CN207761667U - A kind of supporting construction for tunnel reconstruction and extension project - Google Patents

A kind of supporting construction for tunnel reconstruction and extension project Download PDF

Info

Publication number
CN207761667U
CN207761667U CN201820164709.9U CN201820164709U CN207761667U CN 207761667 U CN207761667 U CN 207761667U CN 201820164709 U CN201820164709 U CN 201820164709U CN 207761667 U CN207761667 U CN 207761667U
Authority
CN
China
Prior art keywords
protecting assembly
branch protecting
vertical branch
tunnel
pipe fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820164709.9U
Other languages
Chinese (zh)
Inventor
武科
于雅琳
崔帅帅
张前进
厉雅萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201820164709.9U priority Critical patent/CN207761667U/en
Application granted granted Critical
Publication of CN207761667U publication Critical patent/CN207761667U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of supporting construction for tunnel reconstruction and extension project, it solves tunnel structure reorganization and expansion construction and needs to put into a large amount of manpowers, equipment and financial resources, and the problem of easy ting produce construction risk, it is formed with " diaphram wall " structure for preventing lateral deformation of effect by branch protecting assembly, construction and stabilization, technical solution to meet soft stratum or the tunnel structure reorganization and expansion of shallow embedding location are:Including the first vertical branch protecting assembly and the second vertical branch protecting assembly, it is spaced setpoint distance between the first vertical branch protecting assembly and the second vertical branch protecting assembly, the first vertical branch protecting assembly and the second vertical branch protecting assembly include Multi-row-tube group, include multiple horizontally disposed first pipe fittings successively from top to bottom per tubulation group, there is setting spacing between the center line of adjacent tubulation group;Semi-circular branch protecting assembly is set between the first vertical branch protecting assembly and the second vertical branch protecting assembly.

Description

A kind of supporting construction for tunnel reconstruction and extension project
Technical field
The utility model is related to Geotechnical Engineering fields, more particularly to a kind of supporting for tunnel reconstruction and extension project Structure.
Background technology
With the fast development of Chinese national economy, volume of traffic rapid development, some build highway of the remote past, even Be highway tunnel since design standard is relatively low, the traffic capacity cannot meet growing transport need, to influence Economic fast development, needs the reorganization and expansion to can be only achieved corresponding service level.Again, compared to building a new tunnel again For, tunnel reorganization and expansion carries out on the basis of original tunnel, has excavated volume few, with can refer to engineering when just building The data such as matter, hydrogeology, or the position for directly serious plant disease occur in tunnel carry out supplement survey, can save and largely survey Look into work.
Tunnel is different from ground structure, therefore answers the actual conditions of incorporation engineering comprehensive the modified threshold of established tunnel Demonstration is closed, most rational reorganization and expansion mode is sought.Meanwhile in tunnel reconstruction and extension project, due to carrying out one to existing tunnel structure Enlarging is removed in side or both sides, causes tunnel surrounding to be exposed in air in non-support, seriously affects the steady of tunnel structure It is qualitative.If effective ways cannot be taken to be closed tunnel surrounding and be subject to supporting, tunnel structure necessarily leads to moderate finite deformation, harm Tunnel operation and people's life.Therefore, it is necessary to propose fast and effectively supporting construction to tunnel reconstruction and extension project, work is met with this Safe, the quick and requirement stablized of range request.
In conclusion in the prior art tunnel structure reorganization and expansion construction is needed to put into a large amount of manpowers, equipment and financial resources, And the problem of easy ting produce construction risk, still lack effective solution scheme.
Utility model content
In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a kind of branch for tunnel reconstruction and extension project Protection structure is formed with " diaphram wall " structure for preventing lateral deformation of effect by branch protecting assembly, to meet soft stratum Or construction and the stabilization of shallow embedding location tunnel structure reorganization and expansion;
Further, the utility model uses following technical proposals:
A kind of supporting construction for tunnel reconstruction and extension project, including the first vertical branch protecting assembly and the second vertical supporting group Part is spaced setpoint distance, the first vertical supporting group between the first vertical branch protecting assembly and the second vertical branch protecting assembly Part and the second vertical branch protecting assembly include Multi-row-tube group, include multiple from top to bottom successively horizontally disposed the per tubulation group One pipe fitting has setting spacing between the center line of adjacent tubulation group;The first vertical branch protecting assembly and the second vertical supporting Semi-circular branch protecting assembly is set between component.
Further, there is setpoint distance between adjacent first pipe fitting of same pipe group.
Further, first pipe fitting of adjacent tubulation group is laid staggeredly.
Further, first pipe fitting is connected in sequence by more pipes, passes through casing connection between adjacent tubes.
Further, the described first vertical branch protecting assembly and the second vertical branch protecting assembly are higher by semi-circular supporting module sets Highly.
Further, the semi-circular branch protecting assembly is at a distance from the first vertical branch protecting assembly, the second vertical branch protecting assembly It is equal.
Further, the semi-circular branch protecting assembly includes multiple rows of return bend group, and it includes more often to arrange return bend group A be arranged in order is surrounded by semicircular second pipe fitting.
Further, there is setting spacing between the center line of return bend group described in adjacent row.
Further, it is surrounded by between semicircular adjacent second pipe fitting with setpoint distance.
Further, second pipe fitting of adjacent row return bend group is laid staggeredly.
Further, second pipe fitting is horizontally disposed.
Further, second pipe fitting is connected in sequence by more pipes, passes through casing connection between adjacent tubes.
A kind of in order to overcome the deficiencies of the prior art, the utility model provides supporting knot for tunnel reconstruction and extension project The construction method of structure, includes the following steps:
1) be prefabricated in the factory the first pipe fitting and the second pipe fitting, and transports it into construction site;
2) drill hole of drilling machine at the construction field (site), is utilized;Drilling interval carries out, and even hole is bored in subdrilling odd number hole afterwards;
3) in default reorganization and expansion tunnel both sides, the first vertical branch protecting assembly is installed respectively and the second vertical branch protecting assembly is gone forward side by side Row slip casting forms vertical continuous underground wall structure;
4) further along default reorganization and expansion tunnel top boundary, 2~3m drillings laying semi-circular supporting above the boundary of top Component and slip casting, to form circumferential continuous underground wall structure.
Compared with prior art, the utility model has the beneficial effects that:
Vertical and circumferential " diaphram wall " structure is formed by vertical branch protecting assembly and semi-circular branch protecting assembly, enduringly The stability for improving tunnel reorganization and expansion region country rock, efficiently reduces the deformation on tunnel stratum during reorganization and expansion;Also, it will It shortens the construction period, reduce engineering cost, and be adapted to the unfavorable geological conditions such as a variety of soft stratums, shallow embedding stratum, have There is controllability.
(1) in terms of Tunnel Stability:The scope of application of tunnel reconstruction and extension project can be effectively improved, tunnel is reduced and changes expansion The unstable failure on stratum, enduringly raising tunnel surrounding self-stability energy during building, ensure tunnel reorganization and expansion construction and operation phase Between personnel safety and equipment operation.
(2) in terms of geological conditions adaptability:The unfavorable geological conditions such as a variety of soft stratums, shallow embedding stratum are adapted to, are had Controllability.
(3) in terms of construction:Branch protecting assembly improves production efficiency completely by precast plant according to design drawing processing and fabricating, Reduce the pollution to construction environment, and daguanpeng construction technical maturity, convenient and efficient.Vertical branch protecting assembly and semi-circular supporting Component forms vertical and circumferential " diaphram wall " structure, compared with conventional tunnel reorganization and expansion is constructed, shortens the construction period, subtracts Lack that engineering cost, construction technology are simple to operation, and durability is strong.
Description of the drawings
The accompanying drawings which form a part of this application are used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its explanation do not constitute the improper restriction to the application for explaining the application.
Fig. 1 is the front view of vertical branch protecting assembly;
Fig. 2 is that tunnel reorganization and expansion has been constructed the plan view of the first vertical branch protecting assembly;
Fig. 3 is that tunnel reorganization and expansion has been constructed the plan view of the second vertical branch protecting assembly;
Fig. 4 is that tunnel reorganization and expansion has been constructed the plan view of semi-circular branch protecting assembly;
Fig. 5 is the plan view that tunnel reorganization and expansion tunnel ends completion;
In figure, the 1, first vertical branch protecting assembly;2, the tunnel structure of reorganization and expansion is needed;3, the second vertical branch protecting assembly;4、 Semi-circular branch protecting assembly;5, the tunnel structure after the completion of reorganization and expansion, the 6, first pipe fitting, the 7, second pipe fitting.
Specific implementation mode
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
As background technology is introduced, tunnel structure reorganization and expansion construction exists in the prior art and needs to put into a large amount of people The problem of power, equipment and financial resources, in order to solve technical problem as above, present applicant proposes one kind being used for tunnel reconstruction and extension project Supporting construction, efficiently controlled tunnel reorganization and expansion construction risk, various formation tunnel entrances, shallow can effectively be adapted to by having Buried section of equal unfavorable geological conditions.The supporting construction of the application is particularly suitable for soft stratum or shallow embedding formation tunnel reorganization and expansion work Cheng Zhong, to meet construction and the stabilization of soft stratum or the tunnel structure reorganization and expansion of shallow embedding location.
In a kind of typical embodiment of the application, as shown in figure 4, the setting that Fig. 4 is the application supporting construction is shown It is intended to, this application provides a kind of supporting construction for tunnel reconstruction and extension project, including the first vertical branch protecting assembly 1 and second Vertical branch protecting assembly 3, is spaced setpoint distance between the 1 and second vertical branch protecting assembly 3 of the first vertical branch protecting assembly, and described the One vertical branch protecting assembly, 1 and second vertical branch protecting assembly 3 includes Multi-row-tube group, include per tubulation group it is multiple from top to bottom according to First pipe fitting 6 of sub-level setting has setting spacing between the center line of adjacent tubulation group;The first vertical branch protecting assembly 1 and second protecting assembly of setting semi-circular branch between vertical branch protecting assembly 34.It can be with by adjusting the reinforcing height of each branch protecting assembly The mountain ridge stratum that height rises and falls is adapted to, to reach the monolithic stability of structure.
There is setpoint distance between adjacent first pipe fitting 6 of same pipe group.
First pipe fitting 6 of adjacent tubulation group is laid staggeredly.I.e. for two vertical branch protecting assemblies, make the first pipe fitting by plum Flower stake mode arranges that arrangement can play reinforcement effect not only for the non-uniform stratum of rock soil medium mechanical strength, and And also effectively control lateral deformation in tunnel reorganization and expansion construction.
First pipe fitting 6 is connected in sequence by more pipes, passes through casing connection between adjacent tubes.
First vertical branch protecting assembly, the 1 and second vertical branch protecting assembly 3 is higher by 4 setting height of semi-circular branch protecting assembly.
The semi-circular branch protecting assembly 4 is equal at a distance from the first vertical branch protecting assembly 1, the second vertical branch protecting assembly 3. That is, semi-circular branch protecting assembly 4 is set to the intermediate position between the first vertical branch protecting assembly 1, the second vertical branch protecting assembly 3, half Annular branch protecting assembly 4 is equal to semi-circular branch protecting assembly 4 and the second vertical branch protecting assembly 3 at a distance from the first vertical branch protecting assembly 1 Distance.
The semi-circular branch protecting assembly 4 includes multiple rows of return bend group, often arranges return bend group and is arranged successively including multiple Row are surrounded by semicircular second pipe fitting 7.
There is setting spacing between the center line of return bend group described in adjacent row.
It is surrounded by between semicircular adjacent second pipe fitting 7 with setpoint distance.
Second pipe fitting 7 of adjacent row return bend group is laid staggeredly.I.e. for semi-circular branch protecting assembly, make the second pipe Part is arranged that arrangement can play reinforcing not only for the non-uniform stratum of rock soil medium mechanical strength and make by quincuncial pile mode With, but also effectively lateral deformation in control tunnel reorganization and expansion construction.
Second pipe fitting 7 is horizontally disposed.
Second pipe fitting 7 is connected in sequence by more pipes, passes through casing connection between adjacent tubes.
The two vertical branch protecting assemblies and semi-circular branch protecting assembly of the application are pressed steel tube shed support form and are laid, and big pipe is formed Canopy curtain band.
In the present embodiment, the first pipe fitting 6 and 7 equal length of the second pipe fitting are 20.0m (φ 108mm × 6mm), two vertical supportings Component laying is located within the scope of 2~4m of tunnel reorganization and expansion both sides, respectively uses two tubulation groups, circumferential spacing 20cm between pipe group, The vertical branch protecting assembly in both sides can form effective " diaphram wall " structure, control soft stratum or shallow embedding location country rock is lateral Deformation reduces the unstable failure to tunnel structure, ensures both sides adjoining rock stability in tunnel reorganization and expansion work progress, will not be to building Engineering generates lateral deformation harm;Semi-circular branch protecting assembly 4 is laid along tunnel Reformed and expanded plan design boundary, by the laying of three comb groups At circumferential spacing 20cm, effectively controls in tunnel reorganization and expansion work progress, the sedimentation and deformation and ground of tunnel top country rock between pipe group Layer deformation, reduces the harmfulness to engineering construction.After the above support system is formed, tunnel reorganization and expansion work can be effectively improved The scope of application of journey reduces tunnel instability and destroys, enduringly improves tunnel surrounding self-stability energy, ensures that tunnel reorganization and expansion was constructed Tunnel top adjoining rock stability in journey not will produce larger surrouding rock deformation or cave in, the personnel during ensureing constructing tunnel and runing Safety and equipment operation.
In order to ensure that the stability on stratum, the vertical branch protecting assembly in tunnel both sides are symmetrically set in the both sides in tunnel after reorganization and expansion.
First pipe fitting 6 and the second pipe fitting 7 are tempering pipe, (are connected in sequence by more piece pipe, are often saved per root long 20.0m Long 6.0m, using long 89.0cm casing connections), the every section of overlap joint 1.5m that should interlock, spacing 15.0cm plum blossoms are pressed on steel pipe when applying Shape bores the aperture of 10.0mm.First segment steel pipe top is made tapered, and so as to jacking, steel pipe is coupled using casing.
Semi-circular branch protecting assembly 4 is set to reorganization and expansion tunnel top, apart from reorganization and expansion tunnel top 2.0m-3.0m.
In the typical embodiment of another kind of the application, a kind of supporting construction for tunnel reconstruction and extension project is provided Construction method, include the following steps:
1) be prefabricated in the factory the first pipe fitting and the second pipe fitting, and transports it into construction site;
2) it at the construction field (site), is drilled according to branch protecting assembly artwork using drilling machine;To ensure hole quality, adjacent hole drill is prevented Into when before pore-forming cave in, drilling interval carries out, and even hole is bored in subdrilling odd number hole afterwards, and drilling diameter is φ 140mm;
3) in default reorganization and expansion tunnel both sides, the first vertical branch protecting assembly is installed respectively and the second vertical branch protecting assembly is gone forward side by side Row slip casting forms vertical continuous underground wall structure;
4) further along default reorganization and expansion tunnel top boundary, 2~3m drillings laying semi-circular supporting above the boundary of top Component and slip casting, to form circumferential continuous underground wall structure.
In order to enable those skilled in the art can clearly understand the technical solution of the application, below with reference to tool The technical solution of the application is described in detail in the embodiment of body.
First pipe fitting 6 and the second pipe fitting 7 are all made of the seamless steel pipe of Φ 108, and steel pipe uses the piecewise spreading of 3m, 6m tube coupling, Jointing uses heavy wall hoop, and upper full screw thread, screw thread length is 15cm;To ensure that uniform force, coupling should be longitudinal wrong It opens;After steel pipe is placed in trolley large arm, rock drill is directed at the guide hole being drilled, low-speed propulsion steel pipe, impact force control System is controlled in 18~20MPa, propelling pressure in 4.0~6.0MPa;It, will by design for the rigidity and intensity of strengthening supporting component After branch protecting assembly steel pipe is all accomplished fluently, residue in most steel pipe first is drawn with drill bit, carries out canopy pipe reinforcement.
After the completion of penstock installation, the stirring of grout injection, cement mortar should carry out in homogenizer, in strict accordance with applying Work match ratio feeds intake, the cementing waterglass slurries in steel pipe, and proportioning is cement:Waterglass=1:1, cement pulp-water ash Than 1:1, modulus of water glass m=2.4, concentration Be=35,0.5~1MPa of first pressing when slip casting, final pressure 2.0Mpa are used after slip casting 1:1 cement mortar fills seamless steel pipe, to enhance steel strength and rigidity.When grout absorption is less than 20~25L/min;Grouting pressure It is stepped up, stablizes 10min or more after reaching design final pressure;1 is used after slip casting:1 cement mortar fills seamless steel pipe.It is complete After branch protecting assembly mortar depositing construction, under the protection of pipe shed support, excavated by the construction procedure of design.
In order to ensure that the stability in reorganization and expansion tunnel, 1 and second vertical branch protecting assembly 3 of the first vertical branch protecting assembly are symmetrically set The both sides of tunnel structure 5 after the completion of the reorganization and expansion, as shown in Figure 3.
It is formed as shown in figure 4, semi-circular branch protecting assembly 4 is surrounded by semicircular steel pipe by three rows, steel pipe presses quincuncial pile It lays, circumferential spacing 20cm.
The structure of the utility model can form effective " diaphram wall " structure, control by the vertical branch protecting assembly in both sides Soft stratum processed or the country rock lateral deformation of shallow embedding location reduce the unstable failure to tunnel structure;On the other hand, change expansion along tunnel It builds meter boundary and lays semi-circular branch protecting assembly, circumferential spacing 20cm is effectively controlled in tunnel reorganization and expansion work progress, tunnel top The sedimentation and deformation and stratum deformation of portion's country rock reduce the harmfulness to engineering construction.After the above support system is formed, Neng Gouyou Effect ground improves the scope of application of tunnel reconstruction and extension project, reduces tunnel instability and destroys, enduringly improves tunnel surrounding self-stability energy.
The process that reorganization and expansion tunnel is carried out using the application supporting construction is:
(1) the first vertical supporting establishment of component on the left of reorganization and expansion tunnel;
The first vertical branch protecting assembly distance needs the 2 left side 3.0m of tunnel structure of reorganization and expansion on the left of reorganization and expansion tunnel, by two The circumferential spacing 20.0cm steel tube sheds composition of row, highly for more than reorganization and expansion tunnel height 5.0m.
(2) the second vertical supporting establishment of component on the right side of reorganization and expansion tunnel;
5 right side of tunnel structure on the right side of reorganization and expansion tunnel after the completion of the second vertical branch protecting assembly distance design reorganization and expansion 2.0m is made of two rows of circumferential spacing 20.0cm steel tube sheds, highly for more than reorganization and expansion tunnel height 5.0m.
(3) along reorganization and expansion tunnel radial direction semi-circular supporting establishment of component;
Along reorganization and expansion tunnel, radial direction semi-circular branch protecting assembly is the 5 top boundary of tunnel structure after the completion of design reorganization and expansion It lays, is made of three row's circumferential direction spacing 20.0cm steel tube sheds.
(4) reorganization and expansion tunnel excavation;
After supporting construction, which is formed, to be stablized, tunnel reorganization and expansion construction is carried out according to design drawing.
The foregoing is merely the preferred embodiments of the application, are not intended to limit this application, for the skill of this field For art personnel, the application can have various modifications and variations.Within the spirit and principles of this application, any made by repair Change, equivalent replacement, improvement etc., should be included within the protection domain of the application.

Claims (9)

1. a kind of supporting construction for tunnel reconstruction and extension project, characterized in that perpendicular including the first vertical branch protecting assembly and second To branch protecting assembly, setpoint distance is spaced between the first vertical branch protecting assembly and the second vertical branch protecting assembly, described first is perpendicular Include Multi-row-tube group to branch protecting assembly and the second vertical branch protecting assembly, includes multiple horizontal successively from top to bottom per tubulation group The first pipe fitting being arranged has setting spacing between the center line of adjacent tubulation group;The first vertical branch protecting assembly and second Semi-circular branch protecting assembly is set between vertical branch protecting assembly.
2. supporting construction as described in claim 1, characterized in that have between adjacent first pipe fitting of same pipe group and set Set a distance.
3. supporting construction as described in claim 1, characterized in that first pipe fitting of adjacent tubulation group is laid staggeredly.
4. supporting construction as described in claim 1, characterized in that first pipe fitting is connected in sequence by more pipes, phase Pass through casing connection between adjacent pipe.
5. supporting construction as described in claim 1, characterized in that the first vertical branch protecting assembly and the second vertical supporting group Part is higher by semi-circular supporting module sets height;The semi-circular branch protecting assembly and the first vertical branch protecting assembly, the second vertical branch The distance of protecting assembly is equal.
6. supporting construction as described in claim 1, characterized in that the semi-circular branch protecting assembly includes multiple rows of return bend Group often arranges return bend group and is surrounded by semicircular second pipe fitting including multiple be arranged in order.
7. supporting construction as claimed in claim 6, characterized in that have between the center line of return bend group described in adjacent row Set spacing;It is surrounded by between semicircular adjacent second pipe fitting with setpoint distance.
8. supporting construction as claimed in claim 6, characterized in that second pipe fitting of adjacent row return bend group interlocks cloth If.
9. supporting construction as claimed in claim 6, characterized in that second pipe fitting is horizontally disposed;Second pipe fitting by More pipes are connected in sequence, and pass through casing connection between adjacent tubes.
CN201820164709.9U 2018-01-31 2018-01-31 A kind of supporting construction for tunnel reconstruction and extension project Expired - Fee Related CN207761667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820164709.9U CN207761667U (en) 2018-01-31 2018-01-31 A kind of supporting construction for tunnel reconstruction and extension project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820164709.9U CN207761667U (en) 2018-01-31 2018-01-31 A kind of supporting construction for tunnel reconstruction and extension project

Publications (1)

Publication Number Publication Date
CN207761667U true CN207761667U (en) 2018-08-24

Family

ID=63179716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820164709.9U Expired - Fee Related CN207761667U (en) 2018-01-31 2018-01-31 A kind of supporting construction for tunnel reconstruction and extension project

Country Status (1)

Country Link
CN (1) CN207761667U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397210A (en) * 2018-01-31 2018-08-14 山东大学 A kind of supporting construction and method for tunnel reconstruction and extension project
CN109695457A (en) * 2018-12-21 2019-04-30 中铁四局集团有限公司 The enlarging large section tunnel in situ and step construction method of hard rock
CN110994523A (en) * 2019-12-31 2020-04-10 广东顺德电力设计院有限公司 Method and system for protecting cable

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397210A (en) * 2018-01-31 2018-08-14 山东大学 A kind of supporting construction and method for tunnel reconstruction and extension project
CN108397210B (en) * 2018-01-31 2024-02-27 山东大学 Supporting structure and method for tunnel reconstruction and expansion engineering
CN109695457A (en) * 2018-12-21 2019-04-30 中铁四局集团有限公司 The enlarging large section tunnel in situ and step construction method of hard rock
CN110994523A (en) * 2019-12-31 2020-04-10 广东顺德电力设计院有限公司 Method and system for protecting cable

Similar Documents

Publication Publication Date Title
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN106351662B (en) Cellular-type segmenting slip casting reinforcement means, construction method and application
CN108166486B (en) Deep buried pipe type prefabricated energy pipe pile and construction process thereof
CN207761667U (en) A kind of supporting construction for tunnel reconstruction and extension project
CN112323823B (en) Filling device and method for waste air-raid shelter of pile foundation construction site
CN101280568A (en) Station pit construction method forming protection for neighboring operated subway interval tunnel
CN105256812B (en) Foundation ditch prefabricated assembled concrete supporting construction and its construction method
CN103422501A (en) Anti-floating anchor structure in sand layer geology and construction method thereof
CN106522989A (en) Air shaft structure and shield excavation parallel construction method
WO2020143066A1 (en) Geothermal exploitation system and construction method therefor
CN106088102A (en) Lattice combined steel plate pile cement-soil composite pile and construction method thereof
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN115182737A (en) Vertical orthogonal ejection type air duct structure of deep-buried subway station and construction method
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN103437779B (en) The construction method of regulation tunnel lining pore gas flow
CN207904917U (en) Deep layer buried tube type prefabrication type energy pile pile
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN108397210A (en) A kind of supporting construction and method for tunnel reconstruction and extension project
CN106979635A (en) A kind of earth-source hot-pump system underground heat-transfer pipe construction method
CN110017155A (en) A kind of coal working face top plate rich water gravel layer grouting and reinforcing erection water-proof method
CN211006701U (en) Foundation pit supporting structure integrating pile and wall
CN109736843B (en) Reverse waterproof method for assembling and pouring two linings of small template
CN108952758B (en) Sand layer grouting ground surface lifting control method based on borehole collapse and induced splitting
CN209959261U (en) Real-time feedback grouting device for correcting horizontal deformation of subway tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824