CN207701142U - A kind of two fluid grouting plugging device for blocking drilling water burst - Google Patents
A kind of two fluid grouting plugging device for blocking drilling water burst Download PDFInfo
- Publication number
- CN207701142U CN207701142U CN201721620704.4U CN201721620704U CN207701142U CN 207701142 U CN207701142 U CN 207701142U CN 201721620704 U CN201721620704 U CN 201721620704U CN 207701142 U CN207701142 U CN 207701142U
- Authority
- CN
- China
- Prior art keywords
- pressure
- pipe
- grouting
- storage tank
- slip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 60
- 230000000903 blocking effect Effects 0.000 title claims abstract description 8
- 238000005553 drilling Methods 0.000 title claims description 28
- 239000012530 fluid Substances 0.000 title claims description 11
- 239000007788 liquid Substances 0.000 claims abstract description 32
- 238000007789 sealing Methods 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 17
- 239000010959 steel Substances 0.000 claims description 17
- 239000003292 glue Substances 0.000 claims description 12
- 239000003795 chemical substances by application Substances 0.000 claims description 5
- 238000007569 slipcasting Methods 0.000 claims 15
- 230000000149 penetrating effect Effects 0.000 claims 1
- 239000004848 polyfunctional curative Substances 0.000 abstract description 13
- 238000000034 method Methods 0.000 abstract description 9
- 239000000463 material Substances 0.000 abstract description 8
- 239000004568 cement Substances 0.000 description 10
- 238000010276 construction Methods 0.000 description 7
- 239000002002 slurry Substances 0.000 description 6
- 239000011268 mixed slurry Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 239000000243 solution Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000011982 device technology Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本实用新型提供了一种用于封堵钻孔涌水的双液注浆封堵装置,包括垂直的井管;井管外部设置有本胶注浆储罐、硬化剂注浆储罐及双液泵,本胶注浆储罐与第一高压胶管、双液泵、第一高压注浆管依次连接,硬化剂注浆储罐与第二高压胶管、双液泵、第二高压注浆管依次连接;第一高压注浆管、第二高压注浆管穿过孔口密封盖板伸入至井管中并至少延伸至涌水层段,第一高压注浆管、第二高压注浆管底端分别与三通混合器的入口连接,三通混合器的出口与单管连接,单管伸入至钻孔的涌水层段。本实用新型所述的双液注浆封堵工艺可使封堵材料渗透到涌水裂隙深处并快速凝固而不被水流稀释冲走,封堵材料凝固后即可把钻孔裂隙的涌水封堵住。
The utility model provides a double-liquid grouting plugging device for blocking water gushing in boreholes, which comprises a vertical well pipe; the well pipe is provided with a rubber grouting storage tank, a hardener grouting storage tank and a double-liquid grouting storage tank. The pump, the rubber grouting storage tank are connected in turn with the first high-pressure rubber hose, double-liquid pump, and the first high-pressure grouting pipe, and the hardener grouting storage tank is connected with the second high-pressure rubber hose, double-liquid pump, and second high-pressure grouting pipe in sequence Connection; the first high-pressure grouting pipe and the second high-pressure grouting pipe extend into the well pipe through the orifice sealing cover plate and extend at least to the water gushing layer section, the bottom of the first high-pressure grouting pipe and the second high-pressure grouting pipe The ends are respectively connected with the inlet of the three-way mixer, and the outlet of the three-way mixer is connected with a single pipe, and the single pipe extends into the water gushing section of the borehole. The double-liquid grouting plugging process described in the utility model can make the plugging material penetrate deep into the water gushing fissure and solidify quickly without being diluted and washed away by the water flow. After the plugging material is solidified, the gushing water in the borehole fissure can be blocked live.
Description
技术领域technical field
本实用新型属于地质、水文地质及岩矿勘探的钻探领域,尤其是涉及应用于小口径绳索取芯钻进领域的用于封堵钻孔涌水的双液浆封堵装置。The utility model belongs to the drilling field of geology, hydrogeology and rock ore exploration, in particular to a double liquid slurry plugging device used in the field of small-caliber rope coring drilling for blocking water gushing in boreholes.
背景技术Background technique
在地质、水文地质及岩矿勘探的钻探领域,特别是小口径绳索取芯钻进工程中,经常会出现涌水或漏水现象,由于钻具与孔壁或双壁钻具之间的间隙极小(毫米量级),采用加重泥浆容易结垢或堵塞,严重时甚至造成卡钻。如果采用泥浆或水泥进行封堵,由于水泥凝固时间的可控精准度较差,水泥浆很容易被水流稀释冲走,再者由于水泥块具有硬、脆的特性,在后期的钻进中水泥块往往又被钻具扰动破坏,继而再次出现涌水或漏水,给钻探施工和封堵施工造成更大的困难。In the drilling fields of geology, hydrogeology, and rock and mineral exploration, especially in small-diameter wireline core drilling projects, water gushing or water leakage often occurs, because the gap between the drilling tool and the hole wall or double-wall drilling tool is extremely small (millimeter level), the use of aggravated mud is easy to scale or block, and even cause pipe sticking in severe cases. If mud or cement is used for plugging, due to the poor controllable accuracy of the cement setting time, the cement slurry is easily diluted and washed away by the water flow. Moreover, due to the hard and brittle characteristics of the cement block, the cement block in the later drilling will Blocks are often damaged by the disturbance of drilling tools, and then water gushing or water leakage occurs again, which causes greater difficulties for drilling construction and plugging construction.
发明内容Contents of the invention
有鉴于此,本实用新型旨在提出一种用于封堵钻孔涌水的双液注浆封堵装置,以实现对压力较大的涌水/漏水层段的封堵,为钻探施工提供便利条件。In view of this, the utility model aims to propose a double-liquid grouting plugging device for plugging water gushing in boreholes, so as to realize the plugging of water gushing/leaking layers with high pressure, and provide convenient conditions for drilling construction .
为达到上述目的,本实用新型的技术方案是这样实现的:In order to achieve the above object, the technical solution of the utility model is achieved in that:
一种用于封堵钻孔涌水的双液注浆封堵装置,包括垂直的井管;A double-fluid grouting plugging device for plugging water gushing in boreholes, including vertical well pipes;
井管顶部设置有孔口密封盖板;The top of the well pipe is provided with an orifice sealing cover;
井管外部设置有本胶注浆储罐、硬化剂注浆储罐及双液泵,本胶注浆储罐与第一高压胶管、双液泵、第一高压注浆管依次连接,硬化剂注浆储罐与第二高压胶管、双液泵、第二高压注浆管依次连接;The outside of the well pipe is equipped with the rubber grouting storage tank, the hardener grouting storage tank and the double liquid pump. The rubber grouting storage tank is connected with the first high pressure rubber hose, the double liquid pump and the first high pressure grouting pipe in sequence. The grouting storage tank is sequentially connected with the second high-pressure rubber hose, the double liquid pump, and the second high-pressure grouting pipe;
第一高压注浆管、第二高压注浆管穿过孔口密封盖板伸入至井管中并至少延伸至涌水层段,第一高压注浆管、第二高压注浆管底端分别与三通混合器的入口连接,三通混合器的出口与单管连接,单管伸入至钻孔的涌水层段;The first high-pressure grouting pipe and the second high-pressure grouting pipe extend into the well pipe through the sealing cover plate of the orifice and extend at least to the water gushing layer section. The bottom ends of the first high-pressure grouting pipe and the second high-pressure grouting pipe are respectively It is connected with the inlet of the three-way mixer, and the outlet of the three-way mixer is connected with a single pipe, and the single pipe extends into the water gushing section of the borehole;
伸入至井管中的第一高压注浆管和第二高压注浆管之间设有连接支架,卷扬机的卷筒连接有钢丝绳,钢丝绳穿过孔口密封盖板伸入至井管中,钢丝绳与连接支架连接,钢丝绳底端与三通混合器连接。A connection bracket is provided between the first high-pressure grouting pipe and the second high-pressure grouting pipe extending into the well pipe, and the reel of the winch is connected with a steel wire rope, which extends into the well pipe through the sealing cover plate of the hole. The steel wire rope is connected with the connecting bracket, and the bottom end of the steel wire rope is connected with the three-way mixer.
进一步的,所述第一高压胶管、第二高压胶管、第一高压注浆管及第二高压注浆管外径为23mm,内径为10mm,耐压阈值为33MPa。Further, the outer diameter of the first high-pressure rubber hose, the second high-pressure rubber hose, the first high-pressure grouting pipe and the second high-pressure grouting pipe are 23 mm, the inner diameter is 10 mm, and the pressure threshold is 33 MPa.
进一步的,所述双液泵为双液气动注浆泵,型号为3ZBQS,输入气压为0.2MPa-0.4MPa。Further, the dual-liquid pump is a dual-liquid pneumatic grouting pump, the model is 3ZBQS, and the input air pressure is 0.2MPa-0.4MPa.
进一步的,所述本胶注浆储罐、硬化剂注浆储罐中储存有相互配合的AB胶。Further, mutually matched AB glues are stored in the grouting storage tank for this glue and the grouting storage tank for hardener.
进一步的,所述连接支架为钢丝架。Further, the connecting bracket is a wire frame.
一种用于封堵钻孔涌水的双液注浆封堵方法,包括如下步骤:A double-fluid grouting plugging method for plugging borehole water gushing, comprising the following steps:
S1,在绳索取芯钻进施工过程中遇到涌水层段的涌水或漏水现象时,在井管外设置本胶注浆储罐、硬化剂注浆储罐、双液泵、第一高压注浆管及第二高压注浆管,本胶注浆储罐与第一高压胶管、双液泵、第一高压注浆管依次连接,硬化剂注浆储罐与第二高压胶管、双液泵、第二高压注浆管依次连接;S1. When water gushing or water leakage occurs in the water gushing layer during the wireline coring drilling construction, the rubber grouting storage tank, hardening agent grouting storage tank, double liquid pump, and the first high pressure injection tank are installed outside the well pipe. The grout pipe and the second high-pressure grouting pipe, the rubber grouting storage tank are connected with the first high-pressure rubber pipe, the double-liquid pump, and the first high-pressure grouting pipe in sequence, and the hardener grouting storage tank is connected with the second high-pressure rubber pipe and the double-liquid pump , The second high-pressure grouting pipes are connected in sequence;
S2,第一高压注浆管、第二高压注浆管穿过孔口密封盖板伸入至井管,下入井管的第一高压注浆管、第二高压注浆管通过连接支架与钢丝绳连接,第一高压注浆管、第二高压注浆管底端分别与三通混合器的入口连接,三通混合器的出口与单管连接,钢丝绳底端与三通混合器连接;S2, the first high-pressure grouting pipe and the second high-pressure grouting pipe extend into the well pipe through the orifice sealing cover plate, and the first high-pressure grouting pipe and the second high-pressure grouting pipe lowered into the well pipe pass through the connecting bracket and the wire rope Connection, the bottom ends of the first high-pressure grouting pipe and the second high-pressure grouting pipe are respectively connected to the inlet of the three-way mixer, the outlet of the three-way mixer is connected to the single pipe, and the bottom end of the steel wire rope is connected to the three-way mixer;
通过钢丝绳顶端的卷扬机卷筒将钢丝绳及第一高压注浆管、第二高压注浆管、三通混合器下入至涌水层段;Lower the steel wire rope, the first high-pressure grouting pipe, the second high-pressure grouting pipe, and the three-way mixer into the water gushing layer through the hoist drum at the top of the wire rope;
S3,本胶注浆储罐、硬化剂注浆储罐中储存有相互配合的AB胶,本胶浆液和硬化剂浆液通过双液泵、第一高压注浆管、第二高压注浆管输送至三通混合器中混合,利用双液泵的压力把混合浆液通过单管压入至钻孔的涌水层段,注浆压力上升至初始注浆压力的5-10倍后结束注浆;S3, the rubber grouting storage tank and the hardener grouting storage tank store mutually matched AB glue, the glue slurry and hardener slurry are transported through the double liquid pump, the first high-pressure grouting pipe, and the second high-pressure grouting pipe Mix in the three-way mixer, use the pressure of the double-liquid pump to press the mixed slurry into the water gushing section of the borehole through the single pipe, and the grouting pressure will rise to 5-10 times the initial grouting pressure before the grouting is completed;
S4,待10-20分钟混合浆液凝固后,打开孔口密封盖板,拔出设备结束作业。S4, after the mixed slurry is solidified for 10-20 minutes, open the orifice sealing cover, pull out the equipment and end the operation.
相对于现有技术,本实用新型所述的用于封堵钻孔涌水的双液浆封堵装置及方法具有以下优势:Compared with the prior art, the double-liquid slurry plugging device and method for plugging borehole water gushing described in the utility model has the following advantages:
(1)双液注浆封堵工艺可使封堵材料渗透到涌水裂隙深处并快速凝固而不被水流稀释冲走,封堵材料凝固后即可把钻孔裂隙的涌水封堵住;(1) The double-liquid grouting plugging process can make the plugging material penetrate deep into the water gushing fissure and solidify quickly without being diluted and washed away by the water flow. After the plugging material solidifies, the water gushing in the borehole fissure can be blocked;
(2)本装置工艺特别适用于封堵涌水压力大、口径小的钻孔,凝结力强,且后期钻进中不易被扰动破坏,达到永久止水的效果;双液注浆封堵的封堵材料对井底环境、水温、水质的适应能力强,本装置和工艺适用范围广泛。(2) The technology of this device is especially suitable for plugging boreholes with high water gushing pressure and small diameter. The plugging material has strong adaptability to the well bottom environment, water temperature and water quality, and the device and process have a wide range of applications.
附图说明Description of drawings
构成本发明创造的一部分的附图用来提供对本发明创造的进一步理解,本发明创造的示意性实施例及其说明用于解释本发明创造,并不构成对本发明创造的不当限定。在附图中:The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute improper limitations to the present invention. In the attached picture:
图1为本实用新型实施例所述的双液注浆封堵装置的示意图。Fig. 1 is a schematic diagram of a double-fluid grouting plugging device described in an embodiment of the present invention.
附图标记说明:Explanation of reference signs:
1-第一高压注浆管;2-第二高压注浆管;3-孔口密封盖板;4-井管;5-钢丝绳;6-三通混合器;7-涌水层段;8-双液泵;9-本胶注浆储罐;10-硬化剂注浆储罐;11-第一高压胶管;12-第二高压胶管;13-单管;14-连接支架。1-the first high-pressure grouting pipe; 2-the second high-pressure grouting pipe; 3-hole sealing cover; 4-well pipe; 5-wire rope; 6-tee mixer; 7-water gushing section; 8- Double liquid pump; 9-primary rubber grouting storage tank; 10-curing agent grouting storage tank; 11-first high-pressure rubber hose; 12-second high-pressure rubber hose; 13-single pipe; 14-connecting bracket.
具体实施方式Detailed ways
需要说明的是,在不冲突的情况下,本发明创造中的实施例及实施例中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
在本发明创造的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明创造和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明创造的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明创造的描述中,除非另有说明,“多个”的含义是两个或两个以上。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of describing the present invention Creation and simplification of description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, a feature defined as "first", "second", etc. may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.
在本发明创造的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电焊连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本发明创造中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be interpreted in a broad sense, for example, it can be a fixed connection or a flexible connection. Detachable connection, or integral connection; it can be mechanical connection or electric welding connection; it can be direct connection or indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention based on specific situations.
下面将参考附图并结合实施例来详细说明本发明创造。The invention will be described in detail below with reference to the accompanying drawings and examples.
本技术方案所要解决的技术问题是:在地质、水文地质及岩矿勘探的钻探领域,特别是小口径绳索取芯钻进工程中,经常会出现涌水或漏水现象,由于钻具与孔壁或双壁钻具之间的间隙极小(毫米量级),采用加重泥浆容易结垢或堵塞,严重时甚至造成卡钻。如果采用泥浆或水泥进行封堵,由于水泥凝固时间的可控精准度较差,水泥浆很容易被水流稀释冲走,再者由于水泥块具有硬、脆的特性,在后期的钻进中水泥块往往又被钻具扰动破坏,继而再次出现涌水或漏水,给钻探施工和封堵施工造成更大的困难。The technical problem to be solved by this technical solution is: in the drilling field of geology, hydrogeology and rock ore exploration, especially in the small-diameter rope core drilling project, water gushing or water leakage often occurs, due to the drilling tool and the hole wall or The gap between the double-wall drilling tools is extremely small (millimeter level), and the use of heavy mud is easy to scale or block, and even cause pipe sticking in severe cases. If mud or cement is used for plugging, due to the poor controllable accuracy of the cement setting time, the cement slurry is easily diluted and washed away by the water flow. Moreover, due to the hard and brittle characteristics of the cement block, the cement block in the later drilling will Blocks are often damaged by the disturbance of drilling tools, and then water gushing or water leakage occurs again, which causes greater difficulties for drilling construction and plugging construction.
为了解决上述技术问题,如图1所示,本实施例提供了一种用于封堵钻孔涌水的双液注浆封堵装置,包括垂直的井管4;井管4顶部设置有孔口密封盖板3;井管4外部设置有本胶注浆储罐9、硬化剂注浆储罐10及双液泵8,本胶注浆储罐9与第一高压胶管11、双液泵8、第一高压注浆管1依次连接,硬化剂注浆储罐10与第二高压胶管12、双液泵8、第二高压注浆管2依次连接;第一高压注浆管1、第二高压注浆管2穿过孔口密封盖板3伸入至井管4中并至少延伸至涌水层段7,第一高压注浆管1、第二高压注浆管2底端分别与三通混合器6的入口连接,三通混合器6的出口与单管13连接,单管13伸入至钻孔的涌水层段7;伸入至井管4中的第一高压注浆管1和第二高压注浆管2之间设有连接支架14,卷扬机的卷筒连接有钢丝绳5,钢丝绳5穿过孔口密封盖板3伸入至井管4中,钢丝绳5与连接支架14连接,钢丝绳5底端与三通混合器6连接。In order to solve the above technical problems, as shown in Figure 1, this embodiment provides a double-fluid grouting plugging device for plugging borehole water gushing, including a vertical well pipe 4; the top of the well pipe 4 is provided with an orifice The sealing cover plate 3; the outside of the well pipe 4 is provided with the rubber grouting storage tank 9, the hardener grouting storage tank 10 and the double-liquid pump 8, the rubber grouting storage tank 9 and the first high-pressure rubber hose 11 and the double-liquid pump 8 , the first high-pressure grouting pipe 1 is connected sequentially, the hardener grouting storage tank 10 is connected with the second high-pressure rubber hose 12, the double liquid pump 8, and the second high-pressure grouting pipe 2 in sequence; the first high-pressure grouting pipe 1, the second The high-pressure grouting pipe 2 extends into the well pipe 4 through the orifice sealing cover plate 3 and extends at least to the water gushing layer section 7. The bottom ends of the first high-pressure grouting pipe 1 and the second high-pressure grouting pipe 2 respectively connect The inlet of the mixer 6 is connected, and the outlet of the three-way mixer 6 is connected with the single pipe 13, and the single pipe 13 stretches into the water gushing interval 7 of the borehole; the first high-pressure grouting pipe 1 and the A connecting bracket 14 is arranged between the second high-pressure grouting pipes 2. The reel of the winch is connected with a steel wire rope 5. The steel wire rope 5 passes through the orifice sealing cover plate 3 and extends into the well pipe 4. The steel wire rope 5 is connected with the connecting bracket 14. The bottom end of the steel wire rope 5 is connected with the three-way mixer 6.
该实施例所提供的技术方案的技术效果是:双液注浆封堵工艺可使封堵材料渗透到涌水裂隙深处并快速凝固而不被水流稀释冲走,封堵材料凝固后封堵住涌水层段7的钻孔漏层;本装置工艺特别适用于封堵压力较大的涌水层段7,凝结力强,且后期钻进中不易被扰动破坏,达到永久止水的效果;双液注浆封堵的封堵材料对井底环境、水温、水质的适应能力强,本装置和工艺适用范围广泛。The technical effect of the technical solution provided by this embodiment is: the double-liquid grouting plugging process can make the plugging material penetrate deep into the water gushing crack and solidify quickly without being diluted and washed away by the water flow, and the plugging material can be blocked after solidification Drilling leakage layer in water gushing section 7; this device technology is especially suitable for plugging water gushing section 7 with high pressure, with strong coagulation force, and it is not easy to be disturbed and damaged during later drilling, so as to achieve the effect of permanent water stop; double liquid The plugging material for grouting plugging has strong adaptability to the bottom-hole environment, water temperature and water quality, and the device and process have a wide range of applications.
所述第一高压胶管11、第二高压胶管12、第一高压注浆管1及第二高压注浆管2外径为23mm,内径为10mm,耐压阈值为33MPa。The first high-pressure rubber hose 11 , the second high-pressure rubber hose 12 , the first high-pressure grouting pipe 1 and the second high-pressure grouting pipe 2 have an outer diameter of 23 mm, an inner diameter of 10 mm, and a pressure threshold of 33 MPa.
具体的,所述双液泵8为双液气动注浆泵,型号为3ZBQS,输入气压为0.2MPa-0.4MPa。所述本胶注浆储罐9、硬化剂注浆储罐10中储存有相互配合的AB胶。所述连接支架14为钢丝架。Specifically, the dual-liquid pump 8 is a dual-liquid pneumatic grouting pump, the model is 3ZBQS, and the input air pressure is 0.2MPa-0.4MPa. The glue grouting storage tank 9 and the hardener grouting storage tank 10 are stored with mutually matched AB glues. The connecting bracket 14 is a wire frame.
一种用于封堵钻孔涌水的双液注浆封堵方法,包括如下步骤:A double-fluid grouting plugging method for plugging borehole water gushing, comprising the following steps:
S1,在绳索取芯钻进施工过程中遇到涌水层段7的涌水或漏水现象时,在井管4外设置本胶注浆储罐9、硬化剂注浆储罐10、双液泵8、第一高压注浆管1及第二高压注浆管2,本胶注浆储罐9与第一高压胶管11、双液泵8、第一高压注浆管1依次连接,硬化剂注浆储罐10与第二高压胶管12、双液泵8、第二高压注浆管2依次连接;S1, when water gushing or water leakage occurs in the water gushing section 7 during the rope core drilling construction, the rubber grouting storage tank 9, the hardener grouting storage tank 10, and the double liquid pump 8 are installed outside the well pipe 4 , the first high-pressure grouting pipe 1 and the second high-pressure grouting pipe 2, the rubber grouting storage tank 9 is connected with the first high-pressure rubber pipe 11, the double liquid pump 8, and the first high-pressure grouting pipe 1 in sequence, and the hardener is grouted The storage tank 10 is sequentially connected with the second high-pressure rubber hose 12, the double liquid pump 8, and the second high-pressure grouting pipe 2;
S2,第一高压注浆管1、第二高压注浆管2穿过孔口密封盖板3伸入至井管4,下入井管4的第一高压注浆管1、第二高压注浆管2通过连接支架14与钢丝绳5连接,第一高压注浆管1、第二高压注浆管2底端分别与三通混合器6的入口连接,三通混合器6的出口与单管13连接,钢丝绳5底端与三通混合器6连接;S2, the first high-pressure grouting pipe 1 and the second high-pressure grouting pipe 2 extend into the well pipe 4 through the orifice sealing cover plate 3, and the first high-pressure grouting pipe 1 and the second high-pressure grouting pipe 4 are lowered into the well pipe 4 The pipe 2 is connected to the steel wire rope 5 through the connecting bracket 14, the bottom ends of the first high-pressure grouting pipe 1 and the second high-pressure grouting pipe 2 are respectively connected to the inlet of the three-way mixer 6, and the outlet of the three-way mixer 6 is connected to the single pipe 13 Connect, the bottom end of the wire rope 5 is connected with the three-way mixer 6;
通过钢丝绳5顶端的卷扬机卷筒将钢丝绳5及第一高压注浆管1、第二高压注浆管2、三通混合器6下入至涌水层段7;Lower the steel wire rope 5, the first high-pressure grouting pipe 1, the second high-pressure grouting pipe 2, and the three-way mixer 6 into the water gushing layer section 7 through the hoist drum at the top of the steel wire rope 5;
S3,本胶注浆储罐9、硬化剂注浆储罐10中储存有相互配合的AB胶,本胶浆液和硬化剂浆液通过双液泵8、第一高压注浆管1、第二高压注浆管2输送至三通混合器6中混合,利用双液泵8的压力把混合浆液通过单管13压入涌水层段7的钻孔漏层,注浆压力上升至初始注浆压力的5-10倍后结束注浆;S3, the glue grouting storage tank 9 and the hardener grouting storage tank 10 store mutually matched AB glue. The grouting pipe 2 is transported to the three-way mixer 6 for mixing, and the pressure of the double-liquid pump 8 is used to press the mixed grout through the single pipe 13 into the leaky layer of the borehole of the water gushing section 7, and the grouting pressure rises to 100% of the initial grouting pressure. Finish grouting after 5-10 times;
S4,待10-20分钟混合浆液凝固后,打开孔口密封盖板3,拔出设备结束作业。S4, after the mixed slurry is solidified for 10-20 minutes, open the orifice sealing cover plate 3, and pull out the equipment to end the operation.
以上所述仅为本发明创造的较佳实施例而已,并不用以限制本发明创造,凡在本发明创造的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明创造的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the Within the scope of protection of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721620704.4U CN207701142U (en) | 2017-11-28 | 2017-11-28 | A kind of two fluid grouting plugging device for blocking drilling water burst |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721620704.4U CN207701142U (en) | 2017-11-28 | 2017-11-28 | A kind of two fluid grouting plugging device for blocking drilling water burst |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207701142U true CN207701142U (en) | 2018-08-07 |
Family
ID=63024001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721620704.4U Active CN207701142U (en) | 2017-11-28 | 2017-11-28 | A kind of two fluid grouting plugging device for blocking drilling water burst |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207701142U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403914A (en) * | 2018-10-15 | 2019-03-01 | 山东交通学院 | Water column only starches two fluid grouting method in a kind of down-hole extra-deep hole drilling |
CN109457703A (en) * | 2018-12-12 | 2019-03-12 | 宁波市轨道交通集团有限公司 | A kind of mini-valve tube and grouting method of the design of two fluid grouting core pipe |
CN111877378A (en) * | 2020-07-24 | 2020-11-03 | 上海隧道地基基础工程有限公司 | Double-liquid grouting machine and double-liquid grouting plugging method |
CN113482026A (en) * | 2021-07-18 | 2021-10-08 | 中天建设集团有限公司 | Plugging method and device for pressure-bearing dewatering well |
-
2017
- 2017-11-28 CN CN201721620704.4U patent/CN207701142U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403914A (en) * | 2018-10-15 | 2019-03-01 | 山东交通学院 | Water column only starches two fluid grouting method in a kind of down-hole extra-deep hole drilling |
CN109457703A (en) * | 2018-12-12 | 2019-03-12 | 宁波市轨道交通集团有限公司 | A kind of mini-valve tube and grouting method of the design of two fluid grouting core pipe |
CN109457703B (en) * | 2018-12-12 | 2023-09-19 | 宁波市轨道交通集团有限公司 | A double-liquid grouting core tube design sleeve valve tube and grouting method |
CN111877378A (en) * | 2020-07-24 | 2020-11-03 | 上海隧道地基基础工程有限公司 | Double-liquid grouting machine and double-liquid grouting plugging method |
CN113482026A (en) * | 2021-07-18 | 2021-10-08 | 中天建设集团有限公司 | Plugging method and device for pressure-bearing dewatering well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207701142U (en) | A kind of two fluid grouting plugging device for blocking drilling water burst | |
US11773693B2 (en) | In-situ system for mixing two or more chemical components downhole in a wellbore and a method employing same | |
RU2351746C2 (en) | Method and system for cementing casing pipe in well borehole with reverse circulation of cement grout | |
LU101599B1 (en) | Grouting reinforcement method for ground drilling to coal seam broken roof and grouting apparatus | |
CN102561992B (en) | Grouting plugging process adopting deformation water stopper | |
CN104747075A (en) | Anti-collapsing drilling method for grout spraying of soft coal seam | |
CN105041264B (en) | A kind of mash gas pumping drilling whirl spraying solidify can multiple sealing of hole method | |
CN104141470A (en) | Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine | |
CN109138904B (en) | Double-packer layered grouting water stop device and use method thereof | |
CN105696967A (en) | Mining hole packer and hole packing method | |
CN109915068B (en) | Device and method for automatic water absorption and plugging of near-horizontal coal seam gas drainage boreholes | |
CN105443098B (en) | A kind of coal mine down-hole drilling segmentation fixed point hydraulic fracturing pore-fixing device and method | |
CN110714769B (en) | Installation device and installation method for monitoring meter | |
CN105781586B (en) | A kind of solid pipe method for blocking of gushing water borehole wall filter stream pressure relief vent inner sleeve | |
CN203476320U (en) | Device for simultaneously determining pressure of coal bed gas through capsule grouting | |
CN104389587A (en) | Quick measurement method of coal seam gas pressure | |
CN209195349U (en) | Twin packer delamination pour slurry antipriming | |
CN106930764A (en) | Multilayer sandstone-type uranium mineralization with respect separate zone production technique | |
CN205330611U (en) | Mining hole packer | |
CN107489399A (en) | A kind of close bad drilling down hole reverse slip casting plugging technology suitable for coal deposit | |
CN111441761A (en) | A simulation device and simulation method for preventing mud loss in formation drilling | |
CN107905762B (en) | A dynamic sealing method of solid powder-grouting under pressure | |
CN105317397A (en) | Double cloth bags type grouting sealing set and method | |
CN106968633A (en) | A kind of mash gas pumping drilling hole sealing device and method for sealing | |
CN105735937A (en) | Plugging device for water-inrush borehole by filtration flow and pressure relief of hole wall and grouting and fixing of in-hole bushing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190618 Address after: 056004 154 Fu Hebei street, contai District, Handan, Hebei. Patentee after: China coal mine hydrogeological survey Co., Ltd. Address before: 056004 154 Fu Hebei street, contai District, Handan, Hebei. Patentee before: China National Administration of Coal Geology Hydrology Geologic Bureau |