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721889971.1U Active CN207833325U (en) | 2017-12-27 | 2017-12-27 | The test device and mast switch controller of mast switch controller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207833325U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109342774A (en) * | 2018-10-09 | 2019-02-15 | 国网湖南省电力有限公司 | Interconnecting device is used in a kind of test of line feed terminals |
CN110877020A (en) * | 2019-11-18 | 2020-03-13 | 镇江宏联电工有限公司 | Wiring terminal strip test on-off test machine |
CN113985169A (en) * | 2021-10-26 | 2022-01-28 | 广东电网有限责任公司 | Relay test protection instrument and FTU's termination |
-
2017
- 2017-12-27 CN CN201721889971.1U patent/CN207833325U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109342774A (en) * | 2018-10-09 | 2019-02-15 | 国网湖南省电力有限公司 | Interconnecting device is used in a kind of test of line feed terminals |
CN110877020A (en) * | 2019-11-18 | 2020-03-13 | 镇江宏联电工有限公司 | Wiring terminal strip test on-off test machine |
CN110877020B (en) * | 2019-11-18 | 2024-04-30 | 镇江宏联电工有限公司 | Connecting terminal strip test on-off testing machine |
CN113985169A (en) * | 2021-10-26 | 2022-01-28 | 广东电网有限责任公司 | Relay test protection instrument and FTU's termination |
CN113985169B (en) * | 2021-10-26 | 2024-04-30 | 广东电网有限责任公司 | Wiring device of relay protection tester and FTU |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106841735B (en) | Electric power collector and energy consumption monitoring method thereof | |
CN207833325U (en) | The test device and mast switch controller of mast switch controller | |
CN104793101B (en) | A kind of transient state travelling wave Small Electric Current Earthing And Routing Device | |
CN104880652A (en) | Switch cabinet live-line partial discharge test system and voltage signal extraction device thereof | |
CN201327509Y (en) | High-voltage transmission line parameter measuring device and system thereof | |
CN207408579U (en) | Low-voltage platform area intelligent diagnosing instrument | |
CN104865471B (en) | Low-voltage electric cable pair verifies instrument | |
CN105510714A (en) | Intelligent substation pressure transmitter secondary automatic phase tester | |
CN205809199U (en) | A kind of Intellectual computer relay-protection tester | |
CN110672984A (en) | Portable direct current system ground fault detection device | |
CN204719085U (en) | A kind of electric energy quality test device being applicable to underground coal mine low voltage electric network | |
CN204142777U (en) | Voltage transformer (VT) calibrating termination | |
CN207516534U (en) | A kind of transformer station direct current system punching current transformer, which does not have a power failure, replaces capacity checking device | |
CN203259547U (en) | Wiring board for high-voltage electric test of transformer | |
CN206097451U (en) | Setting device of working a telephone switchboard is exempted from to messaging parameter | |
CN203086118U (en) | 10kV cable network feeder automation device | |
CN204832265U (en) | Following circuit breaker of 35KV and generating line loop resistance rapid survey termination | |
CN101661090A (en) | Through-flow tester of neutral point current transformer of transformer | |
CN204789879U (en) | Test system is put in electrified office of cubical switchboard and voltage signal extraction element thereof | |
CN104764951B (en) | A kind of detection platform and detection method of the APF of 380V voltage class | |
CN107202944A (en) | The global function automatic voltage withstanding experimental rig of electricity management terminal calibrating installation | |
CN209821264U (en) | Three-phase electric energy meter metering box and test system | |
CN106771841A (en) | A kind of through-flow system of transformer station S types and method | |
CN203054008U (en) | Special-purpose voltage transformer test wiring device | |
CN103630831B (en) | The check system of grounding direction protective relay |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200924 Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd. |
|
TR01 | Transfer of patent right |