CN207812257U - A kind of suspension type monorail Long span track girder system - Google Patents

A kind of suspension type monorail Long span track girder system Download PDF

Info

Publication number
CN207812257U
CN207812257U CN201721564225.5U CN201721564225U CN207812257U CN 207812257 U CN207812257 U CN 207812257U CN 201721564225 U CN201721564225 U CN 201721564225U CN 207812257 U CN207812257 U CN 207812257U
Authority
CN
China
Prior art keywords
girder
tower
bridge
track girder
suspension type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721564225.5U
Other languages
Chinese (zh)
Inventor
黎泰良
裴利华
程国华
徐永浩
张俊龙
陈焰焰
熊志
孙京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201721564225.5U priority Critical patent/CN207812257U/en
Application granted granted Critical
Publication of CN207812257U publication Critical patent/CN207812257U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to technical field of rail traffic, and disclose a kind of suspension type monorail Long span track girder system, including girder and steel case track girder, the longitudinal direction of girder extends along the longitudinal direction, it includes top beam and two side casees, and two side casees are mutually parallel and are separately positioned on the left and right ends of the top beam bottom;The two side casees in left and right are each passed through the bridge tower of respective side and in the bridge towers of respective side, to realize being fixedly connected for bridge tower and girder;In addition, each side case is connected by the bridge tower of suspension cable and respective side respectively;There are two the steel case track girder settings, and the longitudinal direction of each steel case track girder extends along the longitudinal direction, and each steel case track girder is suspended on respectively on the top beam, and the two described steel case track girders are respectively positioned between two side casees.The utility model is simple for structure, the clear feature of stress, the structure safety for solving suspension type monorail Long span track girder and the requirement using function.

Description

A kind of suspension type monorail Long span track girder system
Technical field
The utility model belongs to technical field of rail traffic, more particularly, to a kind of suspension type monorail Long span track Girder system is united.
Background technology
The new technique of suspension type monorail traffic category rail traffic, suspension type rail traffic can not only be followed without technical specification, And can be for reference data it is less, suspension type rail traffic has very long history in developed countries, but various countries are hung Formula single track is based on conventional across footpath (across footpath≤30m).Only two test wires also use conventional span setting, institute at present in China It is the extremely urgent task of current suspension type monorail with suspension type monorail Long span track girder system.
Domestic test wire uses the light section steel case track beam structure with external bottom plate opening, steel track beam exist it is wide across Than small, easy buckling, bearing capacity is small, deformation is big, perishable the problems such as, track beam structure unification hampers pushing away for suspension type rail Extensively.
After conventional steel case track beam structure span is more than 35m, the vertical deflection of track girder is difficult to meet《Railway bridges and culverts is set Count specification》(TB 10002-2017) and《Metro design code》(GB50157-2013) to the maximum allowable amount of deflection of bridge structure in Requirement.
The research of track girder both at home and abroad at present is concentrated mainly on conventional suspension bridge structural system research, regular spans Suspension type monorail bridge structure system accounting in construction it is great, but it is various due to city or scenic spot across obstacle Property, suspension type monorail Long span track girder is indispensable, becomes the key node that can suspension type be implemented, institute sometimes To solve the task that suspension type monorail Long span track girder system is extremely urgent.
In conclusion though suspension type monorail traffic system is in the existing one-hundred-year history of foreign countries, both at home and abroad can be for reference Research data is considerably less, and country's test wire is all made of the light section steel case track girder of bottom plate opening at present, domestic not yet to suspension Formula monorail traffic system carries out systematic research, and there is also some urgent problems to be solved.
Utility model content
For the disadvantages described above or Improvement requirement of the prior art, the utility model provides a kind of suspension type monorail Long span Track girder system, simple for structure, the clear feature of stress, solve suspension type monorail Long span track girder structure safety and Use the requirement of function.
To achieve the above object, according to the utility model, a kind of suspension type monorail Long span track girder system is provided, It is characterized in that, including girder and steel case track girder, wherein
The longitudinal direction of the girder extends along the longitudinal direction comprising top beam and two side casees, two side casees are mutually flat Row, and each side case is separately positioned on the left and right ends of the top beam bottom, to make the girder be inverted U shape;It is left Right two side casees are each passed through the bridge tower of respective side and in the bridge towers of respective side, to realize bridge tower and Girder is fixedly connected;In addition, each side case is connected by the bridge tower of suspension cable and respective side respectively;
There are two the steel case track girder settings, and the longitudinal direction of each steel case track girder extends along the longitudinal direction, often A steel case track girder is suspended on respectively on the top beam, and the two described steel case track girders are respectively positioned on two sides Between case.
Preferably, the part that the bridge tower is located at the top of top beam is upper king-post strut, the affixed horizontal-associate of bridge tower by top beam and Two upper king-post struts in left and right are fixed together.
Preferably, the side case includes tower beam consolidation section, girder transition and girder standard paragraphs, and the tower beam consolidation section is embedding Enter in the bridge tower and its both ends exposes to the bridge tower, the thickness of the tower beam consolidation section is more than the master The thickness of beam standard paragraphs, the tower beam consolidation section carry out being connected transition with the girder standard paragraphs by the girder transition.
Preferably, the part that the bridge tower is located at the lower section of top beam is lower king-post strut, and bridge tower bottom end rail will left and right two The lower king-post strut is fixed together.
In general, it can obtain down the above technical solutions conceived by the present invention are compared with the prior art, Row advantageous effect:
1) " Qiao Xiaqiao " architectural concept that the suspension type monorail Long span track girder system of the utility model proposes, i.e. girder Structure be divided into two layers, upper layer is greatly across structure of main bridge, and lower layer is suspension type rail beam." Qiao Xiaqiao " architectural concept has structure Succinctly, the clear feature of stress, the structure safety for solving suspension type monorail Long span track girder and the requirement using function.
2) the affixed inverted U-shaped cable-stayed bridge suspension type monorail Long span rail system of the tower beam of the utility model, cable-stayed bridge it is more Point elasticity support system ensure that the requirement of large-span structure stress, deformation, rigidity, tower beam consolidation ensure that the anti-of highlight lines area Shake, the requirement of traffic safety and comfort.
3) construction of the suspension type monorail Long span track girder system of the utility model is ripe, convenient and efficient:The body Cantilever method, swivel, support cast-in-place any type construction method can be used in system according to field condition, and construction can be according to place The method that situation chooses economic security.
4) the suspension type monorail Long span track beam structure combined altitudes of the utility model are small, and occupancy volume is also small, save It space and is easily installed.
5) repair and maintenance of the suspension type monorail long span structure of the utility model is convenient.
Description of the drawings
Fig. 1 is Long span girder cross-sectional configuration figure in the utility model;
Fig. 2 is tower beam consolidation cross-sectional configuration figure in the utility model;
Fig. 3 is tower beam consolidation facade structural map in the utility model;
Fig. 4 is cable-stayed bridge elevational schematic view in the utility model.
In figure:1- steel case track girders;The inverted U-shaped girders of 2-;The inverted U-shaped Side boxes of 3-;4- suspension cables;5- vehicle gauges;6- Embedded bridge tower girder;;The affixed horizontal-associate of 7- bridge towers;8- bridge tower bottom end rails;9- upper king-post struts;10- lower king-post struts;11- girder standard paragraphs masters Beam;12- bridge towers increase place's girder;13- girder girder transitions;14- tower beam consolidations;15- bridge towers.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.In addition, institute in the various embodiments of the present invention described below The technical characteristic being related to can be combined with each other as long as they do not conflict with each other.
Referring to Fig.1~Fig. 4, a kind of suspension type monorail Long span track girder system, including girder and steel case track girder 1, In,
The longitudinal direction of the girder extends along the longitudinal direction comprising top beam 2 and two side casees 3, two side casees 3 are mutual It is parallel, and each side case 3 is separately positioned on the left and right ends of 2 bottom of the top beam, to make the girder in U Shape;The two side casees 3 in left and right are each passed through and are embedded in the bridge tower 14 of respective side, to form tower beam consolidation structure in intersection 6;In addition, each side case 3 is connect by suspension cable 4 with the bridge tower 14 of respective side respectively;
There are two the settings of steel case track girder 1, and the longitudinal direction of each steel case track girder 1 extends along the longitudinal direction, Each steel case track girder 1 is suspended on respectively on the top beam 2, and the two described steel case track girders 1 are respectively positioned on two Between the side case 3.Steel case track girder 1 is for hanging monorail train, when two monorail trains are parallel, it should be noted that there are vehicle limits Boundary 5.
Further, the part that the bridge tower 14 is located at the top of top beam 2 is upper king-post strut 9, and the affixed horizontal-associate of bridge tower 7 will top Two upper king-post struts of beam 2 and left and right are fixed together.
Further, the side case 3 includes tower beam consolidation section 12, girder transition 13 and girder standard paragraphs 11, the tower beam Consolidation section 12 is embedded in the bridge tower 14 and its both ends exposes to the bridge tower 14, the tower beam consolidation section 12 Thickness be more than the thickness of the girder standard paragraphs 11, the tower beam consolidation section 12 and the girder standard paragraphs 11 pass through the master Beam transition 13 carries out linking transition.
Further, the part that the bridge tower 14 is located at the lower section of top beam 2 is lower king-post strut 10, and bridge tower bottom end rail 8 will be left Right two lower king-post struts are fixed together.
For the existing suspension type rail beam built up using the bridge span structure form of the steel box of bottom plate opening, one is proposed The kind feasible scheme of suspension type monorail Long span track girder system, specific technical measures are as follows:
1. the utility model uses inverted U-shaped section, the babinet being oppositely arranged using two to form the shape of falling U section with top plate, The platform sling of pre-buried suspended rail beam, suspension type rail beam can be suspended on the top plate between two tanks below top plate between two tanks Under.
2. suspension cable 4 is anchored in the body beam of structure section both sides, forms multiple spot and flexibly support architecture.
3. to reduce structure section size, received in cable-stayed bridge pylon, the both sides case 3 " insertion " of inverted U-shaped section is arrived into king-post Middle formation tower beam is affixed, and one of horizontal-associate is arranged on tower wide scope inner beam, and below the driving limit of suspension train One of horizontal-associate is set, bridge tower transverse frame system is constituted.
4. tower beam is affixed, spanning both ends can locally increase section.
5. the top plate of inverted U-shaped section, both sides case 3 are respectively provided with, longitudinal prestressing steel beam meets operation and the stress of construction is wanted It asks, the top plate of inverted U-shaped section is also provided with lateral prestressing tendon.
It solves the technical issues of suspension type monorail Long span by the above measure, ensure that the rigidity of large-span structure and steady It is qualitative, while sufficient space is provided for equipment installation, the back of structure can be used as maintenance and evacuation platform, and large-span structure is also applied Work is convenient.
Cantilever method, swivel, branch can be used in the suspension type monorail Long span track girder system of the utility model institute utility model The cast-in-place construction method of frame.The construction method above first completes pile foundation construction after-pouring cushion cap first, then existing using creeping formwork Pour construction bridge tower and reserved tower beam consolidation part girder longitudinal prestressing pipeline and reinforcing bar etc..Swivel and support cast-in-place are equal to girder The inverted U-shaped beam of proping construction, and tensioning girder prestressing force are taken, main girder construction is completed and is followed by tensioning suspension cable 4, striking peace Bridge lower railway beam is filled, bridge Suo Li is finally adjusted to and completes other attached installations.The construction method that cantilever method pours is taken, is completed Pier-side bracket and template are set after bridge tower construction at king-tower, assembling reinforcement pours into a mould Cast-in-Situ Segment under tower, waits for that concrete strength is met the requirements Afterwards, end mould, side form and internal model are removed, tensioning vertically and horizontally prestressing tendon, the then symmetrical assembly dragging suspension basket on girder, using leading Rope Hanging Basket sets up side in the symmetrically piecewise cantilever of tower both sides, and the suspension cable 4 and prestressing force of the corresponding segment of tensioning, reasonable arrangement time Lateral opening Cast-in-Situ Segment is poured across falsework, after completing main beam structure construction, mounting bridge lower railway beam is finally adjusted to bridge Suo Li and completes Other attached installations.Whole structure is arranged such that the suspension type monorail Long span track beam structure is compact in a word, and the scale of construction is smaller, Simultaneously again so that its construction is simple, structure are beautiful.
As it will be easily appreciated by one skilled in the art that the above is only the preferred embodiment of the utility model only, not To limit the utility model, any modification made within the spirit and principle of the present invention, equivalent replacement and change Into etc., it should be included within the scope of protection of this utility model.

Claims (4)

1. a kind of suspension type monorail Long span track girder system, which is characterized in that including girder and steel case track girder, wherein
The longitudinal direction of the girder extends along the longitudinal direction comprising and top beam and two side casees, two side casees are mutually parallel, and And each side case is separately positioned on the left and right ends of the top beam bottom, to make the girder be inverted U shape;Left and right two Side case is each passed through the bridge tower of respective side and in the bridge tower of respective side, to realize bridge tower and girder It is fixedly connected;In addition, each side case is connected by the bridge tower of suspension cable and respective side respectively;
There are two the steel case track girder settings, and the longitudinal direction of each steel case track girder extends along the longitudinal direction, Mei Gesuo Steel case track girder is stated to be suspended on respectively on the top beam, and the two described steel case track girders be respectively positioned on two side casees it Between.
2. a kind of suspension type monorail Long span track girder system according to claim 1, which is characterized in that the bridge bridge The part that tower is located at the top of top beam is upper king-post strut, and two upper king-post struts of top beam and left and right are fixedly connected by the affixed horizontal-associate of bridge tower Together.
3. a kind of suspension type monorail Long span track girder system according to claim 1, which is characterized in that the side luggage Include tower beam consolidation section, girder transition and girder standard paragraphs, the tower beam consolidation section be embedded in the bridge tower and its two End exposes to the bridge tower, and the thickness of the tower beam consolidation section is more than the thickness of the girder standard paragraphs, the tower beam Consolidation section carries out being connected transition with the girder standard paragraphs by the girder transition.
4. a kind of suspension type monorail Long span track girder system according to claim 1, which is characterized in that the bridge bridge The part that tower is located at the lower section of top beam is lower king-post strut, and two lower king-post struts in left and right are fixed together by bridge tower bottom end rail.
CN201721564225.5U 2017-11-21 2017-11-21 A kind of suspension type monorail Long span track girder system Active CN207812257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721564225.5U CN207812257U (en) 2017-11-21 2017-11-21 A kind of suspension type monorail Long span track girder system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721564225.5U CN207812257U (en) 2017-11-21 2017-11-21 A kind of suspension type monorail Long span track girder system

Publications (1)

Publication Number Publication Date
CN207812257U true CN207812257U (en) 2018-09-04

Family

ID=63334094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721564225.5U Active CN207812257U (en) 2017-11-21 2017-11-21 A kind of suspension type monorail Long span track girder system

Country Status (1)

Country Link
CN (1) CN207812257U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724225A (en) * 2017-11-21 2018-02-23 中铁第四勘察设计院集团有限公司 A kind of suspension type monorail Long span track girder system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724225A (en) * 2017-11-21 2018-02-23 中铁第四勘察设计院集团有限公司 A kind of suspension type monorail Long span track girder system
CN107724225B (en) * 2017-11-21 2023-05-16 中铁第四勘察设计院集团有限公司 Suspension type single-rail large-span track beam system

Similar Documents

Publication Publication Date Title
CN105735101B (en) A kind of high-speed railway repairing beam and its emergency repair method that can be exchanged into permanent bridge structure
CN102296525B (en) Support system mixed combined beam cable-stayed bridge and construction method thereof
CN106149576B (en) On removed and construction method of installation across both wired bridge whole groups
CN108505405B (en) Combined construction structure of suspension type monorail and highway bridge
CN102704355B (en) Realization method of seamless rail for straddle-type monorail transportation
CN103161101A (en) Straddle type monorail transportation rigid framework system
CN102220741B (en) Steel-concrete composite girder construction technology striding current lines and being parallel to existing lines
CN107724225A (en) A kind of suspension type monorail Long span track girder system
CN103046463A (en) Assembly type saddle-shell-shaped bottom plate continuous box girder bridge and construction method thereof
CN107905043B (en) Combined rail beam system of steel web truss with suspended bottom plate opening
CN105714681A (en) Implementation method and construction process of suspension type monorail transportation rigid-frame system
CN205501788U (en) Convertiblely salvage roof beam for permanent bridge structures's high -speed railway
CN207812257U (en) A kind of suspension type monorail Long span track girder system
CN110130201A (en) A kind of half floats the cable-stayed bridge of truss-like bridge tower
CN112878171A (en) Large-span steel structure arch bridge and construction method
CN113652948A (en) High-speed railway cable-stayed bridge with improved rigidity
CN208472473U (en) A kind of suspension type monorail and highway bridge build structure jointly
CN207314053U (en) Support device based on empty rail train rail
CN208995936U (en) S type steel box girder of cable stayed bridge on across ground rail traffic slides mounting bracket
CN102877417B (en) Anchoring method of girder suspender of continuous camber composite bridge
CN202017181U (en) Falsework for constructing steel and concrete combined beam crossing over conventional route and arranged parallel to existing line
CN204589817U (en) A kind of reinforcing mat posture fence operation integrated apparatus
CN207812189U (en) A kind of suspension type bottom plate open steel web truss combined track girder system system
CN203295955U (en) Composite bridge for railway
CN208072103U (en) A kind of simple oblique pull large span suspension type monorail system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201210

Address after: 650206 Kunming, Guandu, Yunnan province Guandu town Guangfu Road 5349, Yinhai Cherry Blossom happiness square F

Patentee after: CHINA RAILWAY SIYUAN GROUP SOUTHWEST SURVEY AND DESIGN Co.,Ltd.

Patentee after: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

Address before: 430063 Yangyuan peace road, Wuchang, Wuhan, Wuhan, Hubei 745

Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

TR01 Transfer of patent right