CN207794568U - For fitting up fixed leveling inserted link component - Google Patents
For fitting up fixed leveling inserted link component Download PDFInfo
- Publication number
- CN207794568U CN207794568U CN201721641517.4U CN201721641517U CN207794568U CN 207794568 U CN207794568 U CN 207794568U CN 201721641517 U CN201721641517 U CN 201721641517U CN 207794568 U CN207794568 U CN 207794568U
- Authority
- CN
- China
- Prior art keywords
- leveling
- inserted link
- finishing
- block
- main material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 claims abstract description 61
- 230000002093 peripheral effect Effects 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 7
- 238000005034 decoration Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 229920002635 polyurethane Polymers 0.000 description 4
- 239000004814 polyurethane Substances 0.000 description 4
- 125000003003 spiro group Chemical group 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 239000000919 ceramic Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000411 inducer Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000004579 marble Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Landscapes
- Floor Finish (AREA)
Abstract
One kind is used to fit up fixed leveling inserted link component, including:Leveling inserted link;Expanding block, the expanding block is separable to be arranged on the leveling inserted link.When needing using expanding block, expanding block is removed, and be inserted into connecting sleeve from leveling inserted link, connecting sleeve is easily fixed to and is waited in finishing portion.At this time, leveling inserted link is inserted into connecting sleeve, and finishing main material is fixedly installed to and waits for finishing portion, by adjusting the finishing leveling component in finishing main material, finishing main material can be changed and wait for the gap between finishing portion so that finishing main material be not in and category to be fitted up as surface irregularity or inclined situation.This method operation is relatively simple, conveniently, even the decoration worker that experience is less, also can preferably complete the installation of finishing main material.Simultaneously, additionally it is possible to save the finishing time, reduce construction cost.
Description
Technical field
The utility model is related to home improvement arts, and in particular to one kind is for fitting up fixed leveling inserted link component.
Background technology
During house decoration, first have to do is exactly to be fitted up to ground and metope.
For example, being if desired laid with floor heating, then need to be laid with insulating layer on the ground, then again by solid wooden floor board or marble
Ceramic tile etc. is laid on insulating layer.But ground to be fitted up is often and out-of-flatness in the prior art, is easy to cause and is layed in ground
The run-off the straights such as insulating layer, solid wooden floor board and ceramic tile on face influence beauty, reduce customer experience.In addition, waiting in the prior art
The often also simultaneously out-of-flatness of the metope of finishing is easy during being fitted up to metope so that being installed on the decoration on metope
Plate run-off the straight, it is same to influence beautiful, reduction customer experience.
In the prior art, to avoid the finishing layer run-off the straight for being layed in ground or being installed on metope, it usually needs warp
Abundant decoration worker is tested to carry out field survey, calculating and supervise construction.Such mode generally requires a large amount of experience accumulation, no
Conducive to young decoration worker's independently working;In addition, the flatness of finishing layer also can not preferably be ensured, it can also increase and apply
Work cost extends construction period.
Utility model content
The utility model solves the problems, such as it is the flat of the finishing layer for being layed in ground in the prior art or being installed on metope
Whole degree also can not preferably be ensured, construction cost can be also increased, and extend construction period.
It is used to fit up fixed leveling inserted link component to solve the above problems, the utility model provides one kind, including:Leveling
Inserted link;Expanding block, the expanding block is separable to be arranged on the leveling inserted link.
Optionally, the expanding block is arranged in axial one end of leveling inserted link.
Optionally, the leveling inserted link includes the head rod set gradually in an axial direction, the second connecting rod, and described first
Connecting rod waits for finishing portion for being fixedly connected with finishing main material, second connecting rod for being fixedly connected.
Optionally, the expanding block is arranged in the second connecting rod.
Optionally, the leveling inserted link component further includes the second gripping block, and second gripping block is fixedly installed on described
Leveling inserted link, and the head rod, the second connecting rod are located at the both sides of second gripping block.
Optionally, plane where second gripping block is perpendicular to the leveling inserted link.
Optionally, the peripheral surface of the head rod is equipped with external screw thread;The periphery of second connecting rod and/or
Face is equipped with external screw thread.
Optionally, the length of the head rod is less than the length of second connecting rod.
Optionally, the end face of the other end of the leveling inserted link is equipped with slot or protrusion.
Optionally, section circular in shape of the expanding block on axial direction, and the head of the expanding block
Form tip.
Compared with prior art, the technical solution of the utility model has the following advantages:
Described is used to fit up fixed leveling inserted link component, including leveling inserted link and expanding block, by consolidating expanding block
It is fixed to be arranged on leveling inserted link.Therefore, when needing using expanding block, expanding block is removed from leveling inserted link, and is inserted into
In connecting sleeve, connecting sleeve is easily fixed to and is waited in finishing portion.At this point, leveling inserted link is inserted into connecting sleeve
In, and finishing main material is fixedly installed to and waits for finishing portion.If when the surface irregularity in finishing portion or inclination, by adjusting finishing
Finishing leveling component in main material can change finishing main material and wait for the gap between finishing portion, so that finishing main material is not
Will appear and category to be fitted up as surface irregularity or inclined situation.
Due to only needing the relative position between adjustment leveling inserted link and connecting sleeve, it can ensure that multiple finishing main materials are equal
On same vertical plane or same level.This method operation is relatively simple, conveniently, even the upfitter that experience is less
People also can preferably complete the installation of finishing main material.Simultaneously, additionally it is possible to save the finishing time, reduce construction cost.
Further, since expanding block is fixed on leveling inserted link, so as to avoid the loss of expanding block in fitment process, and
And expanding block and leveling inserted link are arranged in a one-to-one correspondence, and expanding block missing or extra situation will not be caused to occur.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model specific embodiment finishing leveling component;
Fig. 2, Fig. 3 are that finishing leveling component shown in Fig. 1 is fixedly connected with sectional view when finishing portion and finishing main material respectively;
Fig. 4, Fig. 5 are structural schematic diagram of the connecting sleeve shown in Fig. 1 under different shape respectively;
Fig. 6 is the structural schematic diagram of the component of leveling inserted link shown in Fig. 1;
Fig. 7 is schematic diagram of the component of leveling inserted link shown in Fig. 6 on the directions A;
Fig. 8 is the sectional view of the first gripping block shown in Fig. 1;
Fig. 9 is schematic diagram of first gripping block on the directions B shown in Fig. 8.
Specific implementation mode
It is understandable to enable the above objects, features, and advantages of the utility model to become apparent, below in conjunction with the accompanying drawings to this
The specific embodiment of utility model is described in detail.
Referring to Fig.1, a kind of finishing leveling component 100, including connecting sleeve 10, leveling inserted link 20 and fixing piece 30.Wherein,
The connecting sleeve 10 is for being fixed in the finishing portion that waits for (such as blank floor, blank metope etc.);The leveling inserted link
20 one end is fixed and is plugged in connecting sleeve 10, and can be as needed, adjusts the leveling inserted link 20 and connecting sleeve 10
Between relative position;The fixing piece 30 is fixed at the other end of leveling inserted link 20, for immovable fixture main material (such as
The decorative panel etc. for being layed in the insulating layer on ground, being installed on metope).
With reference to Fig. 2, Fig. 3, when need will the installation of finishing main material 200 to when in finishing portion 300, first by the connecting sleeve
10 installations are to waiting in finishing portion 300, at this point, waiting for that the connecting sleeve 10 is fixed in finishing portion 300.Then, main material 200 will be fitted up
Installation is fixed main material 200 is fitted up with leveling inserted link 20 to leveling inserted link 20, and using fixing piece 30.Finally, make leveling inserted link
20 one end is inserted into connecting sleeve 10, by being fixedly connected for leveling inserted link 20 and connecting sleeve 10, so as to by institute
Finishing main material 200 is stated to be fixed to and wait in finishing portion 300.
It should be noted that Fig. 2, Fig. 3 illustrate only a finishing leveling component 100 to be fixedly connected with finishing main material
200 and wait for finishing portion 300, it is therefore intended that illustrate the concrete operating principle for fitting up leveling component 100.But it is applied in actually finishing
During work, a finishing main material 200 is often equipped with multiple finishing leveling components 100, and multiple finishing leveling components 100 are uniform
Distribution, the finishing main material 200 is preferably fixed to and waits for finishing portion 300.
When the surface irregularity in finishing portion 300 or inclination, finishing portion is waited for if finishing main material 200 is directly fixed to
300, then it can lead to out-of-flatness or inclined situation occur between multiple finishing main materials 200.
In the present embodiment, by adjusting the leveling inserted link 20 in the position of connecting sleeve 10, change 20 He of leveling inserted link
Relative position between connecting sleeve 10, so as to change finishing main material 200 and wait for the gap between finishing portion 300.Also
It is to say, if waiting for surface irregularity or the inclination in finishing portion 300, by adjusting multiple finishing leveling components in finishing main material 200
100, finishing main material 200 can be made and wait between finishing portion 300 that the gap at various locations is inconsistent, so that finishing master
Material 200 is not in the surface irregularity similar with finishing portion 300 is waited for or inclined situation.
By the way that the finishing leveling component 100 in multiple finishing main materials 200 is adjusted, multiple finishing main materials can be made
200 are respectively positioned in same vertical plane or same level.To make the metope after finishing or ground that there is preferable appearance, promoted
Customer satisfaction.
The present embodiment adjusts the method that finishing main material keeps its smooth, it is only necessary to leveling described in adjustment finishing leveling component 100
Relative position between inserted link 20 and connecting sleeve 10, operation is relatively simple, conveniently, even the decoration worker that experience is less,
Also the installation of finishing main material 200 can preferably be completed.Compared to the prior art, additionally it is possible to save the finishing time, reduce construction
Cost.
With reference to Fig. 4, Fig. 5, in the present embodiment, the connecting sleeve 10 includes interconnecting piece 11 and bulge 12.The connection
Portion 11 is suitable for radially expanding waiting for finishing portion to be fixedly connected for being fixedly connected with leveling inserted link 20, the bulge 12.
Specifically, there is the interconnecting piece 11 first centre bore aa, inner circumferential surface to be equipped with internal thread;The leveling inserted link
20 have external screw thread (shown in Fig. 6), and leveling inserted link 20 is inserted into the first centre bore aa, are spirally connected fixation with the interconnecting piece 11.
Therefore, by rotating the leveling inserted link 20, position of the leveling inserted link 20 in connecting sleeve 10 can be changed, in turn
Finishing main material 200 can be changed and wait for the gap between finishing portion 300.
The bulge 12 has circumferentially distributed multiple expanding petal 12a, and axial one end of expanding petal 12a is fixedly connected
The interconnecting piece 11 has gap between two neighboring expanding petal 12a.The bulge 12 also has the second centre bore bb, the
Two centre bore bb are connected to the first centre bore aa, and the second centre bore bb is surrounded by circumferentially distributed multiple expanding petal 12a
It forms.
In this implementation, the bulge 12 has three circumferentially distributed expanding petal 12a.In other variations.
Two expanding petal 12a can be only set;Alternatively, more than four expanding petal 12a are arranged, the reality of the technical program is not influenced
It applies.
As shown in figure 5, the finishing leveling component 100 further includes expanding block 40, expanding block 40 is on axial direction x
Section circular in shape, and the outer diameter of the expanding block 40 be more than the second centre bore bb aperture.Therefore, when expanding block 40 is stretched
When entering to the second centre bore bb, the radially outer extruding force that expanding petal 12a is bestowed by expanding block 40, multiple expanding petal 12a
Radially outward deform.I.e. radially expansion outward, radial dimension increase bulge 12.
Specifically, the expanding block 40 is made of hard material, radial anti-work of the expanding block 40 by expanding petal 12a is avoided
It deforms when firmly, to cannot preferably strut the expanding petal 12a.In addition, the head of the expanding block 40 forms point
End, so that expanding block 40 more can be stretched to readily in the second centre bore bb.
When needing to install the connecting sleeve 10 to when finishing portion 300, hole 301 is first opened up on waiting for finishing portion 300
(shown in Fig. 2, Fig. 3), and the diameter in hole 301 is made to be slightly larger than the diameter (unexpanded connecting sleeve) of connecting sleeve 10, so as to connect
Female connector pipe 10 can be smoothly inserted into hole 301.Then, by the expanding block 40, in axial direction x is inserted into the second centre bore
In bb.At this point, multiple expanding petal 12a radially outward deform, bulge 12 radially expands, with the hole for waiting for finishing portion
301 inner circumferential towards contact, squeeze and be fixed.
Further, convex block (not shown) can also be set on the peripheral surface of the expanding petal 12a, bulge 12 exists
In expansion process, convex block can radially be inserted into the inside for waiting for finishing portion 300, so that connecting sleeve 10 can preferably be consolidated
It is fixed to waiting for finishing portion 300.
One end of the interconnecting piece 11 is connected from the bulge 12 when connecting sleeve 10 is unexpanded with continued reference to Fig. 4
To the other end of bulge 12, the aperture of the second centre bore bb is gradually reduced.Since expanding block 40 is made of hard material,
It is not susceptible to deform.When in axial direction x is inserted into the second centre bore bb to expanding block 40, the insertion of the expanding block 40 is deeper,
Expanding petal 12a deformation is bigger, and the radial dimension of bulge 12 is also bigger, and waits for that being fixedly connected for finishing portion is more firm
Gu.
Therefore, it waits for finishing portion for different types of, expanding block 40 can be adjusted and be inserted into the specific of the second centre bore bb
Position, so that bulge 12 has more suitable radial dimension so that connecting sleeve 10 and wait for having more between finishing portion
Suitable radial compression power.
It should be noted that using the connecting sleeve 10 that can be shunk and expand in the present embodiment, so that connecting sleeve 10
It can be fixed to and wait in finishing portion.Wherein, the specific material of the connecting sleeve 10 is unrestricted, can be plastic material,
It can also be metal material.In other variations, other fixed forms can also be used, for example, using being spirally connected or being clamped
Form be fixed to and wait in finishing portion.
Further, it is also possible to use other kinds of expanded form with fixed connecting sleeve 10, for example, utilizing material institute itself
The characteristic having is expanded, and is inserted into when finishing portion when by unexpanded connecting sleeve 10, is promoted to be located at by inducer
It waits for that the connecting sleeve 10 in finishing portion is expanded, is waited in finishing portion to which the connecting sleeve 10 to be fixed to.It does not influence
The implementation of the technical program.
It is the structural schematic diagram of leveling inserted link component with reference to Fig. 6.The leveling inserted link component includes leveling inserted link 20, swollen
Expansion block 40 and the second gripping block 32.Wherein, the expanding block 40 is separable is set to leveling inserted link 20.It is needing using expansion
When block 40, expanding block 40 is removed from the leveling inserted link 20, and is inserted into the second centre bore bb of connecting sleeve 10.Such as
This setting, can avoid the loss of expanding block 40 in fitment process, and the expanding block 40, connecting sleeve 10 and leveling inserted link
20 are arranged in a one-to-one correspondence, and the missing of expanding block 40 or extra situation will not be caused to occur.
Specifically, the leveling inserted link 20 includes the head rod 22 set gradually in an axial direction, the second connecting rod 22.Institute
The peripheral surface for stating head rod 22 is equipped with external screw thread, for coordinating fixing piece 30, to be fixedly connected with finishing main material 200;Institute
The peripheral surface for stating the second connecting rod 23 waits for finishing portion for connecting expansion sleeve 10 equipped with external screw thread to be fixedly installed to
300。
Wherein, the expanding block 40 is separable is arranged in axial one end of the second connecting rod 23.
In the present embodiment, the second connecting rod 23 connects expansion sleeve 10, and needs, by rotating the second connecting rod 23, to change
Position of second connecting rod 23 in connecting sleeve 10, to change finishing main material and wait for the gap between finishing portion.To make second
There is connecting rod 23 distance that is adjusted axially of bigger, the length of second connecting rod 23 to be more than the length of the head rod 22
Degree.
It should be noted that in other variations, the axis in head rod 22 can also be arranged in the expanding block 40
To one end or head rod 22, the second connecting rod 23 other positions on.In addition, the expanding block 40 can also be arranged
In connecting sleeve 10.When needing using expanding block 40, expanding block 40 is removed from the connecting sleeve 10, and the company of being inserted into
In second centre bore bb of female connector pipe 10.The implementation of the technical program is not influenced.
With reference to Fig. 7, slot 21, the work of the slot 21 are additionally provided on the end face of the axial other end of the leveling inserted link 20
With rotation leveling inserted link 20 is, to adjust the relative position between leveling inserted link 20 and connecting sleeve 10.Specifically, described insert
Slot 21 can be matched with general screwdriver, by screwdriver to rotate the leveling inserted link 20.In other variations,
Protrusion can be set on the end face, and raised role is also for facilitating rotation leveling inserted link 20.
Referring to Fig.1, Fig. 6, the fixing piece 30 include the first gripping block 31 and the second gripping block 32, first gripping block
31, the second gripping block 32 is in axial direction oppositely arranged.Main material is fitted up to be suitable for being arranged in the first gripping block 31, the second gripping block 32
Between, to be clamped and fixed.
In the present embodiment, first gripping block 31, which is spirally connected, is fixed on the head rod 22.Second gripping block
32 is in the form of annular discs, is fixed on leveling inserted link 20, and the head rod 22, the second connecting rod 23 are located at described
The both sides of two gripping blocks 32.Specifically, second gripping block 32 is perpendicular to the leveling inserted link 20, so that described first clamps
Block 31, the second gripping block 32 being capable of better immovable fixture main materials.
Since the first gripping block 31 is spirally connected fixed head rod 22.It therefore, can by rotating the first gripping block 31
Adjust the spacing between the first gripping block 31 and the second gripping block 32.By adjusting the first gripping block 31 and the second gripping block 32 it
Between spacing, be suitable for clamping finishing main material with different thickness, to keep the application of finishing leveling component 100 more extensive.
With reference to Fig. 8, Fig. 9, first gripping block 31 includes clamping section 31a and spiro union portion 31b.Wherein, the clamping section
31a is in the form of annular discs, is oppositely arranged with second gripping block 32, and finishing main material is suitable for being clamped in the clamping section 31a and the
Between two gripping blocks 32 (shown in Fig. 2, Fig. 3);The spiro union portion 31b has internal thread, suitable for being spirally connected fixation with leveling inserted link 20.
In the present embodiment, through-hole cc is additionally provided on the clamping section 31a.It is typically provided in finishing main material 200 for making tune
The hole 201 (shown in Fig. 2, Fig. 3) that plug flat bar 20 passes through, when this hole 201 has larger diameter, the through-hole cc can be connected to
This hole 201 and the external world.
It is fixedly installed to behind finishing portion 300 when fitting up main material 200, the materials such as polyurethane can be noted by through-hole cc
Enter to hole 201, between the materials such as polyurethane can flow to finishing main material 200 and wait for finishing portion 300, so as to fill finishing
Gap between main material 200, leveling inserted link 20, filling fits up main material 200, waits for the gap between finishing portion 300, to make wall
Or floor has more preferable air-tightness, promotes heat insulation effect, waterproof effect.
Specifically, being set on the clamping section 31a, there are four through-hole cc, four through-hole cc to be uniformly distributed circumferentially.Its
In, the quantity of the through-hole cc is not the limitation to the technical program, size, shape that can be according to clamping section 31a, setting
The particular number of the through-hole cc.
With reference to Fig. 8, between so that the materials such as polyurethane is smoothly injected into finishing main material 200 and is waited for finishing portion 300,
The radial dimension of in axial direction x, the spiro union portion 31b are gradually reduced, and stop the materials edges such as polyurethane to avoid spiro union portion 31b
Axial direction x flowings.
With reference to Fig. 9, in the present embodiment, the end face of first gripping block 31 is equipped with slot 31c.The slot 31c's
Effect is to rotate the first gripping block 31, to adjust the axial distance between the first gripping block 31 and the second gripping block 32.Specifically
, the slot 31c can be matched with general screwdriver, by screwdriver to rotate first gripping block 31.
It should be noted that in the present embodiment, second gripping block 32 is fixed, by the first gripping block 31 along axis
It is moved to direction x, to adjust the axial distance of first gripping block 31, the second gripping block 32.In other variations, may be used also
So that the first gripping block 31 is fixed, by making the second gripping block 32 axially movable, with adjust first gripping block 31,
The axial distance of second gripping block 32;Alternatively, make simultaneously the first gripping block 31, the second gripping block 32 can axially movable, with
Adjust the axial distance of first gripping block 31, the second gripping block 32.The implementation of the technical program is not influenced.
Referring to figs. 1 to Fig. 3, in the present embodiment, finishing main material is installed to waiting for that the mode in finishing portion is as follows:
It waits for opening up hole 301 in finishing portion 300 described, the diameter in the hole 301 is made to be slightly larger than the outer diameter of connecting sleeve 10,
The connecting sleeve 10 is inserted into hole 301, optionally, the end of connecting sleeve 10 is made not stretch out the table for waiting for finishing portion 300
Face.
The expanding block 40 is removed from one end of the leveling inserted link 20, and is inserted into the first centre bore of connecting sleeve
In aa.Using leveling inserted link 20, it is inserted into the first centre bore aa, and rotate leveling inserted link 20.In rotary course, institute
Stating leveling inserted link 20, in axial direction x is moved, and expanding block 40 is pushed in axial direction to move, until expanding block 40 moves to the
In two centre bore bb, and make expanding petal 12a radial outward expansions, the connecting sleeve 10 is fixed to and waits for finishing portion 300.
Leveling inserted link 20 is reversely rotated, is allowed to move to suitable position.The first gripping block is arranged in finishing main material 200
31, between the second gripping block 32, by rotating the first gripping block 31, the first gripping block 31 is made to be moved towards the second gripping block 32 by institute
Finishing main material 200 is stated to be fixedly clamped.
Whether observation finishing main material 200 is located at other finishing main materials on same level or same vertical plane.If it was found that
It fits up main material 200 to tilt, then rotates leveling inserted link 20, until adjusting the finishing main material 200 to horizontal position or vertical position
It sets.Complete installation.
Although the utility model discloses as above, the utility model is not limited to this.Any those skilled in the art,
It does not depart from the spirit and scope of the utility model, can make various changes or modifications, therefore the scope of protection of the utility model
It should be subject to claim limited range.
Claims (10)
1. one kind is for fitting up fixed leveling inserted link component, which is characterized in that including:
Leveling inserted link;
Expanding block, the expanding block is separable to be arranged on the leveling inserted link.
2. leveling inserted link component as described in claim 1, which is characterized in that the axial direction in leveling inserted link is arranged in the expanding block
One end.
3. leveling inserted link component as described in claim 1, which is characterized in that the leveling inserted link includes setting gradually in an axial direction
Head rod, the second connecting rod, for being fixedly connected with finishing main material, second connecting rod is used for the head rod
It is fixedly connected and waits for finishing portion.
4. leveling inserted link component as claimed in claim 3, which is characterized in that the expanding block is arranged in the second connecting rod.
5. leveling inserted link component as claimed in claim 3, which is characterized in that further include the second gripping block, described second clamps
Block is fixedly installed on the leveling inserted link, and the head rod, the second connecting rod are located at second gripping block
Both sides.
6. leveling inserted link component as claimed in claim 5, which is characterized in that plane is perpendicular to institute where second gripping block
State leveling inserted link.
7. leveling inserted link component as claimed in claim 3, which is characterized in that the peripheral surface of the head rod is equipped with outer
Screw thread;And/or the peripheral surface of second connecting rod is equipped with external screw thread.
8. leveling inserted link component as claimed in claim 3, which is characterized in that the length of the head rod is less than described the
The length of two connecting rods.
9. leveling inserted link component as claimed in claim 2, which is characterized in that set on the end face of the other end of the leveling inserted link
There are slot or protrusion.
10. leveling inserted link component as described in claim 1, which is characterized in that the expanding block is on axial direction
Section circular in shape, and the head of the expanding block forms tip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721641517.4U CN207794568U (en) | 2017-11-30 | 2017-11-30 | For fitting up fixed leveling inserted link component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721641517.4U CN207794568U (en) | 2017-11-30 | 2017-11-30 | For fitting up fixed leveling inserted link component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207794568U true CN207794568U (en) | 2018-08-31 |
Family
ID=63285235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721641517.4U Active CN207794568U (en) | 2017-11-30 | 2017-11-30 | For fitting up fixed leveling inserted link component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207794568U (en) |
-
2017
- 2017-11-30 CN CN201721641517.4U patent/CN207794568U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207999047U (en) | Ground levelling device and leveling component | |
CN207609113U (en) | Fit up leveling component and house decoration structure | |
CN207794552U (en) | Fit up leveling component | |
CN211229356U (en) | Variable ground rapid decoration keel frame | |
CN207794568U (en) | For fitting up fixed leveling inserted link component | |
CN210947284U (en) | Leveling support member for assembly type keel partition wall ground | |
CN209742375U (en) | Hole reservation device for building engineering | |
CN109853910A (en) | Finishing leveling component | |
CN109853895A (en) | Finishing leveling component and house decoration structure | |
CN103321382B (en) | Connecting piece and construction method for mounting building decorative stone panel | |
CN207195394U (en) | Expansion tube, house decoration component and house decoration package assembly | |
CN110067361A (en) | A kind of assembled facing horizontal splicing mounting structure and installation method | |
CN104819193A (en) | Invisible expansion screw suitable for multiple wall bodies | |
CN112282276B (en) | Landscape wall panel | |
CN209856175U (en) | Adjustable anchor bolt | |
CN219548262U (en) | Floor bracket | |
CN203334599U (en) | Connector for installing decorative stone panel of building | |
CN204876085U (en) | Pre -buried expand tube of prefab and precast concrete spare | |
CN219298833U (en) | Arc chamfering trowel easy to adjust | |
CN109469672A (en) | Expansion tube, house decoration component and house decoration package assembly | |
CN207999027U (en) | Ground composite plate module | |
CN208040839U (en) | Hiding connector for two plates | |
CN106384685A (en) | 86-type universal soft bottom box | |
CN216239588U (en) | Fitment leveling subassembly | |
CN216896089U (en) | Positioning installation groove supplementing die |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191108 Address after: 201105 floor 5, No. 277, Huqingping Road, Minhang District, Shanghai Patentee after: Heshi (Shanghai) Construction Technology Co., Ltd Address before: 201101 Building 1, building 859, Lane 2, Zhongyi Road, Minhang District, Shanghai Patentee before: Zhang Yinqiang |
|