CN207801426U CN201820296480.4U CN201820296480U CN207801426U CN 207801426 U CN207801426 U CN 207801426U CN 201820296480 U CN201820296480 U CN 201820296480U CN 207801426 U CN207801426 U CN 207801426U
Authority
CN
China
Prior art keywords
interconnecting piece
cable
foundation pit
hook
hanging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820296480.4U
Other languages
Chinese (zh)
Inventor
宋磊
刘小
程万强
胡盛贵
刘洪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201820296480.4U priority Critical patent/CN207801426U/en
Application granted granted Critical
Publication of CN207801426U publication Critical patent/CN207801426U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of cable hanging devices, for cable laying in construction site foundation pit;Including support portion, interconnecting piece and several hooks, described support portion one end is fixed on the ground around at the top of the foundation pit, and the other end extends towards the foundation pit edge;The interconnecting piece is arranged in along the gradient of the foundation pit on the foundation pit inner wall, and the interconnecting piece upper end is fixed on the support portion close to the one end at the foundation pit edge, and the interconnecting piece lower end extends towards the bottom of foundation ditch;Several hooks are fixed on the interconnecting piece and for mounting cable.The cable hanging device of the utility model is, it can be achieved that temporary cable lays and replaces cable position according to the architectural engineering different construction stages;For the cable hanging device of the utility model relative to Normal practice, construction speed is fast, at low cost, safe and reliable, repeatable to be used in turn, and the expense input of temporary electricity is greatly reduced.

Description

A kind of cable hanging device
Technical field
The utility model is related to technical field of buildings, and in particular to a kind of construction site temporary cable mounting fixing device.
Background technology
Cable laying refers to reaching electrical equipment or the cabling mode of another distribution box after cable comes out from distribution box. Such as be along secretly applied along top plate along wall, surface, it is all common overhead cabling method to walk crane span structure, walk cable duct, cabling channel etc., Suitable overhead cabling method is selected depending on different environment, condition, property.Building engineering construction scene is both needed to laying temporary cable To ensure construction, production requirement.Normal practice is to need buried-pipe laying or laid using cable testing bridge.Both the above Normal practice There is different degrees of defect and cost is higher.When using buried-pipe laying, when needing replacing cable position, need to dig on cable Go out, cable destruction is be easy to cause during digging out cable;When being laid using crane span structure, occupation of land is larger, and is easy to be trampled brokenly It is bad.
Utility model content
Technical problem to be solved in the utility model is in view of the deficiencies of the prior art, to provide a kind of cable mounting dress It sets.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of cable hanging device is applied for building Cable laying in the foundation pit of work scene;Including support portion, interconnecting piece and several hooks, described support portion one end is fixed on the foundation pit On ground around top, the other end extends towards the foundation pit edge;The interconnecting piece is arranged in along the gradient of the foundation pit On the foundation pit inner wall, the interconnecting piece upper end is fixed on the support portion close to the one end at the foundation pit edge, the connection Subordinate end extends towards the bottom of foundation ditch;Several hooks are fixed on the interconnecting piece and for mounting cable.
The utility model has the beneficial effects that:The cable hanging device of the utility model, it can be achieved that temporary cable laying with And cable position is replaced according to the architectural engineering different construction stages;The cable hanging device of the utility model is done relative to conventional Method, construction speed is fast, at low cost, safe and reliable, repeatable to be used in turn, and the expense input of temporary electricity is greatly reduced.
Based on the above technical solution, the utility model can also do following improvement.
Further, the interconnecting piece is connecting rod, and the connecting rod and the hook are all made of reinforcing bar and are made, several described The length direction linked up with along the connecting rod is arranged.
Advantageous effect using above-mentioned further scheme is:By the way that several hooks are arranged along the length direction of connecting rod Cloth is, it can be achieved that difference mounts the demands of height in foundation pit.
Further, the interconnecting piece is connection net, and it is online that several hooks are fixed on the connection.
Advantageous effect using above-mentioned further scheme is:Net is connected by setting, and several hooks are fixed on connection On the net, it can be achieved that the cable mounting that different zones require.
Further, the support portion is supporting rod, and the supporting rod and the hook are all made of reinforcing bar and are made, the support Bar is wholely set with the interconnecting piece.
Advantageous effect using above-mentioned further scheme is:By the way that supporting rod is arranged, and supporting rod and interconnecting piece is integrated Setting, facilitates and prepares cable hanging device.
Further, the support portion is fixed on by an angle steel on the ground around at the top of the foundation pit.
Advantageous effect using above-mentioned further scheme is:By the way that support portion is fixed on week at the top of foundation pit by an angle steel It is simple in structure on the ground enclosed, raw material is saved, and more firm with the connection on ground.
Further, the angle steel is fixed on by expansion bolt on the ground.
Advantageous effect using above-mentioned further scheme is:Angle steel is fixed on the ground using expansion bolt, structure is steady Gu the grasp with ground is stronger.
Further, it offers several connecting holes on the interconnecting piece, grafting and institute is fixed on after hook one end bending It states in connecting hole, is crimped on the interconnecting piece in the middle part of the hook, the hook other end is to away from the side of the interconnecting piece To extension.
Advantageous effect using above-mentioned further scheme is:By the way that several connecting holes are arranged on interconnecting piece, and will hook Simultaneously plugged and fixed keeps the connection of hook and interconnecting piece even closer reliable, considerably increases hook in connecting hole for one end bending Load-bearing range.
Further, the hook is welded or is detachably connected with the interconnecting piece.
Advantageous effect using above-mentioned further scheme is:By by welding hook or being detachably connected on interconnecting piece, Connection is more firm.
Further, it is arranged with electro-insulating rubber casing on the hook.
Advantageous effect using above-mentioned further scheme is:By being arranged electro-insulating rubber casing on hook, prevent from linking up with It leaks electricity with cable friction broken skin.
Further, the cable is fixed on by plastics clasp on the hook.
Advantageous effect using above-mentioned further scheme is:By the way that cable to be fixed on by plastics clasp on hook, prevent Only in the construction process, cable is deviate from from hook.
Description of the drawings
Fig. 1 is a kind of side structure schematic view of embodiment of the utility model;
Fig. 2 is the side structure schematic view of the utility model another embodiment.
In attached drawing, parts list represented by the reference numerals are as follows:
1, support portion;2, interconnecting piece;21, connecting hole;3, it links up with;4, angle steel;41, expansion bolt.
Specific implementation mode
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining this practicality It is novel, it is not intended to limit the scope of the utility model.
As depicted in figs. 1 and 2, a kind of cable hanging device of the present embodiment, for cable in construction site foundation pit Laying;Including support portion 1, interconnecting piece 2 and several hooks 3,1 one end of the support portion is fixed on the ground around at the top of the foundation pit On face, the other end extends towards the foundation pit edge;The interconnecting piece 2 is arranged in the foundation pit inner wall along the gradient of the foundation pit On, 2 upper end of the interconnecting piece is fixed on the support portion 1 close to the one end at the foundation pit edge, 2 lower end direction of the interconnecting piece The bottom of foundation ditch extends;Several hooks 3 are fixed on the interconnecting piece 2 and for mounting cable.
The cable hanging device of the present embodiment is, it can be achieved that temporary cable laid and according to the architectural engineering different construction stages Replace cable position;For the cable hanging device of the utility model relative to Normal practice, construction speed is fast, at low cost, safe can It leans on, it is repeatable to be used in turn, the expense input of temporary electricity is greatly reduced.
As depicted in figs. 1 and 2, an embodiment of the present embodiment, the interconnecting piece 2 are connecting rod, the connecting rod Reinforcing bar is all made of with the hook 3 to be made, several hooks 3 are arranged along the length direction of the connecting rod.By will be several The hook is arranged along the length direction of connecting rod, it can be achieved that difference mounts the demands of height in foundation pit.In addition, the present embodiment In, other than it can weld multiple hooks successively from top to bottom in connecting rod, connecting rod bottom can be also bent to form to an extension Hook considerably increases the mounting space of cable.
The present embodiment another embodiment, the interconnecting piece 2 are connection net, and several hooks 3 are fixed on the company It connects online.Connection net can also be welded to each other support using reinforcing bar, connect net by setting, and several hooks are fixed on connection On the net, it can be achieved that the cable mounting that different zones require.
The support portion 1 of the present embodiment is supporting rod, and the supporting rod and the hook 3 are all made of reinforcing bar and are made, institute Supporting rod is stated to be wholely set with the interconnecting piece 2.By the way that supporting rod is arranged, and supporting rod and interconnecting piece are wholely set, it is convenient Prepare cable hanging device.
As depicted in figs. 1 and 2, the support portion 1 of the present embodiment is fixed on surrounding at the top of the foundation pit by an angle steel 4 Ground on.It is simple in structure by the way that support portion to be fixed on by an angle steel on the ground around at the top of foundation pit, raw material is saved, And it is more firm with the connection on ground.Specifically, the angle steel length that the present embodiment uses is highly 5cm with width for 20cm.
As depicted in figs. 1 and 2, the angle steel 4 of the present embodiment is fixed on by expansion bolt 41 on the ground.At angle The hole of a diameter of 12mm is beaten on steel 4, is then fixed on the ground angle steel 4 by expansion bolt 41.Using expansion bolt by angle Steel fixes on the ground, stabilized structure, stronger with the grasp on ground.
As shown in Fig. 2, several connecting holes 21 are offered on the interconnecting piece 2 of the present embodiment, the bending of 3 one end of the hook It grafting and is fixed in the connecting hole 21 afterwards, 3 middle part of the hook is crimped on the interconnecting piece 2,3 other ends of the hook Extend to away from the direction of the interconnecting piece 2.Hook 3 is general to be fixed on by the way of welding in connecting hole 21, by even Several connecting holes are set in socket part, and hook one end is bent simultaneously plugged and fixed to make the company of hook and interconnecting piece in connecting hole It connects even closer reliable, considerably increases the load-bearing range of hook.
One preferred embodiment of the present embodiment, the bending angle after 3 other ends of hook extend are less than 90 °.
The hook 3 of the present embodiment is welded or is detachably connected with the interconnecting piece 2.By by welding hook or removable It unloads and is connected on interconnecting piece, connection is more firm.
It is arranged with electro-insulating rubber casing on the hook 3 of the present embodiment.By being arranged electro-insulating rubber casing on hook, Prevent hook with cable friction broken skin and leak electricity.
The cable can be fixed on by plastics clasp on the hook 3 by a kind of preferred embodiment of the present embodiment.Pass through Cable is fixed on by plastics clasp on hook, is prevented in the construction process, cable is deviate from from hook.
Using being usually the discarded reinforcing bar in construction site in the present embodiment, bar diameter 12mm, then by reinforcing bar according to Preset requirement is bent into certain shape and forms.For example, a reinforcing bar is bent into the angle being adapted to the foundation pit gradient, by reinforcing bar A part for bending is placed on the ground on foundation pit and fixes, and another part that reinforcing bar is bent is laid on foundation pit surface vertically And extend downwardly, and the bottom that reinforcing bar is located to the part in foundation pit is bent to form a hook, then weld on the portion Several hooks form a kind of cable hanging device.
The cable hanging device of the multiple the present embodiment of setting in foundation pit that can be at the construction field (site), two neighboring cable mounting dress Clipping room between setting according to cable model and weight etc. away from controlling between 6-15 meters.The cable hanging device of the present embodiment is applied Work facilitates, and progress is fast, the time is saved, convenient for replacing position at any time as needed;And it is processed using salvage property, cost It is low, it is repeatable to be used in turn function, greatly reduce cost.
In the description of the present invention, it should be understood that term "center", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on ... shown in the drawings Or position relationship, be merely for convenience of describing the present invention and simplifying the description, do not indicate or imply the indicated device or Element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as the limit to the utility model System.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.The meaning of " plurality " is at least two, such as two in the description of the present invention, It is a, three etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be Mechanical connection can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary two The interaction relationship of connection or two elements inside element, unless otherwise restricted clearly.For the common skill of this field For art personnel, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the present invention unless specifically defined or limited otherwise, fisrt feature is "above" or "below" second feature Can be that the first and second features are in direct contact or the first and second features pass through intermediary mediate contact.Moreover, first is special Sign second feature " on ", " top " and " above " can be fisrt feature and be directly above or diagonally above the second feature, or only Indicate that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be with It is that fisrt feature is directly under or diagonally below the second feature, or is merely representative of fisrt feature level height and is less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is contained at least one embodiment or example of the utility model.In the present specification, to the schematic table of above-mentioned term It states and is necessarily directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be with It can be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, this field Technical staff can by the feature of different embodiments or examples described in this specification and different embodiments or examples into Row combines and combination.
Although the embodiments of the present invention have been shown and described above, it is to be understood that above-described embodiment is Illustratively, it should not be understood as limiting the present invention, those skilled in the art are in the scope of the utility model Inside it can make changes, modifications, alterations, and variations to the above described embodiments.

Claims (10)

1. a kind of cable hanging device, for cable laying in construction site foundation pit;It is characterised in that it includes support portion, Interconnecting piece and several hooks, described support portion one end are fixed on the ground around at the top of the foundation pit, and the other end is described in Foundation pit edge extends;The interconnecting piece is arranged in along the gradient of the foundation pit on the foundation pit inner wall, and the interconnecting piece upper end is solid The support portion is scheduled on close to the one end at the foundation pit edge, the interconnecting piece lower end extends towards the bottom of foundation ditch;It is several The hook is fixed on the interconnecting piece and for mounting cable.
2. a kind of cable hanging device according to claim 1, which is characterized in that the interconnecting piece is connecting rod, the company Extension bar and the hook are all made of reinforcing bar and are made, and several hooks are arranged along the length direction of the connecting rod.
3. a kind of cable hanging device according to claim 1, which is characterized in that the interconnecting piece is connection net, Ruo Gansuo It states hook and is fixed on the connection on the net.
4. a kind of cable hanging device according to claim 1, which is characterized in that the support portion is supporting rod, the branch Strut and the hook are all made of reinforcing bar and are made, and the supporting rod is wholely set with the interconnecting piece.
5. a kind of cable hanging device according to claim 1, which is characterized in that the support portion is fixed on by an angle steel On ground around at the top of the foundation pit.
6. a kind of cable hanging device according to claim 5, which is characterized in that the angle steel is fixed on by expansion bolt On the ground.
7. a kind of cable hanging device according to claim 1, which is characterized in that offer several connections on the interconnecting piece Hole grafting and is fixed in the connecting hole after the bending of described hook one end, is crimped on the interconnecting piece in the middle part of the hook, The hook other end extends to away from the direction of the interconnecting piece.
8. a kind of cable hanging device according to claim 1, which is characterized in that it is described hook with the interconnecting piece welding or It is detachably connected.
9. a kind of cable hanging device according to claim 1, which is characterized in that be arranged with insulation rubber sleeve on the hook Pipe.
10. a kind of cable hanging device according to claim 1, which is characterized in that the cable is fixed by plastics clasp On the hook.
CN201820296480.4U 2018-03-02 2018-03-02 A kind of cable hanging device Expired - Fee Related CN207801426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820296480.4U CN207801426U (en) 2018-03-02 2018-03-02 A kind of cable hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820296480.4U CN207801426U (en) 2018-03-02 2018-03-02 A kind of cable hanging device

Publications (1)

Publication Number Publication Date
CN207801426U true CN207801426U (en) 2018-08-31

Family

ID=63275814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820296480.4U Expired - Fee Related CN207801426U (en) 2018-03-02 2018-03-02 A kind of cable hanging device

Country Status (1)

Country Link
CN (1) CN207801426U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112398071A (en) * 2020-11-02 2021-02-23 中船黄埔文冲船舶有限公司 Shore power cable hook tool
CN112665742A (en) * 2020-11-20 2021-04-16 深圳供电局有限公司 Cable temperature measuring device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112398071A (en) * 2020-11-02 2021-02-23 中船黄埔文冲船舶有限公司 Shore power cable hook tool
CN112665742A (en) * 2020-11-20 2021-04-16 深圳供电局有限公司 Cable temperature measuring device

Similar Documents

Publication Publication Date Title
CN104563384B (en) A kind of decoration integrated large scale prefabricated out-hung panel of structural thermal insulation and preparation method thereof
CN207801426U (en) A kind of cable hanging device
CN104989109B (en) It is a kind of at the same lift room beam purlin method
CN107516866A (en) A kind of Prefabricated cable duct
CN109138452A (en) Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
JP5897902B2 (en) Refrigerant piping unit and refrigerant piping construction method
CN208792505U (en) A kind of precast wall body and assembling structure of assembled architecture
CN204592560U (en) A kind of adjustable cable crane span structure support supported for curved wall
CN207032296U (en) A kind of spliced underground pipe gallery
CN110439350A (en) A kind of low-voltage distributing line support bar
CN108150198A (en) For the formwork jumbo for pipe gallery of constructing
KR20140140838A (en) Structure of power-transmission tower
CN108011338A (en) Combined cable support for cable duct
CN210567041U (en) Vibration-damping and anti-seismic support hanger
CN209780132U (en) Laying structure of assembled ceramic tile
CN208046093U (en) Branch stake tool and emergency rescue device
CN205829120U (en) A kind of cable intermediate joint well structure
CN209082792U (en) A kind of connection structure on straight building floor
CN208123629U (en) Outdoor overhead lifting pipeline equipment
CN207053113U (en) A kind of support meanss for crane span structure
CN218415674U (en) Steel truss structure capable of laying power pipeline
Shmelev et al. Experimental study of the work of a temporary structure of a dismountable bar system
CN205840358U (en) A kind of rearmounted hook gear
CN219528344U (en) Platform suspension scaffold device capable of being erected rapidly
CN104594617A (en) Suspension cable scaffold for construction of high-rise roof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831