Utility model content
The purpose of this utility model is to provide a kind of sewage purifier, is carried out at purification to the sewage of water equipment discharge
Reason recycles, and can effectively drop low water usage cost, and can be with environmental protection.
The utility model provides a kind of sewage purifier, including:Cistern, reagent storage chamber and processing pond;Wherein, institute
Stating cistern has the first circulation water route being connected to water equipment, and the second circulation water route being connected to the processing pond;
The reagent storage chamber is connected to the cistern;The processing pond be followed successively by from top to bottom the precipitation portion of perforation, transition part and
Collection portion, the transition part pass through the second circulation water route and the water storage in small big infundibulate, the precipitation portion under being in
Pond is connected to.
Sewage purifier as described above, wherein the first circulation water route includes supplying water to the water equipment
First feed pipe, and the first return pipe from water equipment reflux sewage;The second circulation water route includes to described
Precipitation portion is sent into the second feed pipe of sewage, and the second return pipe from the precipitation portion reflow treatment water.
Sewage purifier as described above, wherein have what is be connected to second return pipe to sink in the precipitation portion
Shallow lake portion water outlet, and the precipitation portion water inlet that is connected to second feed pipe, wherein the position of precipitation portion water outlet
Higher than the position of precipitation portion water inlet.
Sewage purifier as described above, wherein the cistern has:The storage being connected to first water supply pipe
The first water outlet of pond;The second water outlet of cistern being connected to second water supply pipe;Connect with first water return pipeline
Logical the first water inlet of cistern;Wherein, in the height direction with the first water outlet of cistern, the first water inlet of cistern, storage
The sequence of the second water outlet of pond is set gradually.
Sewage purifier as described above, wherein be provided with sieve in the transition part.
Sewage purifier as described above, wherein be provided with switch valve at the outlet at bottom of the transition part.
Sewage purifier as described above, wherein collecting box is equipped in the collection portion, the bottom of the collecting box is set
There is foldable pulley..
Sewage purifier as described above, wherein be provided with agitating device in the cistern.
Sewage purifier as described above, wherein be provided with flow between the reagent storage chamber and the cistern
Meter.
Sewage purifier as described above, wherein further include climbing ladder, be located at the side of the cistern.
The water of the sewage purifier cistern of the utility model is used for water equipment, and sewage of the water equipment after follows
Reagent is added into cistern for loopback cistern, reagent storage chamber, and the dirt in sewage is made to be precipitated, will through second circulation water route
There is the sewage that dirt is precipitated to be sent into processing pond purified treatment, by the precipitation process in processing pond, precipitation in cistern
Dirt falls into collection portion, and clear water stays in precipitation portion, and treated clear water is finally recycled back to cistern.
Specific implementation mode
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and cannot be construed to the utility model
Limitation.
The utility model discloses a kind of sewage purifier, including:Cistern 1, reagent storage chamber 2 and processing pond 3.Wherein
Store water equipment in cistern 1 needs water to be used, and there are two circulation waterway, first circulation water route and second circulations for tool
Water route, the hereinafter referred to as first via and the second tunnel, wherein the first via is connected to water equipment, for being supplied to water equipment
Water, while being additionally operable to recycle sewage from water equipment.Second tunnel is connected to processing pond 3, will mainly be returned from water equipment
The sewage of receipts is sent to processing pond 3 and is purified, and can purified water be drained back cistern 1 again, for subsequently again to water
Equipment supplies water.Above-mentioned cistern 1, reagent storage chamber 2 and processing pond 3 can select 316 stainless steels to prepare.
Reagent storage chamber 2 is connected to cistern 1, after the sewage of water equipment discharge flows into cistern 1, reagent storage
Chamber 2 is passed through reagent into the cistern 1 with sewage, and the pollutants such as impurity, the particle in sewage is made to be precipitated.
Processing pond 3 is followed successively by precipitation portion 31, transition part 32 and the collection portion 33 of perforation from top to bottom, and transition part 32 is small under being in
Upper big infundibulate, precipitation portion 31 is connected to by the second circulation water route with cistern 1.
Specifically, first circulation water route includes the first feed pipe to supply water to water equipment, and flow back from water equipment
First return pipe of sewage;Second circulation water route includes that the second feed pipe of sewage is sent into precipitation portion 31, and from precipitation portion
Second return pipe of 31 reflow treatment water.
In general, first circulation water route and second circulation water route will not be carried out at the same time cycle operation.It cistern 1 and is set with water
Realize the sewage of water supply and recycling water equipment discharge to water equipment in first circulation water route between standby.And as sewage is arranged
The amount put increases, and the water in cistern 1 can not meet the water quality requirement of water equipment again, be purified, at this point, first follows
Ring water route is stopped, and at least stops supplying water to water equipment, but can continue to recycle the sewage of water equipment discharge.
It is corresponding in cistern 1, processing pond 3 in conjunction with the water pipe setting in above-mentioned first circulation water route and second circulation water route
There is corresponding connector in (especially precipitation portion 31), illustrate the facilities of each section connector separately below.
First say that processing pond 3, precipitation portion 31 and the second feed pipe and the second return pipe have connected relation, in precipitation portion 31
Upper to have precipitation portion water outlet and precipitation portion water inlet, certainly, which is connected to the second return pipe, for that will sink
Water behind shallow lake supplies back cistern 1, precipitation portion water inlet to be connected to the second feed pipe, heavy for introducing the sewage in cistern 1
Shallow lake portion 31.In order to ensure the effect of purification, purification efficiency is improved, the position of precipitation portion water outlet is higher than the position of precipitation portion water inlet
It sets, in precipitation portion 31 after precipitation, the water of the dirt of lower sediment, upper layer is cleaner, therefore the position of precipitation portion water outlet
Height is set, certainly, which is relative altitude, not necessarily will be in top, and specific location will be arranged according to operating mode, excessively high
Position may cause return water unsmooth, and the too low pollutant that lower part may be caused to precipitate in position flows into.
Illustrate cistern 1 now, with the first water outlet of cistern, the second water outlet of cistern, cistern first into
The second water inlet of the mouth of a river and cistern.
The first water outlet of cistern is connected to the first water supply pipe, and the second water outlet of cistern and the second water supply pipe connect
It is logical;And the first water inlet of cistern is connected to the first return pipe, the second water inlet of cistern is connected to the second return pipe.
In the height direction with the first water outlet of cistern, the first water inlet of cistern, the second water outlet of cistern it is suitable
Sequence is set gradually.And the position of the second water inlet can be arranged as required to, preferably on the first water inlet of cistern.
The setting of this position mainly considers that the water quality being located at the top is more preferable, therefore is preferably provided with the first water outlet
Button is used for water equipment.Pollutant in sewage, the pollutant of especially big quality can be because gravity precipitates downwards, therefore
The water quality of bottom is poor, so the second water outlet of cistern is arranged in bottom, the water of bottom is introduced processing pond 3.
Certainly, the pump housing can be set on the first water supply, the first return pipe, the second feed pipe and the second return pipe, to provide
The power of drainage should also have valve certainly, and to control connection situation, such as water equipment supplies water and progress sewage is net
It when change, can not be carried out at the same time, then just needing the control by valve progress connection situation.
Then, reagent storage chamber 2 is passed through reagent to cistern 1, for the dirts such as impurity in sewage to be precipitated.Reagent
Specific ingredient is needed according to the composition adjustment in sewage.Such as have the pollutant for being dissolved in water in sewage, the examination in reagent storage chamber 2
Agent should have the ingredient for making it be precipitated.And if pollutant is insoluble in water, reagent storage chamber 2 can not use, and may be used yet
Being can be by the ingredient of the pollutant polymerization not soluble in water.It is set by the edging in CIGS hull cell production line of water equipment
For standby, which is used for grinding work-piece edge, containing glass powder particles and other pollutants, the glass in the sewage of discharge
Glass powder is not soluble in water, and other pollutants may be dissolved in water, then the reagent used, which can be at least, can allow other pollutions
The ingredient that object is precipitated.Different pollutants is corresponded to according to different reagents, the amount of reagent used is also different, with above-mentioned edging
For equipment, the ratio of the water (sewage quantity) in medicament and cistern 1,4/10000ths between one thousandth.
The quantity of above-mentioned water equipment can be arranged as required to, they can share same set of first circulation water route, when
So, multiple water equipments are usually to be arranged in parallel.
In order to ensure the stabilization being precipitated, flowmeter is provided between reagent storage chamber 2 and cistern 1.Reagent storage chamber 2 with
There is delivery pipe, flowmeter can be arranged in delivery pipe, preferably in one end of close cistern 1, to carry between cistern 1
The levels of precision of high amount of reagent.
By the effect of reagent, pollutant is precipitated in sewage, is provided with agitating device in preferred cistern 1, avoids dirt
Contaminate object precipitation in cistern 1.Then second circulation water route is started to work, and the sewage in cistern 1 is introduced processing pond 3.It is excellent
Choosing, the second feed pipe is connected to the bottom of cistern 1, also can be by accordingly even when there is pollutant to be deposited in 1 bottom of cistern
Lead into processing pond 3.
Preferably sieve is provided in transition part 32.Sieve can the larger pollutant of filter sizes, but will not shadow
Ring the precipitation of smaller pollutant.
Pollutant staticly settles in processing pond 3, and the shape of transition part 32 contributes to the decline of pollutant, will not clamping stagnation,
Pollutant eventually falls into collection portion 33.
The exit of the bottom of transition part 32 is provided with switch valve.Sediment can be deposited on the bottom in precipitation portion 31 at first
Portion can turn on the switch valve after depositing dosed quantities, it is made to fall into collection portion 33.After in this way can be to avoid precipitation, there is water collecting
In portion 33, it can not recycle and cause to waste, using switch valve, can effectively avoid wasting water.
Precipitation floss hole is provided in collection portion 33, with easy cleaning sediment.Specifically, there is inside in collection portion 33
Accommodating space, collecting box is provided in the accommodating space, for accepting sediment.In collecting box bottom, pulley is set, with
Facilitate taking-up collecting box, clears up precipitation therein.Preferably, which is folding.
It checks or repairs in order to facilitate staff, climbing ladder 4 is additionally provided in the side of cistern 1.
In addition, being additionally provided with fluid level controller in cistern 1, liquid level can be obtained, it is usually right in processing pond 3
After sewage disposal, after purified water is led back in cistern 1, if liquid level cannot be met the requirements, can be additional to
Add water in cistern 1.It is similar, it is provided with sensor in reagent storage chamber 2, equally monitors the amount of reagent therein, by
It is not necessarily limited to liquid in the reagent, therefore sensor can be diversified forms, as long as monitoring reagent can be realized
Amount can send out alarm when amount of reagent is low.
The structure, feature and effect of the utility model are described in detail based on the embodiments shown in the drawings, with
Upper described is only the preferred embodiment of the utility model, but the utility model is to limit practical range shown in drawing, it is every according to
Change made by conception according to the utility model, or be revised as the equivalent embodiment of equivalent variations, still without departing from specification and figure
When showing covered spirit, it should be within the protection scope of the present utility model.