CN207760813U - A kind of flume garbage barrier net - Google Patents

A kind of flume garbage barrier net Download PDF

Info

Publication number
CN207760813U
CN207760813U CN201721832217.4U CN201721832217U CN207760813U CN 207760813 U CN207760813 U CN 207760813U CN 201721832217 U CN201721832217 U CN 201721832217U CN 207760813 U CN207760813 U CN 207760813U
Authority
CN
China
Prior art keywords
net
flume
anchor ring
straight stake
string bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721832217.4U
Other languages
Chinese (zh)
Inventor
李兴奎
李冠星
冯海波
张颖
李春保
胡涛
高迎歆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FOURTH HARBOR ENGINEERING BUREAU HARBOUR ENGINEERING DESIGN INSTITUTE Co Ltd
Original Assignee
CCCC FOURTH HARBOR ENGINEERING BUREAU HARBOUR ENGINEERING DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FOURTH HARBOR ENGINEERING BUREAU HARBOUR ENGINEERING DESIGN INSTITUTE Co Ltd filed Critical CCCC FOURTH HARBOR ENGINEERING BUREAU HARBOUR ENGINEERING DESIGN INSTITUTE Co Ltd
Priority to CN201721832217.4U priority Critical patent/CN207760813U/en
Application granted granted Critical
Publication of CN207760813U publication Critical patent/CN207760813U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of flume garbage barrier nets, including linked network, anchor block, connection fastener and more than two pile foundation support tables;Pile foundation support table includes the straight stake of cushion cap and the front row being arranged before and after water inlet direction and the straight stake of heel row, and underwater geological conditions layer is goed deep into front-seat directly one end of stake and the straight stake of heel row, and the other end is equipped with the cushion cap of connection front-seat straight stake and the straight stake of heel row;Linked network includes plane net and the string bag, and the left and right ends of plane net are connected to respectively by connection fastener in the front row straight stake and cushion cap of different pile foundation support tables, and the lower end of plane net is connect by connection fastener with anchor block;The right and left of the string bag is connected to the straight stake of heel row of different pile foundation support tables by connection fastener respectively, on cushion cap and anchor block connection.The garbage barrier net of the utility model can effectively intercept flume leading portion small-sized marine life;It can realize that tunneling boring intercepts simultaneously so that intercept more thorough.

Description

A kind of flume garbage barrier net
Technical field
The utility model belongs to nuclear power station flume and blocks dirty technical field, and in particular to a kind of flume garbage barrier net.
Background technology
The cooling water of nuclear power plant's recirculating cooling water system and essential service water system and important equipment is with nuclear power plant Intake as water source, the quality of intake operating status directly affects safe operation and the reliability of power plant.
In recent years, with east tourist industry, the fast development of aquaculture, the variation of the coastal marine eco-environment, power station SEC/CRF system intakes surrounding waters threatens the small-sized marine growth of power station water intaking safety more and more, as (size exists shrimp Within 3cm), jellyfish etc., existing intercept process equipment such as garbage barrier net, mechanical grille, filter drum in power station etc. cannot cope with small-sized sea The threat of biological large-scale outbreak.Occur both at home and abroad a lot of because intake blocking leads to power station unit drop power or shutdown thing Part directly contributes huge economic losses and influences npp safety related system.For such situation, to ensure power station water intaking peace Entirely, the marine growth for influencing power station water intaking safety is intercepted and is used as special subject study by many nuclear power stations, including quick-fried from marine growth The source of hair, mechanism have carried out numerous studies, but achievement in research at this stage only exists in theoretical research stage, and there are no form one It covers perfect professional standard and thorough solution and is limited only to be transformed the passive of upgrading to existing interception facility Intercept pattern.
Conventional solution is the bottom of blocking in the nuclear power station flume front end setting together garbage barrier net with floating drum positioning device Portion and both sides setting anchor block and anchor pier.The structure type simple structure, it is of low cost, replace it is convenient, can effectively prevent it is various compared with Rubbish, the sundries of large volume enter pumping plant intake, and pumping plant water intaking grid, filter drum is avoided to block.But to occurring recently such as hair The smaller marine growth of the bodily forms such as shrimp, jellyfish, phaeocystis cannot play good interception function.It is mainly stranded existing for the structure at present Difficult and defect is as follows:(1) many small-sized marine growths it is small, without very strong floating capability, drift with the tide, inlet channel compared with Under the drive of high speed water flow, block mesh is easily caused to block, in order to not influence the conveyance capacity of inlet channel, need it is regular and Timely mesh sheet is replaced in cleaning, and conventional block is difficult to realize quickly clean folding and unfolding mesh sheet and the human cost of more draping is higher;(2) Conventional garbage barrier net mostly uses anchor block and floating drum and block is fixed, and structures under wind wave ability is weaker, poor in sheltering condition Inlet channel front end, under the action of wind, wave, stream, block stressing conditions are complicated, especially when marine growth is largely broken out, merely Hauling type structure, for the angle of stress, design margin evaluation is relatively low;(3) conventional garbage barrier net is only capable of intercepting water body table Layer floating material can not achieve tunneling boring interception.As between block and inlet channel slope, riverbed face there is also gap loophole, this It is respectively formed the channel that marine growth enters hydro plant intake a bit;(4) conventional garbage barrier net mostly uses the material of nylon wire, in ocean ring The performance of durability and anti-sea organism attachment under border is poor, need to often replace, maintenance cost is higher.
Utility model content
The utility model provides a kind of flume garbage barrier net, and can realize has flume front end small-sized marine life Effect intercepts, while can reduce the later maintenance cost of garbage barrier net.
To achieve the goals above, the utility model uses following technical scheme:
A kind of flume garbage barrier net, including linked network, anchor block, connection fastener and more than two pile foundation support tables;
The pile foundation support table includes cushion cap and the straight stake in front row and the straight stake of heel row that are arranged before and after water inlet direction, described Underwater geological conditions layer is goed deep into one end of front-seat straight stake and the straight stake of heel row, and the other end, which is equipped with, connects the front-seat straight stake and the straight stake of heel row The cushion cap;
The linked network includes plane net and the string bag, and the mesh size of the plane net is more than the mesh size of the string bag;
The left and right ends of the plane net are connected to the straight stake in front row of different pile foundation support tables by the connection fastener respectively On cushion cap, the lower end of the plane net is connect by the connection fastener with the anchor block;
The right and left of the string bag be connected to respectively by the connection fastener different pile foundation support tables the straight stake of heel row and On cushion cap, the lower end of the string bag is connect by the connection fastener with the anchor block.
Further, the making material of the plane net is metal, and the making material of the string bag is nylon.
Further, the pile foundation support table is equidistantly laid along the linked network axis direction.
Further, the plane net be include copper alloy net and wire rope net;
The mesh size of the copper alloy net is less than the mesh size of the wire rope net, and the copper alloy net is set to institute State the front of wire rope net.
Further, the mesh size of the copper alloy net is 50mm*50mm;The mesh size of the wire rope net is 1m*1m;The mesh size of the string bag is 5mm*5mm.
Further, the connection fastener includes anchor ring, active connection;
It is installed with the anchor ring respectively on front-seat straight stake, cushion cap and the anchor block, the plane net is distinguished with the string bag It is connect with the anchor ring by the active connection.
Further, the anchor ring includes the first anchor ring and the second anchor ring, and the diameter of first anchor ring is more than described the The diameter of two anchor rings;First anchor ring is equidistantly fixedly arranged in the two opposite side walls of the front-seat straight stake and cushion cap, before described It arranges and is equidistantly installed with second anchor ring on front side wall, the straight stake of heel row and the anchor block of straight stake;
The active connection includes activity lock and flexible rope;The wire rope net left and right ends pass through the activity Lock is connect with first anchor ring, and lower end, copper alloy net and the string bag of the wire rope net pass through the flexible strand respectively Rope is connect with second anchor ring.
Further, a diameter of 35-50mm of first anchor ring, a diameter of 20-30mm of second anchor ring.
Further, further include positioning floating drum, the positioning floating drum is set on the tail portion of the string bag.
Further, further include water-level instrumentation, the water-level instrumentation is set on the pile foundation support table.
Compared with prior art, the beneficial effects of the utility model are:
1, it is combined with multilayer block structure by using pile foundation support table structure, fully combines pile foundation support table structure level and hold Loading capability is big and multilayer linked network intercepts the advantages of classification intercepts so that the garbage barrier net has strcture safety high, and interception effect can The features such as control, can effectively intercept flume front end small-sized marine life;Meanwhile anchor block back cover is arranged in bottom of blocking, really Realize that tunneling boring intercepts so that intercept more thorough;
2, linked network is separated by pressing mesh thickness, does not easily cause mesh blocking;It is designed simultaneously by using the string bag, both favorably In expanding the cross-section of river, the collection processing of marine growth is also allowed for;
3, by using copper alloy net in upstream face front end, the attachment of marine growth can be prevented, that improves mesh sheet uses the longevity Life, to effectively reduce the maintenance cost of block;
4, the flume garbage barrier net of the utility model had both solved existing block structure to small-sized marine growth interception effect not Ideal, the problems such as structural reliability and durability are poor, and facilitate the collection of interceptor to handle and reduce human cost, realize structure Simply, reliably, it is practical, the multiple targets such as save, can be applicable in the garbage barrier net engineering of nuclear power station flume front end.
Description of the drawings
Fig. 1 is the intercept net structural facades figure of the utility model;
Fig. 2 is the sectional view at A-A.
Description of the drawings:1, pile foundation support table;11, front-seat straight stake;12, the straight stake of heel row;13, cushion cap, 2, plane net;21, steel wire Netting;22, copper alloy net;3, the string bag;4, anchor ring;41, the first anchor ring;42, the second anchor ring;5, active connection;51, flexible strand Rope;6, anchor block;7, floating drum is positioned
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings.
Specific implementation mode
The preferred embodiment of the utility model is illustrated below in conjunction with attached drawing, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
The utility model discloses a kind of flume garbage barrier nets, as Figure 1-Figure 2, including linked network, anchor block 6, junction button Part and more than two pile foundation support tables;
Pile foundation support table includes cushion cap 13 and the straight stake 11 in front row and the straight stake 12 of heel row that are arranged before and after water inlet direction, preceding Underwater geological conditions layer is goed deep into the one end for arranging straight stake 11 and the straight stake of heel row 12, and the other end is equipped with the front-seat straight stake 11 of connection and the straight stake of heel row 12 Cushion cap 13;In one embodiment, front-seat straight stake 11 and the straight stake of heel row 12 can use prestressed high-strength according to geological conditions Concrete tubular pile or cast-in-place concrete pile, and the spacing of front-seat straight stake 11 and the straight stake of heel row 12 is not preferably less than 4m;Cushion cap 13 uses Monolithic reinforced concrete structure, size should meet technique and detailing requiments;The pile foundation support table is that the utility model intercepts The main force structure of net.
Linked network includes plane net 2 and the string bag 3, and the mesh size of plane net 2 is more than the mesh size of the string bag 3;Specifically, flat The making material of veil 2 is metal, and the making material of the string bag 3 is nylon.
The left and right ends of plane net 2 are connected to the straight stake 11 in front row and the cushion cap of different pile foundation support tables by connection fastener respectively On 13, the lower end of plane net 2 is connect by connection fastener with anchor block 6;
The right and left of the string bag 3 is connected to the straight stake 12 of heel row and the cushion cap 13 of different pile foundation support tables by connection fastener respectively On, the lower end of the string bag 3 is connect by connection fastener with anchor block 6.In one embodiment, anchor block 6 passes through between being set to pile foundation support table Cross the flume sea bed face of metalling leveling processing.Separately it should be noted that in the present invention, front, rear, left and right are For the water inlet direction of flume, wherein before upstream face forefront is, other orientation and so on.
Based on above-mentioned structure design, the flume garbage barrier net of the utility model fully combines pile foundation support table structure level Large carrying capacity and multilayer linked network intercept the advantages of classification intercepts, and have the features such as strcture safety is high, and interception effect is controllable, energy Enough effective interception flume leading portion small-sized marine lifes;Meanwhile 6 back cover of anchor block is arranged in bottom of blocking, and really realizes tunneling boring It intercepts so that intercept more thorough.
As a kind of embodiment, as Figure 1-Figure 2, pile foundation support table is equidistantly laid along the linked network axis direction, It lays spacing to be determined according to the stress of garbage barrier net and the bearing capacity calculation of pile foundation support table, generally 15m-20m.In a specific implementation In example, the top mark height of pile foundation support table adds certain rich height to determine by extreme high water level.
In the above-described embodiments, as Figure 1-Figure 2, plane net 2 be include copper alloy net 22 and wire rope net 21;Copper closes The mesh size of golden net 22 is less than the mesh size of wire rope net 21, and copper alloy net 22 is set to the front of wire rope net 21.Its In, the string bag 3 is such as carried out dip-coating chlorinated rubber processing, can be extended the usage time of the string bag 3 using the nylon material of preservative treatment; Same wire rope net 21 extends the use of stainless (steel) wire using zinc-plated processing to enhance the anti-seawater corrosion ability of stainless steel Time.But it should be recognized that the copper alloy net 22 shown in Fig. 1 does not represent its true form, actual copper alloy net 22 It is the net-layer structure for convenience of display plane net 2 herein for full wafer web frame identical with 21 shape of wire rope net, and copper is closed Golden net 22 is illustrated into shape as shown in Figure 1.
Specifically, in the above-described embodiments, the mesh size of copper alloy net 22 is 50mm*50mm;The mesh of wire rope net Size is 1m*1m;The mesh size of the string bag 3 is 5mm*5mm, and the length of the string bag 3 is not less than the linked network span of the string bag 3, thereon It is not less than design high-water along absolute altitude.
Positioned at the straight stake 11 in the front row of upstream face, aperture 50mm × 50mm copper alloys are hung respectively from outside to inside along water inlet direction The double layer planar net 2 of net 22 and aperture 1m*1m zinc-coated wires netting 21, it is main to realize the rubbish and marine growth larger to volume Interception.Wherein, the service life of mesh sheet, which can be improved, in the copper alloy net 22 of 50mm*50mm prevents the attachment of marine growth, to drop The maintenance cost of low block, 1m*1m zinc-coated wires netting 21 are stress mesh sheet, are primarily subjected to active force of the stormy waves stream to block, And the active force is transmitted on pile foundation support table.The string bag 3 between the straight stake of the heel row 12 then main small-sized sea realized to small volume Biology is intercepted to be handled with collection.
In the above-described embodiments, as Figure 1-Figure 2, connection fastener includes anchor ring 4, active connection 5;Front-seat straight stake 11, it is installed with anchor ring 4 respectively on cushion cap 13 and anchor block 6, plane net 2 is connected by active connection 5 and anchor ring 4 respectively with the string bag 3 It connects.
In the above-described embodiments, anchor ring 4 includes the first anchor ring 41 and the second anchor ring 42, and the diameter of the first anchor ring 41 is more than the The diameter of two anchor rings 42, the first anchor ring 41 is equidistantly fixedly arranged in the two opposite side walls of front-seat straight stake 11 and cushion cap 13, front-seat straight It is equidistantly installed with the second anchor ring 42 on the front side wall of stake 11, the straight stake 12 of heel row and anchor block 6;
Active connection 5 includes activity lock and flexible rope 51;21 left and right ends of wire rope net by activity lock with First anchor ring 41 connects, and lower end, copper alloy net 22 and the string bag 3 of wire rope net 21 pass through flexible rope 51 and the second anchor respectively Ring 42 connects.And copper alloy net 22 and the wire side of wire rope net 21 are fixed by plastic lock catch.
Specifically, in the above-described embodiments, a diameter of 35-50mm of the first anchor ring 41, a diameter of 20- of the second anchor ring 42 30mm.In one embodiment, the preferred 40mm of diameter of the first anchor ring 41, the preferred 25mm of diameter of the second anchor ring 42, it is flexible The preferably nylon rope of a diameter of 28mm of rope 51.But it should be recognized that first anchor ring 41, the second anchor ring 42 and flexible strand The material and diameter of rope 51 are not limited to this.Linked network both ends and anchor ring 4 are linked together by using active connection 5, So that linked network is convenient for disassembly and assembly, the ship disengaging for being convenient to clean and safeguarding.
In the above-described embodiments, as shown in Fig. 2, the tail portion of the string bag 3 is provided with positioning floating drum 7, in order to the receipts of marine growth Collection.
In the above-described embodiments, pile foundation support table 1 is equipped with water-level instrumentation.It can be according to the flume detected using unit Water level, in time cleaning and adjustment linked network can start emergency advance warning prediction scheme to prevent unexpected hair in time when there is extreme water level It is raw.
Other contents of flume garbage barrier net described in the utility model are referring to the prior art, and details are not described herein.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, therefore it is every without departing from the content of the technical scheme of the utility model, according to the technical essence of the utility model to implementing above Any modification, equivalent variations and modification, are still within the scope of the technical solutions of the present invention made by example.

Claims (10)

1. a kind of flume garbage barrier net, it is characterised in that:Including linked network, anchor block, connection fastener and more than two pile foundation support tables;
The pile foundation support table includes the straight stake of cushion cap and the front row being arranged before and after water inlet direction and the straight stake of heel row, the front row Underwater geological conditions layer is goed deep into one end of straight stake and the straight stake of heel row, and the other end, which is equipped with, connects the described of the front-seat straight stake and the straight stake of heel row Cushion cap;
The linked network includes plane net and the string bag, and the mesh size of the plane net is more than the mesh size of the string bag;
The left and right ends of the plane net are connected to the straight stake in front row of different pile foundation support tables and are held by the connection fastener respectively On platform, the lower end of the plane net is connect by the connection fastener with the anchor block;
The right and left of the string bag is connected to the straight stake of heel row and the cushion cap of different pile foundation support tables by the connection fastener respectively On, the lower end of the string bag is connect by the connection fastener with the anchor block.
2. flume garbage barrier net according to claim 1, it is characterised in that:The making material of the plane net is metal, The making material of the string bag is nylon.
3. flume garbage barrier net according to claim 1, it is characterised in that:The pile foundation support table is along the linked network axis side It is laid to equidistant.
4. flume garbage barrier net according to claim 1, it is characterised in that:The plane net be include copper alloy net and steel Cord net;
The mesh size of the copper alloy net is less than the mesh size of the wire rope net, and the copper alloy net is set to the steel The front of cord net.
5. flume garbage barrier net according to claim 4, it is characterised in that:The mesh size of the copper alloy net is 50mm*50mm;The mesh size of the wire rope net is 1m*1m;The mesh size of the string bag is 5mm*5mm.
6. flume garbage barrier net according to claim 4, it is characterised in that:The connection fastener includes anchor ring, activity company Fitting;
It is installed with the anchor ring respectively on front-seat straight stake, cushion cap and the anchor block, the plane net passes through respectively with the string bag The active connection is connect with the anchor ring.
7. flume garbage barrier net according to claim 6, it is characterised in that:The anchor ring includes the first anchor ring and the second anchor Ring, the diameter of first anchor ring are more than the diameter of second anchor ring;First anchor ring is equidistantly fixedly arranged on the front row In the two opposite side walls of straight stake and cushion cap, equidistantly it is installed on the front-seat directly front side wall of stake, the straight stake of heel row and the anchor block Second anchor ring;
The active connection includes activity lock and flexible rope;The wire rope net left and right ends are latched by the activity Connect with first anchor ring, lower end, copper alloy net and the string bag of the wire rope net respectively by the flexible rope with The second anchor ring connection.
8. flume garbage barrier net according to claim 7, it is characterised in that:A diameter of 35-50mm of first anchor ring, A diameter of 20-30mm of second anchor ring.
9. the flume garbage barrier net according to any one of claim 1-8, it is characterised in that:Further include positioning floating drum, institute State the tail portion that positioning floating drum is set to the string bag.
10. the flume garbage barrier net according to any one of claim 1-8, it is characterised in that:Further include water-level instrumentation, The water-level instrumentation is set on the pile foundation support table.
CN201721832217.4U 2017-12-25 2017-12-25 A kind of flume garbage barrier net Active CN207760813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721832217.4U CN207760813U (en) 2017-12-25 2017-12-25 A kind of flume garbage barrier net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721832217.4U CN207760813U (en) 2017-12-25 2017-12-25 A kind of flume garbage barrier net

Publications (1)

Publication Number Publication Date
CN207760813U true CN207760813U (en) 2018-08-24

Family

ID=63188167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721832217.4U Active CN207760813U (en) 2017-12-25 2017-12-25 A kind of flume garbage barrier net

Country Status (1)

Country Link
CN (1) CN207760813U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179527A (en) * 2018-09-25 2019-01-11 合肥学院 A kind of pollution treatment device of the ecological intercepting with double barrier
CN109667246A (en) * 2019-02-12 2019-04-23 中交第四航务工程勘察设计院有限公司 A kind of nuclear power plant's water intaking open channel sewage blocking device
CN109914351A (en) * 2019-04-11 2019-06-21 苏州热工研究院有限公司 A kind of nuclear power plant's intake high intensity intercept net system
CN112726531A (en) * 2020-11-20 2021-04-30 深圳中广核工程设计有限公司 Circulating water prefiltering system of nuclear power plant
CN113737756A (en) * 2021-08-25 2021-12-03 湖南鑫海股份有限公司 Net bag type sewage blocking system for water intake open channel
CN113987621A (en) * 2021-08-25 2022-01-28 湖南鑫海股份有限公司 Design method of trash rack according to water resistance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179527A (en) * 2018-09-25 2019-01-11 合肥学院 A kind of pollution treatment device of the ecological intercepting with double barrier
CN109667246A (en) * 2019-02-12 2019-04-23 中交第四航务工程勘察设计院有限公司 A kind of nuclear power plant's water intaking open channel sewage blocking device
CN109914351A (en) * 2019-04-11 2019-06-21 苏州热工研究院有限公司 A kind of nuclear power plant's intake high intensity intercept net system
CN112726531A (en) * 2020-11-20 2021-04-30 深圳中广核工程设计有限公司 Circulating water prefiltering system of nuclear power plant
CN113737756A (en) * 2021-08-25 2021-12-03 湖南鑫海股份有限公司 Net bag type sewage blocking system for water intake open channel
CN113987621A (en) * 2021-08-25 2022-01-28 湖南鑫海股份有限公司 Design method of trash rack according to water resistance
CN113737756B (en) * 2021-08-25 2022-11-22 湖南鑫海股份有限公司 Net bag type sewage blocking system for water intake open channel

Similar Documents

Publication Publication Date Title
CN207760813U (en) A kind of flume garbage barrier net
CN107372260B (en) Anchor type self-energy-supply semi-submersible aquaculture net cage
CN207519426U (en) A kind of cultivation work ship
CN103422480B (en) A kind of method and apparatus of big waters blue-green algae water conservancy diversion enrichment
CN109235403A (en) A kind of ocean refuse collector
CN104986300A (en) Cleaning boat for garbage on water surface
CN208650017U (en) A kind of nuclear power plant's marine growth intercepting system
CN106381855B (en) A kind of floatation type active Non-energy-consumption garbage recovery device
CN109914351A (en) A kind of nuclear power plant's intake high intensity intercept net system
CN105454171A (en) Movable demersal fish trapping and collection device and method
CN203256676U (en) Floating breakwater giving consideration to fishing and aquaculture
CN104872008B (en) A kind of far-reaching coast defence stormy waves aquaculture net cage device
CN205320960U (en) Movable demersal fish lures an album device
CN105494192A (en) Mariculture device with net cage added to jacket fan base
CN201891105U (en) Movable wave dragging and flow stopping facility
CN210013199U (en) Float sea grass salvage net
CN109349165B (en) Marine ranch
CN206667208U (en) Floater cleaning fence band peculiar to vessel
CN108782478A (en) Jellyfish intercepts finishing device and its application method
CN103243695B (en) A kind of oil fence that can prevent toppling in torrent
CN208618373U (en) Automatically cleaning blocks dirt and leads dirty system
CN216627127U (en) Pile type lifting net cage
CN204047608U (en) A kind of aquiculture net cage
CN208572925U (en) River mouth intertidal zone biological monitoring net
CN210127451U (en) High-strength interception net system for water intake of nuclear power plant

Legal Events

Date Code Title Description
GR01 Patent grant