CN207727566U - 一种现浇复合桩基结构 - Google Patents
一种现浇复合桩基结构 Download PDFInfo
- Publication number
- CN207727566U CN207727566U CN201820005820.3U CN201820005820U CN207727566U CN 207727566 U CN207727566 U CN 207727566U CN 201820005820 U CN201820005820 U CN 201820005820U CN 207727566 U CN207727566 U CN 207727566U
- Authority
- CN
- China
- Prior art keywords
- pile
- stake
- bored concrete
- concrete pile
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种现浇复合桩基结构,其特点是灌注桩设置在设有若干坐落在土体中的鼓包结构的旋搅桩内,所述灌注桩为同心圆设置在旋喷桩内的钢筋混凝土桩;所述鼓包结构为轴向设置在桩身的若干个外凸混凝土包,其间距为5~10m。本实用新型与现有技术相比具有结构简单,施工方便,有效增加了桩的承载力,灌注桩为刚性桩位设置于柔性的旋搅桩内,施工无泥浆的产生,进一步降低工程造价,绿色环保,尤其适用于软弱地层区域的高层建筑桩基。
Description
技术领域
本实用新型涉及桩基工程技术领域,尤其是一种适用于软弱地层区域高层建筑桩基的现浇复合桩基结构。
背景技术
目前,国内桩基工程一般采用灌注桩基、预制桩基或复合桩基等,预制桩基不适用于软弱地层区域的高层建筑,且桩基施工中会产生很大的挤土效应,对周边环境影响较大。现有技术的复合桩基为柔性桩内插入预制桩,同样会产生挤土效应,不适用于软弱地层区域的高层建筑;灌注桩基多数为泥浆护壁或者全套管护壁两种工艺,泥浆护壁施工过程中会产生大量的泥浆,对现场及周边的环境保护有很大的影响,全套管护壁,工程造价较高,且施工速度较慢。
发明内容
本实用新型的目的是针对现有技术的不足而设计的一种现浇复合桩基结构,采用灌注桩位于设有若干坐落在土体中鼓包结构的旋搅桩内,有效增加了桩的承载力,灌注桩为刚性桩位设置于柔性的旋搅桩内,施工无泥浆的产生,进一步降低工程造价,绿色环保。提高经济效益,尤其适用于软弱地层区域的高层建筑桩基。
本实用新型的目的是这样实现的:一种现浇复合桩基结构,包括旋喷桩和灌注桩,其特点是灌注桩设置在设有若干坐落在土体中的鼓包结构的旋搅桩内,所述灌注桩为同心圆设置在旋搅桩内的钢筋混凝土桩;所述鼓包结构为轴向设置在桩身的若干个外凸混凝土包,其间距为5~10m;所述旋喷桩直径为1400~2000mm;所述灌注桩直径为600~1000mm;所述鼓包结构最大直径为2000~2600mm,其高度为1m。
本实用新型与现有技术相比具有结构简单,施工方便,有效增加了桩的承载力,灌注桩为刚性桩位设置于柔性的旋搅桩内,施工无泥浆的产生,进一步降低工程造价,绿色环保,提高经济效益,尤其适用于软弱地层区域的高层建筑桩基。
附图说明
图1为本实用新型结构示意图;
图2为图1的俯视图。
具体实施方式
参阅附图1,本实用新型包括旋喷桩1和灌注桩2,所述灌注桩2设置在设有若干个坐落在土体中的鼓包结构3的旋搅桩1内。
参阅附图2,所述灌注桩2为同心圆设置在旋喷桩1内的钢筋混凝土桩;所述鼓包结构3为轴向设置在桩身的若干个外凸混凝土包,其间距为5~10m;所述旋喷桩1直径为1400~2000mm;所述灌注桩2直径为600~1000mm;所述鼓包结构3最大直径为2000~2600mm。
本实用新型中的旋搅桩1为大直径旋搅桩,直径一般取1.4~2m;灌注桩2为钢筋混凝土桩,直径一般取600~1000mm。旋搅桩1直径大于灌注桩2直径,且旋搅桩1先施工,待旋搅桩1有一定强度后,再施工灌注桩2。上部荷载传递给灌注桩2,然后灌注桩2再传递给旋搅桩1,最后旋搅桩1再传递给土体,增加了桩的承载力,在相同承载力的情况下,节约了混凝土等原材料,即节约了造价,同时在施工灌注桩2的时候为干成孔作业,无泥浆排放,绿色施工。
以上只是对本实用新型作进一步的说明,并非用以限制本专利,凡为本实用新型等效实施,均应包含于本专利的权利要求范围之内。
Claims (1)
1.一种现浇复合桩基结构,包括旋喷桩和灌注桩,其特征在于灌注桩设置在设有若干坐落在土体中的鼓包结构的旋搅桩内,所述灌注桩为同心圆设置在旋搅桩内的钢筋混凝土桩;所述鼓包结构为轴向设置在桩身的若干个外凸混凝土包,其间距为5~10m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820005820.3U CN207727566U (zh) | 2018-01-03 | 2018-01-03 | 一种现浇复合桩基结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820005820.3U CN207727566U (zh) | 2018-01-03 | 2018-01-03 | 一种现浇复合桩基结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207727566U true CN207727566U (zh) | 2018-08-14 |
Family
ID=63084891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820005820.3U Active CN207727566U (zh) | 2018-01-03 | 2018-01-03 | 一种现浇复合桩基结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207727566U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104118A (zh) * | 2018-01-03 | 2018-06-01 | 上海智平基础工程有限公司 | 一种现浇复合桩基结构及其施工方法 |
-
2018
- 2018-01-03 CN CN201820005820.3U patent/CN207727566U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104118A (zh) * | 2018-01-03 | 2018-06-01 | 上海智平基础工程有限公司 | 一种现浇复合桩基结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108221910B (zh) | 一种中心排水注浆混凝土桩地基加固的结构及方法 | |
CN102900079A (zh) | 高频液振水泥土插芯组合桩施工工法 | |
CN207727566U (zh) | 一种现浇复合桩基结构 | |
CN203487542U (zh) | 混合配筋h型板桩与五轴水泥土搅拌墙结合的围护结构 | |
CN202730791U (zh) | 一种建筑物的复合桩基 | |
WO2017133373A1 (zh) | 一种用于桩基的小直径桩簇及其施工方法 | |
CN202247947U (zh) | 一种带有抗滑水泥土桩的挡土结构 | |
JP2016053273A (ja) | 加圧注入型棒状補強体による土構造物の耐震・耐降雨対策斜面安定化工法 | |
CN207891869U (zh) | 钢管桩 | |
CN1259604A (zh) | 水泥土加强组合桩工法 | |
CN205954640U (zh) | 一种桩板墙 | |
CN202369993U (zh) | 对拉式灌注桩基坑支护结构 | |
CN202247910U (zh) | 一种带有不同倾角的抗滑水泥土桩的挡土结构 | |
CN201588208U (zh) | 一种钢板桩和搅拌桩相结合的围护结构 | |
CN1143032C (zh) | 干作业复合灌注桩及其施工方法 | |
CN1891913A (zh) | 重锤冲扩置换法 | |
CN108104118A (zh) | 一种现浇复合桩基结构及其施工方法 | |
CN207109808U (zh) | 一种扩径水泥搅拌桩‑预制桩基础 | |
CN203174586U (zh) | 加固铁路软土地基的混凝土管桩 | |
CN201981530U (zh) | 一种湿陷性黄土地区孔内深层强夯桩 | |
CN205999879U (zh) | 挖孔薄壁碎石填芯注浆桩复合地基 | |
CN207419448U (zh) | 一种基于静压法施工的新型复合地基桩 | |
CN104131568A (zh) | 新型混合配筋h型板桩与五(六)轴水泥土搅拌墙结合的围护结构及施工方法 | |
CN203905025U (zh) | 一种异形钢筋混凝土与水泥土分列式基坑支护墙 | |
CN201924342U (zh) | 现浇混凝土筒板联桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |