CN206204969U - Reservoir submerges area's brick mixed building terrace lift structure - Google Patents

Reservoir submerges area's brick mixed building terrace lift structure Download PDF

Info

Publication number
CN206204969U
CN206204969U CN201621290679.3U CN201621290679U CN206204969U CN 206204969 U CN206204969 U CN 206204969U CN 201621290679 U CN201621290679 U CN 201621290679U CN 206204969 U CN206204969 U CN 206204969U
Authority
CN
China
Prior art keywords
brick mixed
mixed building
reservoir
barricade
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621290679.3U
Other languages
Chinese (zh)
Inventor
黄竟强
陈静
董世海
刘雨
彭丹
刘德英
刘丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201621290679.3U priority Critical patent/CN206204969U/en
Application granted granted Critical
Publication of CN206204969U publication Critical patent/CN206204969U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model is related to a kind of reservoir submergence area's brick mixed building terrace lift structure.The utility model includes brick mixed building that number of floor levels is at least two-layer, the surrounding of brick mixed building builds the barricade of stone masonry or concrete structure by laying bricks or stones, there is interval between barricade and brick mixed building, sand horsestone compacting reclamation district is set on the outside of barricade, inner side is set to the artificial landfill of sand horsestone, and the artificial landfill of sand horsestone is distributed in the outer wall body both sides of brick mixed building simultaneously, the apical side height of barricade, sand horsestone is compacted the apical side height of reclamation district, the apical side height of the artificial landfill of sand horsestone is above the design high-water that reservoir submerges area, gear coping is provided with the panel of reinforced concrete structure, panel has the extension towards brick mixed building, set between the outer wall body outside of its extension and brick mixed building and fill out sealing.The utility model can recover the use function that reservoir submerges area's brick mixed building, mitigate society and the economic pressures of relocation of people from reservoir areas.

Description

Reservoir submerges area's brick mixed building terrace lift structure
Technical field
The utility model is related to a kind of reservoir submergence area's brick mixed building terrace lift structure, it is adaptable to which reservoir submergence area's brick is mixed The reconstruction project of building.
Background technology
With the abundant area large medium-size station of China's water resource, the construction of reservoir, cause after reservoir filling underground water and River lake stage lifting, a large amount of relatively low houses of original physical features are submerged, and a large amount of immigrants need to carry out Relocation and Settlement.Meanwhile, also there is phase When the house for closing on reservoir area of quantity, do not influenceed by storehouse water logging, ground floor flashing, interior are poured water, even one layer in Gao Shui Flooded completely during position.By the way of grade is raised, former grade is promoted to the height of two layers of original building, can be extensive The use function in area house is submerged again, mitigates society, the economic pressures of immigration allocation, with quite extensive promotional value.So And, brick mix structure form is generally used positioned at the house in submergence area, wall is vertical load-carrying members, it is impossible to undertake horizontal direction water Soil pressure, therefore fill compaction operation directly can not be carried out in existed building periphery, operation is banketed due to the interior space in interior Limitation is difficult to be compacted.It is domestic at present to throw the house that bottom is submerged aside due to the limitation of above-mentioned contradiction, carry out weight on highland Build.
Utility model content
Technical problem to be solved in the utility model is:A kind of reservoir submergence area brick mixed building terrace lifting knot is provided Structure, can recover the use function that reservoir submerges area's brick mixed building, mitigate society and the economic pressures of relocation of people from reservoir areas.
For the technical scheme that solution above-mentioned technical problem the utility model is used is:Reservoir submerges area's brick mixed building terrace Lift structure, including the brick mixed building that number of floor levels is at least two-layer, the surrounding of brick mixed building have built stone masonry or concrete knot by laying bricks or stones The barricade of structure, has interval between barricade and brick mixed building, sand horsestone compacting reclamation district, inner side are set on the outside of barricade and are set It is the artificial landfill of sand horsestone, and the artificial landfill of sand horsestone is distributed in the outer wall body both sides of brick mixed building simultaneously, barricade Apical side height, the apical side height of sand horsestone compacting reclamation district, the apical side height of the artificial landfill of sand horsestone are above reservoir submergence The design high-water in area, gear coping is provided with the panel of reinforced concrete structure, and panel has prolonging towards brick mixed building Set between the outer wall body outside of extending portion, its extension and brick mixed building and fill out sealing.
It is further:Brick mixed building is above panel and the floor nearest apart from panel is provided with door.
It is further:Door is reconstructed by the window opening of floor where it and obtained.
It is further:The stair of marking time of the floor for connecting brick mixed building, building of marking time are provided with the top of panel Ladder is located at one end of panel positioned at one end of brick mixed building higher than it.
It is further:Mark time and be provided with using waterproof roll between stair top and the outer wall body outside of brick mixed building Waterproof portion.
It is further:The apical side height of the artificial landfill of sand horsestone is less than the apical side height of barricade, the artificial heap of sand horsestone The top surface for filling out area is provided with floor damp-proof course.
It is further:The top surface of sand horsestone compacting reclamation district flushes setting with the top surface of panel.
The beneficial effects of the utility model are:Using barricade by the way of panel is combined, by all skirts of brick mixed building Close, while being filled using the compacting of sand horsestone on the outside of barricade, artificial heap back-up sand is carried out on the inside of barricade and in brick mixed building room Horsestone, grade is raised, so as to the use functional rehabilitation by former brick mixed building higher than water level part.Original brick mix structure is not Water And Earth Pressures are undertaken, the packing requirement banketed to interior is relatively low, is easy to landfill to construct, while barricade isolation grade landfill The vibrations of compacting and pressure, and reduce barricade to the unique deformation on the inside of outer wall body.The utility model simple structure, it is easy to apply Work, cost is relatively low.
Brief description of the drawings
Fig. 1 is the architectural section before terrace is raised;
Fig. 2 is the schematic diagram in terrace lifting construction;
Fig. 3 is the architectural section after terrace is raised;
Fig. 4 is the layer plane figure of building one after terrace is raised;
Fig. 5 is the building first floor plan after terrace is raised;
Marked in figure:1- brick mixed buildings, 2- barricades, 3- sand horsestone compacting reclamation district, the artificial landfill of 4- sand horsestones, 5- faces Plate, 6- mark time stair, 7- waterproofs portion, 8- floor damp-proof courses, 9- design high-waters, 10- originals grade, mono- layer of 11- indoorly Face, the floor faces of 12- bis-, 13- building foundations, mono- layer of door opening of 14-.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Fig. 1~Fig. 5, the utility model includes the brick mixed building 1 that number of floor levels is at least two-layer, brick mixed building 1 Surrounding builds the barricade 2 of stone masonry or concrete structure by laying bricks or stones, has interval, the outside of barricade 2 between barricade 2 and brick mixed building 1 It is set to sand horsestone compacting reclamation district 3, inner side and is set to the artificial landfill 4 of sand horsestone, and sand horsestone artificial landfill 4 same time-division It is distributed in the outer wall body both sides of brick mixed building 1, the apical side height of barricade 2, the apical side height of sand horsestone compacting reclamation district 3, sand folder The apical side height of the artificial landfill 4 of stone is above the design high-water 9 that reservoir submerges area, and the top of barricade 2 is provided with reinforcing bar and mixes The panel 5 of Xtah Crude Clay structure, panel 5 has the outer wall body of the extension towards brick mixed building 1, its extension and brick mixed building 1 Set between outside and fill out sealing.
The utility model should be selected in dry season construction, and construction procedure is as follows:When dry season water level declines, in brick mixed building Made a circle outside 1 exterior wall, build the barricade 2 of stone masonry or concrete structure by laying bricks or stones.But it is different from usual barricade, it is of the present utility model Banketed the both sides of barricade 2.Artificial landfill is used near the side of brick mixed building 1, the exterior wall of brick mixed building 1 is inside and outside to be filled simultaneously; Barricade opposite side is filled using the compacting of sand horsestone, it is desirable to which compacting factor is not less than the requirement of grade related specifications, due to barricade Obstruct, grade lifting compacting construction it is smaller to the existing wall influence of brick mixed building 1, compacting filling soil pressure is by barricade 2 Undertake.Simultaneously as the soil body is filled in the existing exterior wall both sides of brick mixed building 1 simultaneously, and water can be by former one layer of door opening and substrate Wall both sides are flowed to, the horizontal pressure force that wall undertakes is reduced.
During using stone masonry barricade, as barricade is constantly built by laying bricks or stones, barricade both sides synchronously carry out fill construction.Building side is filled out Soil when construction to higher than maximum water level certain distance after, carry out it is smooth, thereon build floor damp-proof course 8, this layer can as partly Storage cellar is used.Being banketed due to barricade both sides can reduce barricade tilt displacement deformation.Proceed barricade to build by laying bricks or stones, keep off Wall outside is banketed and carries out compacting construction, until reach close to original building apart from nearest one layer of design high-water floor flooring highly When (usually second layer flooring), carry out smooth, complete to fill, below water level isolation to indoor terrace.
Then the panel 5 for carrying out armored concrete at the top of barricade 2 is constructed, and the panel 5 is mixed with existing brick to barricade Space between construction wall is closed, and gap is clogged using Bituminous hemp fiber between panel and existing building wall, so as to subtract Influence of the small barricade deformation to building.The root of panel 5 carries out thickening to be poured with barricade being integrated, from without toppling.Sand is pressed from both sides The top surface of stone compacting reclamation district 3 flushes setting with the top surface of panel 5.When newly grade sedimentation and deformation is filled, to outdoor ground Level ground carries out benefit and fills out, and does not influence existing building.
The utility model is raised by by grade, so as to former brick mixed building is extensive higher than the use function of water level part It is multiple.Use for convenience, brick mixed building 1 is positioned at the top of panel 5 and the floor nearest apart from panel 5 is provided with door.Door is preferably Reconstructed by the window opening of floor where it and obtained, the destruction to original wall body can be reduced.
In addition, using for convenience, the top of panel 5 is provided with the stair of marking time of the floor for connecting brick mixed building 1 6, stair 6 of marking time are located at one end of panel 5 positioned at one end of brick mixed building 1 higher than it.Mark time the top of stair 6 and brick mixed building 1 Outer wall body outside between waterproof portion 7 is provided with using waterproof roll.

Claims (7)

1. reservoir submergence area's brick mixed building terrace lift structure, including the brick mixed building (1) that number of floor levels is at least two-layer, its feature It is:The surrounding of brick mixed building (1) builds the barricade (2) of stone masonry or concrete structure, barricade (2) and brick mixed building (1) by laying bricks or stones Between there is interval, the compacting of sand horsestone reclamation district (3), inner side are set on the outside of barricade (2) and are set to the artificial landfill of sand horsestone Area (4), and the artificial landfill of sand horsestone (4) is while be distributed in the outer wall body both sides of brick mixed building (1), the top surface of barricade (2) Highly, the apical side height of sand horsestone compacting reclamation district (3), the apical side height of the artificial landfill of sand horsestone (4) are above reservoir leaching Do not have the design high-water (9) in area, the panel (5) of reinforced concrete structure is provided with the top of barricade (2), panel (5) is with court To the extension of brick mixed building (1), set between the outer wall body outside of its extension and brick mixed building (1) and fill out sealing.
2. reservoir as claimed in claim 1 submerges area's brick mixed building terrace lift structure, it is characterised in that:Brick mixed building (1) Positioned at panel (5) top and the floor nearest apart from panel (5) is provided with door.
3. reservoir as claimed in claim 2 submerges area's brick mixed building terrace lift structure, it is characterised in that:Door is by where it The window opening reconstruction of floor is obtained.
4. reservoir as claimed in claim 1 submerges area's brick mixed building terrace lift structure, it is characterised in that:The top of panel (5) Portion is provided with the stair of marking time (6) of the floor for connecting brick mixed building (1), and stair of marking time (6) are positioned at brick mixed building (1) One end is located at one end of panel (5) higher than it.
5. reservoir as claimed in claim 4 submerges area's brick mixed building terrace lift structure, it is characterised in that:Mark time stair (6) Waterproof portion (7) is provided with using waterproof roll between the outer wall body outside of top and brick mixed building (1).
6. the reservoir as described in any one in Claims 1 to 5 submerges area's brick mixed building terrace lift structure, and its feature exists In:The apical side height of the artificial landfill of sand horsestone (4) is less than the apical side height of barricade (2), the top of the artificial landfill of sand horsestone (4) Face is provided with floor damp-proof course (8).
7. the reservoir as described in any one in Claims 1 to 5 submerges area's brick mixed building terrace lift structure, and its feature exists In:The top surface of sand horsestone compacting reclamation district (3) flushes setting with the top surface of panel (5).
CN201621290679.3U 2016-11-29 2016-11-29 Reservoir submerges area's brick mixed building terrace lift structure Withdrawn - After Issue CN206204969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621290679.3U CN206204969U (en) 2016-11-29 2016-11-29 Reservoir submerges area's brick mixed building terrace lift structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621290679.3U CN206204969U (en) 2016-11-29 2016-11-29 Reservoir submerges area's brick mixed building terrace lift structure

Publications (1)

Publication Number Publication Date
CN206204969U true CN206204969U (en) 2017-05-31

Family

ID=58747801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621290679.3U Withdrawn - After Issue CN206204969U (en) 2016-11-29 2016-11-29 Reservoir submerges area's brick mixed building terrace lift structure

Country Status (1)

Country Link
CN (1) CN206204969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498958A (en) * 2016-11-29 2017-03-15 中国电建集团成都勘测设计研究院有限公司 Reservoir submergence area brick mixed building terrace lift structure and technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498958A (en) * 2016-11-29 2017-03-15 中国电建集团成都勘测设计研究院有限公司 Reservoir submergence area brick mixed building terrace lift structure and technique
CN106498958B (en) * 2016-11-29 2018-05-04 中国电建集团成都勘测设计研究院有限公司 Reservoir submerges area's brick mixed building terrace lift structure and technique

Similar Documents

Publication Publication Date Title
CN102277867B (en) Construction method for collapsible loess foundation
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN105002913B (en) A kind of highly permeable stratum deep basal pit back cover water sealing structure and its construction method
CN201883450U (en) Coastal deep-foundation anti-seepage waterproof basement structure
CN105256810B (en) Construction method for round underground continuous wall two-in-one structure
CN110258538B (en) Soil nail reinforced buffer type manual hole digging pile and construction method thereof
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN101806055B (en) Vacuum pre-pressed joint rigid pile composite foundation reinforcing method
CN104846841A (en) Anti-floating construction method for basements without uplift piles
CN207079718U (en) A kind of basement waterproofing structure
CN204982908U (en) Elevartor shaft deep basal pit seepage prevention structure
CN110080248A (en) Nearly depth of water foundation pit supporting construction
CN206204969U (en) Reservoir submerges area's brick mixed building terrace lift structure
CN103469828A (en) Construction method of hydrophobic structure of post-cast strip of bottom plate of basement
CN112726682A (en) Construction method for preventing water scattering and cracking in combination of high water level area and waterproof curtain
CN1155606A (en) Foundation side wall as basement wall and construction method thereof
CN208501761U (en) A kind of sedimentation reinforcing jacking leveling structure suitable for industrial premises independence pile foundation
CN110670613A (en) Anti-seepage structure of foundation pit elevator shaft and construction method thereof
CN106498958B (en) Reservoir submerges area's brick mixed building terrace lift structure and technique
CN207331699U (en) One kind cheats reinforced concrete barricade composite supporting construction in hole
CN105544621A (en) Building structure for lowering designed anti-floating water level of heap slope building
CN205530218U (en) Slip casting composite foundation suitable for high -rise building structural strengthening is rectified
CN211547830U (en) Structure for preventing ground from being wetted
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170531

Effective date of abandoning: 20180504