CN207714151U - A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment - Google Patents

A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment Download PDF

Info

Publication number
CN207714151U
CN207714151U CN201721696419.0U CN201721696419U CN207714151U CN 207714151 U CN207714151 U CN 207714151U CN 201721696419 U CN201721696419 U CN 201721696419U CN 207714151 U CN207714151 U CN 207714151U
Authority
CN
China
Prior art keywords
steel pipe
abutment pier
interference cancellation
construction
successive interference
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721696419.0U
Other languages
Chinese (zh)
Inventor
张光亮
唐德兴
陈炳鑫
林旭杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Third Aviation Bureau Sixth Engineering Xiamen Co ltd
CCCC Third Harbor Engineering Co Ltd
CCCC Third Harbor Engineering Co Ltd Xiamen Branch
Original Assignee
In Sanhang (xiamen) Engineering Co Ltd
China Construction Third Engineering Bureau Co Ltd
CCCC Third Harbor Engineering Co Ltd Xiamen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In Sanhang (xiamen) Engineering Co Ltd, China Construction Third Engineering Bureau Co Ltd, CCCC Third Harbor Engineering Co Ltd Xiamen Branch filed Critical In Sanhang (xiamen) Engineering Co Ltd
Priority to CN201721696419.0U priority Critical patent/CN207714151U/en
Application granted granted Critical
Publication of CN207714151U publication Critical patent/CN207714151U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of construction brackets of Successive interference cancellation end bay Cast-in-Situ Segment, including bracket basis, two root long longerons, two carlings, more distribution beams, bed die and external mold.Bracket basis includes ten six roots of sensation steel pipe posts, 14 cross-braces and 24 longitudinal bracings;Wherein, 14 steel pipe posts are divided on two rows of abutment pier cushion caps being located at side by side on the inside of abutment pier, and on the abutment pier cushion cap of the left and right side for the abutment pier that also two steel pipe posts are located at, two root long longerons are respectively welded at the upper end of every row's steel pipe post;Two carlings are respectively welded at the upper end of the steel pipe post of left and right side;More distribution beams are laterally shelved on the upper end of two root long longerons and two carlings each by polylith timber wedge;Bed die is bamboo slab rubber and is fixed on the upper end of more distribution beams by the polylith lumps of wood;External mold is located at the left and right side of bed die and is fixed on the upper end of carling.The construction bracket of the utility model meets intensity, rigidity and stability requirement and convenient for construction.

Description

A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment
Technical field
The utility model is related to a kind of construction brackets of Successive interference cancellation end bay Cast-in-Situ Segment.
Background technology
There are two main pier and two abutment piers for Successive interference cancellation tool, and the superstructure of bridge is that continuous rigid frame encircles composite structure, Girder is that straight web-type single box double room gets higher section box beam.Left arch rib is the concrete filled steel tube of contour Dumbbell-shaped cross section, left Right arch rib is parallel, and arch uses second-degree parabola, and non-shrinkage concrete is filled in string pipe and web.Master bridge portion is divided into seven 15 segmental constructions, the main span part between No. 0 block on two main piers share 35 segments, two No. 0 blocks and side 19 segments are shared between pier, wherein ten No. eight segments are side midspan closing section, and ten No. nine segments are end bay Cast-in-Situ Segment.It adopts With the construction method of first beam rear arch.Beam portion uses Hanging Basket cantilever pouring, arch rib assembled using holder is set up on beam.End bay Cast-in-Situ Segment It is constructed using corbelling system.In order to ensure that end bay Cast-in-Situ Segment continuously poured in one is molded, need design a kind of easy for construction Holder.
Utility model content
It is cast-in-place that a kind of Successive interference cancellation end bay is provided the purpose of the utility model is to overcome the defect of the prior art The construction bracket of section, it can meet intensity, rigidity and stability requirement, and can accelerate construction progress.Construction cost is reduced, is improved Construction quality.
What the purpose of this utility model was realized in:A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment, packet Include bracket basis, two root long longerons, two carlings, more distribution beams, bed die and external mold, wherein
The bracket basis includes ten six roots of sensation steel pipe posts, 14 cross-braces and 24 longitudinal bracings;Wherein, 14 steel pipe posts are divided on two rows of abutment pier cushion caps being located at side by side on the inside of abutment pier, and also two steel pipe posts are located at On the abutment pier cushion cap of the left and right side of abutment pier, totally seven steel pipe posts are each by a row of two steel pipe posts and the neighbouring abutment pier It is connect from by two connection sheets one on the other with abutment pier;14 cross-braces are connected to two rows of steel one on the other respectively Between tube column;The position that 24 longitudinal bracings correspond to cross-brace is connected to two adjacent steel of every row's steel pipe post Between tube column;
Two root long longerons are respectively welded at the upper end of every row's steel pipe post;
Two carlings are respectively welded at the upper end of the steel pipe post of the left and right side for the abutment pier that two are located at;
The more distribution beams each by polylith timber wedge be laterally shelved on two root long longerons upper end and two carlings Upper end;
The bed die is bamboo slab rubber and is fixed on the upper end of more distribution beams by the polylith lumps of wood;
The external mold is punching block, which is located at the left and right side of the bed die by Screw arbor with nut at both-ends and is fixed on described short The upper end of longeron.
The construction bracket of above-mentioned Successive interference cancellation end bay Cast-in-Situ Segment, wherein the cross-brace and longitudinal bracing are equal For the bridging made of channel steel.
The construction bracket of above-mentioned Successive interference cancellation end bay Cast-in-Situ Segment, wherein the long longeron and carling are by two Root I-steel arranged side by side is constituted.
The construction bracket of above-mentioned Successive interference cancellation end bay Cast-in-Situ Segment, wherein the distribution beam is I-steel.
The construction bracket of above-mentioned Successive interference cancellation end bay Cast-in-Situ Segment, wherein the construction bracket further includes that two rows are set The lateral fence at the both ends of the long longeron and a row be located at the inner end of the distribution beam and with the both ends of two rows of lateral fences Longitudinal fence of connection;Lateral fence and longitudinal fence are made of more railings and safety net.
The construction bracket of the Successive interference cancellation end bay Cast-in-Situ Segment of the utility model, its simple structure, selection are convenient, system Make simply, securely and reliably, deformation meets construction requirement, and support rod unit and holder integrally meet intensity, rigidity in the construction process And stability requirement, convenient for construction, and can accelerate construction progress.Construction cost is reduced, construction quality is improved.
Description of the drawings
Fig. 1 is the skiagraph of the construction bracket of the Successive interference cancellation end bay Cast-in-Situ Segment of the utility model;
Fig. 2 is the cross-sectional view of the construction bracket of the Successive interference cancellation end bay Cast-in-Situ Segment of the utility model;
Fig. 3 is the plan view of the construction bracket of the Successive interference cancellation end bay Cast-in-Situ Segment of the utility model.
Specific implementation mode
Below in conjunction with attached drawing, the utility model is described in further detail.
It please refers to Fig.1 to Fig.3, a kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment of the utility model, including Bracket basis, two root long longerons, 21, two carlings 22, more distribution beams 4, bed die 6, external mold 7 and fence.
Bracket basis includes ten six roots of sensation steel pipe posts, 1,14 cross-brace 12 and 24 longitudinal bracings 13;Its In, 14 steel pipe posts 1 are divided into the abutment pier cushion cap that two rows of (often arranging seven steel pipe posts) are located at 10 inside of abutment pier side by side On 100, on the abutment pier cushion cap 100 of the left and right side for the abutment pier that also two steel pipe posts 1 are located at, two steel pipe posts 1 and neighbour Totally seven steel pipe posts 1 are connect each by two connection sheets 11 one on the other with abutment pier 10 one row of near side (ns) pier 10;14 A cross-brace 12 is connected between two rows of steel pipe posts 1 one on the other respectively;24 longitudinal bracings 13 correspond to transverse direction The position of support 12 is connected between two adjacent steel pipe posts 1 of every row's steel pipe post 1.Connection sheet 11 is I-steel.It is horizontal It is the bridging made of channel steel to support 12 and longitudinal bracing 13, to ensure the overall stability of strutting system.
Two root long longerons 21 are respectively welded at the upper end of every row's steel pipe post 1.
Two carlings 22 are respectively welded at the upper end of the steel pipe post 1 of the left and right side of two abutment piers being located at 10.
Long longeron 21 and carling 22 are made of two I-steel arranged side by side.
More distribution beams 4, which are I-steel and are laterally shelved on two root longs each by the timber wedge of 20 × 20cm of polylith 3, indulges The upper end of the upper end of beam 21 and two carlings 22.
Bed die 6 is the bamboo slab rubber that thickness is 1.5cm and is fixed on more distribution beams 4 by the lumps of wood of 10 × 10cm of polylith 5 Upper end.
External mold 7 is punching block, which is located at the left and right side of bed die 6 and is fixed on the upper end of carling 22, and external mold 7 passes through Bed die 6 is clamped in Screw arbor with nut at both-ends.
Fence include two rows of both ends for being located at long longeron 21 lateral fence 81 and a row be located at distribution beam 4 inner end and with Longitudinal fence 82 of the both ends connection of two rows of transverse direction fences 81.The height of lateral fence 81 and longitudinal fence 82 be 1.2m and Be made of more railings and safety net, there are the channel of construction personnel between lateral fence 81 and external mold 6, longitudinal fence 82 with Also there are the channels of construction personnel between end bay Cast-in-Situ Segment 19, to ensure the safety of construction personnel.
The construction bracket of the Successive interference cancellation end bay Cast-in-Situ Segment of the utility model, its simple structure, selection are convenient, system Make simply, securely and reliably, deformation meets construction requirement, and support rod unit and holder integrally meet intensity, rigidity in the construction process And stability requirement, convenient for construction, and can accelerate construction progress.Construction cost is reduced, construction quality is improved.
Above example is only for illustration of the utility model rather than limitations of the present invention, related technical field Technical staff can also make various transformation or modification in the case where not departing from the spirit and scope of the utility model, because This all equivalent technical solution should also belong to the scope of the utility model, should be limited by each claim.

Claims (5)

1. a kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment, including it is bracket basis, two root long longerons, two short vertical Beam, more distribution beams, bed die and external mold, which is characterized in that
The bracket basis includes ten six roots of sensation steel pipe posts, 14 cross-braces and 24 longitudinal bracings;Wherein, ten four Root steel pipe post is divided on two rows of abutment pier cushion caps being located at side by side on the inside of abutment pier, the abutment pier that also two steel pipe posts are located at Left and right side abutment pier cushion cap on, totally seven steel pipe posts respectively lead to a row of two steel pipe posts and the neighbouring abutment pier Two connection sheets crossed one on the other are connect with abutment pier;It is vertical that 14 cross-braces are connected to two rows of steel pipes one on the other respectively Between column;Two adjacent steel pipes that the position that 24 longitudinal bracings correspond to cross-brace is connected to every row's steel pipe post are vertical Between column;
Two root long longerons are respectively welded at the upper end of every row's steel pipe post;
Two carlings are respectively welded at the upper end of the steel pipe post of the left and right side for the abutment pier that two are located at;
The more distribution beams each by polylith timber wedge be laterally shelved on two root long longerons upper end and two carlings it is upper End;
The bed die is bamboo slab rubber and is fixed on the upper end of more distribution beams by the polylith lumps of wood;
The external mold is punching block, which is located at the left and right side of the bed die by Screw arbor with nut at both-ends and is fixed on the carling Upper end.
2. the construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment according to claim 1, which is characterized in that the transverse direction Support and longitudinal bracing are the bridging made of channel steel.
3. the construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment according to claim 1, which is characterized in that the length is vertical Beam and carling are made of two I-steel arranged side by side.
4. the construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment according to claim 1, which is characterized in that the distribution Beam is I-steel.
5. the construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment according to any one of claims 1 to 4, feature exist In the construction bracket further includes that the lateral fence at two rows of both ends for being located at the long longeron and a row are located at the distribution beam Inner end and the longitudinal fence being connect with the both ends of two rows of lateral fences;Lateral fence and longitudinal fence are by more railings and safety Net is constituted.
CN201721696419.0U 2017-12-07 2017-12-07 A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment Active CN207714151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721696419.0U CN207714151U (en) 2017-12-07 2017-12-07 A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721696419.0U CN207714151U (en) 2017-12-07 2017-12-07 A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment

Publications (1)

Publication Number Publication Date
CN207714151U true CN207714151U (en) 2018-08-10

Family

ID=63060024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721696419.0U Active CN207714151U (en) 2017-12-07 2017-12-07 A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment

Country Status (1)

Country Link
CN (1) CN207714151U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565526A (en) * 2019-07-29 2019-12-13 南昌大学 Conveniently-disassembled side-span cast-in-place support suitable for bridge and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565526A (en) * 2019-07-29 2019-12-13 南昌大学 Conveniently-disassembled side-span cast-in-place support suitable for bridge and construction method

Similar Documents

Publication Publication Date Title
KR101654742B1 (en) Movable scaffolding system mounted upper-structure of bridge and bridge construction method therewith
CN208917702U (en) Fish-bellied type concrete box girder cast-in-place construction formwork-support
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN203795291U (en) Bearing-free prestressed concrete continuous rigid frame bridge with single-wall piers
CN110130558A (en) Square formed fences system and construction method made of steel secondary beam and truss arranged crosswise
CN207714151U (en) A kind of construction bracket of Successive interference cancellation end bay Cast-in-Situ Segment
CN206396646U (en) The construction bracket of the longitudinal binder of the double rope face low-pylon cable-stayed bridge bridge towers of double tower
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN212956151U (en) Cast-in-place beam flange plate template system
CN103410311A (en) Raising-plate high-formwork construction method of indoor pool
CN211815595U (en) Lower tower column tension and compression structure for cable tower
CN103850185B (en) A kind of many truss-likes supper wide type hanging basket for bridge construction
CN202969278U (en) Molding frame for assembling of bridge frameworks
CN203603013U (en) Newly-built railway small-angle over-crossing existing railway combined rigid frame structure
CN211221311U (en) Segment prefabricated variable cross-section concrete box girder steel bar binding jig frame
CN210460691U (en) City gate-type tunnel lining quick detach template system
CN211228134U (en) Large cantilever prestress bent cap support device
CN207646620U (en) The movable construction platform of prefabricated wide cut beam slab
CN207987774U (en) Overwater construction platform system for river-crossing bridge cast-in-place box girder
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN206143641U (en) Continuous rigid frame bridge vertical pre -stress positioner
CN110561613A (en) Segment prefabricated variable cross-section concrete box girder steel bar binding jig frame
CN215669015U (en) Die carrier device and two bridge integral casting systems of striding for frame bridge construction
CN206319260U (en) A kind of variable arc bridge floor stand device
CN203878739U (en) Lightweight steel structure building system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 200032 No. 139, Xuhui District, Shanghai, Pingjiang Road

Patentee after: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee after: CCCC Third Aviation Bureau Sixth Engineering (Xiamen) Co.,Ltd.

Patentee after: XIAMEN BRANCH OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Address before: 200032 No. 139, Xuhui District, Shanghai, Pingjiang Road

Patentee before: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee before: CCCC Sanya (Xiamen) Engineering Co.,Ltd.

Patentee before: XIAMEN BRANCH OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.