CN207715158U - A kind of 12 meters of inverted arch and filling are staggered construction bridge - Google Patents

A kind of 12 meters of inverted arch and filling are staggered construction bridge Download PDF

Info

Publication number
CN207715158U
CN207715158U CN201721884211.1U CN201721884211U CN207715158U CN 207715158 U CN207715158 U CN 207715158U CN 201721884211 U CN201721884211 U CN 201721884211U CN 207715158 U CN207715158 U CN 207715158U
Authority
CN
China
Prior art keywords
inverted arch
template
mould bases
filling
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721884211.1U
Other languages
Chinese (zh)
Inventor
张维颂
郑怀臣
王亚波
李骥
毛成宝
许思军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Formwork Co Ltd
Original Assignee
Hunan Wuxin Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuxin Formwork Co Ltd filed Critical Hunan Wuxin Formwork Co Ltd
Priority to CN201721884211.1U priority Critical patent/CN207715158U/en
Application granted granted Critical
Publication of CN207715158U publication Critical patent/CN207715158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

It is staggered construction bridge the utility model is related to a kind of 12 meters of inverted arch and filling, belong to tunnel or Construction Technique of Underground Works field, including longeron and moving trolley, telescopic oil cylinder is arranged in the bottom of moving trolley, further include two moving trolleys of the front and back setting on longeron, and the full arc inverted arch template being arranged between double trolley;Full arc inverted arch template includes horizontal mould bases;And it is fixed on mould bases front end, the inverted arch sealing end template being arranged downward;Be fixed on mould bases rear end, the filling that is arranged upward sealing end template;The front and back setting otic placode of mould bases, otic placode are connect with the telescopic oil cylinder axis pin of moving trolley bottom.The utility model has the advantage of, 1, can carry full arc inverted arch template, inverted arch construction more standard;2, trestle uses front and back double small bassinet structure, trestle work structure to increase, and template is simpler;3, inverted arch template is supported without long longeron, is driven without rear end.4, construction usage is convenient, and multi-process is constructed simultaneously, reduces the concrete initial set stand-by period.

Description

A kind of 12 meters of inverted arch and filling are staggered construction bridge
Technical field
It is staggered construction bridge the utility model is related to a kind of 12 meters of inverted arch and filling, belongs to tunnel or underground engineering construction skill Art field.
Background technology
In constructing tunnel, the section-bottom arc of excavation is referred to as inverted arch;And in the work progress at tunnel inverted arch position In, inverted arch trestle need be set up in inverted arch excavation face, be connected to excavation face and the tunnel rear end fill surface channel of tunnel front end, filled out Fill term when face i.e. inverted arch carries out concrete construction, the presence of inverted arch trestle makes tunnel excavation slagged tap outward with material to hole Interior transport is not applied by inverted arch and is influenced, and ensure that inverted arch concrete construction and tunnel excavation are continuous, are carried out at the same time, what inverted arch was constructed There has also been prodigious changes for mode.
Utility model content
The utility model provides a kind of 12 meters of inverted arch and filling is staggered construction bridge, to overcome the shortage of prior art.
The utility model is achieved through the following technical solutions, including longeron and moving trolley, the bottom setting of moving trolley Telescopic oil cylinder, further includes two moving trolleys of the front and back setting on longeron, and the full arc inverted arch being arranged between double trolley Template;Full arc inverted arch template includes horizontal mould bases;And it is fixed on mould bases front end, the inverted arch sealing end template being arranged downward;With It is fixed on mould bases rear end, the filling sealing end template being arranged upward;The front and back setting otic placode of mould bases, otic placode and moving trolley bottom Telescopic oil cylinder axis pin connects.
The filling sealing end template is also connect with central trench template.
The utility model has the advantage of, 1, can carry full arc inverted arch template, inverted arch construction more standard;2, trestle uses Front and back double small bassinet structure, trestle work structure increase, and template is simpler;3, inverted arch template is supported without long longeron, is driven without rear end. 4, construction usage is convenient, and multi-process is constructed simultaneously, reduces the concrete initial set stand-by period.
Description of the drawings
Fig. 1 is full arc inverted arch template schematic diagram.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is full arc inverted arch template front view.
Ditch template front view centered on Fig. 4.
Fig. 5 is trestle climbing shuttering advance schematic diagram.
Fig. 6 is Template Location schematic diagram.
Fig. 7 is template construction schematic diagram.
Specific implementation mode
In order to which specific embodiment of the present utility model is explained further, 1 to 7 pair of the utility model below in conjunction with the accompanying drawings Preferred embodiment is described further, including longeron 2 and moving trolley 1, and telescopic oil cylinder 11 is arranged in the bottom of moving trolley 1, also Include two moving trolleys 1 of the front and back setting on longeron 2, and the full arc inverted arch template 3 being arranged between double trolley 1;
Full arc inverted arch template 3 includes horizontal mould bases 31;And it is fixed on 31 front end of mould bases, the inverted arch sealing end being arranged downward Template 32;Be fixed on 31 rear end of mould bases, the filling that is arranged upward sealing end template 33;
The front and back setting otic placode 311 of mould bases 31, otic placode 311 are connect with 11 axis pin of telescopic oil cylinder of 1 bottom of moving trolley.
The filling sealing end template 33 is also connect with central trench template 4.
As shown in figure 5, the telescopic oil cylinder 11 of 1 bottom of front and back two moving trolleys retracts at the same time, by full arc inverted arch when mobile 3 rear and front end of template is promoted, and is moved along with trestle;As shown in fig. 6, previous inverted arch construction station is after movement in place Primary tunnel central trench construction station, the telescopic oil cylinder 11 of 1 bottom of front and back two moving trolleys stretch out, full arc are faced upward simultaneously afterwards Encircle the landing of 3 rear and front end of template, inverted arch sealing end template 32 is contacted with construction area ground;Inverted arch is applied simultaneously with central trench multi-process Work, as shown in fig. 7, reducing the concrete initial set stand-by period.

Claims (2)

  1. Construction bridge, including longeron 1. a kind of 12 meters of inverted arch and filling are staggered(2)With moving trolley(1), moving trolley(1)Bottom Telescopic oil cylinder is arranged in portion(11), it is characterised in that:Further include in longeron(2)Upper front and back two moving trolleys being arranged(1), and It is arranged in double trolley(1)Between full arc inverted arch template(3);
    Full arc inverted arch template(3)Including horizontal mould bases(31);And it is fixed on mould bases(31)Front end, the inverted arch envelope being arranged downward Side Template(32);Be fixed on mould bases(31)Rear end, the filling sealing end template being arranged upward(33);
    Mould bases(31)Front and back setting otic placode(311), otic placode(311)With moving trolley(1)The telescopic oil cylinder of bottom(11)Axis pin Connection.
  2. The construction bridge 2. a kind of 12 meters of inverted arch according to claim 1 and filling are staggered, it is characterised in that:
    The filling blocks template(33)Also with central trench template(4)Connection.
CN201721884211.1U 2017-12-28 2017-12-28 A kind of 12 meters of inverted arch and filling are staggered construction bridge Active CN207715158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721884211.1U CN207715158U (en) 2017-12-28 2017-12-28 A kind of 12 meters of inverted arch and filling are staggered construction bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721884211.1U CN207715158U (en) 2017-12-28 2017-12-28 A kind of 12 meters of inverted arch and filling are staggered construction bridge

Publications (1)

Publication Number Publication Date
CN207715158U true CN207715158U (en) 2018-08-10

Family

ID=63050914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721884211.1U Active CN207715158U (en) 2017-12-28 2017-12-28 A kind of 12 meters of inverted arch and filling are staggered construction bridge

Country Status (1)

Country Link
CN (1) CN207715158U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281689A (en) * 2018-10-19 2019-01-29 湖南五新模板有限公司 Integral construction method based on tunnel trestle full width inverted arch template
CN111058869A (en) * 2019-12-31 2020-04-24 中铁十九局集团第三工程有限公司 Traction fixing method of inverted arch template
CN113605932A (en) * 2021-06-30 2021-11-05 湖南五新模板有限公司 Inverted arch filling forming template and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281689A (en) * 2018-10-19 2019-01-29 湖南五新模板有限公司 Integral construction method based on tunnel trestle full width inverted arch template
CN111058869A (en) * 2019-12-31 2020-04-24 中铁十九局集团第三工程有限公司 Traction fixing method of inverted arch template
CN111058869B (en) * 2019-12-31 2022-07-05 中铁十九局集团第三工程有限公司 Traction fixing method of inverted arch template
CN113605932A (en) * 2021-06-30 2021-11-05 湖南五新模板有限公司 Inverted arch filling forming template and construction method thereof

Similar Documents

Publication Publication Date Title
CN207715158U (en) A kind of 12 meters of inverted arch and filling are staggered construction bridge
CN105240048B (en) A kind of gas filling method based on paste body filling
CN106481278A (en) A kind of rotary digging drill bit
CN204267093U (en) A kind of portable filling in mine barricade
CN104564102A (en) Tunnel lining concrete grouting device
CN204299617U (en) One is anti-breaks type gob side entry retaining filling air bag
CN104481555A (en) Method of grouting and drilling construction by passing through weak surrounding rock
CN209686391U (en) A kind of solution cavity section pile body enclosure device
CN103628898B (en) A kind of for preventing the diaphragm wall supporting method of Floor Heave in Roadway
CN208441848U (en) Freezing Method for Cross-passage Construction class rectangle push-bench
CN204186410U (en) A kind of coal mine filling transversal end hydraulic support
CN208089319U (en) A kind of inverted arch layer filled layer is staggered the monoblock type inverted arch mould bases poured
CN207111142U (en) Temporary supporting device for laneway tunneling
CN205742173U (en) A kind of prefabricated bulkhead for cast-in-place concrete pile
CN103883336B (en) A kind of adjustable gob side entry retaining body of wall of first initiatively relief pressure supporting and construction method thereof
CN203296778U (en) Rigid-flexible combination gob-side entry retaining roadway-side shoring device
CN103075188B (en) Downhole waste rock filling equipment and filling method using same
CN205977257U (en) Mining excavation is walking prop and entry driving machine for working face
CN211737045U (en) Crawler-type mobile trolley
CN204754943U (en) Concrete kick -backs and expects collection device for tunnel boring machine
CN107587777A (en) One kind transport drilling installation electric wire lever apparatus
CN204344162U (en) A kind of crawler-type traveling filling machine
CN208816046U (en) A kind of novel hydropower hole penetrating device
CN203360987U (en) Setting-out device of road boundary lines
CN203570313U (en) Double-alley chain type stoping and filling arrangement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant