CN207671749U - Sewage purifier - Google Patents

Sewage purifier Download PDF

Info

Publication number
CN207671749U
CN207671749U CN201721781383.6U CN201721781383U CN207671749U CN 207671749 U CN207671749 U CN 207671749U CN 201721781383 U CN201721781383 U CN 201721781383U CN 207671749 U CN207671749 U CN 207671749U
Authority
CN
China
Prior art keywords
cistern
water
sewage
precipitation
sewage purifier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721781383.6U
Other languages
Chinese (zh)
Inventor
齐维滨
林俊荣
李新宇
张学良
王宏
姜威
吕河江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongjun new energy Co.,Ltd.
Original Assignee
Beijing Apollo Ding Rong Solar Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Apollo Ding Rong Solar Technology Co Ltd filed Critical Beijing Apollo Ding Rong Solar Technology Co Ltd
Priority to CN201721781383.6U priority Critical patent/CN207671749U/en
Application granted granted Critical
Publication of CN207671749U publication Critical patent/CN207671749U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The utility model discloses a kind of sewage purifiers to include:Cistern, reagent storage chamber and processing pond;Wherein, cistern has the first circulation water route being connected to water equipment, and the second circulation water route being connected to processing pond;Reagent storage chamber, is connected to cistern;Processing pond is followed successively by precipitation portion, transition part and the collection portion of perforation from top to bottom, and transition part is connected to by second circulation water route with cistern in small big infundibulate, precipitation portion under being in.The water of the sewage purifier cistern of the utility model is used for water equipment, effluent cycle after water equipment is used returns cistern, reagent is added into cistern for reagent storage chamber, so that the dirt in sewage is precipitated, through second circulation water route, will there is the sewage that dirt is precipitated to be sent into processing pond purified treatment in cistern, by the precipitation process in processing pond, the dirt of precipitation falls into collection portion, and clear water stays in precipitation portion, and treated clear water is finally recycled back to cistern.

Description

Sewage purifier
Technical field
The utility model is related to a kind of sewage purifiers.
Background technology
Water pollution situation in China's allows of no optimist at present, has continuous degradating trend, the vicious circle impetus not to change still greatly, The following sewage disposal must will be changed from " concentration " tupe to " dispersion " tupe.Pollution sources are blocked with source, are pre- The most effective means of anti-secondary pollution.Realize " dispersion " processing target, equipment is the most important thing.
Edger unit in CIGS hull cell production line needs to cool down it with a large amount of water when in use, because Edger unit processing object is the float glass of plated film, can be contaminated as cooling water, contain in generated waste water in this way There are a large amount of glass powder particles, direct emission that will seriously affect environment and great lot of water resources is caused to waste.Therefore, it is using water wisely And environmental protection, water recycling equipment is just at necessity.
Utility model content
The purpose of this utility model is to provide a kind of sewage purifier, is carried out at purification to the sewage of water equipment discharge Reason recycles, and can effectively drop low water usage cost, and can be with environmental protection.
The utility model provides a kind of sewage purifier, including:Cistern, reagent storage chamber and processing pond;Wherein, institute Stating cistern has the first circulation water route being connected to water equipment, and the second circulation water route being connected to the processing pond; The reagent storage chamber is connected to the cistern;The processing pond be followed successively by from top to bottom the precipitation portion of perforation, transition part and Collection portion, the transition part pass through the second circulation water route and the water storage in small big infundibulate, the precipitation portion under being in Pond is connected to.
Sewage purifier as described above, wherein the first circulation water route includes supplying water to the water equipment First feed pipe, and the first return pipe from water equipment reflux sewage;The second circulation water route includes to described Precipitation portion is sent into the second feed pipe of sewage, and the second return pipe from the precipitation portion reflow treatment water.
Sewage purifier as described above, wherein have what is be connected to second return pipe to sink in the precipitation portion Shallow lake portion water outlet, and the precipitation portion water inlet that is connected to second feed pipe, wherein the position of precipitation portion water outlet Higher than the position of precipitation portion water inlet.
Sewage purifier as described above, wherein the cistern has:The storage being connected to first water supply pipe The first water outlet of pond;The second water outlet of cistern being connected to second water supply pipe;Connect with first water return pipeline Logical the first water inlet of cistern;Wherein, in the height direction with the first water outlet of cistern, the first water inlet of cistern, storage The sequence of the second water outlet of pond is set gradually.
Sewage purifier as described above, wherein be provided with sieve in the transition part.
Sewage purifier as described above, wherein be provided with switch valve at the outlet at bottom of the transition part.
Sewage purifier as described above, wherein collecting box is equipped in the collection portion, the bottom of the collecting box is set There is foldable pulley..
Sewage purifier as described above, wherein be provided with agitating device in the cistern.
Sewage purifier as described above, wherein be provided with flow between the reagent storage chamber and the cistern Meter.
Sewage purifier as described above, wherein further include climbing ladder, be located at the side of the cistern.
The water of the sewage purifier cistern of the utility model is used for water equipment, and sewage of the water equipment after follows Reagent is added into cistern for loopback cistern, reagent storage chamber, and the dirt in sewage is made to be precipitated, will through second circulation water route There is the sewage that dirt is precipitated to be sent into processing pond purified treatment, by the precipitation process in processing pond, precipitation in cistern Dirt falls into collection portion, and clear water stays in precipitation portion, and treated clear water is finally recycled back to cistern.
Description of the drawings
Fig. 1 is the schematic diagram of the utility model sewage purifier.
Reference numeral:
Cistern 1, reagent storage chamber 2, processing pond 3, climbing ladder 4, precipitation portion 31, transition part 32, collection portion 33.
Specific implementation mode
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and cannot be construed to the utility model Limitation.
The utility model discloses a kind of sewage purifier, including:Cistern 1, reagent storage chamber 2 and processing pond 3.Wherein Store water equipment in cistern 1 needs water to be used, and there are two circulation waterway, first circulation water route and second circulations for tool Water route, the hereinafter referred to as first via and the second tunnel, wherein the first via is connected to water equipment, for being supplied to water equipment Water, while being additionally operable to recycle sewage from water equipment.Second tunnel is connected to processing pond 3, will mainly be returned from water equipment The sewage of receipts is sent to processing pond 3 and is purified, and can purified water be drained back cistern 1 again, for subsequently again to water Equipment supplies water.Above-mentioned cistern 1, reagent storage chamber 2 and processing pond 3 can select 316 stainless steels to prepare.
Reagent storage chamber 2 is connected to cistern 1, after the sewage of water equipment discharge flows into cistern 1, reagent storage Chamber 2 is passed through reagent into the cistern 1 with sewage, and the pollutants such as impurity, the particle in sewage is made to be precipitated.
Processing pond 3 is followed successively by precipitation portion 31, transition part 32 and the collection portion 33 of perforation from top to bottom, and transition part 32 is small under being in Upper big infundibulate, precipitation portion 31 is connected to by the second circulation water route with cistern 1.
Specifically, first circulation water route includes the first feed pipe to supply water to water equipment, and flow back from water equipment First return pipe of sewage;Second circulation water route includes that the second feed pipe of sewage is sent into precipitation portion 31, and from precipitation portion Second return pipe of 31 reflow treatment water.
In general, first circulation water route and second circulation water route will not be carried out at the same time cycle operation.It cistern 1 and is set with water Realize the sewage of water supply and recycling water equipment discharge to water equipment in first circulation water route between standby.And as sewage is arranged The amount put increases, and the water in cistern 1 can not meet the water quality requirement of water equipment again, be purified, at this point, first follows Ring water route is stopped, and at least stops supplying water to water equipment, but can continue to recycle the sewage of water equipment discharge.
It is corresponding in cistern 1, processing pond 3 in conjunction with the water pipe setting in above-mentioned first circulation water route and second circulation water route There is corresponding connector in (especially precipitation portion 31), illustrate the facilities of each section connector separately below.
First say that processing pond 3, precipitation portion 31 and the second feed pipe and the second return pipe have connected relation, in precipitation portion 31 Upper to have precipitation portion water outlet and precipitation portion water inlet, certainly, which is connected to the second return pipe, for that will sink Water behind shallow lake supplies back cistern 1, precipitation portion water inlet to be connected to the second feed pipe, heavy for introducing the sewage in cistern 1 Shallow lake portion 31.In order to ensure the effect of purification, purification efficiency is improved, the position of precipitation portion water outlet is higher than the position of precipitation portion water inlet It sets, in precipitation portion 31 after precipitation, the water of the dirt of lower sediment, upper layer is cleaner, therefore the position of precipitation portion water outlet Height is set, certainly, which is relative altitude, not necessarily will be in top, and specific location will be arranged according to operating mode, excessively high Position may cause return water unsmooth, and the too low pollutant that lower part may be caused to precipitate in position flows into.
Illustrate cistern 1 now, with the first water outlet of cistern, the second water outlet of cistern, cistern first into The second water inlet of the mouth of a river and cistern.
The first water outlet of cistern is connected to the first water supply pipe, and the second water outlet of cistern and the second water supply pipe connect It is logical;And the first water inlet of cistern is connected to the first return pipe, the second water inlet of cistern is connected to the second return pipe.
In the height direction with the first water outlet of cistern, the first water inlet of cistern, the second water outlet of cistern it is suitable Sequence is set gradually.And the position of the second water inlet can be arranged as required to, preferably on the first water inlet of cistern.
The setting of this position mainly considers that the water quality being located at the top is more preferable, therefore is preferably provided with the first water outlet Button is used for water equipment.Pollutant in sewage, the pollutant of especially big quality can be because gravity precipitates downwards, therefore The water quality of bottom is poor, so the second water outlet of cistern is arranged in bottom, the water of bottom is introduced processing pond 3.
Certainly, the pump housing can be set on the first water supply, the first return pipe, the second feed pipe and the second return pipe, to provide The power of drainage should also have valve certainly, and to control connection situation, such as water equipment supplies water and progress sewage is net It when change, can not be carried out at the same time, then just needing the control by valve progress connection situation.
Then, reagent storage chamber 2 is passed through reagent to cistern 1, for the dirts such as impurity in sewage to be precipitated.Reagent Specific ingredient is needed according to the composition adjustment in sewage.Such as have the pollutant for being dissolved in water in sewage, the examination in reagent storage chamber 2 Agent should have the ingredient for making it be precipitated.And if pollutant is insoluble in water, reagent storage chamber 2 can not use, and may be used yet Being can be by the ingredient of the pollutant polymerization not soluble in water.It is set by the edging in CIGS hull cell production line of water equipment For standby, which is used for grinding work-piece edge, containing glass powder particles and other pollutants, the glass in the sewage of discharge Glass powder is not soluble in water, and other pollutants may be dissolved in water, then the reagent used, which can be at least, can allow other pollutions The ingredient that object is precipitated.Different pollutants is corresponded to according to different reagents, the amount of reagent used is also different, with above-mentioned edging For equipment, the ratio of the water (sewage quantity) in medicament and cistern 1,4/10000ths between one thousandth.
The quantity of above-mentioned water equipment can be arranged as required to, they can share same set of first circulation water route, when So, multiple water equipments are usually to be arranged in parallel.
In order to ensure the stabilization being precipitated, flowmeter is provided between reagent storage chamber 2 and cistern 1.Reagent storage chamber 2 with There is delivery pipe, flowmeter can be arranged in delivery pipe, preferably in one end of close cistern 1, to carry between cistern 1 The levels of precision of high amount of reagent.
By the effect of reagent, pollutant is precipitated in sewage, is provided with agitating device in preferred cistern 1, avoids dirt Contaminate object precipitation in cistern 1.Then second circulation water route is started to work, and the sewage in cistern 1 is introduced processing pond 3.It is excellent Choosing, the second feed pipe is connected to the bottom of cistern 1, also can be by accordingly even when there is pollutant to be deposited in 1 bottom of cistern Lead into processing pond 3.
Preferably sieve is provided in transition part 32.Sieve can the larger pollutant of filter sizes, but will not shadow Ring the precipitation of smaller pollutant.
Pollutant staticly settles in processing pond 3, and the shape of transition part 32 contributes to the decline of pollutant, will not clamping stagnation, Pollutant eventually falls into collection portion 33.
The exit of the bottom of transition part 32 is provided with switch valve.Sediment can be deposited on the bottom in precipitation portion 31 at first Portion can turn on the switch valve after depositing dosed quantities, it is made to fall into collection portion 33.After in this way can be to avoid precipitation, there is water collecting In portion 33, it can not recycle and cause to waste, using switch valve, can effectively avoid wasting water.
Precipitation floss hole is provided in collection portion 33, with easy cleaning sediment.Specifically, there is inside in collection portion 33 Accommodating space, collecting box is provided in the accommodating space, for accepting sediment.In collecting box bottom, pulley is set, with Facilitate taking-up collecting box, clears up precipitation therein.Preferably, which is folding.
It checks or repairs in order to facilitate staff, climbing ladder 4 is additionally provided in the side of cistern 1.
In addition, being additionally provided with fluid level controller in cistern 1, liquid level can be obtained, it is usually right in processing pond 3 After sewage disposal, after purified water is led back in cistern 1, if liquid level cannot be met the requirements, can be additional to Add water in cistern 1.It is similar, it is provided with sensor in reagent storage chamber 2, equally monitors the amount of reagent therein, by It is not necessarily limited to liquid in the reagent, therefore sensor can be diversified forms, as long as monitoring reagent can be realized Amount can send out alarm when amount of reagent is low.
The structure, feature and effect of the utility model are described in detail based on the embodiments shown in the drawings, with Upper described is only the preferred embodiment of the utility model, but the utility model is to limit practical range shown in drawing, it is every according to Change made by conception according to the utility model, or be revised as the equivalent embodiment of equivalent variations, still without departing from specification and figure When showing covered spirit, it should be within the protection scope of the present utility model.

Claims (10)

1. a kind of sewage purifier, which is characterized in that including:
Cistern (1), reagent storage chamber (2) and processing pond (3);Wherein,
The cistern (1) has the first circulation water route that is connected to water equipment, and the be connected to the processing pond (3) Two-cycle road;
The reagent storage chamber (2) is connected to the cistern (1);
The processing pond (3) is followed successively by precipitation portion (31), transition part (32) and the collection portion (33) of perforation, the mistake from top to bottom Small big infundibulate under portion (32) is in is crossed, the precipitation portion (31) passes through the second circulation water route and the cistern (1) Connection.
2. sewage purifier according to claim 1, which is characterized in that
The first circulation water route includes the first feed pipe to supply water to the water equipment, and is flowed back from the water equipment First return pipe of sewage;
The second circulation water route includes that the second feed pipe of sewage is sent into the precipitation portion (31), and from the precipitation portion (31) the second return pipe of reflow treatment water.
3. sewage purifier according to claim 2, which is characterized in that
There is the precipitation portion water outlet being connected to second return pipe on the precipitation portion (31), and supply water with described second The precipitation portion water inlet of pipe connection, wherein the position of precipitation portion water outlet is higher than the position of precipitation portion water inlet.
4. sewage purifier according to claim 2, which is characterized in that
The cistern (1) has:
The first water outlet of cistern being connected to first water supply pipe;
The second water outlet of cistern being connected to second water supply pipe;
The first water inlet of cistern being connected to first water return pipeline;Wherein,
In the height direction with the first water outlet of cistern, the first water inlet of cistern, the second water outlet of cistern sequence according to Secondary setting.
5. sewage purifier according to claim 1, which is characterized in that
It is provided with sieve in the transition part (32).
6. sewage purifier according to claim 1, which is characterized in that
It is provided with switch valve at the outlet at bottom of the transition part (32).
7. sewage purifier according to claim 1, which is characterized in that
Collecting box is equipped in the collection portion (33), the bottom of the collecting box is equipped with foldable pulley.
8. sewage purifier according to claim 1, which is characterized in that
It is provided with agitating device in the cistern (1).
9. sewage purifier according to claim 1, which is characterized in that
It is provided with flowmeter between the reagent storage chamber (2) and the cistern (1).
10. sewage purifier according to claim 1, which is characterized in that
Further include climbing ladder (4), is located at the side of the cistern (1).
CN201721781383.6U 2017-12-19 2017-12-19 Sewage purifier Active CN207671749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721781383.6U CN207671749U (en) 2017-12-19 2017-12-19 Sewage purifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721781383.6U CN207671749U (en) 2017-12-19 2017-12-19 Sewage purifier

Publications (1)

Publication Number Publication Date
CN207671749U true CN207671749U (en) 2018-07-31

Family

ID=62969515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721781383.6U Active CN207671749U (en) 2017-12-19 2017-12-19 Sewage purifier

Country Status (1)

Country Link
CN (1) CN207671749U (en)

Similar Documents

Publication Publication Date Title
CN113479981A (en) Sewage treatment method
CN207659263U (en) A kind of industrial sewage processing unit
CN207671749U (en) Sewage purifier
CN108947128A (en) Urea industrial production waste water treatment apparatus
CN206027243U (en) Lead acid battery closes cream waste water recycling device
CN103086535B (en) Low-pressure film rainwater quick purification device
CN215403460U (en) Multistage wastewater treatment device
CN207175661U (en) A kind of desulfurization wastewater treatment system
CN216737850U (en) Slice wastewater resourceful treatment retrieval and utilization device
CN215756753U (en) Online circulation recovery system of silicon wafer cutting fluid
CN108408989A (en) Water treatment facilities in aluminum alloy pattern plate high-pressure cleaning system
CN213060598U (en) Municipal sludge heavy metal treatment system
CN108609710A (en) A kind of municipal wastewater processing unit that process cycle is short
CN209522686U (en) A kind of processing unit handling mercurous waste liquid
CN208055101U (en) A kind of water quantity exchange device for wastewater treatment
CN204159125U (en) A kind of fracturing outlet liquid treatment facility
CN208980532U (en) Electroplating waste water high-efficiency processing system
CN106380019A (en) Novel water body purification device
CN207943962U (en) A kind of coating wastewater processing unit
CN111592129A (en) Concrete mixing plant water circulation method and system
CN207031135U (en) The Waste Water Treatment of copper ion containing network of integrated circuit industry
CN104150630A (en) Heavy metal capture device
CN110614586A (en) Cooling water circulation system and application method thereof
CN203170621U (en) Environment-protecting and energy-saving efficient cleaning workshop
CN207986893U (en) Papermaking wastewater automated processing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201217

Address after: 102206 1611, floor 16, building 5, No. 106, Kexing West Road, Changping District, Beijing

Patentee after: Beijing heshengtong Technology Co.,Ltd.

Address before: 100176 Beijing Daxing District Beijing economic and Technological Development Zone Rongchang East Street 7 hospital 6 Building 3001 room.

Patentee before: BEIJING APOLLO DING RONG SOLAR TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210324

Address after: 101400 Yanqi Street, Yanqi Economic Development Zone, Huairou District, Beijing

Patentee after: Dongjun new energy Co.,Ltd.

Address before: 102206 1611, floor 16, building 5, No. 106, Kexing West Road, Changping District, Beijing

Patentee before: Beijing heshengtong Technology Co.,Ltd.