CN209195349U - Twin packer delamination pour slurry antipriming - Google Patents

Twin packer delamination pour slurry antipriming Download PDF

Info

Publication number
CN209195349U
CN209195349U CN201821509734.2U CN201821509734U CN209195349U CN 209195349 U CN209195349 U CN 209195349U CN 201821509734 U CN201821509734 U CN 201821509734U CN 209195349 U CN209195349 U CN 209195349U
Authority
CN
China
Prior art keywords
pipe
high pressure
pressure gas
grouting pipe
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821509734.2U
Other languages
Chinese (zh)
Inventor
解伟
王明明
邵新民
刘振英
叶成明
安永会
李小杰
冯建月
何计彬
吴海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Center for Hydrogeology and Environmental Geology CGS
Original Assignee
Center for Hydrogeology and Environmental Geology CGS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Center for Hydrogeology and Environmental Geology CGS filed Critical Center for Hydrogeology and Environmental Geology CGS
Priority to CN201821509734.2U priority Critical patent/CN209195349U/en
Application granted granted Critical
Publication of CN209195349U publication Critical patent/CN209195349U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of twin packer delamination pour slurry antipriming, including well casing, grouting device and packing device, well casing includes real pipe, filter pipe and grout outlet, grouting device includes slush pump, grouting pipe and Grouting Pipe, packing device includes high pressure gas cylinder, high pressure gas pipeline, decompression table, upper packer and lower packet, grouting pipe protrudes into well casing inner cavity, grouting pump, grouting pipe, upper packer, Grouting Pipe and lower packet are sequentially connected, it is stifled that lower packet lower end connects bottom, the position of Grouting Pipe corresponds to grout outlet, the packing element cavity of upper packer and the packing element cavity of lower packet are ganged up through high pressure gas pipeline B, high pressure gas pipeline A is communicated at the top of the packing element cavity of upper packer, the arrival end of high pressure gas pipeline A connects decompression table, decompression table connects high pressure gas cylinder.High pressure gas cylinder is opened, is inflated to upper packer and lower packet, it is made to be bonded fitting completely with real inside pipe wall, cement slurry is injected to the gap that sealing position has been filled with gravel material by slush pump and carries out layering sealing.

Description

Twin packer delamination pour slurry antipriming
Technical field
The utility model relates to survey for the purpose of locating hydrogeological resources exploration engineering field, a kind of especially twin packer delamination pour slurry sealing Device.
Background technique
In survey for the purpose of locating hydrogeological resources and groundwater exploration, the detailed water of underground water is accurately obtained by being layered bailing test Literary geologic parameter, the layering in water-bearing layer is portrayed in realization, for objectively recognizing hydrogeologic condition, reasonable generalization hydrogeology Model, relatively accurately evaluating the premise that groundwater resources are of crucial importance, and implement layering bailing test is to implement It is layered hydrogeological hole.
Traditional layering hydrogeology hole well completion method is mainly kelp sealing, expanded rubber sealing and clay ball sealing. Kelp and expanded rubber sealing belong to provisional sealing, have certain water-stagnating effect, but at high cost, process is many and diverse, pressure-bearing Property is looked into, and water-stagnating effect is unstable, is not suitable for permanent leaking water.It is most common that clay ball sealing is that hydrogeological hole separates into well Method is by filling gravel material and clay ball to outside well casing, and at low cost, water-stagnating effect is good, but in fine grained stratum or probing knot Structure caving ground separate into well and easily occurs that the backfill of gravel material is collapsed, measures backfill position inaccuracy or be unable to measure in hole Highly, gravel material backfill height is more than that accidents, the influences such as clay ball " bridge formation " caused by sealing position and drilling necking down separate into well Quality, or even drilling is caused to be scrapped, meanwhile, clay ball hydration time is short, is not also suitable for big depth hydrogeology hole and separates into Well.Therefore, it needs to develop a kind of Novel layered and realizes the hydrogeology efficient fast hierarchical Cheng Jing in hole at well technology.
Utility model content
The purpose of this utility model is to provide a kind of twin packer delamination pour slurry antiprimings, eliminate and fill out clay ball Process is changed to complete opening and fills out gravel, enormously simplifies and separates into well construction difficulty, and construction efficiency greatly improved, and sealing position is quasi- Really, sealing is reliable.
To reach above-mentioned purpose, the utility model uses following technical scheme:
A kind of twin packer delamination pour slurry antipriming, it includes well casing, grouting device and packing device, which includes Real pipe, filter pipe and grout outlet, the grouting device include slush pump, grouting pipe and Grouting Pipe, which includes high pressure Gas cylinder, decompression table, high pressure gas pipeline A, upper packer, high pressure gas pipeline B and lower packet, the grouting pipe protrude into the well casing The upper end of inner cavity, the grouting pipe connects slush pump, and the lower end of the grouting pipe is connected to the central tube of the upper packer, envelope on this It is connected to the central tube of the lower packet by Grouting Pipe every the central tube of device, the lower end connection bottom of the lower packet is stifled, the note Slurry pipe corresponds to the grout outlet, and the packing element cavity of the upper packer and the packing element cavity of the lower packet are concatenated through high pressure gas pipeline B Connection, is communicated with high pressure gas pipeline A at the top of the packing element cavity of the upper packer, the arrival end connection of high pressure gas pipeline A Decompression table, the decompression table connect high pressure gas cylinder.
The lower end of the grouting pipe connects the pipe nipple of the upper packer, and the lower end of the central tube of the upper packer connects note Starch the upper end of pipe, the pipe nipple of the lower end connection lower packet of the Grouting Pipe, the lower ending opening connection of the central tube of the lower packet The bottom is stifled.
Preferably, high-pressure rubber pipe is connected between the slush pump and the grouting pipe.
Preferably, the grout outlet is bridge-type screen pipe, and hole matches with gravel gauge lattice, so that gravel material cannot be into Enter in well casing.
The grout outlet is corresponding with the height of the Grouting Pipe, and the height of the grout outlet is 1-1.5 meters, the Grouting Pipe Height is 1-1.5 meters.
The utility model has the beneficial effects that
1, the delamination pour slurry antipriming of the utility model changes traditional hydrogeological hole and separates into well process flow, goes In addition to " gravel and sealing are filled out in layering " this boring accidents high-incidence stage, will separate into well process modifications is drilling → down tube → complete opening Gravel → well-flushing → packing slip casting layering sealing is filled out, drilling is effectively reduced and separates into well accident rate.
2) sealing target zone can be isolated for the twin packer delamination pour slurry antipriming of the utility model, pass through slush pump Cement slurry sealing material is injected, sealing position is accurate, and water-stagnating effect is reliable.
3) the utility model twin packer delamination pour slurry antipriming is reusable, ensure that the construction of low cost;
4) the utility model twin packer delamination pour slurry antipriming can satisfy the layering of the hydrogeological hole within 1000m Cheng Jing;
5) the utility model twin packer delamination pour slurry antipriming, which has, insulates reliable, off-load conveniently, strong operability The features such as.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
1: well casing, 11: real pipe, 12: filter pipe, 13: grout outlet, 21: water barrier, 22: water-bearing layer, 31: slush pump, 32: Grouting pipe, 33: Grouting Pipe, 34: high-pressure rubber pipe, 41: high pressure gas cylinder, 42: decompression table, 43: high pressure gas pipeline A, 43': high pressure Gas pipeline B, 44: upper packer, 45: lower packet, 46: bottom is stifled.
Specific embodiment
As shown in Figure 1, a kind of twin packer delamination pour slurry antipriming of the utility model, it includes well casing, slip casting dress It sets and packing device, the well casing includes real pipe 11, filter pipe 12 and grout outlet 13, the corresponding water barrier 21 of the grout outlet 13, the filter Corresponding the drawn water water-bearing layer 22 of water pipe, the grouting device include slush pump 31, grouting pipe 32 and Grouting Pipe 33, packing dress It sets including high pressure gas cylinder 41, decompression table 42, high pressure gas pipeline A43, upper packer 44, high pressure gas pipeline B43' and lower packet 45, which protrudes into the inner cavity of the well casing 1, and the upper end of the grouting pipe 32 connects slush pump 31, the grouting pipe 32 Lower end connect the pipe nipple of the upper packer 44, the pipe nipple of the lower end of the central tube of the upper packer 44 and the lower packet 45 it Between connect Grouting Pipe 33, the lower end connection bottom stifled 46 of the central tube of the lower packet 45, the corresponding grout outlet 13 of the Grouting Pipe 33, The packing element cavity of the upper packer 44 is connected to the packing element cavity of the lower packet 45 through high pressure gas pipeline B43 concatenation, on this The top of the packing element cavity of packer 44 is also communicated with high pressure gas pipeline A43 ', and the arrival end connection of high pressure gas pipeline A43 ' subtracts Table 42 is pressed, which connects high pressure gas cylinder 41.
Upper packer is identical with the structure of lower packet, be selected as the patent No. 201820351644.9 announced it is a kind of excessively electric Cable crossed gas pipeline packer.The packer axisymmetricly shape, including pipe nipple, top connection, central tube, packing element and air supported head; The pipe nipple is connected with the central tube by tubing thread, which is set in the tubing thread periphery;The packing element is set in the center In the middle part of pipe, by screwed connection, which passes through screwed connection with the air supported head for one end of the packing element and the top connection, The air supported head is connect with the basepipe seal;The upper end of the top connection is connect with the pipe nipple by tubing thread, and lower end is inside and outside two Layer structure, internal layer lower end are connect with the central tube top by tubing thread, and outer layer lower end and the packing element top pass through screwed connection, The packing element is set in the center pipe surface, is concentric type structure;The air supported head is similarly ectonexine structure, internal layer and the central tube It is tightly connected, outer layer and the packing element bottom end pass through screwed connection.
In order to operate more safety and conveniently, connect high-pressure rubber pipe between the slush pump 31 and the grouting pipe 32 34。
It is preferred that the grout outlet 13 is bridge-type screen pipe, it is welded between two sections of real pipes 11, the hole of the bridge-type screen pipe Gap matches with gravel gauge lattice, so that gravel material not can enter in well casing.
Preferably, the height of the grout outlet is 1-1.5 meters.Preferably, the length of the Grouting Pipe 33 is 1-1.5 meters.
The application method of twin packer delamination pour slurry antipriming is described below, in the case where ensureing equipment safety, first Open high pressure gas cylinder 41, make high pressure gas through decompression table 42 decompression after enter high-pressure air pipe B43 ', after sequentially enter upper packer The packing element cavity of 44 packing element cavity, high-pressure air pipe A43 and lower packet 45, so that the upper packer 44 and the lower packet Pressure rise in 45 packing element cavitys and after reaching a setting pressure value so that the upper packer 44 and the lower packet 45 with 11 inner wall of real pipe of the well casing 1 is bonded completely;Then the 31 note clear water of slush pump for starting earth's surface, if clear water can be with normal circulation (illustrate that Grouting Pipe and grout outlet to just, can squeeze into clear water, if the abnormal circulation of clear water, illustrates the corresponding real pipe position of Grouting Pipe, because This cannot squeeze into clear water) mud being stirred can be injected grouting pipe, it is flowed out by the Grouting Pipe, and injected by grout outlet To outside the well casing, until all (volume of the cement slurry volume substantially depends between sealing segment length and gravel material for injection by mud amount Porosity calculates), cement slurry all after injection, continues to be pumped into clear water into grouting pipe with slush pump, makes to remain in slip casting and lead All injection sealing section, the clear water amount volume being pumped into are the volume of grouting pipe inner cavity and ground in tripping in well casing to cement slurry in pipe Table connects high-pressure rubber pipe cavity volume summation;Slip casting terminates, closing slush pump, to cement initial set after 2-3h, dismantles high-pressure air pipe Line and decompression meter connector, discharge high pressure gas make the inner cavity of upper packer and lower packet shrink deblocking, lift out and be located at well casing The grouting device and packing device of inner cavity;The grouting device and packing device that lift out positioned at well casing inner cavity are cleaned, prevented Sealing mud solidifies injury device in the device.
Preferably, which is 0.6-0.8MPa, and the supply gas pressure of the upper packer and lower packet is packing The sum of hydraulic pressure that device is born and setting pressure value.
Preferably, the main component of the cement slurry is cement, water and bentonite, and wherein the ratio of mud is 0.5-0.6, swelling Soil is 3%, so that the mud has mobility, and meets sealing demand.
The technique of utility model approximately as: after drilling, well casing is installed, the grout outlet of well casing is corresponding required Water barrier position section, filter pipe is corresponding in required water-bearing layer position section, and well casing installation terminates;Complete opening is carried out to fill out gravel and wash Well fills out that gravel material is more closely knit, and later period gravel material no longer sinks so that enclosing;After equipment inspection can be safely operated, the utility model Antipriming is started to work, and is injected cement slurry to the gap that sealing position has been filled with gravel material by slush pump and is carried out layering sealing, Slip casting terminates;Cement slurry initial set is waited, proposes equipment in well;Its sealing position is accurate, and water-stagnating effect is reliable, and can effectively drop Low drilling separates into well accident rate, provides technical support to be layered the efficient quick well formation in hydrogeological hole.

Claims (5)

1. a kind of twin packer delamination pour slurry antipriming, it is characterised in that: it includes well casing, grouting device and packing device, The well casing includes real pipe, filter pipe and grout outlet, which includes slush pump, grouting pipe and Grouting Pipe, packing dress It sets and is stretched including high pressure gas cylinder, decompression table, high pressure gas pipeline A, upper packer, high pressure gas pipeline B and lower packet, the grouting pipe Enter the inner cavity of the well casing, the upper end of the grouting pipe connects slush pump, and the lower end of the grouting pipe is connected in the upper packer Heart pipe, the central tube of the upper packer are connected to the central tube of the lower packet by Grouting Pipe, and the lower end of the lower packet connects It is stifled to connect bottom, which corresponds to the grout outlet, and the packing element cavity of the upper packer and the packing element cavity of the lower packet are through high pressure Gas pipeline B concatenation connection, is communicated with high pressure gas pipeline A at the top of the packing element cavity of the upper packer, high pressure gas pipeline A's Arrival end connects decompression table, which connects high pressure gas cylinder.
2. twin packer delamination pour slurry antipriming according to claim 1, it is characterised in that: under the grouting pipe End connects the pipe nipple of the upper packer, the upper end of the lower end connection Grouting Pipe of the central tube of the upper packer, under the Grouting Pipe The pipe nipple of end connection lower packet, it is stifled that the lower ending opening of the central tube of the lower packet connects the bottom.
3. twin packer delamination pour slurry antipriming according to claim 1 or 2, it is characterised in that: the slush pump with High-pressure rubber pipe is connected between the grouting pipe.
4. twin packer delamination pour slurry antipriming according to claim 3, it is characterised in that: the grout outlet is bridge-type Screen pipe, hole match with gravel gauge lattice, so that gravel material not can enter in the well casing.
5. twin packer delamination pour slurry antipriming according to claim 4, it is characterised in that: the grout outlet with it is described The height of Grouting Pipe is corresponding, and the height of the grout outlet is 1-1.5 meters, and the height of the Grouting Pipe is 1-1.5 meters.
CN201821509734.2U 2018-09-14 2018-09-14 Twin packer delamination pour slurry antipriming Active CN209195349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821509734.2U CN209195349U (en) 2018-09-14 2018-09-14 Twin packer delamination pour slurry antipriming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821509734.2U CN209195349U (en) 2018-09-14 2018-09-14 Twin packer delamination pour slurry antipriming

Publications (1)

Publication Number Publication Date
CN209195349U true CN209195349U (en) 2019-08-02

Family

ID=67406135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821509734.2U Active CN209195349U (en) 2018-09-14 2018-09-14 Twin packer delamination pour slurry antipriming

Country Status (1)

Country Link
CN (1) CN209195349U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138904A (en) * 2018-09-14 2019-01-04 中国地质调查局水文地质环境地质调查中心 Twin packer delamination pour slurry antipriming and its application method
CN111561310A (en) * 2020-05-09 2020-08-21 北京慧坤科技有限公司 Hydrogeology long-term drilling layering monitoring devices that sees
CN115627786A (en) * 2022-12-07 2023-01-20 中国冶金地质总局第三地质勘查院 Method for plugging waste water taking well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138904A (en) * 2018-09-14 2019-01-04 中国地质调查局水文地质环境地质调查中心 Twin packer delamination pour slurry antipriming and its application method
CN109138904B (en) * 2018-09-14 2024-02-20 中国地质调查局水文地质环境地质调查中心 Double-packer layered grouting water stop device and use method thereof
CN111561310A (en) * 2020-05-09 2020-08-21 北京慧坤科技有限公司 Hydrogeology long-term drilling layering monitoring devices that sees
CN115627786A (en) * 2022-12-07 2023-01-20 中国冶金地质总局第三地质勘查院 Method for plugging waste water taking well

Similar Documents

Publication Publication Date Title
CN109138904A (en) Twin packer delamination pour slurry antipriming and its application method
CN209195349U (en) Twin packer delamination pour slurry antipriming
CN107620582B (en) Bilayer sleeve sand control completion technique and double-layer anti-sand completion tubular column
CN106285681B (en) A kind of hard coal seam top plate fracturing device and method
CN107654206B (en) Drilling water stopping device and water stopping method
CN206627405U (en) The double embolism original position injection pressure water penetration detectors of expansion type
CN101975041B (en) Well cementing method for avoiding coal bed and device thereof
CN106872334A (en) A kind of method of the prominent mud Excavation simulation device of gushing water and the prominent mud disaster of simulation gushing water
CN205063929U (en) Colliery is sealed in pit and is pressed integration segmentation hydraulic fracturing device
CN102889958A (en) Coal bed gas pressure direct measurement device and pressure measurement method thereof
CN111456721B (en) Multistage airbag rapid hole sealing gas pressure measuring device and measuring method
CN109915070A (en) The down-hole coal bed test gas pressure hole sealing device of one kind and method
CN105781586B (en) A kind of solid pipe method for blocking of gushing water borehole wall filter stream pressure relief vent inner sleeve
CN203164441U (en) Portable air bag isolation drilling pressured water tester
CN202869731U (en) Device for directly measuring gas pressure in coal seam
CN207686665U (en) A kind of drill-hole pumping experiment water barrier device
CN105178908A (en) Chemical grouting packing device and method for downhole stratum plugging
CN107269245B (en) A method of it is insulated again for seperated layer water injection/oil recovery sand control section substratum
CN210049864U (en) Packer grouting layered water stop simulation device
CN2888063Y (en) Integrated bridge plug squeeze cementing tool
CN105735937A (en) Plugging device for water-inrush borehole by filtration flow and pressure relief of hole wall and grouting and fixing of in-hole bushing
CN208364097U (en) It is a kind of to block the device for disclosing the drilling of coating artesian water
CN111058795A (en) Recyclable bag type rapid well completion device and using method
CN110685677A (en) Water control simulation experiment device and experiment method for horizontal well of heterogeneous oil reservoir
CN203961897U (en) A kind of cement paste filling tube external packer envelope is altered instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant