CN207827400U - Aerated concrete finished product pallet automatic dispensing apparatus - Google Patents

Aerated concrete finished product pallet automatic dispensing apparatus Download PDF

Info

Publication number
CN207827400U
CN207827400U CN201820086427.1U CN201820086427U CN207827400U CN 207827400 U CN207827400 U CN 207827400U CN 201820086427 U CN201820086427 U CN 201820086427U CN 207827400 U CN207827400 U CN 207827400U
Authority
CN
China
Prior art keywords
lifting
rail set
cylinder
clamping device
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820086427.1U
Other languages
Chinese (zh)
Inventor
钟继
张跃祥
吴唐鹏
王天元
黄军
秦代连
王泽松
钟野
王学培
彭玉平
张勇
杜正伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Xinchang Hang Technology Co Ltd
Original Assignee
Guizhou Xinchang Hang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinchang Hang Technology Co Ltd filed Critical Guizhou Xinchang Hang Technology Co Ltd
Priority to CN201820086427.1U priority Critical patent/CN207827400U/en
Application granted granted Critical
Publication of CN207827400U publication Critical patent/CN207827400U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Specific Conveyance Elements (AREA)

Abstract

The utility model discloses a kind of aerated concrete finished product pallet automatic dispensing apparatus, including rack, elevating mechanism, clamping device, transport mechanism and control system, the elevating mechanism is fixed on rack, the elevating mechanism connect with clamping device and clamping device can be driven to lift, the transport mechanism is located at below clamping device, and the elevating mechanism, clamping device and transport mechanism are electrically connected with control system.The operation and action of elevating mechanism, clamping device and transport mechanism are controlled by using PLC control devices, make elevating mechanism, clamping device and transport mechanism through transport cooperation, to concrete finished product pallet input in a pile, it is clamped and promotes upper tray, one pallet in bottom is exported afterwards, to realize the automatic granting of concrete finished product pallet.It can save labour turnover, improve working efficiency.

Description

Aerated concrete finished product pallet automatic dispensing apparatus
Technical field
The utility model is related to air entrained concrete to produce and process field, more particularly to a kind of aerated concrete finished product pallet is certainly Dynamic dispensing apparatus.
Background technology
Air entrained concrete is all concrete for having added gas, including air-entrained concrete building block in a larger sense, and foam is mixed Solidifying soil and the concrete for having added air entraining agent.It is light with unit weight, heat-insulating property is high, sound-absorbing effect is good, certain intensity and Ke Jia The advantages that work is that China promotes and applies earliest, one of most popular light wall material.The concrete produced at Product need to convey storage stacking, and the concrete finished product after storage carries out outward transport sale after needing outbound to be packaged.In concrete product During storage or outbound, needs concrete finished product being placed on pallet and be conveyed by delivery track.Current support Disk is all to stack in a pile when not making, and again by being manually placed on delivery track when needing to use, manual operation workload is suitable Greatly, and it is inefficient.Application No. is 201710433857.6 Chinese patent, " the automatic of air-entrained concrete building block pallet divides pile defeated Send system ", it uses manipulator that pallet in a pile to be clamped one by one and moves back and forth to transfer out the transport system of pallet one by one. Although saving manpower than manual operation, manipulator is needed back and forth and is moved up and down, and transfer efficiency is not still high.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of aerated concrete finished product pallet of automation control from Dynamic dispensing apparatus.
One side according to the present utility model provides a kind of aerated concrete finished product pallet automatic dispensing apparatus, packet Including rack, elevating mechanism, clamping device, transport mechanism and control system, the elevating mechanism are fixed on rack, the elevator Structure connect with clamping device and clamping device can be driven to lift, and the transport mechanism is located at the lower section of clamping device, the lifting Mechanism, clamping device and transport mechanism are electrically connected with control system.Pallet in a pile can be distributed automatically as a result, defeated Go out the pallet granting, it can be achieved that rapidly and efficiently, save labour turnover, improves working efficiency.
In some embodiments, the elevating mechanism includes lifting cylinder, lifting support, guide cylinder and guide post, institute It states lifting cylinder and is fixed on rack, the free end of the lifting cylinder connect with lifting support and lifting support can be driven to lift, The guide cylinder is fixed on one end of guide post described in rack and is fixedly connected with lifting support, and the other end of the guide post passes through Wear guide cylinder.Pass through lifting cylinder as a result,
In some embodiments, the lifting cylinder include the first lifting cylinder and the second lifting cylinder, described first The tail end of lifting cylinder is fixed on rack, and the free end of first lifting cylinder is fixed with the tail end of the second lifting cylinder to be connected It connects, the free end of second lifting cylinder is connect with lifting support.Be arranged as a result, two lifting cylinders can to adjustable height into Row Discrete control extends the working range of elevating mechanism.
In some embodiments, the clamping device includes gripper cylinder and holding frame, the upper end of the holding frame with Lifting support is hinged, and the tail end and lifting support of the gripper cylinder are hinged, and free end and the holding frame of the gripper cylinder are cut with scissors It connects.It is with the articulated position of its other end and lifting support by one end of the flexible controllable holding frame of gripper cylinder as a result, Center rotating can carry out gripping operation to pallet.
In some embodiments, the gripper cylinder and holding frame are disposed as two and are symmetrically connected to lifting support Both ends.Symmetrical gripper cylinder and holding frame can be such that pallet uniform force, chucking power stablizes relatively as a result,.
In some embodiments, the transport mechanism includes the first rail set, the second rail set and third track Device, first rail set and the second rail set square crossing, the third rail set and the second rail set Output end connects, and second rail set is located at below clamping device.The whole pile support that the first rail set folds heap as a result, Disk is transported to will most by the second rail set after the second rail set, elevating mechanism and clamping device capture upper tray with merging A pallet is transported to third rail set below, after exported by third rail set.
In some embodiments, the control system includes PLC control devices, lifting sensing device, pan feeding induction dress Set and discharge sensing device, the lifting sensing device, pan feeding sensing device and discharging sensing device respectively with PLC control devices It is electrically connected, the lifting sensing device is installed on upper rack and, the pan feeding sensing device installation corresponding with elevating mechanism In the input terminal of the second rail set, the discharging sensing device is installed on the output end of the second rail set.Lifting sense as a result, It answers device that can incude the lifting position of elevating mechanism and sends a signal to PLC control devices, pan feeding sensing device and discharging incude Device can incude the transfer position of pallet and send a signal to PLC control devices, and PLC control devices are believed according to the position received Number, the operation and action of elevating mechanism, clamping device and transport mechanism are controlled, elevating mechanism, clamping device and transport mechanism are made Through transport coordinates to realize the automatic granting of concrete finished product pallet.
The beneficial effects of the utility model:By using PLC control devices control elevating mechanism, clamping device and conveyer The operation and action of structure make elevating mechanism, clamping device and transport mechanism through transport cooperation, defeated to concrete finished product pallet in a pile Enter, be clamped and promoted upper tray, after a bottom pallet is exported, to realize the automatic hair of concrete finished product pallet It puts.It can save labour turnover, improve working efficiency.
Description of the drawings
Fig. 1 is the structural representation of the aerated concrete finished product pallet automatic dispensing apparatus of one embodiment of the utility model Figure;
Fig. 2 is the clamping device part-structure schematic diagram of aerated concrete finished product pallet automatic dispensing apparatus shown in FIG. 1;
Fig. 3 is the transport mechanism part-structure schematic diagram of aerated concrete finished product pallet automatic dispensing apparatus shown in FIG. 1;
Fig. 4 is the structural representation of the aerated concrete finished product pallet automatic dispensing apparatus of another embodiment of the utility model Figure.
Specific implementation mode
Utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment 1
Fig. 1~Fig. 3 schematically show a kind of air entrained concrete of embodiment according to the present utility model a kind of at Product pallet automatic dispensing apparatus.
Referring to Fig.1, aerated concrete finished product pallet automatic dispensing apparatus include rack 1, elevating mechanism 2, clamping device 3, Transport mechanism 4 and control system.Elevating mechanism 2 is fixed on rack 1, and elevating mechanism 2 connect with clamping device 3 and can drive clamping Mechanism 3 lifts, and transport mechanism 4 is located at the lower section of clamping device 3, elevating mechanism 2, clamping device 3 and transport mechanism 4 with control System is electrically connected.Multiple pallets being stacked are sent to below clamping device by transport mechanism, and clamping device gripping removes All pallets outside a nethermost pallet are simultaneously promoted certain altitude, and transport mechanism transfers out a nethermost support Disk, rear grip mechanism put down all pallets, then grip all pallets in addition to a nethermost pallet and promoted certain Highly, transport mechanism transfers out a nethermost pallet again, and so cycle is until all pallets are conveyed out.Transport mechanism afterwards Next pile pallet is sent to below clamping device again, is repeated above operation.
Elevating mechanism 2 includes lifting cylinder 21, lifting support 22, guide cylinder 23, guide post 24 and lifting induction strut 25. 21 tail end of lifting cylinder is fixed on rack 1, and the free end of lifting cylinder 21 is downward and is fixedly connected with lifting support 22, lifting air Cylinder 21 is flexible can to drive lifting support 22 to lift.Guide cylinder 23 be fixed on one end of 1 guide post 24 of rack and with lifting support 22 It is fixedly connected, the other end of guide post 24 runs through guide cylinder 23.Guide post 24 may be configured as two and be individually fixed in lifting branch The both ends of frame 22, guide cylinder 23 are set as two and corresponding with two guide posts 24 respectively.It can drive and lift in lifting cylinder 21 Holder 22 ensures that lifting support 22 operates steadily during lifting.Drop induction strut 25 is fixed on the upper end of guide post 24 and can It is lifted with guide post 24.
Clamping device 3 includes gripper cylinder 31 and holding frame 32, and the upper end of holding frame 32 and lifting support 22 are hinged, clamping The tail end of cylinder 31 is hinged with lifting support 22, and the free end of gripper cylinder 31 and holding frame 32 are hinged.Gripper cylinder 31 and folder Hold the both ends that frame 32 is disposed as two and is symmetrically connected to lifting support 22.Symmetrical two holding frames 32 can be from the two of pallet End applies chucking power to pallet and clamps pallet.
With reference to Fig. 2, holding frame 32 includes two cross bars, 321, two montants 322 and two hooks 323.Two montants 322 Be individually fixed in the both ends of two cross bars 321, two hooks 323 are individually fixed in the lower ends of two montants 322, hook 323 with 322 perpendicular connection of montant.The upper end of montant 322 is hinged with holding frame 32, in gripper cylinder 31 and a wherein cross bar 321 Section is hinged.The hook 323 of two holding frames 32 is opposite, and the bottom of pallet can be hooked in holding tray, holding frame 32 is made to lift It can be held fixedly pallet during rising.
With reference to Fig. 3, transport mechanism 4 includes the first rail set 41, the second rail set 42 and third rail set 43.The 42 square crossing of one rail set 41 and the second rail set, the output end phase of third rail set 43 and the second rail set 42 It connects.Second rail set 42 is located at the lower section of clamping device 3.The whole pile pallet that heap is folded is transported to by the first rail set 41 Two rail sets 42, elevating mechanism 2 and clamping device 3 will be bottom by the second rail set 42 after capturing upper tray with merging One pallet is transported to third rail set 43, after exported by third rail set 43.First rail set 41 and the second track Device 42 is vertically arranged, it can be ensured that without departing from track side when whole pile pallet is transported to the second rail set 42, is avoided straight Wire type connects the case where being unable to control transfer position.
Second rail set 42 include motor 421, the first conveyer belt 422, the second conveyer belt 423, third conveyer belt 424, Lifting gear 425 and connecting seat 426.Motor 421 connect with the first conveyer belt 422 and the first conveyer belt 422 can be driven to run, the One conveyer belt 422 is connect by transmission mechanism with the second conveyer belt 423 and third conveyer belt 424 and can drive the second conveyer belt 423 and third conveyer belt 424 run simultaneously.Lifting gear 425 passes through connecting seat 426 and the first conveyer belt 422, the second conveyer belt 423 connect with third conveyer belt 424 and the first conveyer belt 422, the second conveyer belt 423 can be driven synchronous with third conveyer belt 424 Lifting.
First rail set 41 includes the first conveyor track 411 and the second conveyor track 412 of two synchronous operation.First conveying For the output end of rail 411 between the first conveyer belt 422 and the second conveyer belt 423, the output end of the second conveyor track 412 is located at the Between two conveyer belts 423 and third conveyer belt 424.When the first rail set 41 is run, the upside of the second rail set 42 is low In the upside of the first rail set 41, whole pile pallet can be transported to the top of the second rail set 42 by the first rail set 41. After clamping device 3 grips upper tray, the lifting gear 425 of the second rail set 42 rises the second rail set 42 of lifting First conveyer belt 422, the second conveyer belt 423 and third conveyer belt 424, rear first conveyer belt 422, the second conveyer belt 423 and The synchronous operation of three conveyer belts 424 by a bottom pallet be transported to third rail set 43 and by third rail set 43 it is defeated Go out.
Control system includes PLC control devices, lifting sensing device, pan feeding sensing device 51 and discharging sensing device 52. PLC control devices, which can be arranged, automatically controls and manually controls two modules, and whole automatic control can be carried out to conveying and distribution procedure System, also can manually control each course of work respectively, staff is facilitated to operate.
First rail set of the lifting cylinder 21 of elevating mechanism 2, the gripper cylinder 31 of clamping device 3, transport mechanism 4 41, the second rail set 42 and third rail set 43 are electrically connected respectively with PLC control devices and by PLC control device controls System.Sensing device, pan feeding sensing device 51 and discharging sensing device 52 is lifted to be electrically connected with PLC control devices respectively.
Lifting sensing device is installed on 1 top of rack and correspondings with elevating mechanism 2, and lifting sensing device includes first incuding Device 53, the second inductor 54 and third inductor 55, the second inductor 54 and third inductor 55 can respectively with the first inductor 53 are incuded.First inductor 53 is fixed on 1 top of rack, and the second inductor 54 and third inductor 55 are spaced apart It is fixed on lifting induction strut 25 and operation can be lifted with lifting induction strut 25.When elevating mechanism 2 rises, the first induction Device 53 is corresponding with the second inductor 54, and when elevating mechanism 2 declines, the first inductor 53 is corresponding with third inductor 55.It can be accurate The really lifting position of induction elevating mechanism 2.
Pan feeding sensing device 51 is installed on the input terminal of the second rail set 42, and discharging sensing device 52 is installed on the second rail The output end of road device 42.Pan feeding sensing device 51 and discharging sensing device 52 can incude outputting and inputting for pallet.
It is placed on the first rail set 41 of transport mechanism 4 in use, being about to whole pile pallet, clamping device 3, which is in, to be opened Open state.Pallet is transported to 42 top of the second rail set i.e. lower section of clamping device 3 by the first rail set 41.Pan feeding incudes Device 51 senses that pallet is admitted to after concurrent OFF signal gives PLC control devices, PLC control devices to receive signal and sends control letter Number controlling lifting cylinder 21 to elevating mechanism 2 and stretch out makes 22 downlink of lifting support and drives to be connected to the clamping machine of lifting support 22 3 downlink of structure.When elevating mechanism 2 goes downwards to precalculated position, the first inductor 53 and third inductor 55 of sensing device are lifted Corresponding to incude and send a signal to PLC control devices, PLC control devices send control signals to the control clamping gas of clamping device 3 Cylinder 31, which is retracted, drives holding frame 32 to live all pallets in addition to a bottom pallet, rear PLC controls dress from pallet sandwich It sets the control rising of elevating mechanism 2 and lifts pallet.The second rail set 42 that PLC control devices control transport mechanism 4 again rises simultaneously Operation exports pallet after conveying pallet to third rail set 43.PLC control devices control elevating mechanism 2 is clamped after declining afterwards Mechanism 3 decontrols pallet, and all pallets in addition to a bottom pallet, weight are clamped by clamping device 3 after the rising of elevating mechanism 2 Multiple above-mentioned steps are until pallet is all exported one by one.Automatically output can be distributed to pallet in a pile, it can be achieved that quickly high The pallet granting of effect, saves labour turnover, and improves working efficiency.
Embodiment 2
Fig. 4 schematically shows a kind of a kind of aerated concrete finished product pallet of embodiment according to the present utility model Automatic dispensing apparatus.
With reference to Fig. 4, aerated concrete finished product pallet automatic dispensing apparatus include rack 1, elevating mechanism 2, clamping device 3, Transport mechanism 4 and control system.Elevating mechanism 2 is fixed on rack 1, and elevating mechanism 2 connect with clamping device 3 and can drive clamping Mechanism 3 lifts, and transport mechanism 4 is located at the lower section of clamping device 3, elevating mechanism 2, clamping device 3 and transport mechanism 4 with control System is electrically connected.
Elevating mechanism 2 includes lifting cylinder 21, lifting support 22, guide cylinder 23, guide post 24 and lifting induction strut 25. 21 tail end of lifting cylinder is fixed on rack 1, and the free end of lifting cylinder 21 is downward and is fixedly connected with lifting support 22, lifting air Cylinder 21 is flexible can to drive lifting support 22 to lift.Guide cylinder 23 be fixed on one end of 1 guide post 24 of rack and with lifting support 22 It is fixedly connected, the other end of guide post 24 runs through guide cylinder 23.Guide post 24 may be configured as two and be individually fixed in lifting branch The both ends of frame 22, guide cylinder 23 are set as two and corresponding with two guide posts 24 respectively.It can drive and lift in lifting cylinder 21 Holder 22 ensures that lifting support 22 operates steadily during lifting.Drop induction strut 25 is fixed on the upper end of guide post 24 and can It is lifted with guide post 24.
Lifting cylinder 21 includes the first lifting cylinder 211 and the second lifting cylinder 212.The tail end of first lifting cylinder 211 It is fixed on rack 1, the free end of the first lifting cylinder 211 is fixedly connected with the tail end of the second lifting cylinder 212, the second lifting air The free end of cylinder 212 is fixedly connected with lifting support 22.The stroke of lifting support 22 can be expanded using two lifting cylinder series connection Range.
Clamping device 3 includes gripper cylinder 31 and holding frame 32, and the upper end of holding frame 32 and lifting support 22 are hinged, clamping The tail end of cylinder 31 is hinged with lifting support 22, and the free end of gripper cylinder 31 and holding frame 32 are hinged.Gripper cylinder 31 and folder Hold the both ends that frame 32 is disposed as two and is symmetrically connected to lifting support 22.Symmetrical two holding frames 32 can be from the two of pallet End applies chucking power to pallet and clamps pallet.
Holding frame 32 includes two cross bars, 321, two montants 322 and two hooks 323.Two montants 322 are fixed respectively In the both ends of two cross bars 321, two hooks 323 are individually fixed in the lower end of two montants 322, and hook 323 is in montant 322 Vertical connection.The upper end of montant 322 is hinged with holding frame 32, and gripper cylinder 31 and the stage casing of wherein one cross bar 321 are hinged.Two The hook 323 of a holding frame 32 is opposite, and the bottom of pallet can be hooked in holding tray, makes energy during lifting of holding frame 32 Enough it is held fixedly pallet.
Transport mechanism 4 includes the first rail set 41, the second rail set 42 and third rail set 43.First track fills 41 and 42 square crossing of the second rail set are set, third rail set 43 connects with the output end of the second rail set 42.Second Rail set 42 is located at the lower section of clamping device 3.The whole pile pallet that heap is folded is transported to the second track by the first rail set 41 Device 42, elevating mechanism 2 and clamping device 3 are held in the palm bottom one by the second rail set 42 after matching merging crawl upper tray Disk is transported to third rail set 43, after exported by third rail set 43.First rail set 41 and the second rail set 42 It is vertically arranged, it can be ensured that without departing from track side when whole pile pallet is transported to the second rail set 42, avoid linear phase Connect the case where being unable to control transfer position.
Second rail set 42 include motor 421, the first conveyer belt 422, the second conveyer belt 423, third conveyer belt 424, Lifting gear 425 and connecting seat 426.Motor 421 connect with the first conveyer belt 422 and the first conveyer belt 422 can be driven to run, the One conveyer belt 422 is connect by transmission mechanism with the second conveyer belt 423 and third conveyer belt 424 and can drive the second conveyer belt 423 and third conveyer belt 424 run simultaneously.Lifting gear 425 passes through connecting seat 426 and the first conveyer belt 422, the second conveyer belt 423 connect with third conveyer belt 424 and the first conveyer belt 422, the second conveyer belt 423 can be driven synchronous with third conveyer belt 424 Lifting.
First rail set 41 includes the first conveyor track 411 and the second conveyor track 412 of two synchronous operation.First conveying For the output end of rail 411 between the first conveyer belt 422 and the second conveyer belt 423, the output end of the second conveyor track 412 is located at the Between two conveyer belts 423 and third conveyer belt 424.When the first rail set 41 is run, the upside of the second rail set 42 is low In the upside of the first rail set 41, whole pile pallet can be transported to the top of the second rail set 42 by the first rail set 41. After clamping device 3 grips upper tray, the lifting gear 425 of the second rail set 42 rises the second rail set 42 of lifting First conveyer belt 422, the second conveyer belt 423 and third conveyer belt 424, rear first conveyer belt 422, the second conveyer belt 423 and The synchronous operation of three conveyer belts 424 by a bottom pallet be transported to third rail set 43 and by third rail set 43 it is defeated Go out.
Control system includes PLC control devices, lifting sensing device, pan feeding sensing device 51 and discharging sensing device 52. PLC control devices, which can be arranged, automatically controls and manually controls two modules, and whole automatic control can be carried out to conveying and distribution procedure System, also can manually control each course of work respectively, staff is facilitated to operate.
First rail set of the lifting cylinder 21 of elevating mechanism 2, the gripper cylinder 31 of clamping device 3, transport mechanism 4 41, the second rail set 42 and third rail set 43 are electrically connected respectively with PLC control devices and by PLC control device controls System.Sensing device, pan feeding sensing device 51 and discharging sensing device 52 is lifted to be electrically connected with PLC control devices respectively.
Lifting sensing device is installed on 1 top of rack and correspondings with elevating mechanism 2, and lifting sensing device includes first incuding Device 53, the second inductor 54 and third inductor 55, the second inductor 54 and third inductor 55 can respectively with the first inductor 53 are incuded.First inductor 53 is fixed on 1 top of rack, and the second inductor 54 and third inductor 55 are spaced apart It is fixed on lifting induction strut 25 and operation can be lifted with lifting induction strut 25.When elevating mechanism 2 rises, the first induction Device 53 is corresponding with the second inductor 54, and when elevating mechanism 2 declines, the first inductor 53 is corresponding with third inductor 55.It can be accurate The really lifting position of induction elevating mechanism 2.
Pan feeding sensing device 51 is installed on the input terminal of the second rail set 42, and discharging sensing device 52 is installed on third rail The input terminal of road device 43.Pan feeding sensing device 51 and discharging sensing device 52 can incude outputting and inputting for pallet.Finally answer What is illustrated is:Above-described each embodiment is merely to illustrate the technical solution of the utility model, rather than its limitations;Although ginseng The utility model is described in detail according to previous embodiment, it will be understood by those of ordinary skill in the art that:It is still It can modify to the technical solution recorded in previous embodiment, or which part or all technical features are equal It replaces;And these modifications or substitutions, various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution Range.

Claims (7)

1. a kind of aerated concrete finished product pallet automatic dispensing apparatus, it is characterised in that:Including rack (1), elevating mechanism (2), Clamping device (3), transport mechanism (4) and control system, the elevating mechanism (2) are fixed on rack (1), the elevating mechanism (2) it is connect with clamping device (3) and clamping device (3) can be driven to lift, the transport mechanism (4) is located at clamping device (3) Lower section, the elevating mechanism (2), clamping device (3) and transport mechanism (4) are electrically connected with control system.
2. aerated concrete finished product pallet automatic dispensing apparatus according to claim 1, it is characterised in that:The elevator Structure (2) includes lifting cylinder (21), lifting support (22), guide cylinder (23) and guide post (24), and the lifting cylinder (21) is solid It is connect with lifting support (22) due to the free end of rack (1), the lifting cylinder (21) and lifting support (22) can be driven to rise Drop, the guide cylinder (23) are fixed on one end of rack (1) guide post (24) and are fixedly connected with lifting support (22), institute The other end for stating guide post (24) runs through guide cylinder (23).
3. aerated concrete finished product pallet automatic dispensing apparatus according to claim 2, it is characterised in that:The lifting air Cylinder (21) includes the first lifting cylinder (211) and the second lifting cylinder (212), and the tail end of first lifting cylinder (211) is solid It is fixedly connected with the tail end of the second lifting cylinder (212) due to the free end of rack (1), first lifting cylinder (211), institute The free end for stating the second lifting cylinder (212) is connect with lifting support (22).
4. aerated concrete finished product pallet automatic dispensing apparatus according to claim 1,2 or 3, it is characterised in that:It is described Clamping device (3) includes gripper cylinder (31) and holding frame (32), and upper end and the lifting support (22) of the holding frame (32) are cut with scissors It connects, the tail end and lifting support (22) of the gripper cylinder (31) are hinged, the free end of the gripper cylinder (31) and holding frame (32) hinged.
5. aerated concrete finished product pallet automatic dispensing apparatus according to claim 4, it is characterised in that:The clamping gas Cylinder (31) and holding frame (32) are disposed as two and are symmetrically connected to the both ends of lifting support (22).
6. aerated concrete finished product pallet automatic dispensing apparatus according to claim 1, it is characterised in that:The conveyer Structure (4) includes the first rail set (41), the second rail set (42) and third rail set (43), first rail set (41) with the second rail set (42) square crossing, the output end of the third rail set (43) and the second rail set (42) Connect, second rail set (42) is located at below clamping device (3).
7. aerated concrete finished product pallet automatic dispensing apparatus according to claim 6, it is characterised in that:The control system System includes PLC control devices, lifting sensing device, pan feeding sensing device 51 and discharging sensing device 52, the lifting induction dress It sets, pan feeding sensing device 51 and discharging sensing device 52 are electrically connected with PLC control devices respectively, the lifting sensing device peace Loaded on rack (1) top and corresponding with elevating mechanism (2), the pan feeding sensing device 51 is installed on the second rail set (42) Input terminal, the discharging sensing device 52 are installed on the output end of the second rail set (42).
CN201820086427.1U 2018-01-18 2018-01-18 Aerated concrete finished product pallet automatic dispensing apparatus Expired - Fee Related CN207827400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820086427.1U CN207827400U (en) 2018-01-18 2018-01-18 Aerated concrete finished product pallet automatic dispensing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820086427.1U CN207827400U (en) 2018-01-18 2018-01-18 Aerated concrete finished product pallet automatic dispensing apparatus

Publications (1)

Publication Number Publication Date
CN207827400U true CN207827400U (en) 2018-09-07

Family

ID=63393674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820086427.1U Expired - Fee Related CN207827400U (en) 2018-01-18 2018-01-18 Aerated concrete finished product pallet automatic dispensing apparatus

Country Status (1)

Country Link
CN (1) CN207827400U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108190535A (en) * 2018-01-18 2018-06-22 贵州新畅航科技有限公司 Aerated concrete finished product pallet automatic dispensing apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108190535A (en) * 2018-01-18 2018-06-22 贵州新畅航科技有限公司 Aerated concrete finished product pallet automatic dispensing apparatus

Similar Documents

Publication Publication Date Title
CN105667878A (en) Automatic marshalling and binning device and binning method of small packaging boxes
CN106315216A (en) Automatic stacker for trays
CN212739692U (en) Automatic feeding and discharging device for material tray
CN102267136A (en) Manipulator used for denitration honeycomb ceramic catalyst production
CN207827400U (en) Aerated concrete finished product pallet automatic dispensing apparatus
CN209768658U (en) Disinfection feeding line for young silkworm breeding
CN207511403U (en) A kind of automatic arranging feeding manipulator for packing tin for foodstuff production
CN112824261A (en) Automatic unloader that goes up of two groups of trays
CN208932541U (en) A kind of stacking material frame automatic conveying device
CN108190535A (en) Aerated concrete finished product pallet automatic dispensing apparatus
CN211253964U (en) Automatic unloader that goes up of two groups of trays
CN210882828U (en) Automatic middle package machine for wet tissues
CN209455068U (en) Hollow brick automatically loads and unloads, is packaged integral system
CN209507104U (en) Sample shelf apparatus suitable for automatic loading/unloading
CN212531450U (en) Brick hacking machine permeates water
CN109484694A (en) Hollow brick automatically loads and unloads, is packaged integral system
CN214358766U (en) Working table frame with material conveying and reversing functions
CN205971990U (en) Multi -functional pencil packing plant
CN212953134U (en) Stacking mechanism of stacker crane
CN208217105U (en) A kind of mechanism packed automatically for Ceramic Tiles box foam type
CN207129623U (en) Chopsticks sorting equipment
CN202448192U (en) Automatic plate skin receiving machine
CN206126095U (en) A production line for inciting somebody to action EPS cystosepiment is automatic to be carried
CN216613096U (en) Feeding structure for shuttle machine
CN204872610U (en) Saline and alkaline conveyer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907

Termination date: 20200118