CN207727604U - A kind of prefabricated open caisson elevator pit - Google Patents
A kind of prefabricated open caisson elevator pit Download PDFInfo
- Publication number
- CN207727604U CN207727604U CN201721709389.2U CN201721709389U CN207727604U CN 207727604 U CN207727604 U CN 207727604U CN 201721709389 U CN201721709389 U CN 201721709389U CN 207727604 U CN207727604 U CN 207727604U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- rectangular cylinder
- elevator
- bottom plate
- open caisson
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model is related to a kind of prefabricated open caisson elevator pits.It includes prefabricated lining rectangular cylinder, plain concrete bed course, cast-in-place arrangement of reinforcement bottom plate, drawknot ring muscle, shearing resistance groove, ground beam slab, buffer of elevator, rubber water-proof item.It is in place using open caisson mode after prefabricated lining rectangular cylinder is prefabricated, plain concrete bed course, cast-in-place arrangement of reinforcement bottom plate, buffer of elevator construction are completed later, bottom slab stress is completed by the shearing resistance groove on the inside of prefabricated lining rectangular cylinder and water proof structure, prefabricated lining rectangular cylinder are connect by drawknot ring muscle with ground beam slab.The purpose of this utility model is that simplifying the cumbersome flow of routine heavy excavation mode, reducing quantities and shortening the construction period.
Description
Technical field
The utility model is related to elevator pit construction field, especially a kind of prefabricated open caisson elevator pit.
Background technology
Traditional elevator pit construct, generally use shoveling slope, pour bed course, assembling reinforcement, branch inner side template, pour it is mixed
The flow of solidifying soil, form removal pours bed course and reinforcing bar binding construction all in the presence of certain since pit depth is larger and is related to slope
Difficulty, the Dewatering period is long, and quantities is big, long in time limit.
Invention content
The purpose of this utility model is to provide a kind of open caisson construction mode of elevator pit, prefabricated lining is pre- in ex situ
Open caisson construction mode is made and used, the mode of integral cast-in-situ after foundation pit heavy excavation is avoided, reduce quantities and is shortened the construction period.
In order to solve the above technical problems, the technical solution of the utility model is:
A kind of prefabricated open caisson elevator pit, it include prefabricated lining rectangular cylinder, plain concrete bed course, arrangement of reinforcement bottom plate, drawknot ring muscle,
Shearing resistance groove, ground beam slab, buffer of elevator, the prefabricated lining rectangular cylinder setting is in elevator pit position, the element concrete pad
Layer and arrangement of reinforcement bottom plate are successively set on the bottom of prefabricated lining rectangular cylinder, and arrangement of reinforcement floor level is corresponded on the inside of prefabricated lining rectangular cylinder
Shearing resistance groove is offered, poured after the ground beam slab and is connected as entirety, the elevator cushion with prefabricated lining rectangular cylinder top
Device is beaten anchor bolt and is fixed on arrangement of reinforcement bottom plate after passing through.
Preferably, the drawknot ring muscle is integrally formed and stretches out outside prefabricated lining rectangular cylinder with prefabricated lining rectangular cylinder, draws
Knot ring muscle also serves as the lifting of prefabricated lining rectangular cylinder and uses hanging ring muscle in place.
Preferably, it is arranged on the inside of the prefabricated lining rectangular cylinder to block the shearing resistance groove of cast-in-place arrangement of reinforcement bottom plate, it is described
The height of shearing resistance groove is equal with the thickness of arrangement of reinforcement bottom plate.
Preferably, drawknot ring muscle is arranged to connect prefabricated lining rectangular cylinder and ground beam slab in top.
Preferably, the depth of the shearing resistance groove is 50mm.
Preferably, setting twice prevent the rubber water-proof item that construction joint seeps water in the shearing resistance groove.
Preferably, bentonite sealing blanket replacement can be used in the twice rubber water-proof item in the shearing resistance groove.
The beneficial effects of the utility model:It completes in elevator pit work progress, avoids usual manner shoveling slope, pours
Bed course, binding slope baseplate reinforcing bar, installation liner template, casting concrete, form removal Complicated Flow are built, construction is just
Victory reduces quantities and greatly shortens the construction period.
Description of the drawings
Fig. 1 is the utility model elevator pit prefabricated lining vertical section figure.
Fig. 2 is the utility model shearing resistance groove structure schematic diagram.
In figure:1- prefabricated linings rectangular cylinder, 2- element concretes bed course, 3- arrangements of reinforcement bottom plate, 4- drawknot rings muscle, 5- shearing resistances groove, 6-
Ground beam slab, 7- buffer of elevator, 8- rubber water-proofs item, reinforcing bar in 9- bottom plates.
Specific implementation mode
As shown in Figure 1 and 2, the utility model discloses a kind of prefabricated open caisson elevator pits, it includes prefabricated lining rectangular cylinder
1, plain concrete bed course 2, arrangement of reinforcement bottom plate 3, drawknot ring muscle 4, shearing resistance groove 5, ground beam slab 6, buffer of elevator 7, rubber water-proof item 8,
The prefabricated lining rectangular cylinder 1 is arranged in elevator pit, and the element concrete bed course 2 is arranged in the bottom of prefabricated lining rectangular cylinder 1,
The corresponding arrangement of reinforcement floor level in the inside of prefabricated lining rectangular cylinder 1 offers shearing resistance groove 5, poured after the ground beam slab 6 and with it is prefabricated
1 top of borehole wall rectangular cylinder is connected as entirety, and the buffer of elevator 7 is vertically disposed at arrangement of reinforcement bottom plate 3.
Prefabricated lining rectangular cylinder 1 can be prefabricated in ex situ in the utility model, not by field condition and time restriction, waterproof
It is required that thickness of shaft wall >=250mm;In practical application, when elevator pit planar dimension is larger and when pit is deeper, construction period
Horizontal bars can be added in hole temporarily to support, to bear soil pressure.
Shearing resistance groove 5, depth can use 50mm, highly equal with 3 thickness of arrangement of reinforcement bottom plate, can in prefabricated lining rectangular cylinder 1
Fixed polystyrene batten is as template, convenient for being convenient for being formed shearing resistance groove 5;
Twice rubber water-proof item 8 is set in shearing resistance groove 5, to prevent in Groundwater infiltration elevator pit;
After 1 open caisson to designed elevation of prefabricated lining rectangular cylinder, hole subsoil should be tamped smooth, then pour blinding concrete,
Arrange plain concrete bed course 2;
Drawknot ring muscle 4, throws away from prefabricated lining rectangular cylinder 1, in use as connection reinforcing bar, in the construction process
Hanging ring use is can be used as, but should take measures to avoid by stretch bending in lifting construction;
Maintenance cat ladder need to be arranged when being more than 1.6m in elevator pit depth, built-in fitting can be arranged in prefabricated lining or beat temporarily
Hole anchors after using anchor bolt.
Prefabricated lining rectangular cylinder 1 is in place by the way of open caisson construction, avoids heavy excavation.
Shearing resistance groove 5 is reserved on the inside of 1 borehole wall of prefabricated lining rectangular cylinder, is stretched into and is put convenient for reinforcing bar 9 in the bottom plate of arrangement of reinforcement bottom plate 3
It sets, also as the anti-shearing of after-pouring concrete floor, the elevator pit construction and maintenance load that arrangement of reinforcement bottom plate 3 is born, buffering
Device load, board bottom soil counter-force are effectively transferred to the borehole wall, and obstruct underground by placing two rubber water-proof items 8 in shearing resistance groove 5
The infiltration of water.
Buffer of elevator 7 disposes after cast-in-place arrangement of reinforcement bottom plate 3 pours, and fixed use can be beaten on the arrangement of reinforcement bottom plate 3 poured
Anchor bolt.
Prefabricated lining rectangular cylinder 1 is in place using open caisson construction mode, and plain concrete bed course 2 and arrangement of reinforcement bottom plate 3 pour at the scene, institute
The buffer of elevator 7 stated is beaten anchor bolt after passing through and is fixed on arrangement of reinforcement bottom plate 3, pours and is linked as with the borehole wall whole after the ground beam slab 6
Body fixes entire elevator pit.Prefabricated lining rectangular cylinder 1 is in place using open caisson construction mode, constructs without heavy excavation.Drawknot ring
Muscle 4, shearing resistance groove 5 are integrally formed when prefabricated lining rectangular cylinder 1 makes.
Shearing resistance groove 5 is for blocking cast-in-place arrangement of reinforcement bottom plate with Transfer of Shear and installation rubber water-proof item.
The utility model prefabricated lining, open caisson construction mode, be not limited only to elevator pit, it can also be used to which depth is larger
Catch pit.
It is only the preferred embodiment of the utility model in summary, not is used for limiting the implementation model of the utility model
It encloses.Equivalent changes and modifications made by i.e. all contents according to present utility model application the scope of the claims, all should be the utility model
Technology scope.
Claims (5)
1. a kind of prefabricated open caisson elevator pit, it is characterised in that:It includes prefabricated lining rectangular cylinder(1), plain concrete bed course(2), match
Muscle bottom plate(3), drawknot ring muscle(4), shearing resistance groove(5), ground beam slab(6), buffer of elevator(7), the prefabricated lining rectangle
Cylinder(1)Setting is in elevator pit position, the element concrete bed course(2)With arrangement of reinforcement bottom plate(3)It is successively set on prefabricated lining rectangular cylinder
(1)Bottom, prefabricated lining rectangular cylinder(1)Inside corresponds to arrangement of reinforcement bottom plate(3)Shearing resistance groove is offered at absolute altitude(5), describedly
Face beam slab(6)After pour and with prefabricated lining rectangular cylinder(1)Top is connected as entirety, the buffer of elevator(7)It is beaten by rear
Anchor bolt is fixed on arrangement of reinforcement bottom plate(3)On.
2. a kind of prefabricated open caisson elevator pit according to claim 1, it is characterised in that:The drawknot ring muscle(4)With it is pre-
Borehole wall rectangular cylinder processed(1)It is integrally formed and stretches out prefabricated lining rectangular cylinder(1)Outside.
3. a kind of prefabricated open caisson elevator pit according to claim 1, it is characterised in that:Prefabricated lining rectangular cylinder(1)It is interior
Side is arranged to block cast-in-place arrangement of reinforcement bottom plate(3)Shearing resistance groove(5).
4. a kind of prefabricated open caisson elevator pit according to claim 1, drawknot ring muscle is arranged in top(4)To connect prefabricated well
Wall rectangular cylinder(1)With ground beam slab(6).
5. a kind of prefabricated open caisson elevator pit according to claim 1, it is characterised in that:The shearing resistance groove(5)Inside set
Set the rubber water-proof item that twice prevent construction joint from seeping water(8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721709389.2U CN207727604U (en) | 2017-12-11 | 2017-12-11 | A kind of prefabricated open caisson elevator pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721709389.2U CN207727604U (en) | 2017-12-11 | 2017-12-11 | A kind of prefabricated open caisson elevator pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207727604U true CN207727604U (en) | 2018-08-14 |
Family
ID=63098036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721709389.2U Active CN207727604U (en) | 2017-12-11 | 2017-12-11 | A kind of prefabricated open caisson elevator pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207727604U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295995A (en) * | 2018-10-22 | 2019-02-01 | 张云天 | The multi-storey building of cold district installs the prefabricated assembled pit base apparatus of elevator additional |
CN113818716A (en) * | 2021-10-28 | 2021-12-21 | 北京中地恒基建筑工程有限公司 | Construction method for deepening and transforming elevator shaft |
-
2017
- 2017-12-11 CN CN201721709389.2U patent/CN207727604U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295995A (en) * | 2018-10-22 | 2019-02-01 | 张云天 | The multi-storey building of cold district installs the prefabricated assembled pit base apparatus of elevator additional |
CN113818716A (en) * | 2021-10-28 | 2021-12-21 | 北京中地恒基建筑工程有限公司 | Construction method for deepening and transforming elevator shaft |
CN113818716B (en) * | 2021-10-28 | 2022-05-17 | 北京中地恒基建筑工程有限公司 | Construction method for deepening and transforming elevator shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105178357B (en) | Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition | |
CN101250880B (en) | Method for embedding and fixing steel tube concrete pile and steel tube pile anchor | |
CN103510510B (en) | A kind of enhancement mode long auger cast-with-pressure concrete pile and construction method | |
CN104452829B (en) | A kind of pile-raft foundation float Structure and construction method | |
CN207727604U (en) | A kind of prefabricated open caisson elevator pit | |
CN107338801B (en) | Prestressing force assembled Complex retaining wall structure and construction method | |
CN104358275B (en) | Darker elevator shaft or collecting well construction method | |
CN108396761A (en) | The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit | |
CN208072415U (en) | Deep foundation pit reinforced concrete support part changes structure | |
CN208717934U (en) | A kind of tower-crane foundation structure | |
CN108035379A (en) | A kind of pipe gallery and its construction method | |
CN207685851U (en) | A kind of buried type steel leg structure | |
CN104652493B (en) | Deep foundation pit anti-floating anchor cable post-water-proof construction method | |
CN203594023U (en) | Enhanced type long auger drilling pressure-grouting concrete pile | |
CN105484270B (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN209428870U (en) | A kind of phreatic high is low to fill out shallow cut subgrade in swelling soil zone structure | |
CN117127642A (en) | Fluidized solidified soil bearing platform structure and manufacturing method | |
CN207277110U (en) | Insulation infiltration combined type underdrain structure | |
CN207775907U (en) | A kind of high intensity ecological revetment | |
CN110438859A (en) | A kind of the precast concrete road and its construction method of draining of catchmenting | |
CN215165533U (en) | Anchoring structure for side slope of solid waste landfill | |
CN211735489U (en) | Plate rib type cast-in-situ anchor rod high retaining wall | |
CN204326119U (en) | A kind of pile-raft foundation float Structure | |
CN107700632B (en) | The construction method of heat preservation infiltration combined type underdrain | |
CN208280156U (en) | The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |