CN207812699U - A kind of waterproof construction on toilet doorway - Google Patents
A kind of waterproof construction on toilet doorway Download PDFInfo
- Publication number
- CN207812699U CN207812699U CN201820088082.3U CN201820088082U CN207812699U CN 207812699 U CN207812699 U CN 207812699U CN 201820088082 U CN201820088082 U CN 201820088082U CN 207812699 U CN207812699 U CN 207812699U
- Authority
- CN
- China
- Prior art keywords
- toilet
- layer
- passageway
- coat
- screed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model proposes a kind of waterproof constructions on toilet doorway, belong to interior decoration design technical field, solve the problems, such as that the water-proofing treatment of common accomodation ground cannot prevent water in ground each interregional mutually flee infiltration and causes to be easy leak, including accomodation ground and passageway ground, accomodation ground includes successively from bottom to top:Bathroom floor layer, toilet backfill layer, toilet sloping layer, toilet screed-coat and toilet paving layer;Passageway ground includes successively from bottom to top:Passageway floor layer, passageway screed-coat and passageway paving layer;Height of the height of passageway paving layer higher than toilet paving layer, the dark bank of sealing being provided with above the floor layer of passageway between toilet screed-coat and passageway screed-coat, the dark bank upper surface of sealing is provided with slope surface, height of the slope surface close to toilet screed-coat one end is less than the height close to passageway screed-coat one end, achievees the purpose that prevent water is each in ground interregional mutually to flee infiltration and drainage occur.
Description
Technical field
The utility model is related to interior decoration design technical field, more particularly to a kind of waterproof construction on toilet doorway.
Background technology
Currently, in toilet construction waterproof field, bottom waterproof is focused in construction.Existing toilet waterproof method, be
Building molding after, first accomodation ground is carried out with cement mortar it is levelling, screed-coat naturally do after, then on it smearing waterproof material
Material, then the making cement mortar cover on waterproof layer, finally carries out decoration surface construction, can prevent water from leaking to lower layer in this way.
However, the characteristic of water is not only only toward flowing down, water can also be to horizontal direction scattering and permeating.There is no anti-for existing water-proofing treatment
Each interregional effect for mutually fleeing infiltration of sealing in the plane, waterproof effect is bad, is susceptible to drainage.
Utility model content
The purpose of this utility model is to provide a kind of waterproof construction on toilet doorway, by the way that the dark bank of sealing is arranged, solves
The problem of water interpenetrates more than waterproof layer, has the advantages that water resistance is good.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of toilet doorway
Waterproof construction, including accomodation ground and passageway ground, the accomodation ground include successively from bottom to top:Bathroom floor
Layer, toilet backfill layer, toilet sloping layer, toilet screed-coat, toilet adhered layer and toilet paving layer;The passageway
Ground includes successively from bottom to top:Passageway floor layer, passageway screed-coat, passageway adhered layer and passageway paving layer;The passageway paving
The height of face layer is higher than the height of toilet paving layer, is provided with positioned at the toilet above the passageway floor layer
The dark bank of sealing between screed-coat and the passageway screed-coat, the dark bank upper surface of sealing are provided with slope surface, and the slope surface is leaned on
The height of nearly toilet screed-coat one end is less than the height close to passageway screed-coat one end.
By using above-mentioned technical proposal, the dark bank of sealing is set between toilet screed-coat and passageway screed-coat, can be prevented
Only the moisture in toilet screed-coat laterally leaks into passageway screed-coat, and the slope surface on the dark bank of sealing is into toilet screed-coat
It tilts, makes to flow back under the effect of gravity after the Water deep leaching to the dark bank slope surface of sealing in toilet screed-coat levelling to toilet
Layer, improves the water resistance of the dark bank of sealing.
The further setting of the utility model, the dark bank of sealing and the toilet screed-coat, the passageway screed-coat
Between be provided with the first waterproof layer.
By using above-mentioned technical proposal, the first waterproof layer has the function of waterproof, moisture resistance, cracking resistance, impervious, can effectively carry
The water-impervious function of the high dark bank of sealing.
The further setting of the utility model, the dark bank of sealing are poured by pea gravel concreten.
By using above-mentioned technical proposal, the compactness of this dark bank of sealing is high, and water permeability resistance can be more preferable.
The further setting of the utility model, the passageway paving layer are provided with close to the part of toilet paving layer
Threshold stone, the gap glass cement closing between the threshold stone and toilet paving layer are formed with glass cement sealing knot
Structure.
By using above-mentioned technical proposal, the setting of glass glue sealing structure makes the moisture of toilet paving layer surface be not easy
It is leaked into toilet screed-coat by the gap between threshold stone and toilet paving layer.
The further setting of the utility model, the threshold stone are provided at the position of the glass glue sealing structure
Inclined-plane, glass glue sealing structure include the first glass cement being adhesive between the toilet paving layer and the threshold stone side wall
Sealant;And it is adhesive in the second glass cement sealant above the first glass cement sealant between inclined-plane.
By using above-mentioned technical proposal, what this first glass cement sealant and the second glass cement sealant were composed
The bond area bigger of glass glue sealing structure and threshold stone, bonding force is stronger, and glass glue sealing structure is not susceptible to fall off, into
One step keeps water resistance between threshold stone and toilet paving layer more preferable.
The further setting of the utility model is provided with two between the toilet backfill layer and the bathroom floor layer
Secondary waterproof layer.
By using above-mentioned technical proposal, secondary waterproof layer has the function of waterproof, impervious, improves bathroom floor layer
Water permeability resistance energy.
The further setting of the utility model is provided with waterproof between the secondary waterproof layer and toilet backfill layer
Protective layer.
By using above-mentioned technical proposal, fish tail and waterproof layer shields to secondary waterproof layer, prevents in work progress
The destruction caused by secondary waterproof layer.
The further setting of the utility model, the toilet screed-coat are formed by dry cement mortar solidification.
By using above-mentioned technical proposal, the ratio of mud of dry cement mortar itself is smaller, and Mortar shrinkage deformation is small, defends
The hardening time of screed-coat is short between life, and flatness is good.
In conclusion the utility model has the advantages that:
The dark bank of sealing is set between toilet screed-coat and passageway screed-coat, the moisture in toilet screed-coat can be prevented
Passageway screed-coat laterally is leaked into, and the slope surface on the dark bank of sealing is tilted to toilet screed-coat, makes in toilet screed-coat
Water deep leaching to the dark bank slope surface of sealing after flowed back under the effect of gravity to toilet screed-coat, improve the waterproof of the dark bank of sealing
Performance.
Description of the drawings
Fig. 1 is the cross-section diagram of toilet door floor in the utility model embodiment.
Reference numeral:1, accomodation ground;11, bathroom floor layer;12, toilet backfills layer;13, slope is looked in toilet
Layer;14, toilet screed-coat;15, toilet adhered layer;16, toilet paving layer;17, secondary waterproof layer;18, waterproofing protection
Layer;2, passageway ground;21, passageway floor layer;22, passageway screed-coat;23, passageway adhered layer;24, passageway paving layer;3, sealing
Dark bank;4, the first waterproof layer;5, threshold stone;51, inclined-plane;6, glass glue sealing structure;61, the first glass cement sealant;62,
Two glass cement sealants.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:A kind of waterproof construction on toilet doorway, as shown in Figure 1, including accomodation ground 1 and passageway ground 2.
Accomodation ground 1 includes bathroom floor layer 11, and being backfilled with toilet with haydite on bathroom floor layer 11 backfills
Layer 12, toilet backfill and are formed with toilet sloping layer 13 with cement mortar plastering on layer 12, used on toilet sloping layer 13 dry
Hydraulic cement mortar has been formed by curing toilet screed-coat 14, and toilet screed-coat 14 is formed by dry cement mortar solidification,
14 hardening time of toilet screed-coat of this way is short, flatness is good, and screed-coat 14 top in toilet is pasted by toilet
Layer 15 is bonded with toilet paving layer 16, and toilet paving layer 16 is ceramic tile.Toilet backfills layer 12 and bathroom floor layer 11
Between be equipped with secondary waterproof layer 17, secondary waterproof layer 17 has the function of waterproof, impervious, improves bathroom floor layer 11
Water permeability resistance energy.It is provided with fish tail and waterproof layer 18 between secondary waterproof layer 17 and toilet backfill layer 12, fish tail and waterproof layer 18 is right
Secondary waterproof layer 17 shields, and prevents in haydite backfilling process to destruction caused by secondary waterproof layer 17.
Passageway ground 2 includes passageway floor layer 21, and the height of passageway floor layer 21 is higher than the height of bathroom floor layer 11,
Floor layer 21 upper end cement mortar plastering in passageway is formed with passageway screed-coat 22, and screed-coat 22 top in passageway is pasted by passageway
Layer 23 is bonded with passageway paving layer 24, and the height of passageway paving layer 24 is higher than the height of toilet paving layer 16.
The top of passageway floor layer 21 poured by pea gravel concreten be formed with it is levelling positioned at toilet screed-coat 14 and passageway
The setting of the dark bank 3 of sealing between layer 22, the dark bank of sealing 3 can prevent the moisture in toilet screed-coat 14 from laterally leaking into passageway
Screed-coat 22.The upper surface of the dark bank of sealing 3 is provided with slope surface, and height of the slope surface close to 14 one end of toilet screed-coat is less than close
The slope surface of the height of 22 one end of passageway screed-coat, the dark bank of sealing 3 is tilted to toilet screed-coat 14, makes toilet screed-coat 14
It is flowed back under the effect of gravity to toilet screed-coat 14 after interior Water deep leaching to dark 3 slope surface of bank of sealing, improves the dark bank of sealing 3
Water resistance.
It is equipped with the first waterproof layer 4 between the dark bank 3 of sealing and toilet screed-coat 14, passageway screed-coat 22.First waterproof
4 itself waterproof of layer, moisture resistance, cracking resistance, impervious performance are good, improve the water-impervious function of the dark bank of sealing 3.
Passageway paving layer 24 is provided with threshold stone 5, threshold stone 5 and toilet paving close to the part of toilet paving layer 16
Gap glass cement closing between layer 16 is formed with glass glue sealing structure 6, and the setting of glass glue sealing structure 6 makes toilet
The moisture of paving 16 upper surface of layer not easily passs through the gap between threshold stone 5 and toilet paving layer 16 to toilet screed-coat 14
Interior leakage.
Threshold stone 5 is provided with inclined-plane 51 at the position of glass glue sealing structure 6, and glass glue sealing structure 6 includes glue
Viscous the first glass cement sealant 61 being solidificated between toilet paving layer 16 and 5 side wall of threshold stone;And adhesive curing is
The second glass cement sealant 62 between one glass cement sealant, 61 top and inclined-plane 51.This first glass cement sealant, 61 He
The bond area bigger of glass glue sealing structure 6 that second glass cement sealant 62 is composed and threshold stone 5, bonding force are more
By force, glass glue sealing structure 6 is not susceptible to fall off, further make threshold stone 5 and toilet paving layer 16 between water resistance more
It is good.
The course of work and principle:The dark bank 3 of sealing is set between toilet screed-coat 14 and passageway screed-coat 22, can be prevented
Moisture in toilet screed-coat 14 laterally leaks into passageway screed-coat 22, and the slope surface on the dark bank of sealing 3 is levelling to toilet
Layer is 14 tilted, makes to flow back under the effect of gravity after the Water deep leaching to dark 3 slope surface of bank of sealing in toilet screed-coat 14 to defending
Screed-coat 14 between life improve the water resistance of the dark bank of sealing 3.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as all being protected by Patent Law in the right of the utility model.
Claims (8)
1. a kind of waterproof construction on toilet doorway, including accomodation ground (1) and passageway ground (2), which is characterized in that
The accomodation ground (1) includes successively from bottom to top:Bathroom floor layer (11), toilet backfill layer (12), health
Between sloping layer (13), toilet screed-coat (14), toilet adhered layer (15) and toilet paving layer (16);
The passageway ground (2) include successively from bottom to top:Passageway floor layer (21), passageway screed-coat (22), passageway adhered layer
(23) and passageway paving layer (24);
The height of the passageway paving layer (24) is higher than the height of toilet paving layer (16),
It is provided with above the passageway floor layer (21) positioned at the toilet screed-coat (14) and the passageway screed-coat
(22) the dark bank of sealing (3) between, the dark bank of sealing (3) upper surface are provided with slope surface, and the slope surface is close to the toilet
The height of screed-coat (14) one end is less than the height close to described passageway screed-coat (22) one end.
2. a kind of waterproof construction on toilet doorway according to claim 1, which is characterized in that the dark bank of sealing (3)
It is provided with the first waterproof layer (4) between the toilet screed-coat (14), the passageway screed-coat (22).
3. a kind of waterproof construction on toilet doorway according to claim 1, which is characterized in that the dark bank of sealing (3)
It is poured by pea gravel concreten.
4. a kind of waterproof construction on toilet doorway according to claim 1, which is characterized in that the passageway paving layer
(24) part of toilet paving layer (16) is provided with threshold stone (5), the threshold stone (5) and toilet paving
Gap glass cement closing between face layer (16) is formed with glass glue sealing structure (6).
5. a kind of waterproof construction on toilet doorway according to claim 4, which is characterized in that the threshold stone (5) is leaned on
Inclined-plane (51) is provided at the position of the nearly glass glue sealing structure (6), glass glue sealing structure (6) is described including being adhesive in
The first glass cement sealant (61) between layer (16) and the threshold stone (5) side wall of toilet paving;And it is adhesive in first
The second glass cement sealant (62) above glass cement sealant (61) between inclined-plane (51).
6. a kind of waterproof construction on toilet doorway according to claim 5, which is characterized in that the toilet backfills layer
(12) secondary waterproof layer (17) is provided between the bathroom floor layer (11).
7. a kind of waterproof construction on toilet doorway according to claim 6, which is characterized in that the secondary waterproof layer
(17) it is provided with fish tail and waterproof layer (18) between toilet backfill layer (12).
8. a kind of waterproof construction on toilet doorway according to claim 1, which is characterized in that the toilet screed-coat
(14) it is formed by dry cement mortar solidification.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820088082.3U CN207812699U (en) | 2018-01-18 | 2018-01-18 | A kind of waterproof construction on toilet doorway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820088082.3U CN207812699U (en) | 2018-01-18 | 2018-01-18 | A kind of waterproof construction on toilet doorway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207812699U true CN207812699U (en) | 2018-09-04 |
Family
ID=63324027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820088082.3U Expired - Fee Related CN207812699U (en) | 2018-01-18 | 2018-01-18 | A kind of waterproof construction on toilet doorway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207812699U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962798A (en) * | 2021-02-07 | 2021-06-15 | 深圳瑞和建筑装饰股份有限公司 | Indoor toilet water stop structure and construction method |
CN114277945A (en) * | 2021-12-01 | 2022-04-05 | 中国五冶集团有限公司 | Construction method for preventing moisture on ground of outer side wall of toilet door |
-
2018
- 2018-01-18 CN CN201820088082.3U patent/CN207812699U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962798A (en) * | 2021-02-07 | 2021-06-15 | 深圳瑞和建筑装饰股份有限公司 | Indoor toilet water stop structure and construction method |
CN114277945A (en) * | 2021-12-01 | 2022-04-05 | 中国五冶集团有限公司 | Construction method for preventing moisture on ground of outer side wall of toilet door |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106544961A (en) | A kind of distress in concrete blocking method | |
CN104988955B (en) | The anti-row's convolution waterproof system of ultra-deep basement and construction method | |
CN109488371B (en) | Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method | |
CN207812699U (en) | A kind of waterproof construction on toilet doorway | |
CN108755319A (en) | A kind of road construction method and the road built using the engineering method | |
CN109750758A (en) | The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched | |
CN102839691B (en) | Quick sealing method and device for sandless cement pipe deep well dewatering wellhead | |
CN110359957A (en) | A kind of dam body connection structure and its construction method | |
CN108755979A (en) | A kind of toilet moistureproof and waterproof processing method | |
CN204982908U (en) | Elevartor shaft deep basal pit seepage prevention structure | |
CN108547260A (en) | A kind of full library basin Anti-seeping technology structure of karst area and construction method | |
CN105178364B (en) | Underground building light precipitation well point post-cast strip anti-seepage construction method | |
CN208380085U (en) | The draining pipe-through floor slab structure of a kind of ground leak | |
CN106320502A (en) | Seepage-proofing compound floor drain and construction method thereof | |
CN107675811B (en) | Bathroom waterproof system and construction method | |
CN208668952U (en) | A kind of kitchen drainage standpipe through-flooring structure | |
CN204080750U (en) | Box-type suction foundation sluice structure | |
CN208455573U (en) | A kind of full library basin Anti-seeping technology structure of karst area | |
CN104818835B (en) | Toilet threshold stone waterproof structure and construction method | |
CN208167997U (en) | Waterproof construction at a kind of toilet threshold | |
CN211773666U (en) | Spillway bottom plate concrete penetrating crack chemical grouting hole arrangement structure | |
CN206204969U (en) | Reservoir submerges area's brick mixed building terrace lift structure | |
CN109763457B (en) | Dam body structure of underground reservoir and construction method thereof | |
CN207988425U (en) | A kind of moisture-proof ground of rubble drainage layer | |
CN207295866U (en) | Caisson of toilet secondary drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180904 Termination date: 20190118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |