CN109853895A - Finishing leveling component and house decoration structure - Google Patents

Finishing leveling component and house decoration structure Download PDF

Info

Publication number
CN109853895A
CN109853895A CN201711242400.3A CN201711242400A CN109853895A CN 109853895 A CN109853895 A CN 109853895A CN 201711242400 A CN201711242400 A CN 201711242400A CN 109853895 A CN109853895 A CN 109853895A
Authority
CN
China
Prior art keywords
finishing
leveling
sleeve
bar
main material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711242400.3A
Other languages
Chinese (zh)
Inventor
张引强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711242400.3A priority Critical patent/CN109853895A/en
Publication of CN109853895A publication Critical patent/CN109853895A/en
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

A kind of finishing leveling component and house decoration structure, the finishing leveling component includes: leveling bar, and described axial one end for leveling bar is adapted to abut against portion to be fitted up;Disk is leveled, with sleeve and the wing for being fixedly installed on the sleeve, and extending radially outward;The leveling bar fixation is inserted in the sleeve, and the relatively described sleeve is adjustable along the axial direction position, and the wing is adapted for contact with surface of the finishing main material towards portion to be fitted up.By adjusting the position of the opposite leveling disk of leveling bar in the axial direction, the axial one end for leveling bar is set mutually to be butted on the surface to be installed for repairing portion, make the surface for the wing contact finishing main material for leveling disk, and finishing main material can be changed and to the gap between finishing portion, be vertically arranged or be horizontally disposed with so as to make to fit up main material.This method operation is relatively simple, conveniently, even the decoration worker that experience is less, also can preferably complete the installation of finishing main material.Simultaneously, additionally it is possible to save the finishing time, reduce construction cost.

Description

Finishing leveling component and house decoration structure
Technical field
The present invention relates to home improvement arts, and in particular to a kind of finishing leveling component and house decoration structure.
Background technique
During house decoration, first have to do is exactly to fit up to ground and metope.
For example, being if desired laid with floor heating, then need to be laid with insulating layer on the ground, then again by solid wooden floor board or marble Ceramic tile etc. is laid on insulating layer.But ground to be fitted up is often and out-of-flatness in the prior art, is easy to cause and is layed in ground The run-off the straights such as insulating layer, solid wooden floor board and ceramic tile on face influence beauty, reduce customer experience.In addition, in the prior art to Often also simultaneously out-of-flatness is easy during fitting up to metope so that being installed on the decoration on metope the metope of finishing Plate run-off the straight, it is same to influence beautiful, reduction customer experience.
In the prior art, to avoid the finishing layer run-off the straight for being layed in ground or being installed on metope, it usually needs warp Decoration worker abundant is tested to carry out field survey, calculating and supervise construction.Such mode generally requires a large amount of experience accumulation, no Conducive to young decoration worker's independently working;In addition, the flatness of finishing layer also can not preferably be guaranteed, it also will increase and apply Work cost extends construction period.
Summary of the invention
Problems solved by the invention is the flatness for the finishing layer for being layed in ground in the prior art or being installed on metope Also it can not preferably be guaranteed, also will increase construction cost, extend construction period.
To solve the above problems, the present invention provides a kind of finishing leveling component, comprising:
Bar is leveled, axial one end of the leveling bar is adapted to abut against portion to be fitted up;
Disk is leveled, with sleeve and the wing for being fixedly installed on the sleeve, and extending radially outward;
The leveling bar fixation is inserted in the sleeve, and the relatively described sleeve is adjustable along the axial direction position, institute It states the wing and is adapted for contact with surface of the finishing main material towards portion to be fitted up.
Optionally, the finishing leveling component further includes gasket, and the gasket is set to axial one end of the leveling bar, The leveling bar is connected to the portion to be fitted up by the gasket.
Optionally, the leveling bar, which is spirally connected, is fixed on the leveling disk.
Optionally, the wing is the fixed disk being set in outside the sleeve;Or, the outer peripheral surface of the sleeve is equipped with more A wing, multiple wings are respectively positioned on same plane.
Optionally, the wing is fixedly installed on axial one end of the sleeve.
Optionally, the axial other end from described axial one end of the sleeve to the sleeve, the outer diameter of the sleeve It is gradually reduced.
Optionally, the gasket is rotatably arranged on the leveling bar or is fixedly installed on the leveling bar.
Optionally, the face of the gasket towards leveling bar is equipped with annular protrusion, and the leveling bar is plugged in the annular In raised area defined.
Optionally, the end face of the axial other end of the leveling bar is equipped with slot or protrusion.
In order to solve the above technical problems, the present invention also provides a kind of room fitting structure, including portion to be fitted up and finishing main material, The finishing main material is equipped with mounting hole;
The house decoration structure further includes above-described finishing leveling component;
In the mounting hole, the wing is set to the inner surface of the finishing main material for the sleeve setting;
The leveling bar is inserted in the sleeve, and axial one end of the leveling bar is connected to the portion to be fitted up.
Compared with prior art, technical solution of the present invention has the advantage that
The finishing levels component, including leveling bar and leveling disk.In fitment process, the sleeve for leveling disk is arranged It is plugged in sleeve in the mounting hole of finishing main material, and by leveling bar fixation, by adjusting the opposite leveling disk of leveling bar in axis Position on direction makes the axial one end for leveling bar mutually be butted on the surface to be installed for repairing portion, makes the wing contact finishing master for leveling disk The surface of material.When level bar, level disk relative axial position change when, can change finishing main material and portion to be fitted up it Between gap, so as to make fit up main material be vertically arranged or be horizontally disposed with.So that finishing main material is not in and portion to be fitted up Similar surface irregularity or inclined situation, metope or ground after capable of making finishing have preferable appearance, promote client Satisfaction.
Due to only needing adjustment leveling bar and leveling the relative position between disk, it can guarantee that multiple finishing main materials are respectively positioned on On same vertical plane or same level.This method operation is relatively simple, conveniently, even the decoration worker that experience is less, The installation of finishing main material can preferably be completed.Simultaneously, additionally it is possible to save the finishing time, reduce construction cost.
Further, the sleeve is fixed with axial one end of the wing to the axial other end, and the outer diameter of sleeve is gradually reduced. Therefore, easily sleeve can be inserted into the mounting hole of finishing main material, it is especially desirable to be interference fitted sleeve and mounting hole When, the one end of sleeve far from the wing can gradually guide sleeve ontology be inserted into mounting hole, save the set-up time, reduction is mounted to This.
Detailed description of the invention
Fig. 1 is that first embodiment of the invention finishing main material is installed to schematic diagram when fitting up portion;
Fig. 2 is the cross-sectional view on A-A direction shown in Fig. 1;
Fig. 3 is the enlarged drawing of B area shown in Fig. 2, to show the specific structure for fitting up leveling component;
Fig. 4 is the three-dimensional structure diagram of leveling disk shown in Fig. 3;
Fig. 5 is the three-dimensional structure diagram of leveling bar shown in Fig. 3;
Fig. 6 is the enlarged drawing of C region shown in Fig. 2, to show the specific structure of finishing fixing piece;
Fig. 7 is the structural schematic diagram of second embodiment of the invention finishing leveling component;
Fig. 8 is the three-dimensional structure diagram of gasket shown in Fig. 7.
Specific embodiment
To make the above purposes, features and advantages of the invention more obvious and understandable, with reference to the accompanying drawing to the present invention Specific embodiment be described in detail.
First embodiment
Referring to Fig.1, Fig. 2 needs to fit up main material 200 and (such as is layed in the heat preservation on ground during house decoration Layer, the decorative panel for being installed on metope etc.) it is fixedly installed on portion 300 (such as blank floor, blank metope etc.) to be fitted up.To make Floor or metope after finishing have preferable appearance, it is also necessary to level to the finishing main material 200 after fixed installation.
In the present embodiment, portion 300 to be fitted up is fixedly installed to by main material 200 is fitted up first with finishing fixing piece 400;It is to be installed It repairs after main material 200 is firmly fixed, recycles finishing leveling component 100 to level component 200 is fitted up, to avoid finishing master There is the case where out-of-flatness or inclination in material, and the floor or metope after making finishing have preferable appearance.
Referring to Fig. 3, the present embodiment provides a kind of finishings to level component 100, including leveling bar 10 and leveling disk 20.Wherein, The leveling disk 20 includes sleeve 21 and the wing 22, and the wing 22 is fixedly installed on the outer peripheral surface of sleeve 21, and is radially outward prolonged It stretches;The leveling bar 10 is plugged in the sleeve 21, is fixedly connected with the sleeve 21.
It fits up main material 200 and is equipped with mounting hole 201, be fixedly installed in the finishing fixing piece 400 by main material 200 is fitted up Before portion 300 to be fitted up, first the leveling disk 20 is arranged between finishing main material 200 and portion to be fitted up 300, and make sleeve 21 It stretches in mounting hole 201, the fixation of leveling bar 10 is plugged in sleeve 21.Then, finishing (Fig. 2 institute of fixing piece 400 is utilized Show) the finishing main material 200 is fixedly installed in portion 300 to be fitted up.
Finally, making to level bar 10 by adjusting the position of the relatively described leveling disk 20 of leveling bar 10 in the axial direction Axial one end is mutually butted on the surface to be installed for repairing portion 300, makes the surface for the contact finishing main material 200 of the wing 22 for leveling disk.That is, When the relative axial position for leveling bar 10, leveling disk 20 changes, finishing main material 200 and portion to be fitted up 300 can be changed Between gap, so as to make fit up main material 200 be vertically arranged or be horizontally disposed with.
Therefore, when the surface irregularity in the portion of fitting up 300 or inclination, leveling component 100 is fitted up by adjusting, can be adjusted Gap between section finishing main material 200 and portion to be fitted up 300, so that finishing main material 200 is not in and portion 300 to be fitted up Similar surface irregularity or inclined situation, metope or ground after making finishing have preferable appearance, promote customer satisfaction Degree.
The present embodiment adjusts the method that finishing main material 200 keeps its smooth, it is only necessary to adjust described in adjustment finishing leveling component 100 Relative position between flat bar 10 and leveling disk 20, operate it is relatively simple, conveniently, even the decoration worker that experience is less, The installation of finishing main material 200 can preferably be completed.Compared to the prior art, additionally it is possible to save the finishing time, reduction is constructed into This.
In addition, no setting is required in portion 300 to be fitted up since one end of leveling bar 10 is mutually butted on the surface to be installed for repairing portion 300 In the corresponding hole of the leveling bar 10, so that will not treat finishing portion 300 causes biggish damage.Meanwhile also lead finishing The fixation of material 200, installation become simpler, conveniently.
As shown in Figure 1, a finishing main material 200 is often equipped with multiple finishing leveling components in practical fitment process 100 and multiple finishing fixing pieces 400.The finishing main material 200 can be preferably fixed to wait fit up by multiple finishing fixing pieces 400 Portion 300;Between multiple finishing leveling components 100 can be adjusted on multiple positions between finishing main material 200 and portion to be fitted up 300 Gap, it is easier to finishing main material 200 be made to keep horizontally disposed or be vertically arranged.
It should be noted that being needed in most cases using the finishing fixing piece 400 dress is fixedly mounted Repair main material 200 and portion to be fitted up 300.But in some specific finishing examples, for example, during installation floor insulating layer, by It is laid on ground in insulating layer, can be preferably fixed in floor (portion to be fitted up) by gravity;Moreover, heat preservation Need to be laid with ceramic tile or timber floor toward contact on layer, it, also can be preferable by insulating layer even if not fitting up fixing piece 400 at this time It is fixed on bottom plate.
Referring to Fig. 3, Fig. 4, the inner peripheral surface of the sleeve 21 is equipped with internal screw thread, and the outer peripheral surface of leveling bar 10 is equipped with outer spiral shell Line, the leveling bar 10, which is spirally connected, is fixed on the sleeve 21.Therefore, by rotating the leveling bar 10, can change described Position of the bar 10 in sleeve 21 is leveled, and then the gap between finishing main material 200 and portion to be fitted up 300 can be changed.
During adjusting finishing main material 200 and 300 gap of portion to be fitted up, the leveling bar 10 is rotated, if the tune Square position 20 is rotated with leveling bar 10, then can not change the relative position between leveling disk 20, leveling bar 10, can not both change finishing Gap between main material 200, portion to be fitted up 300.
Therefore, the leveling disk 20 need to be made to be fixed in finishing main material 200, specifically, the leveling disk 20 is consolidated It surely can be in the following ways.
First, making the wing 22 for leveling disk that there is biggish roughness on its surface towards finishing main material 200, when described When the wing 22 contacts fitting with finishing main material 200, using the frictional force between the wing 22 and finishing main material 200 to realize fixation.
Second, the sleeve 21 for leveling disk is inserted into peace before finishing main material 200 is fixedly installed to portion 300 to be fitted up During filling hole 201, i.e., the wing 22 is fixedly connected on to the surface in portion 300 to be fitted up.Wherein, specific fixed form can be with It is to be fixed, be spirally connected fixed or be adhesively fixed.
Third, the sleeve 21 for leveling disk is inserted into peace before finishing main material 200 is fixedly installed to portion 300 to be fitted up During filling hole 201, make 21 interference of sleeve is matched with mounting hole 201, by sleeve 21, fits up squeezing for main material 200 Pressure is to realize fixation.
Referring to Fig. 3, Fig. 4, in the present embodiment, the wing 22 shape in disk form is fixed at axial one end of sleeve 21, So that the wing 22 can preferably fit in the surface of finishing main material 200, better support is played to the finishing main material 200 Effect.
In other variations, the wing 22 can also structure (only along one of radial direction extend) in the form of sheets, together Sample can support the finishing main material 200.At this point, in order to play better supporting role, it can be in the sleeve 21 Multiple wings 22 are set on outer peripheral surface, and multiple wings 22 are respectively positioned on same plane, and are uniformly distributed circumferentially.
In addition, the wing 22 and non-limiting axial one end that sleeve 21 is arranged in, the wing 22 can also be arranged and cover The intermediate position of cylinder 21, does not influence the implementation of the technical program.
With continued reference to Fig. 3, Fig. 4, axial one end of the wing 22 is fixed with to the axial direction of the sleeve 21 from the sleeve 21 The outer diameter of the other end, the sleeve 21 is gradually reduced.Specifically, the radial dimension of the described one end of sleeve 21 far from the wing 22 is less than The radial dimension of mounting hole 201.
Therefore, easily the sleeve 21 can be inserted into mounting hole 201, it is especially desirable to make sleeve 21 and the peace When filling the interference fit of hole 201, the described one end of sleeve 21 far from the wing 22 gradually can be inserted into mounting hole by 21 ontology of guide sleeve In 201.
Referring to Fig. 5, axial one end of the leveling bar 10 is for abutting portion 300 to be fitted up, in the end face of the axial other end On be additionally provided with slot 11, the effect of the slot 11 is to rotate leveling bar 10, between adjustment leveling bar 10 and leveling disk 20 Relative position.Specifically, the slot 11 can cooperate with tools such as corresponding screwdrivers, rotated by screwdriver described Level bar 10.
In other variations, protrusion can also be set on the end face, raised role can equally facilitate rotation to adjust Flat bar 10, does not influence the implementation of the technical program.
Referring to Fig. 2, Fig. 6, the finishing fixing piece 400 of the present embodiment can be using common screw, such as existing is used for Bar for line, the rosehead for fixing decorative panel etc. of fixed insulating layer.But the effect of aforesaid way is only that fixation, The screw uses the gap that can not be but adjusted between finishing main material 200 and portion to be fitted up 300 at position.
In the present embodiment, between the finishing fixing piece 400 also can be to fitting up between main material 200 and portion to be fitted up 300 Gap is adjusted.Specifically, the finishing fixing piece 400 includes connecting sleeve 410, leveling bolt 420 and fixing piece 430.Its In, the connecting sleeve 410 is for being fixed in portion 300 to be fitted up;One end fixation of the leveling bolt 420 is plugged in In connecting sleeve 410, and can be as needed, adjust the relative position between the leveling bolt 420 and connecting sleeve 410; The fixing piece 430 is fixed at the other end of leveling bolt 420, is used for immovable fixture main material 200.
When need will the finishing installation of main material 200 to when in the portion of fitting up 300, first by the connecting sleeve 410 installation to In finishing portion 300, at this point, portion to be fitted up 300 is fixed by the connecting sleeve 410.Then, by finishing main material 200 installation to tune Flat bolt 420, and main material 200 will be fitted up using fixing piece 430 and fixed with leveling bolt 420.Finally, making leveling bolt 420 One end is inserted into connecting sleeve 410, by being fixedly connected for leveling bolt 420 and connecting sleeve 410, so as to will be described Finishing main material 200 is fixed in portion 300 to be fitted up.
By adjusting position of the leveling bolt 420 in connecting sleeve 410, change leveling bolt 420 and connector sleeve Relative position between pipe 410, so as to change the gap between finishing main material 200 and portion to be fitted up 300.That is, If surface irregularity or the inclination in portion 300 to be fitted up, by adjusting the finishing fixing piece 400 in finishing main material 200, can also make The gap fitted up between main material 200 and portion to be fitted up 300 at various locations is inconsistent, so that finishing main material 200 will not There is the surface irregularity similar with portion 300 to be fitted up or inclined situation.
With continued reference to Fig. 3, the technical program also provides a kind of house decoration structure, including portion to be fitted up 300, finishing main material 200 and above-described finishing level component 100.Wherein, the mounting hole of finishing main material is arranged in the sleeve 21 of the leveling disk In 201, the wing 22 of the leveling disk is set to the inner surface of finishing main material 200;The leveling bar 10 is inserted in described be inserted in The sleeve 21, and axial one end of the leveling bar 10 is connected to the portion 300 to be fitted up.
Second embodiment
Referring to Fig. 7, Fig. 8, the present embodiment and first embodiment the difference is that: the finishing leveling component 100 and also Including gasket 30, the gasket 30 is set to axial one end of the leveling bar 10, and the leveling bar 10 passes through the gasket 30 It is connected to the portion 300 to be fitted up.
There is preferable appearance to make to fit up main material 200, the mounting hole 201 fitted up in main material 200 is typically small, is inserted in The leveling bar 10 of the mounting hole 201 is also relatively thin, if directly allow leveling 10 phase of bar be butted on it is to be installed repair portion 300, leveling In the process, the rotation for leveling bar 10 is easy to damage the surface in the portion 300 to be fitted up, and generates in leveling 10 contact position of bar recessed Slot.
By being arranged gasket 30 between portion 300 to be fitted up, leveling bar 10, the surface in gasket 30 and portion 300 to be fitted up it Between there is biggish contact area, thus the surface for being not easy to treat finishing portion 300 damages.Moreover, gasket 30 is generally adopted It is made of metal material, the contact between leveling bar 10 and gasket 30 also not easily leads to gasket 30 and is damaged;In addition, even if Gasket 30 is damaged, and only needs to change the gasket 30, not will cause biggish loss.
In the present embodiment, the gasket 30 is rotatably arranged on the leveling bar 10.That is, when leveling bar 10 revolves Turn, adjusts finishing main material 200 and when the gap between the portion of fitting up 300, the leveling bar 10 occurs relatively with the gasket 30 Rotation, the gasket 30 and portion 300 to be fitted up are relatively fixed.
Therefore, it can be avoided relative rotation between gasket 30, portion to be fitted up 300, damage the surface in portion 300 to be fitted up;Together When, do not need too big rotating force to overcome the rotating friction force between gasket 30, portion to be fitted up 300 yet.
With continued reference to Fig. 7, Fig. 8, the face of the gasket 30 towards leveling bar 10 is equipped with annular protrusion 31, the leveling bar 10 are plugged in 31 area defined of annular protrusion.The effect of annular protrusion 31 is to limit gasket 30, with Gasket 30 is prevented to be detached from leveling bar 10.
In other variations, if the gasket 30 have biggish thickness, can also gasket 30 towards leveling bar 10 Face on groove is set, make to level bar 10 and be inserted in groove, can also play and gasket 30 is limited, prevent gasket 30 de- Effect from leveling bar 10.
Although present disclosure is as above, present invention is not limited to this.Anyone skilled in the art are not departing from this It in the spirit and scope of invention, can make various changes or modifications, therefore protection scope of the present invention should be with claim institute Subject to the range of restriction.

Claims (10)

1. a kind of finishing levels component characterized by comprising
Bar is leveled, axial one end of the leveling bar is adapted to abut against portion to be fitted up;
Disk is leveled, with sleeve and the wing for being fixedly installed on the sleeve, and extending radially outward;
The leveling bar fixation is inserted in the sleeve, and the relatively described sleeve is adjustable along the axial direction position, the wing It is adapted for contact with surface of the finishing main material towards portion to be fitted up.
2. finishing leveling component as described in claim 1, which is characterized in that further include gasket, the gasket is set to described Axial one end of bar is leveled, the leveling bar is connected to the portion to be fitted up by the gasket.
3. finishing leveling component as described in claim 1, which is characterized in that the leveling bar, which is spirally connected, is fixed on the leveling Disk.
4. finishing leveling component as described in claim 1, which is characterized in that the wing is that fixation is set in outside the sleeve Disk;Or, the outer peripheral surface of the sleeve is equipped with multiple wings, multiple wings are respectively positioned on same plane.
5. finishing leveling component as described in claim 1, which is characterized in that the wing is fixedly installed on the axial direction of the sleeve One end.
6. finishing leveling component as claimed in claim 5, which is characterized in that from described axial one end of the sleeve to described The axial other end of sleeve, the outer diameter of the sleeve are gradually reduced.
7. finishing leveling component as claimed in claim 2, which is characterized in that the gasket is rotatably arranged on the leveling Bar is fixedly installed on the leveling bar.
8. finishing leveling component as claimed in claim 7, which is characterized in that the face of the gasket towards leveling bar is equipped with ring Shape protrusion, the leveling bar are plugged in the annular protrusion area defined.
9. finishing leveling component as described in claim 1, which is characterized in that on the end face of the axial other end of the leveling bar Equipped with slot or protrusion.
10. a kind of house decoration structure, including portion to be fitted up and finishing main material, the finishing main material is equipped with mounting hole, special Sign is, further includes the described in any item finishing leveling components of claim 1-9;
In the mounting hole, the wing is set to the inner surface of the finishing main material for the sleeve setting;
The leveling bar is inserted in the sleeve, and axial one end of the leveling bar is connected to the portion to be fitted up.
CN201711242400.3A 2017-11-30 2017-11-30 Finishing leveling component and house decoration structure Pending CN109853895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711242400.3A CN109853895A (en) 2017-11-30 2017-11-30 Finishing leveling component and house decoration structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711242400.3A CN109853895A (en) 2017-11-30 2017-11-30 Finishing leveling component and house decoration structure

Publications (1)

Publication Number Publication Date
CN109853895A true CN109853895A (en) 2019-06-07

Family

ID=66888627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711242400.3A Pending CN109853895A (en) 2017-11-30 2017-11-30 Finishing leveling component and house decoration structure

Country Status (1)

Country Link
CN (1) CN109853895A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528811A (en) * 2019-08-22 2019-12-03 变形积木(北京)装饰工程有限公司 Wall surface keel quick level adjusting device
CN111962808A (en) * 2020-08-20 2020-11-20 北京东豪建设集团有限公司 Large-size ceramic thin plate ground paved based on light steel keel screeds and construction process thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3017247U (en) * 1995-03-28 1995-10-24 洋二 佐々木 Height adjustment fittings and concrete members with height adjustment fittings
CN2654759Y (en) * 2003-11-08 2004-11-10 周世斌 Regulatable plane installing construction unit
US20050050818A1 (en) * 2003-09-04 2005-03-10 Yao-Chung Chen Adjuster for elevated floor
JP3110184U (en) * 2005-02-03 2005-06-16 耀宗 陳 Elevated floor stand structure
CN201722892U (en) * 2010-08-02 2011-01-26 张高荣 Floor filling block lined with honeycombed plate
CN203531157U (en) * 2013-05-03 2014-04-09 韩毅 Fixation structure of external wall insulation and exterior trimming panel
CN203846709U (en) * 2014-04-24 2014-09-24 山东天意机械股份有限公司 Insulation decorative fireproof plate
US20150267420A1 (en) * 2014-03-18 2015-09-24 Profilitec S.P.A. Socio Unico Leveling device for laying tiles or the like
CN205777398U (en) * 2016-07-15 2016-12-07 北京品智家科技有限责任公司 A kind of based on the mounting structure that ground is carried out modularity dry construction

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3017247U (en) * 1995-03-28 1995-10-24 洋二 佐々木 Height adjustment fittings and concrete members with height adjustment fittings
US20050050818A1 (en) * 2003-09-04 2005-03-10 Yao-Chung Chen Adjuster for elevated floor
CN2654759Y (en) * 2003-11-08 2004-11-10 周世斌 Regulatable plane installing construction unit
JP3110184U (en) * 2005-02-03 2005-06-16 耀宗 陳 Elevated floor stand structure
CN201722892U (en) * 2010-08-02 2011-01-26 张高荣 Floor filling block lined with honeycombed plate
CN203531157U (en) * 2013-05-03 2014-04-09 韩毅 Fixation structure of external wall insulation and exterior trimming panel
US20150267420A1 (en) * 2014-03-18 2015-09-24 Profilitec S.P.A. Socio Unico Leveling device for laying tiles or the like
CN203846709U (en) * 2014-04-24 2014-09-24 山东天意机械股份有限公司 Insulation decorative fireproof plate
CN205777398U (en) * 2016-07-15 2016-12-07 北京品智家科技有限责任公司 A kind of based on the mounting structure that ground is carried out modularity dry construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528811A (en) * 2019-08-22 2019-12-03 变形积木(北京)装饰工程有限公司 Wall surface keel quick level adjusting device
CN111962808A (en) * 2020-08-20 2020-11-20 北京东豪建设集团有限公司 Large-size ceramic thin plate ground paved based on light steel keel screeds and construction process thereof

Similar Documents

Publication Publication Date Title
CN207609113U (en) Fit up leveling component and house decoration structure
CN109853895A (en) Finishing leveling component and house decoration structure
CN109267671A (en) A kind of decoration method of indoor wall system
CN109811980B (en) Adjustable decorative panel and hanging piece combination
CN204282731U (en) A kind of wall surface dry-hang syndeton of adjustable process seam
CN208122169U (en) Levelling mechanism and keel assembly including it
US10299591B1 (en) Corner shelf installation tool
CN210947284U (en) Leveling support member for assembly type keel partition wall ground
CN110145090A (en) A kind of assembled floor ceramic tile structure
CN110607856A (en) Leveling support member for assembly type keel partition wall ground
CN207794552U (en) Fit up leveling component
CN109610774A (en) Ground assembly and method for paving
CN207794568U (en) For fitting up fixed leveling inserted link component
CN210482854U (en) Wood veneer module
CN213268689U (en) Up-down leveling device for assembled decoration wall surface
CN105952085B (en) Large space cylinder wood facing piece structure
CN109853910A (en) Finishing leveling component
CN207812910U (en) Indoor large space curved surface wood facing moulding mounting structure
CN212453434U (en) Joint adjusting and mounting structure of finished decorative plate
CN221546201U (en) Adjustable decorative board connecting device
CN112282276B (en) Landscape wall panel
CN106351383B (en) The integrated mounting structure of ceiling decoration
CN206070945U (en) A kind of fine adjustment type assemble type decorative panel for building
CN203393934U (en) Wallboard with adjustable flatness
CN220580443U (en) Ceramic tile locating piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190607