CN207776878U - A kind of underground power house machine hole dividing pier structure - Google Patents

A kind of underground power house machine hole dividing pier structure Download PDF

Info

Publication number
CN207776878U
CN207776878U CN201721528450.3U CN201721528450U CN207776878U CN 207776878 U CN207776878 U CN 207776878U CN 201721528450 U CN201721528450 U CN 201721528450U CN 207776878 U CN207776878 U CN 207776878U
Authority
CN
China
Prior art keywords
dividing pier
rock bolt
joint bar
power house
underground power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721528450.3U
Other languages
Chinese (zh)
Inventor
赵修龙
万祥兵
方丹
补约依呷
李良权
钱军
陆健健
陈鹏
程普
邵兵
陈登义
叶辉辉
吴关叶
何世海
陈建林
徐建荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201721528450.3U priority Critical patent/CN207776878U/en
Application granted granted Critical
Publication of CN207776878U publication Critical patent/CN207776878U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of underground power house machine hole dividing pier structure, it is characterised in that the dividing pier is provided with grouting rock bolt and joint bar, and the grouting rock bolt is arranged in the drilling from dividing pier top down, and gap between drilling and grouting rock bolt is filled with Anchor Agent;Grouting rock bolt head is contacted with foot of hole, and the excavation line that dividing pier last layer rock mass is cheated in the drilling in the aperture at the top of dividing pier and less than machine is sunk in tail portion;Joint bar tail portion is exposed at outside dividing pier top surface and bends;Lid loaded concrete is provided at the top of dividing pier.The utility model can ensure that underground power house machine hole dividing pier excavates molding, also, less with muscle amount in engineering, and the supporting performance that dividing pier is cheated to underground power house machine does not reduce, and can prevent high-ground stress from ensureing successive projects quality to dividing pier influence after molding.

Description

A kind of underground power house machine hole dividing pier structure
Technical field
The utility model discloses a kind of underground power house machines to cheat dividing pier structure, can be in high-ground stress or unfavorable geologic structure Face effect is lower to excavate molding.
Background technology
Reserving machine hole dividing pier can constrain high side wall deformation between underground power house unit, improve Underground Powerhouse and stablize, Concreting amount is reduced, but under high-ground stress or the effect of unfavorable geology structural plane, underground power house machine cheats dividing pier and excavates molding It is more difficult, it is unfavorable to underground power house adjoining rock stability.
Utility model content
The technical problems to be solved in the utility model is:There is provided in view of the above problems a kind of underground power house machine hole every Pier structure can ensure that underground power house machine hole dividing pier excavates molding.For this purpose, the used following technical scheme of the utility model:
A kind of underground power house machine hole dividing pier structure, it is characterised in that the dividing pier is provided with grouting rock bolt and joint bar, described Grouting rock bolt is arranged in the drilling from dividing pier top down, and gap between drilling and grouting rock bolt is filled with Anchor Agent;Mortar anchor Club head is contacted with foot of hole, and tail portion is sunk in the drilling in the aperture at the top of dividing pier and cheats dividing pier last layer less than machine The excavation line of rock mass;
Joint bar tail portion is exposed at outside dividing pier top surface and bends;
Lid loaded concrete is provided at the top of dividing pier.
Further, the length of the grouting rock bolt is less than the length of joint bar, and diameter is less than the diameter of joint bar.
Further, the half or so of former design joint bar is adjusted to grouting rock bolt, and another part is joint bar;Grouting rock bolt and Arranged for interval that both joint bars are quincunx.
Further, arrangement of reinforcement in lid loaded concrete, arrangement of reinforcement use latticed arrangement.
Further, dividing pier implements downwards bonded prestress anchor cable from lid loaded concrete.
Due to using the technical solution of the utility model, the utility model that underground power house machine hole dividing pier can be ensured on highland The stress or effect of unfavorable geology structural plane is lower excavates molding, also, less with muscle amount in engineering, and to underground power house machine hole every The supporting performance of pier does not reduce, and high-ground stress can be prevented on dividing pier influence after molding, ensures successive projects quality.
Description of the drawings
Fig. 1 is the overall structure floor plan of the utility model.
Fig. 2 is the overall structure profilograph of the utility model.
Specific implementation mode
With reference to attached drawing.A kind of guarantee underground power house machine hole dividing pier of the utility model excavates molding strengthening supporting method, Including dividing pier 1 original in machine hole is designed joint bar32, L=6m is adjusted to half grouting rock bolt 2(28, L=4.5m)And half joint bar 3(32, L=6m), joint bar and anchor pole be evenly distributed, and the two is preferable with quincunx arranged for interval.
The grouting rock bolt 2 need to cheat 1 last layer rock mass of dividing pier in machine(Floor height h)Implement to complete before excavating, implementation is Using drill hole of drilling machine, grouting rock bolt 2 is inserted into drilling by hole depth h+4.5m, and 2 head of grouting rock bolt is contacted with foot of hole, and Gap between drilling and grouting rock bolt is filled with high-strength Anchor Agent.2 tail portion of grouting rock bolt is less than excavation line L so that described upper one After layer rock excavation, the tail portion of the grouting rock bolt is sunk in the drilling in the aperture at the top of dividing pier.
The joint bar 3 machine cheat 1 last layer rock excavation of dividing pier after the completion of implement, joint bar 3 and grouting rock bolt 2 it is quincunx between Every arrangement, 3 exposed design excavation line 1m of joint bar bends 0.6m.
After the completion of the joint bar 3 is implemented, 50cm thickness lids loaded concrete 4, lid loaded concrete 4 are poured in machine hole 1 top surface of dividing pier Interior to carry out upper layer arrangement of reinforcement, arrangement of reinforcement uses latticed arrangement, arrangement of reinforcement parameter to recommend to use25 200mm × 200mm, Neng Goujin One step is from practical upper bound, it is ensured that the stability of dividing pier 1.
After the lid loaded concrete 4 pours completion and reaches age requirement, implement bonded prestress anchor cable 5, anchor cable ton Position, length, quantity and arrangement spacing are determined according to field condition.
The above structure is applied in the construction in Southwestern China ultra-large type power station, in high-ground stress and unfavorable geologic structure The excavation molding of underground power house machine hole dividing pier is ensured under the effect of face, and maintains to stablize before the construction of later stage structural concrete.
The foregoing is merely the structure features of specific embodiment of the utility model, but the utility model to be not limited to This, any those skilled in the art in the field of the utility model, made by changes or modifications all cover it is new in this practicality Among the protection domain of type.

Claims (4)

1. a kind of underground power house machine cheats dividing pier structure, it is characterised in that the dividing pier is provided with grouting rock bolt and joint bar, the sand Slurry anchor pole is arranged in the drilling from dividing pier top down, and gap between drilling and grouting rock bolt is filled with Anchor Agent;Grouting rock bolt Head is contacted with foot of hole, and tail portion is sunk in the drilling in the aperture at the top of dividing pier and less than dividing pier last layer rock mass Excavation line;
Joint bar tail portion is exposed at outside dividing pier top surface and bends;
Lid loaded concrete is provided at the top of dividing pier.
2. a kind of underground power house machine as described in claim 1 cheats dividing pier structure, it is characterised in that the length of the grouting rock bolt Less than the length of joint bar, diameter is less than the diameter of joint bar.
3. a kind of underground power house machine as described in claim 1 cheats dividing pier structure, it is characterised in that the half of original design joint bar is left The right side is adjusted to grouting rock bolt, and another part is joint bar;Arranged for interval that both grouting rock bolt and joint bar are quincunx.
4. a kind of underground power house machine as described in claim 1 cheats dividing pier structure, it is characterised in that dividing pier from lid loaded concrete to Lower implementation bonded prestress anchor cable.
CN201721528450.3U 2017-11-15 2017-11-15 A kind of underground power house machine hole dividing pier structure Active CN207776878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721528450.3U CN207776878U (en) 2017-11-15 2017-11-15 A kind of underground power house machine hole dividing pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721528450.3U CN207776878U (en) 2017-11-15 2017-11-15 A kind of underground power house machine hole dividing pier structure

Publications (1)

Publication Number Publication Date
CN207776878U true CN207776878U (en) 2018-08-28

Family

ID=63233322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721528450.3U Active CN207776878U (en) 2017-11-15 2017-11-15 A kind of underground power house machine hole dividing pier structure

Country Status (1)

Country Link
CN (1) CN207776878U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905805A (en) * 2017-11-15 2018-04-13 中国电建集团华东勘测设计研究院有限公司 One kind ensures that underground power house machine hole dividing pier excavates molding strengthening supporting method and underground power house machine hole dividing pier structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905805A (en) * 2017-11-15 2018-04-13 中国电建集团华东勘测设计研究院有限公司 One kind ensures that underground power house machine hole dividing pier excavates molding strengthening supporting method and underground power house machine hole dividing pier structure
CN107905805B (en) * 2017-11-15 2024-04-26 中国电建集团华东勘测设计研究院有限公司 Reinforced supporting method for guaranteeing excavation molding of machine pit partition piers of underground powerhouse and machine pit partition pier structure of underground powerhouse

Similar Documents

Publication Publication Date Title
CN103603369B (en) Construction method of anchor pile counterfort retaining wall
CN207959264U (en) Soft clay foundation adjoins High-filled emkankment pipe gallery
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN207776878U (en) A kind of underground power house machine hole dividing pier structure
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN107905805A (en) One kind ensures that underground power house machine hole dividing pier excavates molding strengthening supporting method and underground power house machine hole dividing pier structure
CN204435407U (en) A kind of batter post group anchor formula rock foundation
CN108222283A (en) A kind of flexible connecting structure and its construction method for filling wall and main body frame
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN207987961U (en) A kind of rockmass high slope anchor pole and earth-retaining wall composite construction
CN209228377U (en) A kind of multistage set arch structure and pipe canopy set arch structure for tunnel portal supporting
CN203977433U (en) Soft Deep Foundation Pit engineering composite supporting construction
CN212375896U (en) Line tower type-returning pile-anchor composite foundation suitable for karst region
CN102296620A (en) Curtain water-stop slope wall and construction method thereof
CN106120853B (en) A kind of inverted construction method of frame bridge
CN207988161U (en) A kind of flexible connecting structure of filling wall and main body frame
CN205557552U (en) Cement pole stock foundation reinforcement structure
CN207469275U (en) A kind of slope rock river bed steel cofferdam
CN209603332U (en) Concrete mixing station feed bin net formula fills soft partition wall
CN203924106U (en) A kind of reinforced soil retaining wall is used from embedded dust block
CN207974834U (en) A kind of Tunnel Engineering pipe curtain support construction
CN202148530U (en) Curtain water stop slope wall
CN206972258U (en) A kind of tunnel excavation support structure
CN203905012U (en) Reinforcing mesh foundation support system
CN206267170U (en) A kind of structure that iron tower base foundation bolt is anchored in rock layer surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant