CN207794100U CN201820160142.8U CN201820160142U CN207794100U CN 207794100 U CN207794100 U CN 207794100U CN 201820160142 U CN201820160142 U CN 201820160142U CN 207794100 U CN207794100 U CN 207794100U
Authority
CN
China
Prior art keywords
layer
steel bar
stake
sealing rod
soil layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820160142.8U
Other languages
Chinese (zh)
Inventor
潘卓民
张晓云
张煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hengxin Design Group Co ltd
Original Assignee
Zhejiang Hengxin Building Tsukito Design Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hengxin Building Tsukito Design Inc filed Critical Zhejiang Hengxin Building Tsukito Design Inc
Priority to CN201820160142.8U priority Critical patent/CN207794100U/en
Application granted granted Critical
Publication of CN207794100U publication Critical patent/CN207794100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses one kind for building elevator foundation pit structure,Its key points of the technical solution are that the bottom plate includes from top to bottom being laid with waterproof layer,Microlith mixed earth protective layer,Waterproof roll layer,Cement sand bed,Concrete cushion and plain soil layer,The first strengthening rib strip for being inserted into bottom stake inner wall is equipped in the waterproof layer,The bottom stake inner wall is equipped with the first sealing rod,First sealing rod is embedded in the upper and lower ends face of waterproof layer,It is equipped with the second reinforcing rib in the element soil layer,The bottom stake inner wall is equipped with the second sealing rod,Second sealing rod is embedded in the upper and lower ends face of plain soil layer,The element soil layer bottom is additionally provided with substrate,Substrate bottom surface is equipped with several reverse taper holes,The company road of connection rounding taper hole is additionally provided on the substrate,The even road undulate,The utility model aim be to provide a kind of intensity it is high and be not easy infiltration and leak for building elevator foundation pit structure.

Description

One kind is for building elevator foundation pit structure
Technical field
The utility model is related to a kind of technical field of building construction, more specifically, it relates to a kind of for building elevator Foundation pit structure.
Background technology
When construction, needs to excavate the buffering that an elevator foundation pit is used for elevator practice, ensure its peace Quan Xing;
Currently, the group of construction foundation pit becomes bottom plate and the support stake for playing a supporting role, but actual During use, it is susceptible to insufficient strength and the problem of bottom is susceptible to leak or infiltration.
Utility model content
In view of the deficienciess of the prior art, it is high the purpose of this utility model is to provide a kind of intensity and be not easy infiltration and Leak is used to build elevator foundation pit structure.
To achieve the above object, the utility model provides following technical solution:One kind is used to build elevator foundation pit structure, Including support stake and bottom plate, it is characterized in that:Support stake along floor peripheral arrangement enclose it is square-shaped, support stake include steelframe body and The pile body of steelframe body is wrapped up, the steelframe body includes warp steel bar and weft steel bar, and the warp steel bar and weft steel bar are in nine Ten degree of cross arrangements, the pile body are equipped with the connecting rod across warp steel bar and weft steel bar intersection, and connecting rod is equipped with two Root supporting rod, two supporting rods are welded with warp steel bar and weft steel bar respectively, and the support stake bottom is equipped with bottom stake, bottom plate week While insert in bottom stake side wall on, the bottom plate include from top to bottom be laid with waterproof layer, microlith mixed earth protective layer, waterproof roll layer, Cement sand bed, concrete cushion and plain soil layer, interior the first strengthening rib strip for being equipped with insertion bottom stake inner wall of the waterproof layer are described Bottom stake inner wall is equipped with the first sealing rod, and first sealing rod is embedded in the upper and lower ends face of waterproof layer, is set in the element soil layer There are the second reinforcing rib, the bottom stake inner wall to be equipped with the second sealing rod, second sealing rod is embedded in the upper and lower ends of plain soil layer Face, the element soil layer bottom are additionally provided with substrate, and substrate bottom surface is equipped with several reverse taper holes, and being additionally provided with connection on the substrate falls The company road of conical bore, the even road undulate.
Include warp steel bar and weft steel bar, the warp steel using the steelframe body by using above-mentioned technical proposal Item and weft steel bar are in 90 degree of cross arrangements, and pile body is equipped with the connecting rod across warp steel bar and weft steel bar intersection, energy Enough reduce additional steel wire winding, then utilize, connecting rod be equipped with two supporting rods, two supporting rods respectively with warp steel bar and Weft steel bar welds, and can carry out further supporting and fix, and increases support strength, and the support stake bottom is equipped with bottom stake, profit It is supported in bottom with bottom stake, and is connect with bottom plate, the bottom plate includes from top to bottom being laid with waterproof layer, the protection of microlith mixed mud Layer, waterproof roll layer, cement sand bed, concrete cushion and plain soil layer, by the way that waterproof layer, protective layer and intermediate isolation is arranged Waterproof roll layer and cement sand bed and bed course and plain soil layer design successively, reached good anti-seepage effect, and Leak preventing effect, waterproof layer are that mixed mud is filled, and have good leak preventing effect, and coordinate waterproof roll layer also can be into The intermediate barrier of row, reaches and completely cuts off effect up and down, and by mixed mud bed course be arranged, increase bottom strength, in cooperation first Sealing rod and the second sealing rod, play good sealing effect, and then reach anti-and blend leak preventing effect, also by the first reinforcing rib Internal intensity reinforcement is carried out with the second reinforcing rib, then by the setting of substrate, is arranged using the reverse taper hole of substrate bottom surface, and match The roads He Lian realize the barrier and limitation of steam, and play the role of internal constraint by corrugated even road, within reaching The anti-seepage effect in portion.
The utility model is further arranged to:The reverse taper hole is connected to the wave trough position in even road.
By using above-mentioned technical proposal, by that can ensure no matter when infiltration, be required for water walk one section away from From and to climb, and even road uses wave, coordinates such difference setting, can more play anti-seepage effect.
The utility model is further arranged to:Filter paper net is equipped in the reverse taper hole.
Good Filtration Filtration steam can be played, is played by the setting of filter paper net by using above-mentioned technical proposal It must obstruct, no matter good barrier and limitation are played on water seepage function, to ensure the antiseepage function of product entirety.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model embodiment.
Fig. 2 is the warp steel bar and weft steel bar structural schematic diagram of the utility model embodiment.
Fig. 3 is the warp steel bar, weft steel bar and connecting rod structural schematic diagram of the utility model embodiment.
Fig. 4 is the substrate internal structure schematic diagram of the utility model embodiment.
Specific implementation mode
The utility model embodiment is described further referring to figs. 1 to Fig. 4.
One kind being used to build elevator foundation pit structure, including support stake and bottom plate, it is characterized in that:Support stake along floor peripheral Arranging, it is square-shaped to enclose, and support stake includes the pile body 101 of steelframe body and package steelframe body, and the steelframe body includes warp steel bar 103 and weft steel bar 102, the warp steel bar 103 and weft steel bar 102 are in 90 degree of cross arrangements, and the pile body 101 is equipped with Connecting rod 104 across 102 intersection of warp steel bar 103 and weft steel bar, connecting rod 104 be equipped with two supporting rods 105, two Root supporting rod 105 is welded with warp steel bar 103 and weft steel bar 102 respectively, and the support stake bottom is equipped with bottom stake 201, bottom plate Periphery insert in bottom stake 201 side walls on, the bottom plate include from top to bottom be laid with waterproof layer 301, microlith mixed earth protective layer 401, Waterproof roll layer 501, cement sand bed 601, concrete cushion 701 and plain soil layer 801, interior be equipped with of the waterproof layer 301 are inserted into The first reinforcing rib 302 of 201 inner walls of bottom stake, 201 inner walls of the bottom stake are equipped with the first sealing rod 303, first sealing Item 303 is embedded in the upper and lower ends face of waterproof layer 301, is equipped with the second reinforcing rib 802 in the element soil layer 801, in the bottom stake 201 Wall is equipped with the second sealing rod 803, and second sealing rod 803 is embedded in the upper and lower ends face of plain soil layer 801, the element soil layer 801 bottoms are additionally provided with substrate 901, and 901 bottom surface of substrate is equipped with several reverse taper holes 903, connection is additionally provided on the substrate 901 The company road 902 of rounding taper hole, even 902 undulate of road.
Include warp steel bar 103 and weft steel bar 102 using the steelframe body by using above-mentioned technical proposal, it is described Warp steel bar 103 and weft steel bar 102 are in 90 degree of cross arrangements, and pile body 101 is equipped with across warp steel bar 103 and weft steel bar The connecting rod 104 of 102 intersections, can reduce additional steel wire winding, then utilize, and connecting rod 104 is equipped with two supporting rods 105, two supporting rods 105 are welded with warp steel bar 103 and weft steel bar 102 respectively, can be carried out further supporting and be fixed, Increasing support strength, the support stake bottom is equipped with bottom stake 201, is supported in bottom using bottom stake 201, and connect with bottom plate, The bottom plate includes from top to bottom being laid with waterproof layer 301, microlith mixed earth protective layer 401, waterproof roll layer 501, cement mortar Layer 601, concrete cushion 701 and plain soil layer 801, by the waterproof roll that waterproof layer 301, protective layer and intermediate isolation is arranged The design successively of layer 501 and cement sand bed 601 and bed course and plain soil layer 801, has reached good anti-seepage effect, and Leak preventing effect, waterproof layer 301 are that mixed mud is filled, and have good leak preventing effect, and coordinate waterproof roll layer 501 Can carry out intermediate barrier, reach up and down completely cut off effect, and by mixed mud bed course be arranged, increase bottom strength, with The first sealing rod 303 and the second sealing rod 803 are closed, good sealing effect is played, and then reaches anti-and blends leak preventing effect, is also led to It crosses the first reinforcing rib 302 and the second reinforcing rib 802 carries out internal intensity reinforcement, then by the setting of substrate 901, utilize substrate The reverse taper hole 903 of 901 bottom surfaces is arranged, and coordinates even road 902, realizes the barrier and limitation of steam, and by corrugated Even road 902 plays the role of internal constraint, to reach internal anti-seepage effect.
The utility model is further arranged to:The reverse taper hole 903 is connected to the wave trough position in even road 902.
By using above-mentioned technical proposal, by that can ensure no matter when infiltration, be required for water walk one section away from From and to climb, and even road 902 uses wave, coordinates such difference setting, can more play anti-seepage effect.
The utility model is further arranged to:Filter paper net is equipped in the reverse taper hole 903.
Good Filtration Filtration steam can be played, is played by the setting of filter paper net by using above-mentioned technical proposal It must obstruct, no matter good barrier and limitation are played on water seepage function, to ensure the antiseepage function of product entirety.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, the skill of this field Art personnel carry out common variations and alternatives within the scope of technical solutions of the utility model should be included in the guarantor of the utility model It protects in range.

Claims (3)

1. one kind being used to build elevator foundation pit structure, including support stake and bottom plate, it is characterized in that:Support stake is arranged along floor peripheral Cloth enclose it is square-shaped, support stake include steelframe body and package steelframe body pile body, the steelframe body includes warp steel bar and weft Steel bar, the warp steel bar and weft steel bar are in 90 degree of cross arrangements, and the pile body is equipped with across warp steel bar and weft steel The connecting rod of intersection, connecting rod are equipped with two supporting rods, and two supporting rods are welded with warp steel bar and weft steel bar respectively It connects, the support stake bottom is equipped with bottom stake, and floor peripheral inserts on bottom stake side wall, and the bottom plate includes from top to bottom being laid with waterproof Layer, microlith mixed earth protective layer, waterproof roll layer, cement sand bed, concrete cushion and plain soil layer are equipped in the waterproof layer It is inserted into the first strengthening rib strip of bottom stake inner wall, the bottom stake inner wall is equipped with the first sealing rod, and first sealing rod is embedded in anti- The upper and lower ends face of water layer, the element soil layer is interior to be equipped with the second reinforcing rib, and the bottom stake inner wall is equipped with the second sealing rod, described Second sealing rod is embedded in the upper and lower ends face of plain soil layer, and the element soil layer bottom is additionally provided with substrate, and substrate bottom surface is equipped with several Reverse taper hole is additionally provided with the company road of connection rounding taper hole, the even road undulate on the substrate.
2. it is according to claim 1 a kind of for building elevator foundation pit structure, it is characterized in that:The reverse taper hole and Lian Dao Wave trough position connection.
3. it is according to claim 2 a kind of for building elevator foundation pit structure, it is characterized in that:It is equipped in the reverse taper hole Filter paper net.
CN201820160142.8U 2018-01-30 2018-01-30 One kind is for building elevator foundation pit structure Expired - Fee Related CN207794100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820160142.8U CN207794100U (en) 2018-01-30 2018-01-30 One kind is for building elevator foundation pit structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820160142.8U CN207794100U (en) 2018-01-30 2018-01-30 One kind is for building elevator foundation pit structure

Publications (1)

Publication Number Publication Date
CN207794100U true CN207794100U (en) 2018-08-31

Family

ID=63267494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820160142.8U Expired - Fee Related CN207794100U (en) 2018-01-30 2018-01-30 One kind is for building elevator foundation pit structure

Country Status (1)

Country Link
CN (1) CN207794100U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112707269A (en) * 2020-12-22 2021-04-27 住友富士电梯有限公司 Pit buffering elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112707269A (en) * 2020-12-22 2021-04-27 住友富士电梯有限公司 Pit buffering elevator

Similar Documents

Publication Publication Date Title
US20140154012A1 (en) Assembled mud-rock flow debris dam and construction method thereof
US20030126809A1 (en) Building block, system and method
CN101245574A (en) Method for building over loading railway road-bed on salting ground
KR101851007B1 (en) Method for constructing road structure using light weight cellular concrete and drain belt
CN107165177A (en) A kind of side slope supporting construction method
CN201317935Y (en) Paramos frozen soil region culvert frost heaving thaw collapse preventing device
CN108677715B (en) A kind of highway bridge subgrade and pavement and its construction method
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN107119695A (en) Operation frame body for canceling basement exterior wall backfill and construction method
CN104499495A (en) Waterproof curtain wall for foundation pit
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
CN207794100U (en) One kind is for building elevator foundation pit structure
CN205475261U (en) Ash dam structure of power plant
KR102210048B1 (en) System of retaining wall for selective draining of percolating water
US7073304B2 (en) Corner building block, system and method
CN111622234B (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN105544463B (en) A kind of construction method of geomembrane face dam composite panel
CN103835310A (en) Crib gravity retaining wall
CN206173757U (en) Protection road bed of mud pit
CN212270826U (en) Check guest net cage
CN111119205A (en) Gabion shoulder pad
CN207714336U (en) A kind of deep basal pit closing fast rainfall guard system
CN207176627U (en) Large-scale earthing concrete block
CN207812457U (en) Foundation pit supporting construction and underground structure, basic integrated structure
CN207160063U (en) A kind of prefabricated box culvert structure for riding pipeline and pipeline water conservancy project supporter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 314001 8th Floor, 35 Jingang Road, Jiaxing Science and Technology City, Nanhu District, Jiaxing City, Zhejiang Province

Patentee after: ZHEJIANG HENGXIN ARCHITECTURAL DESIGN Co.,Ltd.

Address before: Room 302, No. 176 Yuexiu South Road, Jiaxing Economic Development Zone, Zhejiang Province

Patentee before: ZHEJIANG HENGXIN ARCHITECTURAL DESIGN Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 314000 8th floor, No.35, Jingang Road, Jiaxing Science and Technology City, Nanhu District, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Hengxin Design Group Co.,Ltd.

Address before: 314001 8th Floor, 35 Jingang Road, Jiaxing Science and Technology City, Nanhu District, Jiaxing City, Zhejiang Province

Patentee before: ZHEJIANG HENGXIN ARCHITECTURAL DESIGN Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831