CN207760823U - Drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure - Google Patents
Drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure Download PDFInfo
- Publication number
- CN207760823U CN207760823U CN201721879887.1U CN201721879887U CN207760823U CN 207760823 U CN207760823 U CN 207760823U CN 201721879887 U CN201721879887 U CN 201721879887U CN 207760823 U CN207760823 U CN 207760823U
- Authority
- CN
- China
- Prior art keywords
- occluding body
- drainpipe
- concrete
- infiltration
- high pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model is related to a kind of drainage arrangements suitable for the infiltration of diversion tunnel occluding body construction time high pressure, belong to hydraulic and hydroelectric engineering field.The utility model includes concrete occluding body, the rockfill grouting pipe of connection irrigation gallery is equipped in concrete occluding body, the top layout of concrete occluding body has drainpipe, drainpipe to be arranged along concrete occluding body length direction, and multiple osculums are arranged at intervals on drainpipe.Drainpipe is more, is arranged along the contour line interval of concrete occluding body crown.When concrete occluding body seeps water, it is in the milk by original rockfill grouting pipe in concrete occluding body, high pressure water is discharged by drainpipe, after the completion of last concrete occluding body rockfill grouting, drainpipe is closed using high-pressure grouting, infiltration is effectively intercepted, occluding body maintenance quality is improved, ensures that occluding body downstream construction safety carries out.
Description
Technical field
The utility model is related to a kind of drainage arrangements suitable for the infiltration of diversion tunnel occluding body construction time high pressure, belong to water conservancy
Hydroelectric project field.
Background technology
The diversion tunnel of hydraulic and hydroelectric engineering need to be blocked after completing water conservancy diversion task with permanent concrete occluding body,
Occluding body is linked to be entirety, shared water pressure with country rock or lining cutting in the process of running.In general, occluding body lock under diversion tunnel
After start to construct, mainly include concreting and maintenance, during occluding body concrete curing, by Temperature Controlling of Mass Concrete
Measure restricts, and periphery rockfill grouting must lag construction.However, with the raising of upstream water level, under great head pressure, envelope
Stifled body periphery is likely to occur high pressure infiltration, and normal pressures grouting effect is little, once occur by the maintenance of occluding body and under
Trip protected object normal construction impacts.
Utility model content
Technical problem to be solved in the utility model is:Concentration ejectment is carried out to infiltration using drainpipe, then to collection
Middle ejectment pipeline carries out the thinking of grout sealing, intends providing a kind of draining suitable for the infiltration of diversion tunnel occluding body construction time high pressure
Device, the structure simple structure are easy for construction.
Technical solution used by the utility model is to solve above-mentioned technical problem:Body construction is blocked suitable for diversion tunnel
The drainage arrangement of phase high pressure infiltration, including concrete occluding body, the interior backfill for being equipped with connection irrigation gallery of concrete occluding body fill
The top layout of slurry pipe, concrete occluding body has drainpipe, drainpipe to be arranged along concrete occluding body length direction, drainpipe
On be arranged at intervals with multiple osculums.
It is further:Drainpipe is more, is arranged along the contour line interval of concrete occluding body crown.
It is further:Drainpipe is steel pipe.
It is further:Pipe diameter is 80mm~100mm, and thickness of steel pipe is 1mm~2mm.
It is further:A diameter of 5mm~the 10mm of osculum, spacing are 10cm~20cm.
The utility model has the beneficial effects that:When concrete occluding body seeps water, by original in concrete occluding body
Rockfill grouting pipe is in the milk, and high pressure water is discharged by drainpipe, after the completion of last concrete occluding body rockfill grouting, using height
Pressure grouting closing drainpipe, effectively intercepts infiltration, improves occluding body maintenance quality, ensures that occluding body downstream construction safety carries out.
Description of the drawings
Fig. 1 is the longitudinal sectional drawing of the utility model;
Fig. 2 is the structural schematic diagram of drainpipe;
It is marked in figure:1- concrete occluding body, 2- irrigation galleries, 3- rockfill groutings pipe, 4- drainpipes, 5- osculums, 6-
Diversion tunnel lining cutting.
Specific implementation mode
For ease of understanding with implementation the utility model, it is described further with reference to the accompanying drawings and examples.
As shown in Figure 1 and Figure 2, the utility model includes concrete occluding body 1, and connection grouting is equipped in concrete occluding body 1
The top layout of the rockfill grouting pipe 3 of gallery 2, concrete occluding body 1 has drainpipe 4, and drainpipe 4 is along concrete occluding body 1
Length direction is arranged, multiple osculums 5 are arranged at intervals on drainpipe 4.Drainpipe 4 is more, is pushed up along concrete occluding body 1
The contour line interval of arch is arranged.Drainpipe 4 preferably uses steel pipe.Pipe diameter be 80mm~100mm, thickness of steel pipe be 1mm~
2mm.The quantity of drainpipe 4 is selected according to water percolating capacity size.In addition, a diameter of 5mm~10mm of osculum 5, spacing 10cm
~20cm.
When encountering high pressure infiltration, first in the irrigation gallery 2 of concrete occluding body 1, by pre- in concrete occluding body 1
The rockfill grouting pipe 3 buried is in the milk to periphery fissure, and grouting pressure is slightly larger than head pressure, and high pressure infiltration is made to pass through osculum 5
It is pooled to drainpipe 4 and concentrates ejectment, after the completion of waiting for rockfill grouting, in 4 exit of drainpipe, blocked using high-pressure grouting.
By the way that drainpipe 4 is arranged, seeps water to high pressure and effectively block, improve occluding body maintenance quality, ensure occluding body downstream
Construction safety carries out.
Claims (5)
1. suitable for the drainage arrangement of diversion tunnel occluding body construction time high pressure infiltration, including concrete occluding body (1), coagulation grave
The rockfill grouting pipe (3) of connection irrigation gallery (2) is equipped in stifled body (1), it is characterised in that:The top of concrete occluding body (1)
It is disposed with drainpipe (4), drainpipe (4) is arranged along concrete occluding body (1) length direction, and setting is spaced on drainpipe (4)
There are multiple osculums (5).
2. the drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure as described in claim 1, it is characterised in that:
Drainpipe (4) is more, is arranged along the contour line interval of concrete occluding body (1) crown.
3. the drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure, feature exist as claimed in claim 1 or 2
In:Drainpipe (4) is steel pipe.
4. the drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure as claimed in claim 3, it is characterised in that:
Pipe diameter is 80mm~100mm, and thickness of steel pipe is 1mm~2mm.
5. the drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure as described in claim 1, it is characterised in that:
Osculum (5) a diameter of 5mm~10mm, spacing are 10cm~20cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721879887.1U CN207760823U (en) | 2017-12-28 | 2017-12-28 | Drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721879887.1U CN207760823U (en) | 2017-12-28 | 2017-12-28 | Drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207760823U true CN207760823U (en) | 2018-08-24 |
Family
ID=63185559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721879887.1U Active CN207760823U (en) | 2017-12-28 | 2017-12-28 | Drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207760823U (en) |
-
2017
- 2017-12-28 CN CN201721879887.1U patent/CN207760823U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103277120B (en) | A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls | |
CN103967507B (en) | A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff | |
CN102937011B (en) | Mash gas pumping drilling group regional crack field secondary grouting plugging device and method | |
CN204312099U (en) | Tunnel Gushing based on environmental protection prevents and treats system | |
CN101654907A (en) | High-flow high-speed jet plugging grouting technique under high-pressure water head of hydropower station | |
CN103410564B (en) | A kind of Tunnel Gushing treatment structures and construction method thereof | |
CN201874614U (en) | Drainage structure for emptying overhaul of derivation tunnel | |
CN206667278U (en) | Lava crack Tunnel gushing treatment constructing structure | |
CN105386435B (en) | It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution | |
CN101936166A (en) | In-situ leaching, drainage and liquid collection process with diversion holes | |
CN102296589A (en) | Foundation drainage method of well point water-drawing control group pipe siphon | |
CN208965598U (en) | The Anti-seeping technology structure of grout curtain and underground chamber intersection area | |
CN101793154A (en) | Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes | |
CN102400694A (en) | Reinforcement method for combined part of shield tunnel and mining-method tunnel | |
CN103132497B (en) | Deep karst large flow underground karst cave processing method | |
CN103821114B (en) | A kind of reservoir culvert method for blocking discarded under seepage pressure effect | |
CN207974823U (en) | A kind of grouting pipeline structure of deep hole grouting | |
CN108385627A (en) | Power station diversion tunnel plugging construction method based on karst landform | |
CN207348879U (en) | Tailwater tunnel structure | |
CN105649655A (en) | Device used for grouting reinforcement from interior of shield tunneling machine to peripheral stratum | |
CN206707721U (en) | A kind of tunnel structure for passing through large-scale vertical solution cavity group | |
CN207760823U (en) | Drainage arrangement suitable for the infiltration of diversion tunnel occluding body construction time high pressure | |
CN105970882B (en) | Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems | |
CN103132528B (en) | Chemical grouting technology | |
CN206189365U (en) | A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||