CN207739155U - A kind of bridge pier of overpass pours plate - Google Patents

A kind of bridge pier of overpass pours plate Download PDF

Info

Publication number
CN207739155U
CN207739155U CN201820026755.2U CN201820026755U CN207739155U CN 207739155 U CN207739155 U CN 207739155U CN 201820026755 U CN201820026755 U CN 201820026755U CN 207739155 U CN207739155 U CN 207739155U
Authority
CN
China
Prior art keywords
plate
demarcation strip
pours
lock ring
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820026755.2U
Other languages
Chinese (zh)
Inventor
李康
张志军
谭坤
冯晓哲
耿阳阳
全才让
张凌峰
陈浩宇
刘超
李兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201820026755.2U priority Critical patent/CN207739155U/en
Application granted granted Critical
Publication of CN207739155U publication Critical patent/CN207739155U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge piers of overpass to pour plate,Including pouring built module and pouring demarcation strip,The quantity for pouring built module is two,Two pour module symmetry and are arranged on placement platform,And two are poured one cavity of formation between built module,The demarcation strip that pours is located in cavity,And the quantity for pouring demarcation strip is two,Two pour the side that demarcation strip is located remotely from each other and are fitted and connected with the side for pouring built module,And two pour and are equipped with fluting in the middle part of demarcation strip,The top surface of the fluting is fixedly connected with one end of extension rod,The protrusion circle of setting,So that the first lock ring links together with the second lock ring,The positioning column of setting,The position of the first lock ring and the second lock ring is defined,When the first lock ring is detached with the second lock ring,Release the limit to force bearing plate,Demarcation strip is conveniently poured to detach with built module is poured,Overall structure is easy to use,It is high to demould stability.

Description

A kind of bridge pier of overpass pours plate
Technical field
The utility model is related to overpass correlative technology field, specially a kind of bridge pier of overpass pours plate.
Background technology
Overpass, a kind of bridge are generally referred to across zanjon valley to replace the bridge of high embankment, and in Urban Bridge The middle bridge across road is supported by the tower or pillar of height support, during overpass construction, there is a kind of Pier Design On be made of two independent pier studs, two detached pier intercolumniation spacing are smaller, and worker there is no working space, lead to template Form removal and formwork erection are extremely difficult, and especially when pier shaft shape is rectangle, it is parallel surface that pier, which stitches both sides, and from both sides, demoulding does not have Pattern draft causes demoulding more difficult, and difficulty of construction is big.
In the prior art, number of patent application 201620062899.4, a kind of entitled double pier stud bridge piers of patent pour mould Plate is completed to demould by pull-out mechanism, but this pull-out mechanism being made of a large amount of articulated manners, and stability in use is poor, If one of them stuck situation hingedly occurs, cause single unit system that can not use.
Utility model content
The purpose of this utility model is to provide a kind of bridge piers of overpass to pour plate, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides the following technical solutions:A kind of bridge pier of overpass pours plate, including It pours built module and pours demarcation strip, the quantity for pouring built module is two, and two pour module symmetry and are arranged in placement platform On, and two are poured one cavity of formation between built module, the demarcation strip that pours is located in cavity, and pours the quantity of demarcation strip It it is two, two pour the side that demarcation strip is located remotely from each other and are fitted and connected with the side for pouring built module, and two pour separation Fluting is equipped in the middle part of plate, the top surface of the fluting is fixedly connected with one end of extension rod, and the other end of extension rod passes through shaft One end of hinged force bearing plate, the force bearing plate are located in fluting, and the side of force bearing plate is fixedly connected with one end of supports block, supports block it is another One end is fitted and connected with the side for pouring built module, and lower plate and upper plate are equipped in the cavity, and the left and right sides of lower plate is equal Be fixedly connected with the lower wall for pouring demarcation strip, upper plate is fixedly connected with the upper side wall for pouring demarcation strip, the lower plate it is upper End middle part is fixedly connected with the lower end for being oriented to vertical block, is oriented in the other end of vertical block and is equipped with jack, and positioning column is plugged in jack The lower end of lower end, the positioning column is connected with jack by internal and external threads.
Preferably, the outer middle side part of the positioning column is socketed with the first lock ring, and the lower end of the first lock ring is skewed Structure, and the lower end of the first lock ring is fixedly connected with one end of protrusion circle.
Preferably, the other end of the protrusion circle is inserted into the annular groove of the second lock ring upper end, the second lock ring The side of supports block is fixedly connected with for the side of semicircular structure, and the second lock ring.
Preferably, circular hole of the upper end of the positioning column in the middle part of the upper plate and it is fixedly connected with the lower end of knob, it is described Knob is located at the top of upper plate, is socketed with floating bearing on the outside of the upper end of the positioning column, the left and right sides of floating bearing is equal The side wall for pouring demarcation strip is fixedly connected with by supporting rod.
Compared with prior art, the utility model has the beneficial effects that:It is reasonable for structure, the protrusion circle of setting so that first Locking ring links together with the second lock ring, the positioning column of setting, is carried out to the position of the first lock ring and the second lock ring It limits, when the first lock ring is detached with the second lock ring, releases the limit to force bearing plate, conveniently pour demarcation strip and pour mould Block detaches, and overall structure is easy to use, and demoulding stability is high, is not in stuck phenomenon, highly practical, solves well existing There is the shortcoming in technology.
Description of the drawings
Fig. 1 is the utility model structural profile illustration;
Fig. 2 is the utility model partition plate structure diagrammatic cross-section.
In figure:Built module 1, fluting 2 are poured, demarcation strip 3 is poured, extension rod 4, force bearing plate 5, supports block 6, lower plate 7, is oriented to and erects Block 8, positioning column 9, supporting rod 10, upper plate 11, the first lock ring 12, protrusion circle 13, the second lock ring 14.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of bridge pier of overpass pours plate, including pours Built module 1 and demarcation strip 3 being poured, the quantity for pouring built module 1 is two, and two are poured built module 1 and are symmetricly set on placement platform, And two are poured one cavity of formation between built module 1, the quantity for pouring demarcation strip 3 and being located in cavity, and pour demarcation strip 3 is two A, two pour the side that demarcation strip 3 is located remotely from each other and are fitted and connected with the side for pouring built module 1, and two pour demarcation strip 3 Middle part be equipped with fluting 2,2 top surface of slotting is fixedly connected with one end of extension rod 4, and the other end of extension rod 4 is cut with scissors by shaft Connect one end of force bearing plate 5, force bearing plate 5 is located in fluting 2, and the side of force bearing plate 5 is fixedly connected with one end of supports block 6, supports block 6 it is another One end is fitted and connected with the side for pouring built module 1, and lower plate 7 and upper plate 11 are equipped in cavity, and the left and right sides of lower plate 7 is equal Be fixedly connected with the lower wall for pouring demarcation strip 3, upper plate 11 is fixedly connected with the upper side wall for pouring demarcation strip 3, lower plate 7 it is upper End middle part is fixedly connected with the lower end for being oriented to vertical block 8, is oriented in the other end of vertical block 8 and is equipped with jack, and positioning column 9 is plugged in jack Lower end, the lower end of positioning column 9 is connected with jack by internal and external threads;
The outer middle side part of positioning column 9 is socketed with the first lock ring 12, and the lower end of the first lock ring 12 is ramp-like configuration, and The lower end of the first lock ring 12 is fixedly connected with one end of protrusion circle 13, and the other end of protrusion circle 13 is inserted into 14 upper end of the second lock ring Annular groove in, the second lock ring 14 is semicircular structure, and the side of the second lock ring 14 is fixedly connected with the side of supports block 6;
The upper end of positioning column 9 runs through the circular hole at 11 middle part of upper plate and is fixedly connected with the lower end of knob, and knob is located at upper company The upper end outside of the top of plate 11, positioning column 9 is socketed with floating bearing, and the left and right sides of floating bearing is solid by supporting rod 10 Fixed connection pours the side wall of demarcation strip 3;
The protrusion circle 13 of setting so that the first lock ring 12 links together with the second lock ring 14, the positioning column of setting 9, the first lock ring 12 and the position of the second lock ring 14 are defined, when the first lock ring 12 is detached with the second lock ring 14 When, the limit to force bearing plate 5 is released, demarcation strip 3 is conveniently poured and is detached with built module 1 is poured, overall structure is easy to use, and demoulding is steady Qualitative height is not in stuck phenomenon.
Operation principle:The utility model is in demoulding, first turning knob so that positioning column 9 moves up, positioning column 9 It moves up and drives the first lock ring 12 so that protrusion circle 13 is detached with the second lock ring 14, relieves compressing to force bearing plate 5 Power, since extension rod 4 and force bearing plate 5 are hinged so that force bearing plate 5 be easy to pour built module 1 and detach, at this point, pulling up It is dynamic to pour demarcation strip 3.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of bridge pier of overpass pours plate, including pours built module (1) and pours demarcation strip (3), the built module (1) that pours Quantity is two, and two are poured built module (1) and are symmetricly set on placement platform, and two are poured formation one between built module (1) Cavity, it is characterised in that:The demarcation strip (3) that pours is located in cavity, and the quantity for pouring demarcation strip (3) is two, two It pours the side that demarcation strip (3) is located remotely from each other to be fitted and connected with the side for pouring built module (1), and two pour demarcation strip (3) Middle part be equipped with fluting (2), the top surface of the fluting (2) is fixedly connected with one end of extension rod (4), extension rod (4) it is another End is hinged one end of force bearing plate (5) by shaft, and the force bearing plate (5) is located in fluting (2), and the side of force bearing plate (5) is fixed One end of supports block (6) is connected, the other end of supports block (6) is fitted and connected with the side for pouring built module (1), is equipped with down in the cavity Connecting plate (7) and upper plate (11), lower plate are fixedly connected with the lower wall for pouring demarcation strip (3), upper plate at left and right sides of (7) (11) it is fixedly connected with the upper side wall for pouring demarcation strip (3), the upper center of the lower plate (7) is fixedly connected with guiding vertical block (8) lower end is oriented in the other end of vertical block (8) and is equipped with jack, and the lower end of positioning column (9), the positioning are plugged in jack The lower end of column (9) is connected with jack by internal and external threads.
2. a kind of bridge pier of overpass according to claim 1 pours plate, it is characterised in that:Outside the positioning column (9) Middle side part is socketed with the first lock ring (12), and the lower end of the first lock ring (12) is ramp-like configuration, and the first lock ring (12) Lower end be fixedly connected protrusion circle (13) one end.
3. a kind of bridge pier of overpass according to claim 2 pours plate, it is characterised in that:The protrusion encloses the another of (13) One end is inserted into the annular groove of the second lock ring (14) upper end, and the second lock ring (14) is semicircular structure, and second locks The side for determining ring (14) is fixedly connected with the side of supports block (6).
4. a kind of bridge pier of overpass according to claim 1 pours plate, it is characterised in that:The positioning column (9) it is upper It holds the circular hole in the middle part of upper plate (11) and is fixedly connected with the lower end of knob, the knob is located at the top of upper plate (11), Floating bearing is socketed on the outside of the upper end of the positioning column (9), the left and right sides of floating bearing is fixed by supporting rod (10) Connection pours the side wall of demarcation strip (3).
CN201820026755.2U 2018-01-08 2018-01-08 A kind of bridge pier of overpass pours plate Active CN207739155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820026755.2U CN207739155U (en) 2018-01-08 2018-01-08 A kind of bridge pier of overpass pours plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820026755.2U CN207739155U (en) 2018-01-08 2018-01-08 A kind of bridge pier of overpass pours plate

Publications (1)

Publication Number Publication Date
CN207739155U true CN207739155U (en) 2018-08-17

Family

ID=63122373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820026755.2U Active CN207739155U (en) 2018-01-08 2018-01-08 A kind of bridge pier of overpass pours plate

Country Status (1)

Country Link
CN (1) CN207739155U (en)

Similar Documents

Publication Publication Date Title
CN207847066U (en) A kind of construction formwork for placing
CN111021258B (en) Assembly type buttress pouring die carrier for bridge building
CN207739155U (en) A kind of bridge pier of overpass pours plate
CN207747197U (en) A kind of prefabricated wind power tower equipmentization mold of high-precision
CN103255716A (en) Hit-preventing wall template
CN208163929U (en) A kind of prefabricated box -beam mold that can quickly splice
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN209394953U (en) A kind of architectural engineering molding pours component
CN201264290Y (en) Prefabricated box girder means for adjusting limit of movement
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN210507150U (en) But segmental beam pier kicking block notch template of whole dismouting
CN213868938U (en) Groove-shaped aluminum alloy template
CN214143313U (en) Overhead bridge high hollow pier group overturning mold
CN208701705U (en) It is a kind of one concrete revetment pour mold
CN206655471U (en) A kind of beam column node core area concrete construction joint stays raft mould
CN103334584A (en) Template regulating system for sliding form system
CN206267032U (en) Band gradient rectangular pier columns variable area formula hydraulic formwork
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN216766233U (en) Node suitable for regional concrete placement is watered after assembled PEC post
CN207105211U (en) Element precast mould
CN207004010U (en) A kind of building bearing post pours mould
CN206070403U (en) A kind of sliding form apparatus for formwork for placing
CN214885477U (en) Sectional supporting structure for cast-in-place large-gradient concrete roof surface layer template
CN103382700A (en) Movable die frame girder device and method suitable for construction of single side widening box girder with large width
CN217924325U (en) A template for producing exempt from to tear open mould truss floor carrier plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant