CN207685651U - A kind of bridge structure that civil small-scale quickly splices - Google Patents

A kind of bridge structure that civil small-scale quickly splices Download PDF

Info

Publication number
CN207685651U
CN207685651U CN201721481798.1U CN201721481798U CN207685651U CN 207685651 U CN207685651 U CN 207685651U CN 201721481798 U CN201721481798 U CN 201721481798U CN 207685651 U CN207685651 U CN 207685651U
Authority
CN
China
Prior art keywords
bridge
plate
fixture block
far
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721481798.1U
Other languages
Chinese (zh)
Inventor
王芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hua Wei Advisory Service Co Ltd
Original Assignee
Guangzhou Hua Wei Advisory Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hua Wei Advisory Service Co Ltd filed Critical Guangzhou Hua Wei Advisory Service Co Ltd
Priority to CN201721481798.1U priority Critical patent/CN207685651U/en
Application granted granted Critical
Publication of CN207685651U publication Critical patent/CN207685651U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge structures that civil small-scale quickly splices, including multiple inserting columns and bridge plate, the top of each inserting column has been fixedly connected with bridge pier, each bridge plate is erected on bridge pier, one end of each bridge plate is equipped with fixed plate, the each one end of the bridge plate far from fixed plate offers and the mutually matched fixing groove of fixed plate, fixture block groove there are two being opened up on the two side of each fixed plate, the inside of two fixture block grooves is mounted on spring, two opposite one end of the spring are mounted on wedge-shaped fixture block, two wedge-shaped fixture blocks are respectively connected with traction rope close to one end of spring, the one end of two traction ropes far from wedge-shaped fixture block is connected with drawstring jointly.The utility model is simple in structure, easy to operation, is provided with a series of parts easy to use and forms a firm bridge, is easy for installation and removal simultaneously, greatly improves the traffic convenience in rural area and suburb, efficiently convenient, is worthy to be popularized.

Description

A kind of bridge structure that civil small-scale quickly splices
Technical field
The utility model is related to bridges to build technical field more particularly to a kind of bridge knot that civil small-scale quickly splices Structure.
Background technology
Bridge refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. that can smoothly pass through.It is modern to adapt to The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic need and set up make Current more easily building.Bridge is generally made of superstructure, substructure, bearing and attached structure, top knot Structure is also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is spanning knot The load transfer device of structure and the bearing place setting of bridge pier or abutment;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection, Training works etc..Existing bridge structure is complicated, and difficulty of construction is big, and consumptive material is more, and common rural area, suburb modernization construction are not good for Entirely, drop down water, detour area, locals can only rely on less cost, a small amount of manpower, simple tool, the less time Build Simple bridge, thus be badly in need of it is a kind of facilitating passage, reduce the used time, ensure safety, it is long that bridge can be increased and decreased according to varying environment The simple civilian bridge of degree.
Utility model content
Purpose of the utility model is to solve be not easy to the reliable Simple bridge of Build Security in suburb in the prior art The problem of beam, and the bridge structure that a kind of civil small-scale proposed quickly splices.
To achieve the goals above, the utility model uses following technical solution:
A kind of bridge structure that civil small-scale quickly splices, including multiple inserting columns and bridge plate, the top of each inserting column It is fixedly connected with bridge pier, each bridge plate is erected on bridge pier, and one end of each bridge plate is equipped with fixed plate, often A one end of the bridge plate far from fixed plate offer with the mutually matched fixing groove of fixed plate, the two of each fixed plate It is opened up on side wall there are two fixture block groove, the inside of two fixture block grooves is mounted on spring, and two springs are opposite One end is mounted on wedge-shaped fixture block, and two wedge-shaped fixture blocks are respectively connected with traction rope close to one end of spring, are led described in two The one end of messenger far from wedge-shaped fixture block is connected with drawstring jointly, and the side of the fixed plate offers gathering hole, and the drawstring passes through It fastens fixed board and extends to the inside of gathering hole, the one end of the drawstring far from traction rope is connected with pulling block, each bridge pier It is equipped with mounting base on the roof of both sides, fixed link is equipped on the roof of two mounting base opposite ends, described in two The top of fixed link is rotatably connected to motion bar, and the one end of the motion bar far from fixed link is rotatably connected to compression bar and transmission Bar, the one end of the rotating bar far from motion bar are rotatably connected to inserted link.
Preferably, slot corresponding with inserted link position is offered on the side wall of each bridge plate both sides.
Preferably, the bridge plate includes first plate, intermediate plate and tailgate, and the described one end of head plates far from intermediate plate is not provided with solid Fixed board, the one end of the tailgate far from intermediate plate do not offer fixing groove.
Preferably, the lozenges of each wedge-shaped fixture block is towards fixing groove, each on the madial wall of the fixing groove It offers and the mutually matched card slot of wedge-shaped fixture block.
Preferably, the inside of the fixed plate offers cord hole corresponding with traction rope and drawstring position.
Preferably, it is equipped with fixing sleeve on the roof of each mounting base, and inserted link is plugged in fixing sleeve.
In the utility model, when needing to build bridge, inserting column and bridge pier are first inserted into river bed by operator, then in each bridge pier On put bridge plate, so that bridge plate is connected one by one, fixed plate is inserted into fixing groove, and wedge-shaped fixture block, which is caught in, to be realized in card slot and fix, and is pressed Compression bar, by the transmission of drive link, inserted link is inserted into slot the dual fixation realized to bridge plate.The utility model is simple in structure, It is easy to operation, it is provided with a series of parts easy to use and forms a firm bridge, be easy for installation and removal simultaneously, pole The earth improves the traffic convenience in rural area and suburb, efficiently convenient, is worthy to be popularized.
Description of the drawings
Fig. 1 be the utility model proposes a kind of positive structure schematic of bridge structure quickly spliced of civil small-scale;
Fig. 2 be the utility model proposes a kind of vertical view of bridge structure that quickly splices of civil small-scale;
Fig. 3 be the utility model proposes a kind of enlarged structure of the part A of bridge structure quickly spliced of civil small-scale Schematic diagram;
Fig. 4 be the utility model proposes a kind of enlarged structure of the part B of bridge structure quickly spliced of civil small-scale Schematic diagram.
In figure:1 inserting column, Bridge 2 pier, 3 bridge plates, 4 fixed plates, 5 wedge-shaped fixture blocks, 6 drawstrings, 7 card slots, 8 springs, 9 mounting bases, 10 Fixed link, 11 motion bars, 12 compression bars, 13 drive links, 14 inserted links, 15 slots, 31 first plates, 32 intermediate plates, 33 tailgates.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term "upper", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only The utility model and simplifying describes for ease of description, do not indicate or imply the indicated device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-4, a kind of bridge structure that civil small-scale quickly splices, including multiple inserting columns 1 and bridge plate 3, it is each to insert The top of column 1 has been fixedly connected with bridge pier 2, and each bridge plate 3 is erected on bridge pier 2, and one end of each bridge plate 3 is equipped with fixation Plate 4, the one end of each bridge plate 3 far from fixed plate 4 offer with 4 mutually matched fixing groove of fixed plate, each fixed plate 4 Fixture block groove there are two being opened up on two side, the inside of two fixture block grooves is mounted on spring 8, the opposite one end of two springs 8 It is mounted on wedge-shaped fixture block 5, two wedge-shaped fixture blocks 5 are respectively connected with traction rope close to one end of spring 8, and two traction ropes are far from wedge One end of shape fixture block 5 is connected with drawstring 6 jointly, and the side of fixed plate 4 offers gathering hole, and drawstring 6 is through fixed plate 4 and extends To the inside of gathering hole, the one end of drawstring 6 far from traction rope is connected with pulling block, pulls pulling block that can pull wedge-shaped fixture block 5, each It is equipped with mounting base 9 on the roof of 2 both sides of bridge pier, is equipped with fixed link 10 on the roof of two 9 opposite ends of mounting base, two The top of fixed link 10 is rotatably connected to motion bar 11, and the one end of motion bar 11 far from fixed link 10 is rotatably connected to compression bar 12 With drive link 13, the one end of rotating bar 13 far from motion bar 11 is rotatably connected to inserted link 14.
In the utility model, slot 15 corresponding with 14 position of inserted link is offered on the side wall of 3 both sides of each bridge plate, is inserted Bar 14 is inserted into slot 15 and bridge plate 3 can be fixed, and bridge plate 3 includes first plate 31, intermediate plate 31 and tailgate 33, and first plate 31 is remote One end from intermediate plate 32 is not provided with fixed plate 4, and the one end of tailgate 33 far from intermediate plate 32 does not offer fixing groove, each wedge shape The lozenges of fixture block 5 towards fixing groove, facilitates access in fixing groove, is offered on the madial wall of each fixing groove and wedge shape 5 mutually matched card slot 7 of fixture block, carries out fixed plate 4 locking, and the inside of fixed plate 4 offers and 6 position of traction rope and drawstring Corresponding cord hole is equipped with fixing sleeve on the roof of each mounting base 9, and inserted link 14 is plugged in fixing sleeve, limits inserted link 14 Active path.
In the utility model, when needing to build bridge, inserting column 1 and bridge pier 2 are first inserted into river bed by operator, then in each bridge Bridge plate 3 is put on pier 2, bridge plate 3 is made to connect one by one, and fixed plate 4 is inserted into fixing groove, and wedge-shaped fixture block 5 is caught in card slot 7 and realizes admittedly Fixed, by down-pressed pole 12, by the transmission of drive link 13, inserted link 14 is inserted into slot 15 the dual fixation realized to bridge plate 3.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of bridge structure that civil small-scale quickly splices, including multiple inserting columns(1)And bridge plate(3), it is characterised in that:Each The inserting column(1)Top be fixedly connected with bridge pier(2), each bridge plate(3)It is erected at bridge pier(2)On, Mei Gesuo State bridge plate(3)One end be equipped with fixed plate(4), each bridge plate(3)Far from fixed plate(4)One end offer with it is solid Fixed board(4)Mutually matched fixing groove, each fixed plate(4)Two side on open up there are two fixture block groove, two institutes The inside for stating fixture block groove is mounted on spring(8), two springs(8)Opposite one end is mounted on wedge-shaped fixture block(5), two A wedge-shaped fixture block(5)Close to spring(8)One end be respectively connected with traction rope, two traction ropes are far from wedge-shaped fixture block (5)One end be connected with drawstring jointly(6), the fixed plate(4)Side offer gathering hole, the drawstring(6)Through solid Fixed board(4)And the inside of gathering hole is extended to, the drawstring(6)One end far from traction rope is connected with pulling block, each bridge Pier(2)It is equipped with mounting base on the roof of both sides(9), two mounting bases(9)It is equipped with fixation on the roof of opposite end Bar(10), two fixed links(10)Top be rotatably connected to motion bar(11), the motion bar(11)Far from fixed Bar(10)One end be rotatably connected to compression bar(12)And drive link(13), the rotating bar(13)Far from motion bar(11)One end It is rotatably connected to inserted link(14).
2. the bridge structure that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that:Each bridge Plate(3)It is offered on the side wall of both sides and inserted link(14)The corresponding slot in position(15).
3. the bridge structure that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that:The bridge plate (3)Including first plate(31), intermediate plate(32)And tailgate(33), the head plates(31)Far from intermediate plate(32)One end be not provided with it is solid Fixed board(4), the tailgate(33)Far from intermediate plate(32)One end do not offer fixing groove.
4. the bridge structure that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that:Each wedge Shape fixture block(5)Lozenges towards fixing groove, offered on the madial wall of each fixing groove and wedge-shaped fixture block(5)Phase The card slot mutually coordinated(7).
5. the bridge structure that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that:The fixed plate (4)Inside offer and traction rope and drawstring(6)The corresponding cord hole in position.
6. the bridge structure that a kind of civil small-scale according to claim 1 quickly splices, it is characterised in that:Each peace Fill seat(9)Roof on be equipped with fixing sleeve, and inserted link(14)It is plugged in fixing sleeve.
CN201721481798.1U 2017-11-09 2017-11-09 A kind of bridge structure that civil small-scale quickly splices Expired - Fee Related CN207685651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721481798.1U CN207685651U (en) 2017-11-09 2017-11-09 A kind of bridge structure that civil small-scale quickly splices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721481798.1U CN207685651U (en) 2017-11-09 2017-11-09 A kind of bridge structure that civil small-scale quickly splices

Publications (1)

Publication Number Publication Date
CN207685651U true CN207685651U (en) 2018-08-03

Family

ID=62989192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721481798.1U Expired - Fee Related CN207685651U (en) 2017-11-09 2017-11-09 A kind of bridge structure that civil small-scale quickly splices

Country Status (1)

Country Link
CN (1) CN207685651U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653078A (en) * 2018-12-19 2019-04-19 浙江工业大学 A kind of jack-knife bridge of novel portable
CN109853354A (en) * 2019-01-21 2019-06-07 吴增文 A kind of interim bridge spanning the river structure of Construction of Hydropower Engineering and its construction method
CN110158442A (en) * 2019-06-25 2019-08-23 刘雁峰 Shell connects flitch structural bridge
CN111560832A (en) * 2020-05-18 2020-08-21 河南建筑职业技术学院 Steel frame bridge structure of concatenation fast
CN111827149A (en) * 2020-09-01 2020-10-27 浙江世润建创科技发展有限公司 Bridge widening hinge structure and construction method
CN112227212A (en) * 2020-10-10 2021-01-15 招商局重庆交通科研设计院有限公司 Assembled bridge construction equipment
CN112227117A (en) * 2020-09-29 2021-01-15 广州米粒科技有限公司 Urban rail transit rail quick connecting device
CN112921803A (en) * 2021-03-02 2021-06-08 台州市瑞恒优创科技有限公司 Prefabricated assembled guardrail decking structure
CN113356048A (en) * 2021-07-01 2021-09-07 河南盛鼎建设集团有限公司 Bridge structure and construction method of system thereof
CN113756180A (en) * 2021-10-18 2021-12-07 周口市公路勘察设计院 Combined structure bridge and construction method thereof
CN115387243A (en) * 2022-07-25 2022-11-25 中铁十一局集团有限公司 Construction method for splicing prefabricated steel box girder cantilevers at positions across roads

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653078A (en) * 2018-12-19 2019-04-19 浙江工业大学 A kind of jack-knife bridge of novel portable
CN109653078B (en) * 2018-12-19 2021-01-05 浙江工业大学 Portable folding bridge
CN109853354B (en) * 2019-01-21 2020-07-07 吴增文 Temporary river-crossing bridge structure for hydropower engineering construction and construction method thereof
CN109853354A (en) * 2019-01-21 2019-06-07 吴增文 A kind of interim bridge spanning the river structure of Construction of Hydropower Engineering and its construction method
CN110158442A (en) * 2019-06-25 2019-08-23 刘雁峰 Shell connects flitch structural bridge
CN111560832A (en) * 2020-05-18 2020-08-21 河南建筑职业技术学院 Steel frame bridge structure of concatenation fast
CN111827149A (en) * 2020-09-01 2020-10-27 浙江世润建创科技发展有限公司 Bridge widening hinge structure and construction method
CN112227117A (en) * 2020-09-29 2021-01-15 广州米粒科技有限公司 Urban rail transit rail quick connecting device
CN112227212A (en) * 2020-10-10 2021-01-15 招商局重庆交通科研设计院有限公司 Assembled bridge construction equipment
CN112227212B (en) * 2020-10-10 2021-07-20 招商局重庆交通科研设计院有限公司 Assembled bridge construction equipment
CN112921803A (en) * 2021-03-02 2021-06-08 台州市瑞恒优创科技有限公司 Prefabricated assembled guardrail decking structure
CN113356048A (en) * 2021-07-01 2021-09-07 河南盛鼎建设集团有限公司 Bridge structure and construction method of system thereof
CN113356048B (en) * 2021-07-01 2022-12-27 马鞍山市皖江路桥工程有限公司 Bridge structure and construction method of system thereof
CN113756180A (en) * 2021-10-18 2021-12-07 周口市公路勘察设计院 Combined structure bridge and construction method thereof
CN115387243A (en) * 2022-07-25 2022-11-25 中铁十一局集团有限公司 Construction method for splicing prefabricated steel box girder cantilevers at positions across roads

Similar Documents

Publication Publication Date Title
CN207685651U (en) A kind of bridge structure that civil small-scale quickly splices
CN207933874U (en) A kind of bridge structure that civil small-scale quickly splices
CN107419914A (en) A kind of guard rail for building and its installation method
CN206916691U (en) The multipurpose anti-flood wall of hydraulic pressure auxiliary operation
CN112376677A (en) Sewage draining well for municipal road
CN211285418U (en) Intelligent isolation guardrail in middle of road
CN101476283A (en) Stay-cable sticky shearing type damper with steering mechanism
CN212865983U (en) Structure for preventing soil erosion and water loss
CN213898073U (en) Combined lifting hanging basket with anti-falling device
CN209292865U (en) Steel truss assembly lock head shellfish Lei Gangqiao
CN208309358U (en) A kind of non-motorized lane applied to pontic
CN207700028U (en) A kind of novel compositions bridge structure
CN208136793U (en) A kind of municipal administration bridge protective device
CN106677052B (en) A kind of closed bridge
CN208718210U (en) Prefabricated panel suitable for multilayer assembled architecture
CN115354909B (en) Temporary enclosing baffle for foundation pit
CN217204546U (en) Auxiliary drainage waterlogging prevention structure
CN219638577U (en) Fence for road detection and maintenance convenient to install
CN214831994U (en) Efficient mounting equipment for bridge steel structure
CN207121807U (en) A kind of bridge structure
CN204753343U (en) Single tower cable -stay bridge of bridge floor is arranged to non - symmetry plane broken line
CN112874710B (en) Offshore floating platform module convenient to assemble
CN216551834U (en) Folding flood control door
CN211420912U (en) Support frame for supporting bridge
CN217150538U (en) Drainage structure with anti-floating, anti-seepage and filtering functions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

Termination date: 20181109

CF01 Termination of patent right due to non-payment of annual fee