CN207728370U - A kind of advanced jacking of floor device of gob side entry retaining - Google Patents

A kind of advanced jacking of floor device of gob side entry retaining Download PDF

Info

Publication number
CN207728370U
CN207728370U CN201820017437.XU CN201820017437U CN207728370U CN 207728370 U CN207728370 U CN 207728370U CN 201820017437 U CN201820017437 U CN 201820017437U CN 207728370 U CN207728370 U CN 207728370U
Authority
CN
China
Prior art keywords
side entry
gob side
cast
place concrete
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820017437.XU
Other languages
Chinese (zh)
Inventor
张建军
潘海兵
王彦东
张军鹏
石景帅
张凯
曹晓军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD
Shanxi Holzer Xin He Coal Industry Co Ltd
Xian University of Science and Technology
Original Assignee
SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD
Shanxi Holzer Xin He Coal Industry Co Ltd
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD, Shanxi Holzer Xin He Coal Industry Co Ltd, Xian University of Science and Technology filed Critical SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD
Priority to CN201820017437.XU priority Critical patent/CN207728370U/en
Application granted granted Critical
Publication of CN207728370U publication Critical patent/CN207728370U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of advanced jacking of floor devices of gob side entry retaining, including several cast-in-place concrete piles, the first advance of each cast-in-place concrete pile is set on the bottom plate of gob side entry, the other end of each cast-in-place concrete pile is set in basement rock, each walking for prop of the cast-in-place concrete pile by gob side entry lane is arranged to the midline, realize the gob side entry retaining in coal road road of keeping on file, later stage roadside support body sinkage and roof delamination amount are small, roadway deformation amount is small, it ensure that the ventilation section of later stage gob side entry, roadside support body bottom is hard concrete after bottom is played in tunnel, roadside support body stability higher.

Description

A kind of advanced jacking of floor device of gob side entry retaining
Technical field
The utility model belongs to coal mining reinforcement technique field, is related to a kind of advanced jacking of floor device of gob side entry retaining.
Background technology
Gob-side entry retaining support technology is that during coal working face is mined, (or two) tunnel of this working face is protected It stays, is serviced for subsequent work face.In order not to cause the waste of coal and be conducive to assistant conveyance, return airway is generally all adopted Top coal is stayed with along bottom driving, but tunnelling speed is low, coal slabbing easily occurs for top plate, in order to improve driving speed and improve peace Quan Xing, part tunnel tunnel coal of keeping on file using edge top and stay lane roadside support body to be located at pine the gob side entry retaining in such tunnel On soft ground coal, stay the roadside support body depression of lane later stage, roof delamination is serious, and roadway deformation amount is big, cause later maintenance at This is excessively high, and severe patient leads to that lane is stayed to fail.
Utility model content
The purpose of this utility model is to provide a kind of advanced jacking of floor devices of gob side entry retaining, solve in the prior art It keeps on file the gob side entry retaining in coal road road, later stage roadside support body sinkage, roof delamination amount and the big problem of roadway deformation amount.
The utility model the technical scheme adopted is that a kind of advanced jacking of floor device of gob side entry retaining, including several The first advance of cast-in-place concrete pile, each cast-in-place concrete pile is set on the bottom plate of gob side entry, and each concrete fills The other end of note stake is set in basement rock, and each cast-in-place concrete pile is set to the midline along walking for the prop by gob side entry lane It sets.
The utility model is also characterized by
Cast-in-place concrete pile is two rows.
Two rows of cast-in-place concrete piles are symmetrical arranged to the midline along walking for prop.
The spacing of two rows of cast-in-place concrete piles is 300mm~1000mm, and array pitch is 300mm~1500mm.
The depth that each cast-in-place concrete pile gos deep into basement rock is 500mm~1000mm.
The utility model has the beneficial effects that:A kind of advanced jacking of floor device of gob side entry retaining, coagulation is set by staying in advance Native bored concrete pile, the double arrangement of cast-in-place concrete pile across pitch, walking for double cast-in-place concrete pile are walked with roadside support body to the midline It overlaps to the midline, cooperation lag working face, which stays, sets roadside support body, realizes the gob side entry retaining in coal road road of keeping on file, later stage lane collateral branch Watch box sinkage and roof delamination amount are small, and roadway deformation amount is small, ensure that the ventilation section of later stage gob side entry, tunnel play bottom Roadside support body bottom is hard concrete, roadside support body stability higher later.
Description of the drawings
Fig. 1 is a kind of advanced jacking of floor device floor map of gob side entry retaining of the utility model;
Fig. 2 is a kind of advanced jacking of floor device sectional schematic diagram of gob side entry retaining of the utility model.
In figure, 1. cast-in-place concrete piles, 2. props, 3. ground coal, 4. basement rock, 5. gob side entries, 6. goafs.
Specific implementation mode
The utility model is described in detail with reference to the accompanying drawings and detailed description.
A kind of advanced jacking of floor device of gob side entry retaining of the utility model, as depicted in figs. 1 and 2, including several coagulations The first advance of native bored concrete pile 1, each cast-in-place concrete pile 1 is set on the bottom plate of gob side entry 5, each filling concrete The other end of stake 1 is set in basement rock 4, and prop 2 of each cast-in-place concrete pile 1 by 5 lane of gob side entry is walked to the midline Setting.
Cast-in-place concrete pile 1 is two rows.
Two rows of cast-in-place concrete piles 1 are symmetrical arranged to the midline along walking for prop 2.
The spacing of two rows of cast-in-place concrete piles 1 is 300mm~1000mm, and array pitch is 300mm~1500mm.
The depth that each cast-in-place concrete pile 1 gos deep into basement rock 4 is 500mm~1000mm.
A kind of application method of gob side entry retaining advanced stand device of the utility model is:Gob side entry retaining first advance is with edge Walking for 5 roadside support body 2 of empty tunnel is arranged symmetrically two rows of cast-in-place concrete piles 1 to the midline, 1 first advance of cast-in-place concrete pile It being set on 5 bottom plate of gob side entry, the spacing of cast-in-place concrete pile 1 is 300mm~1000mm, and array pitch is 300mm~1500mm, The distance that cast-in-place concrete pile 1 gos deep into basement rock 4 is 500mm~1000mm.
The strength grade of cast-in-place concrete pile 1 is identical as the strength grade of prop 2, in the trend of cast-in-place concrete pile 1 Line 7 overlaps to the midline with walking for roadside support body 2, after roadside support body 2 waits for the advance of the face, is seated stable concrete On bored concrete pile 1, after later stage gob side entry 5 plays bottom, the bottom of roadside support body 2 is hard concrete, be ensure that by lane The stability of prop 2 so that the deflection of gob side entry 5 reduces, and substantially increases similar 4 tunnel of coal of keeping on file and implements to stay along sky The feasibility in lane.
A kind of advanced jacking of floor device of gob side entry retaining of the utility model, sets cast-in-place concrete pile, coagulation by staying in advance The native double arrangement of bored concrete pile across pitch, the walking to walk with roadside support body to the midline of double cast-in-place concrete pile overlap to the midline, match Close lag working face to stay and sets roadside support body, realize the gob side entry retaining in coal road road of keeping on file, later stage roadside support body sinkage with And roof delamination amount is small, roadway deformation amount is small, ensure that the ventilation section of later stage gob side entry, tunnel play roadside support after bottom Body bottom is hard concrete, roadside support body stability higher.

Claims (5)

1. a kind of advanced jacking of floor device of gob side entry retaining, which is characterized in that including several cast-in-place concrete piles (1), each The first advance of the cast-in-place concrete pile (1) is set on the bottom plate of gob side entry (5), each cast-in-place concrete pile (1) the other end is set in basement rock (4), and each cast-in-place concrete pile (1) is along the prop by gob side entry (5) lane (2) walk is arranged to the midline.
2. the advanced jacking of floor device of a kind of gob side entry retaining according to claim 1, which is characterized in that the concrete fills It is two rows to note stake (1).
3. the advanced jacking of floor device of a kind of gob side entry retaining according to claim 2, which is characterized in that two rows of coagulations Native bored concrete pile (1) is symmetrical arranged to the midline along walking for prop (2).
4. the advanced jacking of floor device of a kind of gob side entry retaining according to claim 3, which is characterized in that two rows of coagulations The spacing of native bored concrete pile (1) is 300mm~1000mm, and array pitch is 300mm~1500mm.
5. the advanced jacking of floor device of a kind of gob side entry retaining according to claim 4, which is characterized in that each coagulation The depth that native bored concrete pile (1) gos deep into basement rock (4) is 500mm~1000mm.
CN201820017437.XU 2018-01-05 2018-01-05 A kind of advanced jacking of floor device of gob side entry retaining Expired - Fee Related CN207728370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820017437.XU CN207728370U (en) 2018-01-05 2018-01-05 A kind of advanced jacking of floor device of gob side entry retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820017437.XU CN207728370U (en) 2018-01-05 2018-01-05 A kind of advanced jacking of floor device of gob side entry retaining

Publications (1)

Publication Number Publication Date
CN207728370U true CN207728370U (en) 2018-08-14

Family

ID=63085115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820017437.XU Expired - Fee Related CN207728370U (en) 2018-01-05 2018-01-05 A kind of advanced jacking of floor device of gob side entry retaining

Country Status (1)

Country Link
CN (1) CN207728370U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273700A (en) * 2019-08-01 2019-09-24 贵州大学 It is a kind of to control red shale tunnel strength bolt-grouting support structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273700A (en) * 2019-08-01 2019-09-24 贵州大学 It is a kind of to control red shale tunnel strength bolt-grouting support structure and its construction method

Similar Documents

Publication Publication Date Title
CN104533482B (en) A kind of reinforcement means improving gob side entry driving fender stability
CN103276639B (en) Roadbed structure for deep soft soil region
CN203756206U (en) Novel soft-rock roadway floor heave governing structure
CN105821718B (en) Wide reinforcing construction is helped close to existing ballastless track roadbed
CN208220817U (en) Large section Shallow-Buried Soft Rock tunnel groined type double side wall support system
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN103573272A (en) Tunnel bottom soft stratum dynamic and static load separation tunnel structure
CN205778878U (en) A kind of supporting construction being applicable to large-section box culvert jacking crossing construction
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN108775252A (en) The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN104832200A (en) Self-adaptive feet-lock bolt integrated device and application method thereof
CN205243528U (en) Lining cutting fracture reinforced structure is subsided to tunnel bottom
CN207728370U (en) A kind of advanced jacking of floor device of gob side entry retaining
CN106014413A (en) Method for implementing combined supporting on goaf-along driven roadway and adjacent roadway in thick coal layer
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN103821038B (en) High-speed railway subgrade arch repairing and reinforcement structure
CA2848527C (en) Railway track support system
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN201459525U (en) Foundation structure at tunnel-to-bridge junction of high-speed railway in loess regions
CN108360369A (en) The road and bridge end of the bridge engaging portion structure of pre- anti-jump vehicle phenomenon
CN207728376U (en) A kind of gob side entry retaining strengthening of foundation device
CN102031757B (en) Method for constructing bottom plate guide layer of jacked-in frame bridge
CN102817298A (en) Construction method on frozen soil
CN205714282U (en) Waterproof/drainage structure at the bottom of a kind of soft stratum tunnel
CN207779594U (en) TBM execution conditions detecting earth stress of lower all the period of time systems

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814

Termination date: 20200105

CF01 Termination of patent right due to non-payment of annual fee