CN108222283A - A kind of flexible connecting structure and its construction method for filling wall and main body frame - Google Patents

A kind of flexible connecting structure and its construction method for filling wall and main body frame Download PDF

Info

Publication number
CN108222283A
CN108222283A CN201810213617.XA CN201810213617A CN108222283A CN 108222283 A CN108222283 A CN 108222283A CN 201810213617 A CN201810213617 A CN 201810213617A CN 108222283 A CN108222283 A CN 108222283A
Authority
CN
China
Prior art keywords
connector
wall
body frame
filling wall
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810213617.XA
Other languages
Chinese (zh)
Inventor
周晓洁
李娜
陈培奇
杜金鹏
何颖
梁清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201810213617.XA priority Critical patent/CN108222283A/en
Publication of CN108222283A publication Critical patent/CN108222283A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)

Abstract

A kind of flexible connecting structure for filling wall and main body frame, it is characterised in that including the connector I being embedded in frame column or Vierendeel girder and the connector II being connected with connector I;The connector I is made of riser and dowel;The riser has been evenly arranged dowel on one side, and another side is connect with connector II;Be provided on the connector II wear muscle wear muscle hole.Construction method is:(1)Built-in connection I;(2)After frame column and Vierendeel girder form removal, site welding connector II;(3)Build filling wall by laying bricks or stones;(4)Pour horizontal binder;(5)After the completion of filling wall is built by laying bricks or stones, wall newel post is poured.The present invention reduces the interaction filled in existing rigid connection scheme between wall and main body frame on the basis of ensureing to fill wall Out-of-plane Stability, while improves a series of problems that setting tension rib generates.

Description

A kind of flexible connecting structure and its construction method for filling wall and main body frame
Technical field
The invention belongs to building structure construction technical fields, and in particular to a kind of flexible connection for filling wall and main body frame Structure and its construction method.
Background technology
At present, Fill model is a kind of one of structure type that China is most widely used.It is existing《Building aseismicity Design specification》(GB50011-2010)Filling wall is considered as non-structural element, filling wall dead weight is only considered, does not consider to fill wall Seismic Bearing Capacity considers its influence to structure overall stiffness by reduction coefficient approximation natural vibration period.Although this method letter It is single, but cannot really reflect the stress of structure, because from convenient for constructing and strengthening the angle of filling wall stability, fill wall Rigid connection scheme is generally used between main body frame, the filling wall and main body of rigid connection scheme are used under horizontal earthquake action There is complicated interaction between frame, locally change the stress of frame structure.Using wall-frame rigid connection scheme Practical Project in, fill the embedding reality of generally use mortar between wall and frame, and pass through connecting lacing wire or cast-in-site stripe strengthens filling wall Contacting between main body frame, this way make the interaction between filling wall and frame more prominent, structure are caused to be added interior The appearance of power and the premature breakdown for filling wall, are unfavorable for the performance of structural seismic performance.To solve the above problems,《Concrete Small-sized hollow building block Building technology regulation》(JGJ/T14-2011)Clearly propose that the company of disengagement can be used with frame beam column for filling wall Method, i.e. flexible connecting method are connect, to reduce thrusting action of the filling wall to frame beam column.It is worth noting that, filling wall Out-of-plane Stability is a major issue in wall-frame flexible connection scheme, should take certain construction measure, that is, ensures to fill out Effective disengagement of wall and main body frame is filled, ensures the appropriateness connection of the two again.
In addition, the form of construction work of tension rib is typically bar planting or pre-buried at present, and the insecure of bar planting, embedded ribs position with Building block mortar joint correspond to the FAQs such as inaccuracy can all cause construction puzzlement and Path of Force Transfer it is unstable, while tension rib with Main body frame and filling wall junction can also generate certain additional stress or stress concentration, these are all unfavorable for structural seismic performance Performance.
Therefore a kind of filling wall for being suitable for flexible connection and main body frame attachment device and wall structure scheme are proposed, it is first Realization of the flexible connecting method in engineering between filling wall and main body frame is first solved, it is steady outside next filling wall plane that gives one's hand Qualitatively wall structure scheme, while solve the problems, such as that existing tension rib form of construction work exists, there is important engineering value And realistic meaning.
Invention content
Present invention aims at provide a kind of flexible connecting structure and its construction method for filling wall and main body frame, its energy The deficiencies in the prior art are enough solved, on the basis of ensureing to fill wall Out-of-plane Stability, are reduced in existing rigid connection scheme The interaction between wall and main body frame is filled, while improves a series of problems that setting tension rib generates.
Technical scheme of the present invention:A kind of flexible connecting structure for filling wall and main body frame, it is characterised in that including pre- The connector I being embedded in frame column or Vierendeel girder and the connector II being connected with connector I;The connector I by riser and Dowel forms;The riser has been evenly arranged dowel on one side, and another side is connect with connector II;It is provided on the connector II That wears muscle wears muscle hole.
The connector I is set a roof beam in place with body frame or frame column pours integrally;Wearing in muscle hole for the connector II penetrates U Shape tension rib I, U-shaped tension rib I are stretched into the horizontal binder and newel post of filling wall.
One of horizontal binder of the filling coping setting, end set newel post;Horizontal binder and the newel post at top pour Build up one.
It is described to fill one of horizontal binder of setting at every spacing 800-1000mm within the walls.
The horizontal binder and the depth of section of newel post, which are respectively less than, is equal to 100mm.
The connector II is vertical with connector I.
The connector II is welded with connector I.
The riser is evenly arranged on one side there are four dowel.
The riser quadrangle opens up aperture.
The connector II includes connecting plate I and connecting plate II, and connecting plate I and connecting plate II, which are provided with, corresponding wears muscle Hole;The longitudinal centre line of the connecting plate I and connecting plate II is respectively relative to filling wall edge retraction 35-40mm;I He of connecting plate The muscle hole of wearing of connecting plate II penetrates U-shaped tension rib I.
Rectangular opening is in the muscle hole of wearing;The height 30-35mm of the rectangular opening, width 10-15mm.
A kind of construction method for the flexible connecting structure for filling wall and main body frame, it is characterised in that include the following steps:
(1)Built-in connection I:Connector is embedded in frame column and Vierendeel girder;After built-in connection I, one is welded on it Muscle hole is corresponding with horizontal binder and newel post's reinforcement bar arrangement, i.e., I center line of connector is with horizontal for wearing on the connector II risen Beam or newel post's center line are corresponding, within error 10mm;I fixed position after-pouring main body frame concrete of connector;
(2)After the concrete form removal of frame column and Vierendeel girder, site welding connector II:The welded connections II on connector I, And U-shaped tension rib I is penetrated into muscle hole;
(3)Build filling wall by laying bricks or stones:Newel post position is reserved in wall end, and binds newel post's reinforcing bar;On the position that horizontal binder is set, It is laid with one layer of groove profile building block;
(4)Pour horizontal binder:Using groove profile building block as formwork, longitudinal reinforcement and lacing wire are laid in groove profile building block bottom, wherein vertical It is connect to reinforcing bar with the U-shaped tension rib I being set on frame column corresponding position connector II, U-shaped tension rib I can be being worn in muscle hole Up and down adjustment pours horizontal binder concrete to suitable position;
(5)After the completion of filling wall is built by laying bricks or stones, wall newel post is poured:Newel post's longitudinal reinforcement is with being set to Vierendeel girder corresponding position connector U-shaped tension rib I on II connects, and U-shaped tension rib I, to suitable position, can pour wall newel post and mix wearing left and right adjusting in muscle hole Solidifying soil;" wall newel post and horizontal binder " forms subframe form.
The step(1)Middle I riser of connector is set a roof beam in place with body frame and is held out against on the inside of framed column template, utilizes connector I The quadrangle aperture of riser is fixed by fixing pieces such as iron wire bolts with template, fixes the position of connector I, ensures concrete table Face it is smooth.
The step(2)Middle connector II includes connecting plate I and connecting plate II, II longitudinal center of connecting plate I and connecting plate Line is respectively relative to filling wall edge retraction 35-40mm, wears the rectangle of U-shaped tension rib I across connector II in welding process Muscle hole.
The step(3)Before building filled wall by laying bricks or stones, corresponding to interim on the position of wall on Vierendeel girder and frame column Fixed pointing(Such as blanket of glass wool, mineral wool felt, low-density EPS, XPS or polyurethane foam packing material), pointing Width is less than thickness of wall body, and the later stage does encapsulation process;Pointing method of temporarily fixing is using stickup.
The step(3)Mortar joint uniformly build by laying bricks or stones by full, the building-block device to hole fissure of displacement during building filling wall by laying bricks or stones;The newel post Longitudinal reinforcement connect with the muscle that gets rid of during cast-in-place bottom girder;Along filling wall short transverse every two skin building blocks, bury U-shaped from newel post and draw Knot muscle II, which stretches into, fills at horizontal mortar joint within the walls, and built-in length meets shockproof requirements.
Gap between the frame column and Vierendeel girder of the main body frame and filling wall is using elastic packings materials such as silicone adhesives Material processing.
When the filling sets a plurality of horizontal binder within the walls, step is repeated(3)And step(4), until completing filling wall It builds by laying bricks or stones;Wherein filling wall top portion must be provided with a horizontal binder.
The present invention is advantageous in that:1st, using this filling wall and main body frame flexible connecting structure and wall structure side During case, construction is simple is easy to operate.2nd, in reserved on connector II wear muscle hole and the design of U-shaped tension rib meets the diameter of tension rib It is required that, anchoring requirement, and can suitably adjust reinforcement bar arrangement, improve that tension rib bar planting is insecure in previous way or position is not allowed The limitation really brought.3rd, horizontal binder and newel post's arrangement of reinforcement are connected by connection structure with main body frame, solve tension rib with The problem of main body frame connecting place is also easy to produce additional stress.4th, " son can be formed using " wall newel post+horizontal binder " structural scheme Frame " stress characteristic generates effect of restraint to filling wall, not only contributes to filling wall Out-of-plane Stability, be also beneficial to simultaneously Improve stress performance in filling wall plane.5th, the sub-frame structures and main body frame formed by connection structure are flexibly connected, every From filling wall and interaction of the main body frame under geological process, be conducive to improve structural seismic performance.
Description of the drawings
Fig. 1 is the side view of connector I and connector II in the present invention.
Fig. 2 is the stereogram of connector I and connector II in the present invention.
Fig. 3 is the arrangement schematic diagram of main body frame upper connector I and connector II in the present invention.
Fig. 4 is the connection diagram of U-shaped tension rib I and connector II.
Fig. 5 is that the stereogram after packing material is pasted on the corresponding wall position of frame column.
Fig. 6 is the stereoscopic schematic diagram after frame column built-in connection I and welded connections II.
Fig. 7 is the vertical view pasted on the corresponding wall position of frame column after packing material and the connection tension rib of connector II.
Fig. 8 is the schematic diagram that the present invention builds filling wall by laying bricks or stones.
Fig. 9 is the subframe form schematic diagram of " wall newel post+horizontal binder ".
Figure 10 is to bury U-shaped tension rib II from newel post to stretch into the position view of filling within the walls.
Figure 11 is to fill wall and the processing schematic diagram in frame intercolumniation gap.
Figure 12 is the processing schematic diagram for filling gap between wall and Vierendeel girder.
Wherein, 1 is connector I, and 1-1 is riser, and 1-2 is dowel, and 1-3 is aperture, and 2 be connector II, and 2-1 is connecting plate I, 2-2 are connecting plate II, and 2-3 is wears muscle hole, and 3 be U-shaped tension rib I, and 4 be horizontal binder, and 5 be newel post, and 6 be Vierendeel girder, and 7 be frame Trestle, 8 be pointing, and 9 be longitudinal reinforcement, and 10 be coat of plaster, and 11 be elaxtic seal, and 12 be U-shaped tension rib II.
Specific embodiment
The present invention is described in further detail below in conjunction with specific embodiment.It is it should be appreciated that described herein specific Embodiment is only used to explain the present invention, is not intended to limit the present invention.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", The orientation or position relationship of the instructions such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description rather than instruction or dark Show that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that right The limitation of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi The connection of two components interiors.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
As shown in Figures 1 to 12, a kind of flexible connecting structure for filling wall and main body frame, it is characterised in that including pre-buried Connector I 1 in frame column 7 or Vierendeel girder 6 and the connector II 2 being connected with connector I 1;The connector I 1 is by standing Plate 1-1 and dowel 1-2 compositions;The riser 1-1's has been evenly arranged dowel on one side, and another side is connect with connector II 2;It is described Be provided on connector II 2 wear muscle wear muscle hole 2-3.
The connector I 1 and body frame set a roof beam in place 6 or frame column 7 pour integrally;The connector II 2 wears muscle hole 2-3 In penetrate U-shaped tension rib I 3, U-shaped tension rib I 3 is stretched into the horizontal binder 4 and newel post 5 of filling wall.
One of horizontal binder 4 of the filling coping setting, end set newel post 5;The horizontal binder 4 at top and newel post 5 pour integrally.
It is described to fill one of horizontal binder 4 of setting at every spacing 800-1000mm within the walls.
The horizontal binder 4 and the depth of section of newel post 5, which are respectively less than, is equal to 100mm.
The connector II 2 is vertical with connector I 1.
The connector II 2 is welded with connector I 1.
The riser 1-1's is evenly arranged on one side there are four dowel 1-2.
Tetra- jiaos of the riser 1-1 opens up aperture 1-3.
The connector II 2 is provided with including I 2-1 of connecting plate and connecting plate II 2-2, I 2-1 of connecting plate and II 2-2 of connecting plate It is corresponding to wear muscle hole 2-3;The longitudinal centre line of I 2-1 of connecting plate and II 2-2 of connecting plate is respectively relative to filling wall edge It is retracted 35-40mm;The muscle hole 2-3 that wears of II 2-2 of I 2-1 of connecting plate and connecting plate penetrates U-shaped tension rib I 3.
The muscle hole 2-3 that wears is rectangular opening;The height 30-35mm of the rectangular opening, width 10-15mm.
A kind of construction method for the flexible connecting structure for filling wall and main body frame, it is characterised in that include the following steps:
(1)Built-in connection I 1:Connector I 1 is embedded in frame column 7 and Vierendeel girder 6;After built-in connection I 1, welded with it On the connector II 2 being connected together to wear muscle hole 2-3 corresponding with horizontal binder 4 and 5 reinforcement bar arrangement of newel post, i.e., in connector I 1 Heart line is corresponding with horizontal binder 4 or 5 center line of newel post, within error 10mm;I 1 fixed position after-pouring body frame of connector Frame concrete;
(2)After the concrete form removal of frame column 7 and Vierendeel girder 6, site welding connector II 2:It is welded to connect on connector I 1 Part II 2, and U-shaped tension rib I 3 is penetrated into muscle hole 2-3;
(3)Build filling wall by laying bricks or stones:5 position of newel post is reserved in wall end, and binds 5 reinforcing bar of newel post;In the position for setting horizontal binder 4 On, it is laid with one layer of groove profile building block;
(4)Pour horizontal binder 4:Using groove profile building block as formwork, longitudinal reinforcement and lacing wire are laid in groove profile building block bottom, wherein vertical 3 are connect with the U-shaped tension rib I being set on frame column corresponding position connector II 2 to reinforcing bar, U-shaped tension rib I 3 can wear muscle Up and down adjustment pours horizontal 4 concrete of binder to suitable position in the 2-3 of hole;
(5)After the completion of filling wall is built by laying bricks or stones, wall newel post is poured:Newel post's longitudinal reinforcement is with being set to Vierendeel girder corresponding position connector U-shaped tension rib I 3 on II 2 connects, and U-shaped tension rib I 3, to suitable position, can pour wall wearing left and right adjusting in the 2-3 of muscle hole Newel post's concrete;" wall newel post 5 and horizontal binder 4 " forms subframe form.
The step(1)Middle I 1 riser 1-1 of connector and body frame are set a roof beam in place and are held out against on the inside of 6 and 7 template of frame column, the company of utilization The quadrangle aperture 1-3 of I 1 riser 1-1 of fitting is fixed by fixing pieces such as iron wire bolts with template, consolidates the position of connector I 1 It is fixed, ensure the smooth of concrete surface.
The step(2)Middle connector II 2 includes I 2-1 of connecting plate and connecting plate II 2-2, I 2-1 of connecting plate and connecting plate II 2-2 longitudinal centre lines are respectively relative to filling wall edge retraction 35-40mm, pass through U-shaped tension rib I 3 in welding process and connect The rectangle of fitting II 2 wears muscle hole 2-3.
The step(3)Before building filled wall by laying bricks or stones, correspond on the position of wall and face on Vierendeel girder 6 and frame column 7 When fix pointing 8(Such as blanket of glass wool, mineral wool felt, low-density EPS, XPS or polyurethane foam packing material), joint filling material Expect that 8 width are less than thickness of wall body, the later stage does encapsulation process;8 method of temporarily fixing of pointing is using stickup.Simultaneously as connection Part II 2 protrudes Vierendeel girder and frame column surface, so the laying of pointing should do proper treatment herein.
The step(3)Mortar joint uniformly build by laying bricks or stones by full, the building-block device to hole fissure of displacement during building filling wall by laying bricks or stones;The newel post 5 longitudinal reinforcement 9 is connect with the muscle that gets rid of during cast-in-place bottom girder;Along filling wall short transverse every two skin building blocks, U is buried from newel post 5 Shape tension rib II 12, which stretches into, fills at horizontal mortar joint within the walls, and built-in length meets shockproof requirements.
Gap between the frame column and Vierendeel girder of the main body frame and filling wall is using elastic packings materials such as silicone adhesives 11 processing of material.
The filling wall surface is coat of plaster 10.
When the filling sets a plurality of horizontal binder 4 within the walls, step is repeated(3)And step(4), until completing filling wall It builds by laying bricks or stones;Wherein filling wall top portion must be provided with a horizontal binder 4.
The above is only the preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of flexible connecting structure for filling wall and main body frame, it is characterised in that including being embedded in frame column or Vierendeel girder Connector I and the connector II that is connected with connector I;The connector I is made of riser and dowel;The one of the riser Face has been evenly arranged dowel, and another side is connect with connector II;Be provided on the connector II wear muscle wear muscle hole.
A kind of 2. flexible connecting structure for filling wall and main body frame according to claim 1, it is characterised in that the connection Part I is set a roof beam in place with body frame or frame column pours integrally;Wearing for the connector II penetrates U-shaped tension rib I in muscle hole, U-shaped is drawn Knot muscle I is stretched into the horizontal binder and newel post of filling wall.
A kind of 3. flexible connecting structure for filling wall and main body frame according to claim 2, it is characterised in that the filling One of horizontal binder of coping setting, end set newel post;The horizontal binder at top pours integrally with newel post.
A kind of 4. flexible connecting structure for filling wall and main body frame according to claim 2, it is characterised in that the filling One of horizontal binder of setting at every spacing 800-1000mm within the walls;The horizontal binder and the depth of section of newel post, which are respectively less than, to be equal to 100mm。
A kind of 5. flexible connecting structure for filling wall and main body frame according to claim 1, it is characterised in that the connection Part II is vertical with connector I;The connector II is welded with connector I.
A kind of 6. flexible connecting structure for filling wall and main body frame according to claim 1, it is characterised in that the riser Be evenly arranged on one side there are four dowel;The riser quadrangle opens up aperture.
A kind of 7. flexible connecting structure for filling wall and main body frame according to claim 1, it is characterised in that the connection Part II includes connecting plate I and connecting plate II, and connecting plate I and connecting plate II, which are provided with, corresponding wears muscle hole;The connecting plate I and company The longitudinal centre line of fishplate bar II is respectively relative to filling wall edge retraction 35-40mm;The muscle hole of wearing of connecting plate I and connecting plate II is worn Enter U-shaped tension rib I.
8. a kind of flexible connecting structure for filling wall and main body frame according to claim 1, it is characterised in that described to wear muscle Hole is rectangular opening;The height 30-35mm of the rectangular opening, width 10-15mm.
9. a kind of construction method for the flexible connecting structure for filling wall and main body frame, it is characterised in that include the following steps:
(1)Built-in connection I:Connector I is embedded in frame column and Vierendeel girder;After built-in connection I, one is welded on it Muscle hole is corresponding with horizontal binder and newel post's reinforcement bar arrangement, i.e., I center line of connector is with horizontal for wearing on the connector II risen Beam or newel post's center line are corresponding, within error 10mm;I fixed position after-pouring main body frame concrete of connector;
(2)After frame column and Vierendeel girder form removal, site welding connector II:The welded connections II on connector I, and by U-shaped What tension rib I penetrated connector II wears muscle hole;
(3)Build filling wall by laying bricks or stones:Newel post position is reserved in wall end, and binds newel post's reinforcing bar;On the position that horizontal binder is set, It is laid with one layer of groove profile building block;
(4)Pour horizontal binder:Using groove profile building block as formwork, longitudinal reinforcement and lacing wire are laid in groove profile building block bottom, wherein vertical It is connect to reinforcing bar with the U-shaped tension rib I being set on frame column corresponding position connector II, tension rib is lowered wearing in muscle hole Section pours horizontal binder concrete to suitable position;
(5)After the completion of filling wall is built by laying bricks or stones, wall newel post is poured:Newel post's longitudinal reinforcement is with being set to Vierendeel girder corresponding position connector U-shaped tension rib I on II connects, and tension rib, to suitable position, can pour wall newel post concrete wearing left and right adjusting in muscle hole; " wall newel post and horizontal binder " forms subframe form.
10. a kind of construction method for the flexible connecting structure for filling wall and main body frame, feature exist according to claim 9 In the step(1)Middle I riser of connector is set a roof beam in place with body frame and is held out against on the inside of framed column template, and I riser of connector passes through solid Determine part to fix with template, fix the position of connector I, ensure the smooth of concrete surface;
The step(2)Middle connector II includes connecting plate I and connecting plate II, connecting plate I and connecting plate II longitudinal centre line point Not relative to filling wall edge retraction 35-40mm, the rectangle of connector II is passed through to wear muscle hole U-shaped tension rib I in welding process;
The step(3)Before building filled wall by laying bricks or stones, correspond on the position of wall and be fixed temporarily on Vierendeel girder and frame column Pointing, pointing width are less than thickness of wall body, and the later stage does encapsulation process;Pointing method of temporarily fixing is using viscous Patch;
The step(3)Mortar joint uniformly build by laying bricks or stones by full, the building-block device to hole fissure of displacement during building filling wall by laying bricks or stones;The newel post indulges It is connect to reinforcing bar with the muscle that gets rid of during cast-in-place bottom girder;Along filling wall short transverse every two skin building blocks, U-shaped tension rib is buried from newel post II stretches into filling within the walls at horizontal mortar joint, and built-in length meets shockproof requirements;
Gap between the frame column and Vierendeel girder of the main body frame and filling wall is handled using elaxtic seal.
CN201810213617.XA 2018-03-15 2018-03-15 A kind of flexible connecting structure and its construction method for filling wall and main body frame Pending CN108222283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810213617.XA CN108222283A (en) 2018-03-15 2018-03-15 A kind of flexible connecting structure and its construction method for filling wall and main body frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810213617.XA CN108222283A (en) 2018-03-15 2018-03-15 A kind of flexible connecting structure and its construction method for filling wall and main body frame

Publications (1)

Publication Number Publication Date
CN108222283A true CN108222283A (en) 2018-06-29

Family

ID=62659446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810213617.XA Pending CN108222283A (en) 2018-03-15 2018-03-15 A kind of flexible connecting structure and its construction method for filling wall and main body frame

Country Status (1)

Country Link
CN (1) CN108222283A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057066A (en) * 2018-08-20 2018-12-21 中国冶集团有限公司 A kind of flexible connection anti-seismic structure and construction method
CN111502031A (en) * 2020-04-29 2020-08-07 南宁学院 Connecting structure of beam and wall
CN112575891A (en) * 2020-12-17 2021-03-30 西南交通大学 Low-seismic-loss beam column node based on waveform BFRP connecting plate

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02136476A (en) * 1988-11-15 1990-05-25 Fujita Corp Earthquakeproof structure of multistoried building
CN202380609U (en) * 2011-12-23 2012-08-15 宝钢建筑系统集成有限公司 Pre-split-joint light wall plate capable of realizing industrial production
CN102767288A (en) * 2012-01-17 2012-11-07 中国建筑第四工程局有限公司 Method and structure for mounting precast reinforced concrete stairs
CN203924349U (en) * 2014-04-29 2014-11-05 湖北弘毅钢结构工程有限公司 A kind of prefabricated panel and superposed beam rapid installing connection structure
CN104612283A (en) * 2015-02-02 2015-05-13 西安建筑科技大学 On-site built reinforcing rib ecological composite wall structure and construction method thereof
CN205000504U (en) * 2015-08-12 2016-01-27 苏州柯利达光电幕墙有限公司 Full glass curtain wall bearing structure
CN105649212A (en) * 2016-04-06 2016-06-08 沈阳建筑大学 Flexible connection device for masonry filler wall and main body frame and building method of filler wall
CN105821974A (en) * 2016-03-24 2016-08-03 沈阳建筑大学 Device and method for flexible connection between masonry filler wall and main body frame
CN207988161U (en) * 2018-03-15 2018-10-19 天津城建大学 A kind of flexible connecting structure of filling wall and main body frame

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02136476A (en) * 1988-11-15 1990-05-25 Fujita Corp Earthquakeproof structure of multistoried building
CN202380609U (en) * 2011-12-23 2012-08-15 宝钢建筑系统集成有限公司 Pre-split-joint light wall plate capable of realizing industrial production
CN102767288A (en) * 2012-01-17 2012-11-07 中国建筑第四工程局有限公司 Method and structure for mounting precast reinforced concrete stairs
CN203924349U (en) * 2014-04-29 2014-11-05 湖北弘毅钢结构工程有限公司 A kind of prefabricated panel and superposed beam rapid installing connection structure
CN104612283A (en) * 2015-02-02 2015-05-13 西安建筑科技大学 On-site built reinforcing rib ecological composite wall structure and construction method thereof
CN205000504U (en) * 2015-08-12 2016-01-27 苏州柯利达光电幕墙有限公司 Full glass curtain wall bearing structure
CN105821974A (en) * 2016-03-24 2016-08-03 沈阳建筑大学 Device and method for flexible connection between masonry filler wall and main body frame
CN105649212A (en) * 2016-04-06 2016-06-08 沈阳建筑大学 Flexible connection device for masonry filler wall and main body frame and building method of filler wall
CN207988161U (en) * 2018-03-15 2018-10-19 天津城建大学 A kind of flexible connecting structure of filling wall and main body frame

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周晓洁: "柔性连接填充墙框架结构抗震性能试验" *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057066A (en) * 2018-08-20 2018-12-21 中国冶集团有限公司 A kind of flexible connection anti-seismic structure and construction method
CN111502031A (en) * 2020-04-29 2020-08-07 南宁学院 Connecting structure of beam and wall
CN112575891A (en) * 2020-12-17 2021-03-30 西南交通大学 Low-seismic-loss beam column node based on waveform BFRP connecting plate
CN112575891B (en) * 2020-12-17 2021-10-15 西南交通大学 Low-seismic-loss beam column node based on waveform BFRP connecting plate

Similar Documents

Publication Publication Date Title
CN106703814B (en) Tunneling subway station hole pile construction method
CN105155551B (en) Pressure compensation type foundation pit supporting structure and construction method
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN105155724B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN103469939A (en) Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure
CN105113660B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN108222283A (en) A kind of flexible connecting structure and its construction method for filling wall and main body frame
CN107542115A (en) Underground project waterproof structure and its construction method
CN109386050A (en) A kind of multi-layer combined type house structure
CN110359487A (en) A kind of fabricated construction side wall prefabricated component and its with arch sheet connecting structure
CN109024632A (en) A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement
CN214784171U (en) Basement supports template structure
CN207988161U (en) A kind of flexible connecting structure of filling wall and main body frame
CN207228173U (en) A kind of underground project waterproof structure
CN207987930U (en) One kind exempting from precipitation foundation pit supporting construction
CN207092299U (en) A kind of cast-in-place hollow armored concrete filling wall
CN107587476B (en) Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof
CN205557839U (en) Brickwork infilled wall and main body frame's flexible connection mean
CN110080292A (en) A kind of assembled integral vault is greatly across no column underground structure
CN206189389U (en) Underground continuous wall structure for reverse construction method
CN105804086A (en) Construction method for support change joints in foundation trench reverse building method construction
CN105113663A (en) Assembly type constructional column constructed simultaneously with framework structure infill wall
CN211690389U (en) Inter-pile retaining plate structure for adjacent anti-slide piles
CN208857826U (en) A kind of precast lattice beam structure of slope reinforcement
CN108221954A (en) A kind of quick detachable coercion underground continuous wall, suspender and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629