CN207747196U - A kind of prefabricated wind power tower mould equipment - Google Patents
A kind of prefabricated wind power tower mould equipment Download PDFInfo
- Publication number
- CN207747196U CN207747196U CN201721105056.9U CN201721105056U CN207747196U CN 207747196 U CN207747196 U CN 207747196U CN 201721105056 U CN201721105056 U CN 201721105056U CN 207747196 U CN207747196 U CN 207747196U
- Authority
- CN
- China
- Prior art keywords
- external mold
- internal model
- wind power
- fixed
- power tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to a kind of prefabricated wind power tower mould equipments, including cushion cap, center stand column, external mold, internal model, bed die, backform, end mould, backform pressure thick stick, interior external mold to pull rod, horizontal brace connector, levelling I-steel, bottom to drawing, multiple rubber tubes, slurry seal item, levelling I-steel is fixed on cushion cap, the lower end of external mold and internal model is fixed on levelling I-steel, center stand column is located at center on the inside of internal model, is fixed on cushion cap by centre strut embedded part, and bottom is connected between external mold and the bottom end of internal model drawing.Prefabricated wind power tower mould equipment provided by the utility model, easy to operate, selection economy, reasonable stress, appearance looks elegant, input is small, Forming Quality is high, turnover is efficient, fully achieves standardization, can meet the needs of practical application well.
Description
Technical field
The utility model is related to a kind of prefabricated wind power tower mould equipments.
Background technology
Traditional cast-in-place steel reinforced concrete wind power tower mold is working at height, input amount is big, Forming Quality is poor, construction period
Length cannot achieve normalizing operation.Along with the gradually popularization that fabricated construction system is constructed, especially quickly grow these years
Steel reinforced concrete wind power tower, steel reinforced concrete wind power tower is divided into lower part concrete pre-stress and the part of steel superstructure two forms, lower part
Concrete parts are divided into several pieces according to structure design, and being utilized respectively this mold in component field carries out prefabricated cast, is segmented structure
Part is transported to behind scene carries out spelling from the bottom to top.Often such project characteristic is tight duration, task weight, quality height, so to this
Prefabricated mould design concept, processing progress, quality control requirement are also very high, and good prefabricated wind power tower is designed with mould equipment
It has become and accelerates construction progress, ensure one of construction quality and reaction construction civilization degree mark, traditional cast-in-place steel reinforced concrete wind-powered electricity generation
Pylon mold is working at height, input amount is big, Forming Quality is poor, long construction period, cannot achieve normalizing operation, engineering matter
It measures and is difficult to reliably be ensured, cost is difficult to control, and is unfavorable for the construction civilization at scene, the existing risk factor ratio in dismounting
Larger, with being constantly progressive for Building technology, a kind of more economical safe and efficient mold of pursuit will be building unit
Inevitable choice.
Utility model content
For the above-mentioned prior art the problem of, the purpose of this utility model is to provide one kind can avoid in appearance
State the prefabricated wind power tower mould equipment of technological deficiency.
In order to realize above-mentioned purpose of utility model, the technical scheme that the utility model is provided is as follows:
A kind of prefabricated wind power tower mould equipment, including cushion cap, center stand column, external mold, internal model, bed die, backform, end
Mould, backform pressure thick stick, interior external mold to pull rod, horizontal brace connector, levelling I-steel, bottom to drawing, multiple rubber tubes, slurry seal item,
Levelling I-steel is fixed on cushion cap, and the lower end of external mold and internal model is fixed on levelling I-steel, and center stand column is located in internal model
The center of side is fixed on by centre strut embedded part on cushion cap, and bottom is connected between external mold and the bottom end of internal model drawing,
Mould is held to be arranged between external mold and internal model, multiple rubber tubes are separately positioned on the inside of external mold and the inside of internal model, are located at bottom
To the side of pulling on, slurry seal item is arranged above multiple rubber tubes, is connected between external mold and internal model, and bed die is arranged at the bottom of slurry seal item
On face;Backform pressure thick stick is fixed on the top of external mold and internal model, and interior external mold is connected between external mold and the top of internal model pull rod, pushes up
Mould is fixed on backform pressure thick stick and interior external mold on pull rod.
Further, prefabricated wind power tower mould equipment further includes center stand column diagonal brace, the both ends of center stand column diagonal brace
It is connected respectively in center stand column and cushion cap.
Further, levelling I-steel is fixed on by two anti-floating bolts on cushion cap.
Further, backform pressure thick stick is fixed on the top of external mold and internal model by form removal block jackscrew.
Further, prefabricated wind power tower mould equipment further includes that horizontally-supported, horizontally-supported both ends pass through respectively
Horizontal brace connector is connected in internal model and center stand column.
Prefabricated wind power tower mould equipment provided by the utility model, it is easy to operate, selection economy, reasonable stress, outer
Sight is beautiful, input is small, Forming Quality is high, turnover is efficient, fully achieves standardization, can meet practical application well
It needs.
Description of the drawings
Fig. 1 is longitudinal schematic cross-sectional view of the utility model;
Fig. 2 is the partial enlarged view of part A in Fig. 1;
Fig. 3 is the top view of the utility model;
In figure, 1- external molds, 2- internal models, 3- bed dies, 4- backforms, the ends 5- mould, 6- backforms press thick stick, 7- center stand columns, inside and outside 8-
Mould is to pull rod, and 9- horizontal brace connectors, 10- is horizontally-supported, 11- center stand column diagonal braces, 12- form removal block jackscrews, the levelling I-shapeds of 13-
Steel, 14- anti-floating bolts, 15- cushion caps, 16- centre strut embedded parts, the bottoms 17- are to drawing, 18- rubber tubes, 19- slurry seal items.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with the accompanying drawings and specifically
Embodiment is described further the utility model.It should be appreciated that specific embodiment described herein is only explaining this reality
With novel, it is not used to limit the utility model.Based on the embodiments of the present invention, those of ordinary skill in the art are not having
There is the every other embodiment obtained under the premise of making creative work, shall fall within the protection scope of the present invention.
As shown in Figure 1 to Figure 3, a kind of prefabricated wind power tower mould equipment, including cushion cap 15, center stand column 7, external mold 1,
Internal model 2, bed die 3, backform 4, end mould 5, backform pressure thick stick 6, interior external mold are to pull rod 8, horizontal brace connector 9, horizontally-supported 10, form removal
Block jackscrew 12, levelling I-steel 13, anti-floating bolt 14, bottom are to drawing 17, multiple rubber tubes 18, slurry seal item 19, external mold 1, internal model
2, bed die 3, backform 4 are tubular, and levelling I-steel 13 is fixed on by two anti-floating bolts 14 on cushion cap 15, external mold 1 and interior
The lower end of mould 2 is fixed on levelling I-steel 13, and to drawing 17 to be connected between external mold 1 and the bottom end of internal model 2, end mould 5 is set for bottom
It sets between external mold 1 and internal model 2, multiple rubber tubes 18 are separately positioned on the inside of external mold 1 and the inside of internal model 2, are located at bottom
To drawing 17 tops, slurry seal item 19 to be arranged above multiple rubber tubes 18, be connected between external mold 1 and internal model 2, the setting of bed die 3 exists
On the bottom surface of slurry seal item 19;Center stand column 7 is located at the center of 2 inside of internal model, is fixed on and is held by centre strut embedded part 16
On platform 15, multiple center stand column diagonal braces 11 are connected between center stand column 7 and cushion cap 15;Backform pressure thick stick 6 passes through form removal block jackscrew
12 are fixed on the top of external mold 1 and internal model 2, and interior external mold is connected between external mold 1 and the top of internal model 2 pull rod 8, and backform 4 is solid
Backform pressure thick stick 6 and interior external mold are scheduled on on pull rod 8;Horizontally-supported 10 both ends are connected to by horizontal brace connector 9 interior respectively
On mould 2 and center stand column 7, the both ends of center stand column diagonal brace 11 are connected respectively in center stand column 7 and cushion cap 15.Rubber tube 18
Interior diameter is 50mm.
To facilitate installation, internal model 2 is averagely split as 2 to 8 internal model piecemeals, preferably 8, external mold 1 is averagely split
For 2 to 8 external mold piecemeals, preferably 4, bed die 3 and backform 4 are averagely split as 2 to 8 piecemeals, preferably 4.
Prefabricated wind power tower mould equipment provided by the utility model, it is easy to operate, selection economy, reasonable stress, outer
Sight is beautiful, input is small, Forming Quality is high, turnover is efficient, fully achieves standardization, can meet practical application well
It needs.
The embodiment of the utility model above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the utility model patent range therefore be interpreted as.It should be pointed out that for the ordinary skill of this field
For personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this
The protection domain of utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (4)
1. a kind of prefabricated wind power tower mould equipment, which is characterized in that including cushion cap, center stand column, external mold, internal model, bed die,
Backform, end mould, backform pressure thick stick, interior external mold to pull rod, horizontal brace connector, levelling I-steel, bottom to drawing, multiple rubber tubes,
Slurry seal item, levelling I-steel are fixed on cushion cap, and the lower end of external mold and internal model is fixed on levelling I-steel, and center stand column is located at
Center on the inside of internal model is fixed on by centre strut embedded part on cushion cap, and bottom is connected to drawing at the bottom of external mold and internal model
Between end, end mould is arranged between external mold and internal model, and multiple rubber tubes are separately positioned on the inside of external mold and the inside of internal model, position
In bottom to the side of pulling on, slurry seal item is arranged above multiple rubber tubes, is connected between external mold and internal model, and bed die is arranged in slurry seal
On the bottom surface of item;Backform pressure thick stick is fixed on the top of external mold and internal model, and interior external mold is connected to pull rod on the top of external mold and internal model
Between, backform is fixed on backform pressure thick stick and interior external mold on pull rod, prefabricated wind power tower mould equipment further include it is horizontally-supported,
Horizontally-supported both ends are connected to by horizontal brace connector in internal model and center stand column respectively.
2. prefabricated wind power tower mould equipment according to claim 1, which is characterized in that prefabricated wind power tower mold
Equipment further includes center stand column diagonal brace, and the both ends of center stand column diagonal brace are connected respectively in center stand column and cushion cap.
3. prefabricated wind power tower mould equipment according to claim 1, which is characterized in that levelling I-steel passes through two
Anti-floating bolt is fixed on cushion cap.
4. prefabricated wind power tower mould equipment according to claim 1, which is characterized in that backform pressure thick stick passes through form removal block
Jackscrew is fixed on the top of external mold and internal model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721105056.9U CN207747196U (en) | 2017-08-31 | 2017-08-31 | A kind of prefabricated wind power tower mould equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721105056.9U CN207747196U (en) | 2017-08-31 | 2017-08-31 | A kind of prefabricated wind power tower mould equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207747196U true CN207747196U (en) | 2018-08-21 |
Family
ID=63146521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721105056.9U Active CN207747196U (en) | 2017-08-31 | 2017-08-31 | A kind of prefabricated wind power tower mould equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207747196U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107351228A (en) * | 2017-08-31 | 2017-11-17 | 北京市建筑工程研究院有限责任公司 | A kind of prefabricated wind power tower mould equipment and its construction technology |
CN109750892A (en) * | 2019-01-18 | 2019-05-14 | 中国十七冶集团有限公司 | A kind of prefabricated assembled mixing blower fan pylon template support method and device |
CN109927156A (en) * | 2019-04-12 | 2019-06-25 | 合肥海银杆塔有限公司 | A kind of adjustable electric force pole tower process equipment |
-
2017
- 2017-08-31 CN CN201721105056.9U patent/CN207747196U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107351228A (en) * | 2017-08-31 | 2017-11-17 | 北京市建筑工程研究院有限责任公司 | A kind of prefabricated wind power tower mould equipment and its construction technology |
CN109750892A (en) * | 2019-01-18 | 2019-05-14 | 中国十七冶集团有限公司 | A kind of prefabricated assembled mixing blower fan pylon template support method and device |
CN109927156A (en) * | 2019-04-12 | 2019-06-25 | 合肥海银杆塔有限公司 | A kind of adjustable electric force pole tower process equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207747196U (en) | A kind of prefabricated wind power tower mould equipment | |
CN201326524Y (en) | Composite tower cylinder of wind turbine | |
CN201546435U (en) | Bolted stayed cantilever scaffold | |
CN109914244B (en) | Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof | |
CN105862602B (en) | The convertible template system and its construction method of hollow concrete leaning tower | |
CN107419746A (en) | A kind of mobile formwork system and its construction method | |
CN104005569A (en) | Construction method for supporting beam and removing columns | |
CN206690277U (en) | Fully automatic hydraulic box girder formwork | |
CN204094925U (en) | The internal mould device of prefabricated small box girder | |
CN107351228A (en) | A kind of prefabricated wind power tower mould equipment and its construction technology | |
CN203531365U (en) | Bolt anchor stiffness wall connecting piece | |
CN205636516U (en) | Convertible template system of hollow concrete leaning tower | |
CN206513015U (en) | The aluminum alloy mould plate mechanism that building floor is constructed is used for based on BIM technology | |
CN103572703A (en) | Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method | |
CN203066090U (en) | Assembled bracing structure for steel sheet piling cofferdam construction | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN207211196U (en) | A kind of mobile formwork system | |
CN107419895B (en) | Construction joint control device and construction method thereof | |
CN202000268U (en) | Foldable front outrigger for bridge girder erection machine | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN202611250U (en) | Concreting platform for concrete filled steel tube column | |
CN205857227U (en) | A kind of wind power generation stepped hyollow foundation support | |
CN207598256U (en) | A kind of piping lane low-cost die vehicle | |
CN210858094U (en) | Lifting steel bracket for jacking and storey-adding | |
CN205012326U (en) | A double -deck lower equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |