CN207761108U - 一种水平拼接组合墙 - Google Patents

一种水平拼接组合墙 Download PDF

Info

Publication number
CN207761108U
CN207761108U CN201721775780.2U CN201721775780U CN207761108U CN 207761108 U CN207761108 U CN 207761108U CN 201721775780 U CN201721775780 U CN 201721775780U CN 207761108 U CN207761108 U CN 207761108U
Authority
CN
China
Prior art keywords
wall
plate
floor
level
splices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721775780.2U
Other languages
English (en)
Inventor
徐国军
杨宇焜
宋生志
蒋路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201721775780.2U priority Critical patent/CN207761108U/zh
Application granted granted Critical
Publication of CN207761108U publication Critical patent/CN207761108U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本申请涉及一种水平拼接组合墙,属于一般建筑物的特殊墙体构造技术领域。包括上墙体、下墙体和中间腹板,中间腹板包括上连接板和下连接板,上连接板位于上墙体的连接端处,其侧边设置螺杆,该螺杆连接于上墙体与下墙体之间;下连接板位于下墙体的连接端处,上连接板与下连接板固定,实现上墙体与下墙体的水平对接。将本申请应用于组合墙的拼接,具有现场拼装精度高,误差小;拼接结构强度高,抗剪、抗扭、抗弯性能好,同时还具有较好的抗震性能等优点。

Description

一种水平拼接组合墙
技术领域
本申请涉及一种水平拼接组合墙,属于一般建筑物的特殊墙体构造技术领域。
背景技术
随着我国经济、社会及城镇化建设的快速发展,建筑业由传统建造模式向工业化建造方式转型升级。建筑工业化是采用工厂化生产,装配化施工的建造模式,克服了传统建造模式的弊端,有效提高建筑生产效率,提高结构安全性能,节能减排,提高资源利用率,降低建造成本。
目前,我国住宅工业化剪力墙结构形式大体分为两类:一是钢筋混凝土剪力墙,二是钢骨组合剪力墙。钢筋混凝土剪力墙装配式技术目前已发展较为成熟,全国各地也已建造多栋示范工程;而钢骨组合剪力墙结构体系发展尚处于起步阶段。钢骨组合剪力墙与传统钢筋混凝土剪力墙受力形式有着本质不同,且钢骨相对于钢筋搭接来说,工艺复杂,质量保障差,精度难以把控,施工效率低,成本较高等弊端。
基于此,做出本申请。
实用新型内容
针对现有钢骨组合剪力墙搭接中所存在的上述缺陷,本申请提供一种内嵌钢骨部分组合剪力墙拉杆式水平拼接方法,该方案有效解决上述弊端,施工方便快捷,连接强度高,安全可靠,现场无湿作业,真正实现高装配率、高效施工、绿色环保。
为实现上述目的,本申请采取的技术方案如下:
一种水平拼接组合墙,包括上墙体、下墙体和中间腹板,中间腹板包括上连接板和下连接板,上连接板位于上墙体的连接端处,其侧边设置螺杆,该螺杆连接于上墙体与下墙体之间;下连接板位于下墙体的连接端处,上连接板与下连接板固定,实现上墙体与下墙体的水平对接。
进一步的,作为优选:
所述的螺杆至少设置两个,对称或均匀设置于上连接板外侧。螺杆是形成拉杆式结构的一个关键部件,其设置的位置以及数量对整个组合墙的结构稳定性起到引导和主导作用,中间腹板是上墙体、下墙体的连接部位,对称或均匀设置的螺杆对所承载的作用力起到很好的分散作用。
所述的上墙体是由中间板一、肋板一以及浇筑于中间板一与肋板一外周的混凝土构成,且中间板一沿上墙体的高度方向设置,肋板一安装在中间板一上;肋板一和中间板一形成上墙体的钢骨部分,确保这个构造的稳定性和精确性。更优选的,所述的中间腹板与上墙体连接端处的肋板一固定。
所述的下墙体是由中间板二、肋板二以及浇筑于中间板二与肋板二外周的混凝土构成,且中间板二沿下墙体的高度方向设置,肋板二安装在中间板二上;肋板二和中间板二形成下墙体的钢骨部分,确保这个构造的稳定性和精确性。更优选的,所述的中间腹板与下墙体连接端处的肋板二固定。
所述的上连接板与下连接板通过角钢和紧固件固定。上连接板和下连接板形成分体式结构的中间腹板,可分别与上墙体、下墙体连接后,再进行组装和固定。
所述的螺杆一端预埋在上墙体的连接端上,另一端通过螺母或类似紧固件固定在下墙体的连接端上。螺杆采用半灵活的方式实现固定,方便了组装和混凝土浇筑的操作。
所述的下墙体上还设置有拉条,拉条与螺杆错位设置。
构建过程中,将需对接的两个剪力墙体即上墙体和下墙体按照上述方法将中间腹板焊接好,上墙体上为上连接板,下墙体上为下连接板。将两个剪力墙即上墙体和下墙体对接在一起,对接部位均采用双面角焊缝焊接在一起。然后,将(对拉)螺杆的另一端用螺母拧紧到下墙体的肋板二上,(对拉)螺杆间距均与墙体中的扁钢完全相同。焊接完成后,在对接部位支设模板,现场灌浇混凝土,混凝土强度需比墙体混凝土强度高一个标号。养护规定时间,拆除模板,拼装施工完成。其中:
(1)上墙体与下墙体分别构成内嵌钢骨部分的组合剪力墙,在两个墙体对接端的端部肋板,按照要求预留螺杆,设置多个时,多个螺杆间距、直径及强度等均根据强度设计要求确定;在需要连接的上墙体连接端,预埋对拉螺杆,下墙体的一个区格暂时不浇筑混凝土,方便安装对拉螺杆的另一头。
(2)中间腹板分为上、下两块,一块安装在一个上墙体的上半部分,即上连接板,一个安装在下墙体的下半部分,即下连接板,中间腹板的边缘部位预留螺栓孔,螺栓孔位移需恰与剪力墙端部肋板上预留的螺栓杆对应。
(3)定位角钢预留螺栓孔,中间腹板采用定位角钢(即角钢一、角钢二),初步定位在各剪力墙(上墙体、下墙体)端部,并通过螺栓连接到对应的肋板上,定位好后,采用双面角焊缝将中间腹板焊接于剪力墙端部肋板上。
与现有技术相比,本申请所具有的优点及效果概括如下:
(1)与现有连接构造相比,施工拼装流程方便快捷,有效提高施工效率;
(2)现场拼装精度高,误差小;
(3)拼接质量易于控制,保证拼接部位强度要求,且该拼接结构强度高,抗剪、抗扭、抗弯性能好,同时还具有较好的抗震性能;
(4)构造加工方便简单,成本低。
附图说明
图1为本申请组合墙的结构示意图;
图2为图1中墙段一的结构示意图;
图3为图1中墙段二的结构示意图;
图4为图1中D-D方向视图;
图5为图1中A-A方向视图;
图6为图2中B-B方向视图;
图7为图3中C-C方向视图。
其中标号:1. 上墙体;11. 中间板一;12. 肋板一;2. 紧固件;3. 上连接板;31.角钢一;4. 螺杆;5. 扁钢;6. 下墙体;61. 中间板二;62. 肋板二;7. 下连接板;71. 角钢二;72. 拉条;73. 卡槽。
具体实施方式
实施例1
本实施例一种水平拼接组合墙,结合图1和图4、图5,包括上墙体1、下墙体6和中间腹板,上墙体1的连接端设置上连接板3和螺杆4,螺杆4位于上连接板3侧边,其连接于上墙体1与下墙体6之间;下墙体6的连接端设置下连接板7,上连接板3与下连接板7固定,形成上墙体1与下墙体6之间的中间腹板,中间腹板处现浇混凝土,即完成组合墙的水平拼接。
为实现更多的使用效果,上述方案还可以按照如下方式增设:
螺杆4至少设置两个,对称或均匀设置于上连接板3外侧。螺杆4是形成拉杆式结构的一个关键部件,其设置的位置以及数量对整个组合墙的结构稳定性起到引导和主导作用,中间腹板是上墙体1、下墙体6的连接部位,对称或均匀设置的螺杆4对所承载的作用力起到很好的分散作用。
为实现更多的使用效果,上述方案还可以按照如下方式增设:
结合图2和图6,上墙体1是由中间板一11、肋板一12以及浇筑于中间板一11与肋板一12外周的混凝土构成,且中间板一11沿上墙体1的高度方向设置,肋板一12安装在中间板一11上;肋板一12和中间板一11形成上墙体1的钢骨部分,确保这个构造的稳定性和精确性。更优选的,中间腹板中的上连接板3与上墙体1连接端处的肋板一固定。
为实现更多的使用效果,上述方案还可以按照如下方式增设:
结合图3和图7,下墙体6是由中间板二61、肋板二62以及浇筑于中间板二61与肋板二62外周的混凝土构成,且中间板二61沿下墙体6的高度方向设置,肋板二62安装在中间板二61上;肋板二62和中间板二61形成下墙体6的钢骨部分,确保这个构造的稳定性和精确性。更优选的,中间腹板的下连接板7与下墙体6连接端处的肋板二固定。
为实现更多的使用效果,上述方案还可以按照如下方式增设:结合图1和图5,上连接板3上端设置角钢一31,下连接板7下端设置角钢二71,上连接板3、下连接板7分别通过角钢一31、角钢二72以及对应的紧固件2固定在对应位置。上连接板3和下连接板7形成分体式结构的中间腹板,可分别与上墙体1、下墙体6连接后,再进行组装和固定。
为实现更多的使用效果,上述方案还可以按照如下方式增设:螺杆4一端预埋在上墙体1的连接端上,另一端通过螺母或类似紧固件固定在下墙体6的连接端上。螺杆4采用半灵活的方式实现固定,方便了组装和混凝土浇筑的操作。
为实现更多的使用效果,上述方案还可以按照如下方式增设:下墙体6上设置有拉条72,该拉条72与螺栓4错位设置。
其中,下连接板7上设置有卡槽73,上连接板3嵌入该卡槽73中,即完成上连接板3与下连接板7的固定。
拼装过程中,先将需对接的两个剪力墙体即上墙体1和下墙体6按照上述方法分别将上连接板3和下连接板7通过角钢一31、角钢二71或类似紧固件2采用高强螺栓或类似连接件固定好,上墙体1连接端固定上连接板3,下墙体6连接端固定下连接板7;将上墙体1与下墙体6两个剪力墙对接在一起,对接部位均通过角钢或类似紧固件采用高强螺栓或类似连接件固定在一起;然后,将螺杆4的另一端用螺母拧紧到下墙体6的肋板二上,(对拉)螺杆4间距均与墙体中的扁钢5完全相同;螺杆4拧完成后,在对接部位支设模板,现场灌浇混凝土,混凝土强度需比墙体混凝土强度高一个标号。养护规定时间,拆除模板,拼装施工完成。其中:
(1)上墙体1与下墙体6分别构成内嵌钢骨部分的组合剪力墙,在两个墙体对接端的端部肋板,按照要求预留螺杆4,设置多个时,多个螺杆间距、直径及强度等均根据强度设计要求确定;在需要连接的上墙体1连接端,预埋对拉螺杆4,下墙体6的一个区格暂时不浇筑混凝土,方便安装对拉螺杆的另一头。
(2)中间腹板分为上、下两块,一块安装在一个上墙体的上半部分,即上连接板3,一个安装在下墙体的下半部分,即下连接板7,中间腹板的边缘部位预留螺栓孔,螺栓孔位移需恰与剪力墙端部肋板上预留的螺栓杆对应。
(3)角钢一31作为定位角钢,其上预留长圆形的螺栓孔,并通过高强螺栓连接将中间腹板中的上连接板3固定到上墙体1端部肋板上;下墙体6则通过角钢二71采用高强螺栓作为紧固件2固定在该剪力墙端部肋板二62上。
以上内容是结合本发明创造的优选实施方式对所提供技术方案所作的进一步详细说明,不能认定本发明创造具体实施只局限于上述这些说明,对于本发明创造所属技术领域的普通技术人员来说,在不脱离本发明创造构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明创造的保护范围。

Claims (9)

1.一种水平拼接组合墙,其特征在于:包括上墙体、下墙体和中间腹板,中间腹板包括上连接板和下连接板,上连接板位于上墙体的连接端处,其侧边设置螺杆,该螺杆连接于上墙体与下墙体之间;下连接板位于下墙体的连接端处,上连接板与下连接板固定,实现上墙体与下墙体的水平对接。
2.如权利要求1所述的一种水平拼接组合墙,其特征在于:所述的螺杆至少设置两个,对称或均匀设置于上连接板外侧。
3.如权利要求1所述的一种水平拼接组合墙,其特征在于:所述的上墙体是由中间板一、肋板一以及浇筑于中间板一与肋板一外周的混凝土构成,且中间板一沿上墙体的高度方向设置,肋板一安装在中间板一上。
4.如权利要求3所述的一种水平拼接组合墙,其特征在于:所述的中间腹板与上墙体连接端处的肋板一固定。
5.如权利要求1所述的一种水平拼接组合墙,其特征在于:所述的下墙体是由中间板二、肋板二以及浇筑于中间板二与肋板二外周的混凝土构成,且中间板二沿下墙体的高度方向设置,肋板二安装在中间板二上。
6.如权利要求5所述的一种水平拼接组合墙,其特征在于:所述的中间腹板与下墙体连接端处的肋板二固定。
7.如权利要求1所述的一种水平拼接组合墙,其特征在于:所述的上连接板与下连接板通过角钢和紧固件固定。
8.如权利要求1所述的一种水平拼接组合墙,其特征在于:所述的下墙体上还设置有拉条,拉条与螺杆错位设置。
9.如权利要求1-8任一项所述的一种水平拼接组合墙,其特征在于:所述的螺杆一端预埋在上墙体的连接端上,另一端通过螺母或类似紧固件固定在下墙体的连接端上。
CN201721775780.2U 2017-12-19 2017-12-19 一种水平拼接组合墙 Active CN207761108U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721775780.2U CN207761108U (zh) 2017-12-19 2017-12-19 一种水平拼接组合墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721775780.2U CN207761108U (zh) 2017-12-19 2017-12-19 一种水平拼接组合墙

Publications (1)

Publication Number Publication Date
CN207761108U true CN207761108U (zh) 2018-08-24

Family

ID=63187582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721775780.2U Active CN207761108U (zh) 2017-12-19 2017-12-19 一种水平拼接组合墙

Country Status (1)

Country Link
CN (1) CN207761108U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086530A (zh) * 2017-12-19 2018-05-29 浙江绿筑集成科技有限公司 一种组合墙的水平拼接方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086530A (zh) * 2017-12-19 2018-05-29 浙江绿筑集成科技有限公司 一种组合墙的水平拼接方法

Similar Documents

Publication Publication Date Title
CN106381925A (zh) 一种带套管的装配式钢筋混凝土柱与柱拼接节点
CN106567458B (zh) 装配式钢-混结合梁柱框架结构体系
CN202809834U (zh) 钢梁-混凝土墙半刚性全螺栓连接节点
CN109372129A (zh) 一种新型全装配式混凝土框架节点及其施工方法
CN110145023B (zh) 一种预制装配式混凝土矩形梁柱连接节点
CN107268805A (zh) 一种预制装配式梁柱盒子节点
CN205046677U (zh) 一种装配式混凝土框架节点连接结构
CN106592777B (zh) 装配式钢-混结合梁柱节点结构及其实施方法
CN208918018U (zh) 一种预制装配式混凝土抗震节点
CN103726613B (zh) 一种新型装配式混凝土柱
CN212128825U (zh) 装配式一体化墩柱盖梁组合结构
CN207761108U (zh) 一种水平拼接组合墙
CN205063961U (zh) 顶管管节结构
CN208762895U (zh) 铰缝加固装置
CN206233084U (zh) 一种组合型波形钢腹板底板剪力连接键
CN110130485B (zh) 一种带齿板的预制装配式梁柱节点及其装配方法
CN205530819U (zh) 一种内嵌预制混凝土剪力墙同时抗弯的钢框架构造
CN206233359U (zh) 一种装配式建筑钢筋砼构件
CN204589831U (zh) 一种钢筋混凝土梁桥主梁加固构造
CN208486165U (zh) 一种混凝土圆柱墩与钢梁固结连接构造
CN207892082U (zh) 一种拉杆式组合墙
CN207892085U (zh) 一种内嵌钢骨型水平拼接剪力墙
CN207109837U (zh) 一种地脚螺栓定位架
CN207314537U (zh) 一种装配式外包型钢链式组合结构
CN214833415U (zh) 一种带抗剪键的装配式混凝土梁柱浆锚连接结构

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Dongyue Green Building Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000016

Denomination of utility model: Level concatenation faced wall

Granted publication date: 20180824

License type: Common License

Record date: 20190917

Assignee: Qinhuangdao Seiko Green Building Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000017

Denomination of utility model: Level concatenation faced wall

Granted publication date: 20180824

License type: Common License

Record date: 20190917

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan Green Building Technology Development Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000015

Denomination of utility model: Level concatenation faced wall

Granted publication date: 20180824

License type: Common License

Record date: 20190919

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shandong Tianyuan Jinggong Green Integrated Building Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2020330000115

Denomination of utility model: A kind of horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20201216

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of utility model: A horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of utility model: A horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of utility model: A horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20230421

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Weinan Guokong Jinggong Green Building Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980009941

Denomination of utility model: A horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20240717

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Chongqing Kunda Precision Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980014873

Denomination of utility model: A horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20240914

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Huiyu Construction Engineering Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980016463

Denomination of utility model: A horizontal splicing composite wall

Granted publication date: 20180824

License type: Common License

Record date: 20240926

EE01 Entry into force of recordation of patent licensing contract