CN207811110U - Concrete sleeper enters steam-cured double track translation crane - Google Patents

Concrete sleeper enters steam-cured double track translation crane Download PDF

Info

Publication number
CN207811110U
CN207811110U CN201820216467.3U CN201820216467U CN207811110U CN 207811110 U CN207811110 U CN 207811110U CN 201820216467 U CN201820216467 U CN 201820216467U CN 207811110 U CN207811110 U CN 207811110U
Authority
CN
China
Prior art keywords
crane
lifting
sleeper
handgrip
rotating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820216467.3U
Other languages
Chinese (zh)
Inventor
郑翼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Haoyunda Zhichuang Technology Co Ltd
Good Luck Innovative Intelligence Technology Co Ltd
Original Assignee
Beijing Haoyunda Zhichuang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Haoyunda Zhichuang Technology Co Ltd filed Critical Beijing Haoyunda Zhichuang Technology Co Ltd
Priority to CN201820216467.3U priority Critical patent/CN207811110U/en
Application granted granted Critical
Publication of CN207811110U publication Critical patent/CN207811110U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

Enter steam-cured double track the utility model discloses a kind of concrete sleeper and translates crane, sleeper mould passes through crane lifting, crane handgrip stretches into sleeper mould bottom support sleeper mould including four L-shaped bluff pieces from both sides, automatic rotating device drives handgrip rotation, lifting davit to drive automatic rotating device, handgrip lifting;Crane carriage includes two crane girders disposed in parallel, and two crane girders are moved along track frame;Handgrip captures sleeper mould by L-shaped bluff piece, and by automatic rotating device, lifting davit effect, sleeper mould lifting turns to, stacking successively after being translated with crane carriage.The concrete sleeper of the utility model enters steam-cured double track translation crane, realizes sleeper and enters steam-cured preceding auto-steering translation stacking, two-orbit hoisting transportation, stationarity is high, and Intelligent servo control, hoisting transportation accuracy is high, shortening handling time, and production efficiency is high.

Description

Concrete sleeper enters steam-cured double track translation crane
Technical field
The utility model is related to sleeper manufacturing fields more particularly to a kind of concrete sleeper mold to enter steam-cured double track crane.
Background technology
With the fast development of global economy, construction of the various countries to railway transportation, the especially construction of infrastructure sleeper Carry out extensively and in-depth study.Concrete sleeper be stirred by a certain percentage by cement, sand, stone, water and additive and at Mixture injection equipped with steel wire or reinforcing bar, sleeper accessory combined model in, using vibration moulding or loading vibration moulding, Concrete sleeper product made of steel wire or reinforcing bar, cutting sleeper end etc. is loosened in steam curing.
The principal element that quality is influenced in concrete sleeper production process is the mixing of concrete and vibrates, main reinforcement prestressing force Several key links such as tensioning, maintenance and demoulding.
The maintenance of concrete sleeper is a particularly important ring in sleeper production, and maintenance process not only influences the strong of concrete Degree, and have certain influence to static load breaking resistance, endurance quality and the presentation quality of sleeper.To improve prestressed concrete Sleeper production efficiency, increases mold turnover, and sleeper manufacturing enterprise generally uses steam curing.
Steam curing will generally carry out in special large-scale steaming and cultivating equipment, and in order to improve production efficiency, sleeper mould connects With steaming and cultivating equipment is sent into after the sleeper batch stacking in mould, in the process, hanging device is avoided to the concussion of mold or is inclined Tiltedly, lead to sleeper deformation unformed in mold, influence the quality of sleeper.
Utility model content
The purpose of this utility model is that a kind of concrete sleeper mold of design enters steam-cured double track crane.
For the above-mentioned purpose of utility model of realization, the technical solution of the utility model is:A kind of concrete sleeper enters steam-cured double track Crane, including sleeper mould are translated, for sleeper mould by crane lifting, crane includes the handgrip of bottom end, and handgrip includes four L-shaped Bluff piece, L-shaped bluff piece are oppositely arranged two-by-two, and stretch into sleeper mould bottom support sleeper mould, four L-shaped bluff pieces from both sides respectively Top is separately mounted to the quadrangle of rectangular mounting plate, and rectangular mounting plate upper surface middle part is equipped with automatic rotating device, automatic to rotate Device is connected with lifting davit, and automatic rotating device drives handgrip rotation, lifting davit to drive automatic rotating device, handgrip liter Drop;The lifting hanger top end connects I-shaped crane carriage, and crane carriage includes two crane girders disposed in parallel, two crane girders It is mounted in track frame disposed in parallel by automatic sliding rail respectively, moves along track frame, connected by crossbeam between two crane girders It connects, crossbeam is mounted on by automatic sliding rail on two crane girders, is moved along crane girder, the lifting davit is specifically connected to crossbeam On;
The track frame includes two tracks disposed in parallel, and for track installation on main body frame, main body frame includes extremely Few four pillars, the pillar are equipped with servo-control system;The handgrip captures sleeper mould by L-shaped bluff piece, by certainly Dynamic rotating device, lifting davit effect, sleeper mould lifting turn to, stacking successively after being translated with crane carriage.
The utility model has the beneficial effects that:
The concrete sleeper of the utility model enters steam-cured double track translation crane, realize sleeper enter it is steam-cured before auto-steering it is flat Stacking is moved, two-orbit hoisting transportation, stationarity is high, and Intelligent servo control, hoisting transportation accuracy is high, shortens handling time, raw It produces efficient.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the utility model part-structure schematic diagram.
Specific implementation mode
Below in conjunction with attached drawing, the technical scheme in the utility model embodiment is clearly and completely described.
As shown in Figure 1, 2, a kind of concrete sleeper enters steam-cured double track translation crane, including sleeper mould 1, sleeper mould 1 lead to The lifting of crane 2 is crossed, crane 2 includes the handgrip 3 of bottom end, and handgrip 3 includes four L-shaped bluff pieces 301, and L-shaped bluff piece 301 is opposite two-by-two to be set It sets, and stretches into 1 bottom support sleeper mould 1 of sleeper mould from both sides respectively, four 301 tops of L-shaped bluff piece are separately mounted to square The quadrangle of shape mounting plate 302,302 upper surface middle part of rectangular mounting plate are equipped with automatic rotating device 4, and automatic rotating device 4 connects There are lifting davit 5, automatic rotating device 4 that handgrip 3 is driven to rotate, lifting davit 5 drives automatic rotating device 4, handgrip 3 to lift; Lifting 5 top of davit connects I-shaped crane carriage 6, and crane carriage 6 includes two crane girders 601 disposed in parallel, and two hang Bicycle beam 601 respectively by automatic sliding rail 7 be mounted on track frame 8 disposed in parallel on, moved along track frame 8, two crane girders 601 it Between connected by crossbeam 602, crossbeam 602 by automatic sliding rail 7 be mounted on two crane girders 601 on, moved along crane girder 601, institute Lifting davit 5 is stated specifically to be connected on crossbeam 602.
The track frame 8 includes two tracks 801 disposed in parallel, and track 801 is mounted on main body frame 802, main body Frame 802 includes at least four pillars 803, and the pillar 803 is equipped with servo-control system 9;The handgrip 3 passes through L-shaped pawl Part 301 captures sleeper mould 1, is acted on by automatic rotating device 4, lifting davit 5, and the lifting of sleeper mould 1 turns to, with crane Stacking successively after frame 6 translates.
The described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments.Based on this Embodiment in utility model, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.

Claims (1)

1. a kind of concrete sleeper enters steam-cured double track translation crane, which is characterized in that including sleeper mould, sleeper mould passes through crane Lifting, crane include the handgrip of bottom end, and handgrip includes four L-shaped bluff pieces, and L-shaped bluff piece is oppositely arranged two-by-two, and respectively from both sides Sleeper mould bottom support sleeper mould is stretched into, four L-shaped bluff piece tops are separately mounted to the quadrangle of rectangular mounting plate, rectangle peace Loading board upper surface middle part is equipped with automatic rotating device, and automatic rotating device is connected with lifting davit, and automatic rotating device driving is grabbed Hand rotates, and lifting davit drives automatic rotating device, handgrip lifting;The lifting hanger top end connects I-shaped crane carriage, Crane carriage includes two crane girders disposed in parallel, and two crane girders are mounted on track frame disposed in parallel by automatic sliding rail respectively On, it moves along track frame, is connected by crossbeam between two crane girders, crossbeam is mounted on by automatic sliding rail on two crane girders, edge Crane girder moves, and the lifting davit is specifically connected on crossbeam;
The track frame includes two tracks disposed in parallel, and for track installation on main body frame, main body frame includes at least four Root pillar, the pillar are equipped with servo-control system;The handgrip captures sleeper mould by L-shaped bluff piece, passes through automatic rotary Rotary device, lifting davit effect, sleeper mould lifting turn to, stacking successively after being translated with crane carriage.
CN201820216467.3U 2018-02-07 2018-02-07 Concrete sleeper enters steam-cured double track translation crane Active CN207811110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820216467.3U CN207811110U (en) 2018-02-07 2018-02-07 Concrete sleeper enters steam-cured double track translation crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820216467.3U CN207811110U (en) 2018-02-07 2018-02-07 Concrete sleeper enters steam-cured double track translation crane

Publications (1)

Publication Number Publication Date
CN207811110U true CN207811110U (en) 2018-09-04

Family

ID=63321019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820216467.3U Active CN207811110U (en) 2018-02-07 2018-02-07 Concrete sleeper enters steam-cured double track translation crane

Country Status (1)

Country Link
CN (1) CN207811110U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108263970A (en) * 2018-02-07 2018-07-10 北京好运达智创科技有限公司 Concrete sleeper enters steam-cured double track translation crane
CN109052185A (en) * 2018-10-15 2018-12-21 安徽合力股份有限公司宝鸡合力叉车厂 A kind of fork truck hood lifting mounting device and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108263970A (en) * 2018-02-07 2018-07-10 北京好运达智创科技有限公司 Concrete sleeper enters steam-cured double track translation crane
CN109052185A (en) * 2018-10-15 2018-12-21 安徽合力股份有限公司宝鸡合力叉车厂 A kind of fork truck hood lifting mounting device and its installation method

Similar Documents

Publication Publication Date Title
CN208716348U (en) Double-block sleeper mould automatic stacking system
CN108190807A (en) Concrete sleeper goes out steam-cured double track sliding turnover crane
CN108381746B (en) Construction method of sliding type pedestal prefabricated box girder
CN207811110U (en) Concrete sleeper enters steam-cured double track translation crane
CN102452129A (en) Automatic powerful vibration concrete block moulding machine
CN101082280A (en) Single-track railway tunnel lining trolley
CN108263970A (en) Concrete sleeper enters steam-cured double track translation crane
CN104308989B (en) Track plate mold tensioning device and use method thereof
CN104710155A (en) Production technology of precast reinforced concrete piles
CN104191502B (en) A kind of conveniently stripped concrete square pile die
CN203334680U (en) Upper reversed beam lifting mold for concrete pouring
CN207811216U (en) Concrete sleeper goes out steam-cured double track sliding turnover crane
CN209453846U (en) The automatic de-stacking system of double-block sleeper mould
CN205521918U (en) Prefabricated formwork system of T roof beam batch production
CN207552933U (en) Reinforced mesh entirety mould-entering device
CN204748891U (en) Indulge and move formula high -speed railway case roof beam outside template
CN208716703U (en) Mold after feeding is sent to the mold handling apparatus to centrifuge
CN108044771A (en) One kind makes brick equipment
CN105619590A (en) Reinforcement cage lifting device used for pipe pile production line
CN209453857U (en) A kind of displacement apparatus of aero-concrete mould side plate
CN202781428U (en) Double-block type sleeper prefabrication steel bar truss fixing device
CN206260411U (en) Asymmetric formula reinforcing bar greenhouse
CN202062503U (en) Tube sheet mold flow device
CN201419437Y (en) Movable automatic palletizer
CN204772914U (en) Turn round king's piece mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant