CN207672634U - A kind of geotechnical engineering construction solum settlement monitoring device - Google Patents

A kind of geotechnical engineering construction solum settlement monitoring device Download PDF

Info

Publication number
CN207672634U
CN207672634U CN201721645989.7U CN201721645989U CN207672634U CN 207672634 U CN207672634 U CN 207672634U CN 201721645989 U CN201721645989 U CN 201721645989U CN 207672634 U CN207672634 U CN 207672634U
Authority
CN
China
Prior art keywords
tube body
inverted draw
draw cut
engineering construction
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721645989.7U
Other languages
Chinese (zh)
Inventor
米永超
王东彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721645989.7U priority Critical patent/CN207672634U/en
Application granted granted Critical
Publication of CN207672634U publication Critical patent/CN207672634U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model discloses a kind of geotechnical engineering construction solum settlement monitoring devices,Including the first tube body,Second tube body,Inverted draw cut,Monitor ruler,Cover board and interior tablet,The top of first tube body is fixedly installed inverted draw cut,Inverted draw cut is provided in round slot and it is connected to the inside of the first tube body,The inside of inverted draw cut is fixedly installed monitoring ruler close to the position on the first tube body top,Second tube body is socketed in the inner side of the first tube body,The intermediate active of second tube body is connected with interior tablet,The inner wall of second tube body offers sliding slot close to the position of interior tablet,The inside of second tube body is connected to by open slot with the inside of sliding slot,Interior tablet is fixedly connected with link block close to the position of open slot,By being fixedly installed inverted draw cut on the top of the first tube body,So that the second tube body can avoid the influence of the sedimentation of the second tube body of external environment pair in the first tubular body monitoring process under the protective effect of inverted draw cut,So that monitoring accuracy improves,It monitors and uses convenient for solum settlement.

Description

A kind of geotechnical engineering construction solum settlement monitoring device
Technical field
The utility model is related to solum settlement monitoring device technical field, specially a kind of geotechnical engineering construction solum settlement Use monitoring device.
Background technology
In geotechnical engineering, such as push pipe, shield or excavation of foundation pit construction, to ensure construction itself or periphery adjacent building The safety of object will carry out information-aided construction, novel to the sedimentation of ground soil layer to monitor in real time, generally use deep soil Sedimentometer timely monitor deep soil settles.
The solum settlement monitoring device used in geotechnical engineering construction in the prior art has the following problems:
1, overall structure is too simple, larger by ectocine so that monitoring accuracy declines.
2, data cannot be observed intuitively in monitoring process, and monitoring method is more troublesome, and influence normal use.
Utility model content
It is above-mentioned to solve the purpose of this utility model is to provide a kind of geotechnical engineering construction solum settlement monitoring device The problem of being proposed in background technology.
To achieve the above object, the utility model provides the following technical solutions:A kind of geotechnical engineering construction solum settlement use Monitoring device, including the first tube body, the second tube body, inverted draw cut, monitoring ruler, cover board and interior tablet, the top of first tube body are solid Surely it is provided with inverted draw cut, the inverted draw cut is provided in round slot and it is connected to the inside of the first tube body, and the inside of the inverted draw cut is close The position on the first tube body top is fixedly installed monitoring ruler, and the monitoring ruler is vertically arranged and offers scale line in the above, The top of the inverted draw cut is connected with cover board, and the top of the cover board is fixedly installed handle, and second tube body is socketed in first The intermediate active of the inner side of tube body, second tube body is connected with interior tablet, and the inner wall of second tube body is close to interior flat The position of plate offers sliding slot, and the internal slide of the sliding slot is connected with slide bar, and the slide bar is set as cylinder, the sliding slot Open slot is offered close to the position of interior tablet, the inside of second tube body is connected to by open slot with the inside of sliding slot, institute It states interior tablet and is fixedly connected with link block close to the position of open slot, one end of the link block extends to inside and the cunning of sliding slot The side of bar is fixedly connected, and the interior tablet between link block and slide bar by being fixedly connected.
Preferably, the diameter of the inverted draw cut is set as twice of the first pipe diameter size.
Preferably, the inside of the cover board and the position of inverted draw cut clamping are fixed and are pasted with rubber seal.
Preferably, the length of second tube body is not less than the length of the first tube body, the axial line of the inverted draw cut and first The axial line setting of tube body is on the same line.
Preferably, the shape of the interior tablet matches with the internal diameter section of the second tube body.
Compared with prior art, the utility model has the beneficial effects that:
1, by being fixedly installed inverted draw cut on the top of the first tube body, so that the second tube body is supervised in the first tubular body The influence of the sedimentation of the second tube body of external environment pair can be avoided during survey under the protective effect of inverted draw cut so that monitoring accuracy It improves, is used convenient for solum settlement monitoring.
2, by being fixedly installed vertical monitoring ruler close to the position of the first tube body in the inside of inverted draw cut, so that the The sedimentation information that two tube bodies occur on the inside of the first tube body can directly be observed by monitoring the comparison of ruler, convenient for understanding in time Information is settled, it is efficiently convenient.
Description of the drawings
Fig. 1 is the utility model overall structure sectional view;
Fig. 2 is the utility model overall structure vertical view;
Fig. 3 is tablet attachment structure schematic diagram in the utility model.
In figure:The first tube bodies of 1-;The second tube bodies of 2-;3- inverted draw cuts;4- monitors ruler;5- scale lines;6- cover boards;7- handles;8- Interior tablet;9- sliding slots;10- slide bars;11- open slots;12- link blocks.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of geotechnical engineering construction solum settlement monitoring Device, including the first tube body 1, the second tube body 2, inverted draw cut 3, monitoring ruler 4, cover board 6 and interior tablet 8, the top of first tube body 1 Be fixedly installed inverted draw cut 3, the inverted draw cut 3 is provided in round slot and it is connected to the inside of the first tube body 1, the inverted draw cut 3 it is interior Side is fixedly installed monitoring ruler 4 close to the position on 1 top of the first tube body, and the monitoring ruler 4 is vertically arranged and opens up in the above There is a scale line 5, the top of the inverted draw cut 3 is connected with cover board 6, and the top of the cover board 6 is fixedly installed handle 7, and described second Tube body 2 is socketed in the inner side of the first tube body 1, and the intermediate active of second tube body 2 is connected with interior tablet 8, and described second The inner wall of tube body 2 offers sliding slot 9 close to the position of interior tablet 8, and the internal slide of the sliding slot 9 is connected with slide bar 10, described Slide bar 10 is set as cylinder, and the sliding slot 9 offers open slot 11 close to the position of interior tablet 8, second tube body 2 it is interior Side is connected to by open slot 11 with the inside of sliding slot 9, and the interior tablet 8 is fixedly connected with link block close to the position of open slot 11 12, the inside that one end of the link block 12 extends to sliding slot 9 is fixedly connected with the side of slide bar 10, and the interior tablet 8 passes through It is fixedly connected between link block 12 and slide bar 10.
In order to just be used with normal monitoring, the diameter of the inverted draw cut 3 is set as the two of 1 diameter of the first tube body Times, the position fixation that the inside of the cover board 6 is clamped with inverted draw cut 3 is pasted with rubber seal, and the length of second tube body 2 is not Less than the length of the first tube body 1, the axial line setting of the axial line of the inverted draw cut 3 and the first tube body 1 is on the same line, described The shape of interior tablet 8 and the internal diameter section of the second tube body 2 match.
Operation principle:Selection needs the soil layer position monitored, is pressed downward inverted draw cut 3 so that the bottom surface of inverted draw cut 3 and soil layer top surface In the same plane, then the second tube body 2 is sleeved on to the inside of the first tube body 1, cover the peace that monitoring device can be completed in cover board 6 It fills, in monitoring process, solum settlement is carried out by observing position of the top of the second tube body 2 on the graduation mark of monitoring ruler 4 Monitoring, simple and convenient, highly effective.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of geotechnical engineering construction solum settlement monitoring device, including the first tube body (1), the second tube body (2), inverted draw cut (3), Monitor ruler (4), cover board (6) and interior tablet (8), it is characterised in that:The top of first tube body (1) is fixedly installed inverted draw cut (3), the inverted draw cut (3) is provided in round slot and it is connected to the inside of the first tube body (1), and the inside of the inverted draw cut (3) is close The position on the first tube body (1) top is fixedly installed monitoring ruler (4), and the monitoring ruler (4) is vertically arranged and opens up in the above There are scale line (5), the top of the inverted draw cut (3) to be connected with cover board (6), the top of the cover board (6) is fixedly installed handle (7), second tube body (2) is socketed in the inner side of the first tube body (1), the intermediate active connection of second tube body (2) There are interior tablet (8), the inner wall of second tube body (2) to offer sliding slot (9), the sliding slot (9) close to the position of interior tablet (8) Internal slide be connected with slide bar (10), the slide bar (10) is set as cylinder, and the sliding slot (9) is close to interior tablet (8) Position offers open slot (11), and the inside of second tube body (2) is connected to by open slot (11) with the inside of sliding slot (9), The interior tablet (8) is fixedly connected with link block (12) close to the position of open slot (11), and one end of the link block (12) is prolonged The inside for extending to sliding slot (9) is fixedly connected with the side of slide bar (10), and the interior tablet (8) passes through link block (12) and slide bar (10) it is fixedly connected between.
2. a kind of geotechnical engineering construction solum settlement monitoring device according to claim 1, it is characterised in that:The top The diameter of slot (3) is set as twice of the first tube body (1) diameter.
3. a kind of geotechnical engineering construction solum settlement monitoring device according to claim 1, it is characterised in that:The lid The inside of plate (6) and the position of inverted draw cut (3) clamping are fixed and are pasted with rubber seal.
4. a kind of geotechnical engineering construction solum settlement monitoring device according to claim 1, it is characterised in that:Described The length of two tube bodies (2) is not less than the length of the first tube body (1), the axle center of the axial line and the first tube body (1) of the inverted draw cut (3) Line is arranged on the same line.
5. a kind of geotechnical engineering construction solum settlement monitoring device according to claim 1, it is characterised in that:In described The shape of tablet (8) and the internal diameter section of the second tube body (2) match.
CN201721645989.7U 2017-12-01 2017-12-01 A kind of geotechnical engineering construction solum settlement monitoring device Expired - Fee Related CN207672634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721645989.7U CN207672634U (en) 2017-12-01 2017-12-01 A kind of geotechnical engineering construction solum settlement monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721645989.7U CN207672634U (en) 2017-12-01 2017-12-01 A kind of geotechnical engineering construction solum settlement monitoring device

Publications (1)

Publication Number Publication Date
CN207672634U true CN207672634U (en) 2018-07-31

Family

ID=62967384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721645989.7U Expired - Fee Related CN207672634U (en) 2017-12-01 2017-12-01 A kind of geotechnical engineering construction solum settlement monitoring device

Country Status (1)

Country Link
CN (1) CN207672634U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306608A (en) * 2019-06-19 2019-10-08 武汉中科岩土工程有限责任公司 Overhead section of pile foundation settlement monitoring device of subway and monitoring method
CN110686659A (en) * 2019-11-22 2020-01-14 夏玉军 Surface subsidence monitoring device for subway tunnel construction
CN111006637A (en) * 2019-11-21 2020-04-14 淮南创大实业有限责任公司 Subsidence area earth's surface settlement monitoring facilities
CN111174755A (en) * 2020-01-09 2020-05-19 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306608A (en) * 2019-06-19 2019-10-08 武汉中科岩土工程有限责任公司 Overhead section of pile foundation settlement monitoring device of subway and monitoring method
CN111006637A (en) * 2019-11-21 2020-04-14 淮南创大实业有限责任公司 Subsidence area earth's surface settlement monitoring facilities
CN111006637B (en) * 2019-11-21 2021-12-07 淮南创大实业有限责任公司 Subsidence area earth's surface settlement monitoring facilities
CN110686659A (en) * 2019-11-22 2020-01-14 夏玉军 Surface subsidence monitoring device for subway tunnel construction
CN110686659B (en) * 2019-11-22 2021-09-21 中铁十八局集团有限公司 Surface subsidence monitoring device for subway tunnel construction
CN111174755A (en) * 2020-01-09 2020-05-19 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method
CN111174755B (en) * 2020-01-09 2022-02-15 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method

Similar Documents

Publication Publication Date Title
CN207672634U (en) A kind of geotechnical engineering construction solum settlement monitoring device
CN203177847U (en) Real-time sedimentation monitoring system
CN103698366A (en) Multifunctional digital rock-soil static cone penetration test system
CN207248084U (en) A kind of detection device for communication pipe interior lights slippery
CN108106595B (en) Monitoring and early warning device for slope deformation
CN205808515U (en) A kind of groundwater resources water quality detection and water level monitoring system
CN211291830U (en) High-efficient safe earth's surface settlement monitoring devices
CN103148772A (en) Section bar type soil internal horizontal displacement measuring instrument
CN205909903U (en) Groundwater level metering device
CN205484334U (en) Soil arid monitoring facilities
CN106545326A (en) A kind of long-spiral drilling machine construction monitoring system
CN203163772U (en) Rice field soil moisture content real-time monitoring system
CN105095671B (en) Settle Monitoring and forecasting system in real-time instrument and system and implementation method
CN203824553U (en) Seeping water guiding device of perpendicular protecting tube
CN204329952U (en) A kind of subgrade settlement monitoring device
CN206035478U (en) Liquid level temperature measuring device in pit
CN206362414U (en) A kind of ultrasonic material level meter
CN216283778U (en) Hydrogeology multilayer groundwater water level surveys device
CN203772243U (en) Underground displacement automatic monitor
CN201751537U (en) Monitoring and early-warning device for tunnel water-burst mud-irruption sudden geologic hazards
CN204329948U (en) Displacement type soil body delaminating deposition DEFORMATION MONITORING SYSTEM
CN206338091U (en) A kind of deep wall-rock crack water automated watch-keeping facility of superelevation
CN207528294U (en) A kind of liquid level emasuring device
CN206369528U (en) A kind of apparatus and system for measuring inside concrete displacement
CN106092268A (en) A kind of groundwater level metering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20181201