CN203170621U - Environment-protecting and energy-saving efficient cleaning workshop - Google Patents

Environment-protecting and energy-saving efficient cleaning workshop Download PDF

Info

Publication number
CN203170621U
CN203170621U CN 201320172581 CN201320172581U CN203170621U CN 203170621 U CN203170621 U CN 203170621U CN 201320172581 CN201320172581 CN 201320172581 CN 201320172581 U CN201320172581 U CN 201320172581U CN 203170621 U CN203170621 U CN 203170621U
Authority
CN
China
Prior art keywords
sewage
pump
cleaning
water
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320172581
Other languages
Chinese (zh)
Inventor
王东发
董本才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320172581 priority Critical patent/CN203170621U/en
Application granted granted Critical
Publication of CN203170621U publication Critical patent/CN203170621U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Water Treatment By Electricity Or Magnetism (AREA)

Abstract

The utility model provides an environment-protecting and energy-saving efficient cleaning workshop, which is used for solving the problem that each cleaning station cannot independently control the starting and the stopping of a cleaning device. The cleaning workshop comprises a cold and hot water cleaning mechanism, a sewage and sludge treating pond and an oil sewage integration comprehensive treatment mechanism, wherein the cold and hot water cleaning mechanism comprises a plurality of cleaning platforms at different heights, cleaning pump units corresponding to cleaning tables one by one, cold water supply main pipes and hot water supply main pipes, each cleaning platform is provided with a plurality of cleaning stations, each cleaning station is provided with a cleaning spray gun, the cleaning stations positioned in the same vertical position form one cleaning table, the cold water supply main pipes are connected with the cleaning pump units through cold water electromagnetic valves, and the hot water supply main pipes are connected with the cleaning pump units through hot water electromagnetic valves. The cleaning workshop realizes the effects that each cleaning station has an independent cold water and hot water selecting function and the cleaning pump units have a start and stop function, and the cleaning efficiency is improved.

Description

Between the efficient cleaning Vehicle of environment-friendly and energy-efficient
Technical field
The utility model relates between the efficient cleaning Vehicle of a kind of environment-friendly and energy-efficient in industrial cleaning field, is applicable to design between advanced cleaning Vehicle and the technological transformation between conventional cleaning Vehicle.
Background technology
Between the cleaning Vehicle of conventional design, mainly there is following problem at present:
One, the problem of cleaning device.Conventional design is separately to design with the equipment clipping room between washing and cleaning operation, the cold high pressure hot cleaner is installed in equipment room, adopt a large-scale high-pressure cleaning device, hot and cold water is supply separately, by pressure duct water under high pressure is transported to each washing station, the overflow pressure maintaining valve is adopted in the high-pressure pump outlet, and when washing station was not carried out operation, water tank was returned in unnecessary water under high pressure overflow; The deficiency of this system: (one), a large amount of water under high pressures reflux and have wasted a lot of energy; (2), each washing station can not independently select to clean the supply at water source; (3), each washing station can not independently be controlled the startup of cleaning device and stop; (4) in case cleaning device breaks down, there is not standby host, big to the influence of washing and cleaning operation.
Two, the problem of sewage-treatment plant.Only designed oil removal and three grades of sedimentation basins between the cleaning Vehicle that has, do not disposed special sewage-treatment plant, the cleaning design of workshop that has special sewage-treatment plant but operational effect is very poor.Mainly there are following problems and shortcomings in existing sewage-treatment plant: (one), make up a prescription and the chemicals dosing plant bad adaptability, and fault rate height, medicament are deposited on bottom, dosing pond easily, and stop up dosing pump and dosing pipe easily; (2), the existence of sump oil causes filter element to stop up the backwash weak effect of filter element easily; (3), the impurity component of sewage causes the oil removing material to lose efficacy fast easily, water outlet oil content severe overweight; (4), operate and the control complexity poor stability of device operation; (5), sewage disposal is adopted air-float technology, the effluent characteristics generation considerable influence of the easy centering Small Sewage Treatment Equipment of chain slag scraping mechanism more; (6), device is difficult to satisfy the requirement of user's batch process, the process complexity that device is restarted.
The sewage that produces after cleaning can't be realized recycling, and the underproof sewage of sewage or processing back that cleaning the back does not have to handle is discharged in a large number, has both wasted precious water resource, again environment has been caused more serious pollution.
Three, the problem for the treatment of tank.For the system of three grades of precipitation process of sewage, generally design 4 treatment ponds, be respectively sewage one-level sedimentation basin, sewage second-level settling pond, three grades of sedimentation basins of sewage, mud settlement on storage pond; Because there is defective in design at the bottom of the pond of the existing positive centrum for the treatment of tank, the relevant sewage disposal device in the cesspool generally is installed in the central authorities for the treatment of pond, causes the installation cost height, and maintenance is inconvenient; Three sedimentation basins all need to employ equipment such as crane, excavator, dump truck in addition, frequently carry out pond operation clearly, consume great amount of manpower and material resources and financial resources.
The utility model content
The utility model proposes between the efficient cleaning Vehicle of a kind of environment-friendly and energy-efficient, solved the problem that each washing station can not independently be controlled the cleaning device startup and stop in the prior art.
The technical solution of the utility model is achieved in that between the efficient cleaning Vehicle of environment-friendly and energy-efficient, comprises hot and cold water wiper mechanism, sewage and the Treatment of Sludge pond, the integrated integrated treatment of the oil-polluted water mechanism that are arranged in order, and described hot and cold water wiper mechanism comprises:
A plurality of cleaning platforms that are positioned at differing heights, each described cleaning platform is provided with a plurality of washing stations, is equipped with cleaning spray gun on each described washing station, and all washing stations that are positioned at same upright position are formed a rinsing table position;
Corresponding one by one between a plurality of scavenging pump units, described scavenging pump unit and described rinsing table position;
The cold feed house steward, each described scavenging pump unit is connected with described cold feed house steward by the cold water magnetic valve, and described cold feed house steward is communicated with the cold water storage bin by the cold water stop valve;
The hot water supply main, each described scavenging pump unit is connected with described hot water supply main by the hot water electromagnetic valve, and described hot water supply main is communicated with hot water heating storage bin by the hot water stop valve.
As preferred embodiment a kind of, described scavenging pump unit comprises scavenging pump and connected drive motors; All cleaning spray guns of described rinsing table position are communicated on the corresponding scavenging pump by water pump outlet pipe, and described water pump outlet pipe is provided with pressure switch and safety valve; Be equipped with the execute-in-place case on all washing stations of described rinsing table position, described execute-in-place case is the control box that line traffic control or controlled in wireless are arranged, the execute-in-place case state consistency on all washing stations of described same rinsing table position; Be equipped with the time-delay that is electrically connected with described execute-in-place case on each described rinsing table position and shut down controlling organization.
As to improvement of the technical scheme, described hot and cold water wiper mechanism also comprises the return main who is connected with described cold water storage bin; Be equipped with overflow valve on the water pump outlet pipe of described scavenging pump, described overflow valve is communicated on the described return main by return duct.
As preferred embodiment a kind of, described sewage and Treatment of Sludge pond comprise the three grades of sedimentation basins of sewage sludge sedimentation basin, sewage second-level settling pond, sewage that are arranged in order, have on the described sewage sludge sedimentation basin for the sewage inlet that flows into sewage, described sewage sludge sedimentation basin and described sewage second-level settling pond are provided with overfall one, be provided with overfall two between three grades of sedimentation basins of described sewage second-level settling pond and described sewage, the bottom surface height of described sewage inlet, described overfall one, described overfall two reduces successively.
As to improvement of the technical scheme, in the described sewage sludge sedimentation basin, in the described sewage second-level settling pond, be equipped with sludge pump under the liquid in three grades of sedimentation basins of described sewage.
As preferred embodiment a kind of, the integrated integrated treatment of described oil-polluted water mechanism comprises interconnective chemicals dosing plant and the sewage Integrated Processing Unit of making up a prescription continuously, and the described chemicals dosing plant that makes up a prescription continuously comprises
Two dosing ponds that isolate mutually, described dosing is equipped with Scatula in the pond, all has some outages on the sidewall of described Scatula, is equipped with agitator in the described Scatula;
The water inlet manifold that makes up a prescription is equipped with the water intaking valve that makes up a prescription on it, the described water intaking valve that makes up a prescription makes up a prescription into by two that the water arm is communicated with described Scatula respectively, and described making up a prescription into is equipped with the magnetic valve that makes up a prescription on the water arm;
Dosing pump, its import department is provided with feed liquor electricity triple valve, and its exit is communicated with the pump discharging tube, and described feed liquor electricity triple valve is provided with the pump feed tube that stretches into respectively in the described dosing pond, and described pump discharging tube stretches in the described sewage Integrated Processing Unit;
Described sewage Integrated Processing Unit comprises the sewage feed pump that extracts sewage in three grades of sedimentation basins of described sewage.
As to improvement of the technical scheme, the exit of described dosing pump also is provided with back liquid electricity triple valve, and described time liquid electricity triple valve is provided with the pump liquid back pipe that stretches into respectively in two described Scatulas; Be provided with blowback liquid valve between described dosing pump and described time liquid electricity triple valve, described pump discharging tube is provided with the pump tapping valve.
As to further improvement in the technical proposal, be equipped with make up a prescription ball float and scarce medicine ball float in the described dosing pond; The described ball float that makes up a prescription is electrically connected between the magnetic valve with corresponding making up a prescription, and is electrically connected between described scarce medicine ball float and described feed liquor electricity triple valve, described time liquid electricity triple valve.
As preferred embodiment a kind of, described sewage Integrated Processing Unit comprises
Case is finished in the flocculation blending bin of Lian Tonging, elementary flocculation tanks and flocculation successively, is provided with the blending bin agitator in the described flocculation blending bin, is provided with the flocculation tanks agitator in the described elementary flocculation tanks, and described flocculation is finished to be provided with in the case and finished box mixer;
Settling tank, being arranged at described flocculation finishes the downstream of case and is communicated with it, the lower space of described settling tank is the sediment collecting box, the upper space of described settling tank is provided with the oil slick collection and is communicated with middle force (forcing) pump for sewage effluent, described in the middle of the downstream of force (forcing) pump be provided with a plurality of water separation tank successively;
Blowdown main is equipped with the blowdown triple valve between described blowdown main and described sediment collecting box, the described water separation tank;
Described flocculation blending bin is connected with described sewage feed pump, and described flocculation blending bin also is communicated with described pump discharging tube.
As to improvement of the technical scheme, described flocculation blending bin is provided with the blending bin sample tap, and described elementary flocculation tanks is provided with the flocculation tanks sample tap, and described flocculation is finished case and is provided with and finishes the case sample tap; Be provided with up and down float switch one and the float switch two arranged in the described settling tank, be electrically connected between described float switch one and the described sewage feed pump, be electrically connected between described float switch two and the described centre force (forcing) pump.
After having adopted technique scheme, the beneficial effects of the utility model are: the hot and cold water wiper mechanism between this cleaning Vehicle has at first proposed the concept of rinsing table position, can comprise a plurality of rinsing tables position between cleaning Vehicle, and each rinsing table position can comprise a plurality of washing stations again; The second, independently scavenging pump unit and independently water system have been designed in corresponding each rinsing table position, and be separate between the rinsing table position, complement one another, even fault has appearred in the equipment of a rinsing table position, washing and cleaning operation can be carried out in other rinsing table position in the same old way.
Owing on each washing station, all be provided with the execute-in-place case, and be equipped with the time-delay that is electrically connected with the execute-in-place case on each rinsing table position and shut down controlling organization, can be implemented in any one execute-in-place case control cold water and the selection of hot water and start and stop of scavenging pump unit like this, reduce labor intensity of operating personnel, improved the efficient of washing and cleaning operation; And time-delay shuts down controlling organization and made things convenient for the movement of operating personnel between same cleaning platform or different cleaning platform, avoided the frequent starting of scavenging pump unit and the waste of water resource.
Owing to traditional sewage one-level sedimentation basin and mud settlement on storage pond are merged into the sewage sludge sedimentation basin, can effectively reduce floor space and the engineering cost for the treatment of pond.
Owing in the sewage sludge sedimentation basin, in the sewage second-level settling pond, all be provided with sludge pump under the liquid in three grades of sedimentation basins of sewage, can effectively solve the online timely cleaning problem of above-mentioned three sedimentation basins bottom sludge liquid.
The integrated integrated treatment of oil-polluted water between this cleaning Vehicle mechanism at first is provided with Scatula in the dosing pond, and adopts band setting-out direct injection medicament, can effectively avoid medicament in the deposition of bottom, dosing pond; The second, the design of employing pump tapping valve and blowback liquid valve both can have been strengthened the circulation of soup, again the convenient dose that adds of adjusting dosing pump; The 3rd, adopt the designs in two cover Scatulas and dosing pond, realized making up a prescription and the continuous automatic job of dosing; The 4th, the blending bin of will flocculating, elementary flocculation tanks and flocculation are finished the case design and are in the same place, inner UNICOM, and compact conformation, and design has agitator separately, can effectively guarantee the rapid precipitation of solid flocculate; The 5th, optimal design water separation tank and water-oil separating material thereof, guaranteed the effect of water-oil separating, and do not needed backwash and exhaust operation, do not need to increase in addition the contaminant filter unit yet; The 6th, designed a plurality of blowdown triple valves, realized the automatic pollution discharge of sediment collecting box, a plurality of water separation tank.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram of 16 washing stations in corresponding 4 the rinsing table positions of the utility model;
Fig. 2 is the electrical control block diagram of 16 washing stations in corresponding 4 the rinsing table positions of the utility model;
Fig. 3 is make up a prescription the continuously process flow diagram of chemicals dosing plant of the utility model;
Fig. 4 is the process flow diagram of the utility model sewage Integrated Processing Unit;
Fig. 5 is the embodiment of the utility model hot and cold water wiper mechanism;
Fig. 6 is the local enlarged diagram at I place among Fig. 5;
Fig. 7 is the embodiment of the utility model execute-in-place case;
Fig. 8 is the embodiment in the utility model sewage and Treatment of Sludge pond;
Fig. 9 is the cross-sectional schematic at A-A place among Fig. 8;
Figure 10 is the cross-sectional schematic at B-B place among Fig. 8;
Figure 11 is the embodiment of the integrated integrated treatment of oil-polluted water mechanism;
Figure 12 is the local enlarged diagram at II place among Figure 11;
Figure 13 is the part sectioned view of the integrated integrated treatment of oil-polluted water mechanism;
Among the figure: the 001-electrical control cabinet; 002-hot water stop valve; 003-hot water supply main; 004-cold water stop valve; 005-cold feed house steward; 006-return main; The total pipe holder of 007-; 008-installs the basis; 009-pump group base; 100-drive motors one; The 101-coupling guard; The 102-scavenging pump; 103-hot water electromagnetic valve one; 104-hot water supply pipe one; 105-cold water magnetic valve one; 106-cold feed pipe one; 107-water pump outlet pipe one; 108-overflow valve one; 109-return duct one; 110-Pressure gauge one; The 111-pressure switch; The 112-safety valve; 113-cold water X button; 114-cold water is opened button; 115-cold feed lamp; 116-hot water X button; 117-hot water is opened button; 118-hot water supply lamp; 119-pump group stop botton; 120-pump group start button; 121-pump group running indicator; 122-drive motors two; 123-drive motors three; 124-drive motors four; 201-dosing pond one; The 202-magnetic valve one that makes up a prescription; 203-Scatula one; 204-pump liquid back pipe one; 205-agitator one; 206-pump feed tube one; The 207-ball float one that makes up a prescription; 208-lacks medicine ball float one; 211-dosing pond two; The 212-magnetic valve two that makes up a prescription; 213-Scatula two; 214-pump liquid back pipe two; 215-agitator two; 216-pump feed tube two; The 217-ball float two that makes up a prescription; 218-lacks medicine ball float two; The 301-water inlet manifold that makes up a prescription; The 302-water intaking valve that makes up a prescription; 303-blowback liquid valve; The 304-dosing pump; 305-pump discharging tube; 306-pump tapping valve; 307-feed liquor electricity triple valve; 308-returns liquid electricity triple valve; 401-sewage feed pump; The 402-blending bin of flocculating; 403-blending bin agitator; 404-blending bin sample tap; The elementary flocculation tanks of 405-; 406-flocculation tanks agitator; 407-flocculation tanks sample tap; Case is finished in the 408-flocculation; 409-finishes box mixer; 410-finishes the case sample tap; The 411-settling tank; 412-oil slick collection; Force (forcing) pump in the middle of the 413-; 414-one-level water separation tank; 415-secondary water separation tank; The 416-ultraviolet sterilizer; 417-sediment collecting box; 418-blowdown triple valve one; 419-blowdown triple valve two; 420-blowdown triple valve three; The 421-blowdown main; 422-float switch one; 423-float switch two; The 424-device pedestal; 425-device switch board; 501-sewage sludge sedimentation basin; The 502-sewage second-level settling pond; Three grades of sedimentation basins of 503-sewage; The 504-sewage inlet; 505-overfall one; 506-overfall two; Sludge pump one under the 507-liquid; Sludge pump two under the 508-liquid; Sludge pump three under the 509-liquid; 510-submerged pump base; 511-awl end horizontal plane; 512-bores inclined-plane one partially; 513-bores inclined-plane two partially; 514-bores inclined-plane three partially; 515-treatment pond vertical side.
The specific embodiment
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
Embodiment:
Comprise between the efficient cleaning Vehicle of environment-friendly and energy-efficient of the present utility model: hot and cold water wiper mechanism, sewage and Treatment of Sludge pond, the integrated integrated treatment of oil-polluted water mechanism, wherein, the hot and cold water wiper mechanism provides hot and cold water for cleaning equipment, sewage and Treatment of Sludge pond are collected sewage, mud after cleaning and are precipitated, and the integrated integrated treatment of oil-polluted water mechanism carries out recycling after the integrated treatment to oettIed sewage.
(1), among this embodiment, design has 4 cleaning platforms between cleaning Vehicle, be respectively 0 meter absolute altitude cleaning platform, 4 meters left and right sides absolute altitude cleaning platforms, 8 meters left and right sides absolute altitude cleaning platforms, 12 meters left and right sides absolute altitude cleaning platforms, design has 4 washing stations about before and after on each cleaning platform, be equipped with cleaning spray gun on each washing station, 4 identical washing stations of upright position are formed a rinsing table position, and namely adding up between cleaning Vehicle has 4 rinsing table positions.
As shown in Figure 1, the whole process flow of hot and cold water wiper mechanism is among this embodiment:
Hot water, the cold water in the cold water storage bin in the hot water reservoir enter the scavenging pump unit through hot water electromagnetic valve, cold water magnetic valve respectively, and through flowing to the cleaning spray gun ejection after the pressurization of scavenging pump unit, realize high-pressure wash.
The downstream position that is positioned at the scavenging pump unit at the pipeline of current is equipped with overflow valve, and when all cleaning spray guns were not worked, water under high pressure can be back in the return header through overflow valve, and finally flow in the cold water storage bin, avoided the waste of water resource.
In addition, in order to improve the security performance of system, Pressure gauge, safety valve are installed also between overflow valve and cleaning spray gun, make things convenient for staff's observing system working condition.
As shown in Figure 2, the electrical control flow process of hot and cold water wiper mechanism is among this embodiment:
The staff realizes control to electrical control cabinet by operation control box or pressure switch, and then realizes control to hot water electromagnetic valve, scavenging pump unit, cold water magnetic valve by electrical control cabinet.Simultaneously, also be respectively equipped with cold water float switch, hot water float switch in the cold water storage bin, in the hot water reservoir, play certain excessive low water level protection, it can realize the control to electrical control cabinet equally.
As shown in Figure 5, concrete structure schematic diagram for the hot and cold water wiper mechanism, its water source part comprises hot water supply main 003 and cold feed house steward 005, hot water supply main 003 end extend in the hot water heating storage bin (not shown), cold feed house steward 005 end extend in the cold water storage bin (not shown), hot water supply main 003 break-make that hot water stop valve 002 is used for control hot water is installed, the break-make that cold water stop valve 004 is used for control cold water is installed on the cold feed house steward 005.
As shown in Figure 6, local enlarged diagram for I place among Fig. 5, the scavenging pump unit comprises a scavenging pump 102 and is connected the drive motors 1 that is used for providing power with it, be provided with 101 protective actions of coupling guard in both junctions (certainly, the structure of all the other scavenging pump units all is identical with it, its power source is respectively drive motors 2 122, drive motors 3 123, drive motors 4 124, and concrete structure no longer is repeated in this description at this).Be communicated with by hot water supply pipe 1 between hot water supply main 003 and the scavenging pump 102, at hot water supply pipe 1 hot water electromagnetic valve 1 is installed, same, be communicated with by cold feed pipe 1 between cold feed house steward 005 and the scavenging pump 102, at cold feed pipe 1 cold water magnetic valve 1 be installed.
Water pump outlet pipe 1 is installed on the scavenging pump 102, at the end of water pump outlet pipe 1 cleaning spray gun is installed.In order to increase the safety operation of system, Pressure gauge 1, pressure switch 111 and safety valve 112 also are installed on the water pump outlet pipe 1, make things convenient for the staff to observe situation.
Overflow valve 1 also is installed on water pump outlet pipe 1, and overflow valve 1 is communicated with on return main 006 by return duct 1, and return main 006 end extend in the cold water storage bin simultaneously.
Above-mentioned whole scavenging pump unit, comprise that hot water supply main 003, cold feed house steward 005 all are mounted on the installation basis 008, hot water supply main 003 and cold feed house steward 005 be support on total pipe holder 007, scavenging pump 102 is installed on the pump group base 009.
As shown in Figure 7, be the profile schematic diagram of execute-in-place case, be equipped with such execute-in-place case on each washing station, 16 execute-in-place casees are namely arranged among this embodiment, and the duty of 4 execute-in-place casees of each rinsing table position is consistent.Staff's operation on the control box at the scene will directly reach and be installed in electrical control cabinet 001 place of installing on the basis 008, directly control each hot water electromagnetic valve, cold water magnetic valve and scavenging pump by electrical control cabinet 001.Being respectively equipped with cold water X button 113, cold water at the scene on the control box turns on button 114, cold feed lamp 115, hot water X button 116, hot water and turns on button 117, hot water supply lamp 118, pump group stop botton 119, pump group start button 120, pump group running indicator 121; any one execute-in-place case all can carry out the selection of cold water and hot water, all can control the startup of corresponding scavenging pump unit and stops.
In addition, corresponding each rinsing table position is provided with time-delay and shuts down controlling organization in electrical control cabinet 001, directly the control scavenging pump unit corresponding with it.
Do simple declaration with regard to the job step of hot and cold water wiper mechanism below:
Can press hot water X button 116 when using cold water and cold water is opened button 114, cold feed lamp 115 brightens; Can press cold water X button 113 when using hot water and hot water is opened button 117, hot water supply lamp 118 brightens; Under the situation that cold feed lamp 115 or hot water supply lamp 118 is lighted, press pump group start button 120, pump group running indicator 121 brightens, and starts the scavenging pump unit, hold with a firm grip the handle of corresponding cleaning spray gun, the high-speed water jet that utilizes spray gun to produce is aimed at cleaning object and is carried out washing and cleaning operation; Need be between same rinsing table position or different rinsing table position during the shift position, can unclamp the handle of cleaning spray gun, cleaning spray gun quits work, and time-delay is shut down controlling organization and is begun to start, and water under high pressure is the Returning water storage bin after the overflow valve overflow; Shut down before time that controlling organization sets arrives in time-delay, any one of this rinsing table position of holding with a firm grip again can be restarted washing and cleaning operation to the handle of cleaning spray gun; If the time arrival that controlling organization is set is shut down in time-delay, then the scavenging pump unit of this rinsing table position correspondence is out of service automatically; Continue washing and cleaning operation if desired, can press pump group start button 120 and restart the scavenging pump unit; Press pump group stop botton 119, the scavenging pump unit is out of service.
(2), as shown in Fig. 8, Fig. 9 and Figure 10 are common, the sewage among this embodiment and Treatment of Sludge pond comprise: sewage sludge sedimentation basin 501, sewage second-level settling pond 502, three grades of sedimentation basins 503 of sewage, the dischargeable capacity of each treatment pond is 40m 3, be inclined to one side wimble structure at the bottom of the pond of sedimentation basin; At the bottom of the inclined to one side awl pond of sedimentation basin by treatment pond vertical side 515, partially bore inclined-plane 1, partially bore inclined-plane 2 513, bore inclined-plane 3 514 partially, awl end horizontal plane 511 is formed, bore end horizontal plane 511 and be of a size of: 1m * 1m; 501 designs of sewage sludge sedimentation basin have sewage inlet 504, sewage sludge after the hot and cold water wiper mechanism cleans enters from sewage inlet 504, design has overfall 1 between sewage sludge sedimentation basin 501 and the sewage second-level settling pond 502, design has overfall 2 506 between three grades of sedimentation basins 503 of sewage second-level settling pond 502 and sewage, and the bottom surface height of sewage inlet 504, overfall 1, overfall 2 506 reduces 100-200mm successively; Sludge pump 1 under the liquid of 1 band agitating device of sewage sludge sedimentation basin 501 installations, at sewage second-level settling pond 502 sludge pump 2 508 under 1 liquid is installed, at three grades of sedimentation basins of sewage 503 sludge pump 3 509 under 1 liquid is installed, sludge pump is all installed by submerged pump base 510 under these three liquid; Can utilize sludge pump with the sludge liquid suction sewage sludge sedimentation basin 501 of sedimentation basin bottom accumulation as required at any time.
The flow process that settlement of sewage is handled is generally: sewage at first enters sewage sludge sedimentation basin 501, enter sewage second-level settling pond 502, three grades of sedimentation basins 503 of sewage after overflowing successively, the integrated integrated treatment of oil-polluted water mechanism extracts sewage from three grades of sedimentation basins of sewage 503, water enters the cold water storage bin in forming after the integrated treatment, and the sludge liquid that produces in the sewage disposal process enters sewage sludge sedimentation basin 501; Can utilize sludge pump with the sludge liquid suction sewage sludge sedimentation basin 501 of sedimentation basin bottom accumulation as required at any time.The flow process of Treatment of Sludge is: start sludge pump 1 under the liquid of installing in the sewage sludge sedimentation basin 501, extract sludge liquid and enter sludge treatment equipment, handle the isolated sewage in back through sludge treatment equipment and return sewage sludge sedimentation basin 501, isolated mud is unified to handle as solid waste.
If the solid impurity in the sewage is less or sewage in the solid impurity precipitability fine, can reduce the one-level sedimentation basin, be sewage second-level precipitation process system with three grades of precipitation process system optimizations of sewage; Sewage second-level precipitation process system comprises: all adopt inclined to one side wimble structure at the bottom of the pond of sewage sludge storage pool 501 and 502,2 treatment ponds of sewage second-level settling pond.
(3), the integrated integrated treatment of the oil-polluted water mechanism among this embodiment comprises interconnective chemicals dosing plant and the sewage Integrated Processing Unit of making up a prescription continuously, Fig. 3 Fig. 4 is respectively the process flow diagram of these two devices.
As Figure 11, shown in Figure 12 and Figure 13 were common, the chemicals dosing plant that makes up a prescription continuously comprised: dosing pond 1, Scatula 1, water inlet pipe 301 makes up a prescription, water intaking valve 302 makes up a prescription, magnetic valve 1 makes up a prescription, dosing pump 304, pump feed tube 1, feed liquor electricity triple valve 307, pump discharging tube 305, pump tapping valve 306, pump liquid back pipe 1, blowback liquid valve 303, return liquid electricity triple valve 308, agitator 1, ball float 1 makes up a prescription, lack medicine ball float 1, dosing pond 2 211, Scatula 2 213, magnetic valve 2 212 makes up a prescription, pump feed tube 2 216, pump liquid back pipe 2 214, agitator 2 215, ball float 2 217 makes up a prescription, lack medicine ball float 2 218.The chemicals dosing plant that makes up a prescription continuously design has two cover dosing pond and Scatulas, and Scatula designs in the dosing pond, two uniform outages of side plate of Scatula; The centrifugal soup dosing pump 304 of self-priming is installed in top, dosing pond, the pump inlet design has feed liquor electricity triple valve 307, and be divided into two-way pump feed tube (pump feed tube 1 and pump feed tube 2 216) by feed liquor electricity triple valve 307, insert dosing pond separately respectively, pump feed tube bottom and dosing pond base plate are at a distance of suitable distance; Blowback liquid valve 303 outlet design has back liquid electricity triple valve 308, and is divided into two-way pump liquid back pipe (pump liquid back pipe 1 and pump liquid back pipe 2 214) and inserts respectively in separately the Scatula by returning the electric triple valve 308 of liquid; Water intaking valve 302 outlets of making up a prescription on the water inlet manifold 301 of making up a prescription are divided into make up a prescription water arm into of two-way and feed respectively in separately the Scatula, and two-way makes up a prescription on the water arm respectively that design has magnetic valve (magnetic valve 1 and the magnetic valve 2 212 that makes up a prescription make up a prescription) to control its water inlet; All designing in each dosing pond has scarce medicine ball float and the ball float that makes up a prescription, and the operation of agitator does not influence the state of ball float; The state of a control of dosing pump 304 switches has three kinds: manually/stop/automatically, the state of a control of two way solenoid valves (magnetic valve 1 and the magnetic valve 2 212 that makes up a prescription make up a prescription) switch also has three kinds: manually/stop/automatically.
The working procedure of chemicals dosing plant of making up a prescription continuously is as follows:
1. according to the dischargeable capacity in dosing pond and the ratio of making up a prescription of requirement, load weighted former medicine is added Scatula 1.
2. open the water intaking valve 302 that makes up a prescription, pump tapping valve 306 and blowback liquid valve 303, forward dosing pump 304, magnetic valve one 202 switches that make up a prescription to " automatically " position, agitator one 205 operations, enter dosing pond 1 behind the former medicine mixed dissolution in band setting-out and the Scatula 1, water level in dosing pond 1 reaches going up in limited time of ball float one 207 settings of making up a prescription, the magnetic valve 1 that makes up a prescription cuts out and stops into water, and agitator 1 continues operation.
3. after the magnetic valve 1 that makes up a prescription cuts out, the path of feed liquor electricity triple valve 307 and time liquid electricity triple valve 308 forwards dosing pond 1 to, the time-delay certain hour, dosing pump 304 will start automatically, the aperture of adjusting pump tapping valve 306 and blowback liquid valve 303 can change and adds what of dose, band pushes back the stream soup and returns Scatula 1 and flow into dosing pond 1, and agitator 1 continues operation.
4. according to the dischargeable capacity in dosing pond and the ratio of making up a prescription of requirement, load weighted former medicine is added Scatula 2 213.
5. magnetic valve 2 212 switches that will make up a prescription forward " automatically " position to, agitator 2 215 operations, enter dosing pond 2 211 behind the former medicine mixed dissolution in band setting-out and the Scatula 2 213, water level in dosing pond 2 211 reaches going up in limited time of ball float 2 217 settings of making up a prescription, the magnetic valve 2 212 that makes up a prescription cuts out and stops into water, and agitator 2 215 continues operation.
6. when the liquid level in the dosing pond 1 was reduced to the position that lacks one 208 settings of medicine ball float, the path of feed liquor electricity triple valve 307 and time liquid electricity triple valve 308 forwarded dosing pond 2 211 to, and agitator 1 shuts down, dosing pond one 201 scarce medicine sound and light alarms.
7. an amount of former medicine is added Scatula 1, remove the scarce medicine sound and light alarm in dosing pond 1, the magnetic valve 1 that makes up a prescription is opened into water, agitator 1 starts operation, water level in dosing pond 1 reaches going up in limited time of ball float one 207 settings of making up a prescription, the magnetic valve 1 that makes up a prescription cuts out and stops into water, and agitator 1 continues operation.
8. when the liquid level in the dosing pond 2 211 was reduced to the position that lacks 2 218 settings of medicine ball float, the path of feed liquor electricity triple valve 307 and time liquid electricity triple valve 308 forwarded dosing pond 1 to, and agitator 2 215 is out of service, dosing pond 2 211 scarce medicine sound and light alarms.
9. an amount of former medicine is added Scatula 2 213, remove the scarce medicine sound and light alarm in dosing pond 2 211, the magnetic valve 2 212 that makes up a prescription is opened into water, agitator 2 215 starts operation, water level up to dosing pond 2 211 reaches going up in limited time of ball float 2 217 settings of making up a prescription, the magnetic valve 2 212 that makes up a prescription cuts out and stops into water, and agitator 2 215 continues operation.
10. so circulation just can realize continuous automated dispensing operation and feeding operations.
The sewage Integrated Processing Unit comprises: sewage feed pump 401, float switch 1, flocculation blending bin 402, blending bin agitator 403, blending bin sample tap 404, elementary flocculation tanks 405, flocculation tanks agitator 406, flocculation tanks sample tap 407, case 408 is finished in flocculation, finish box mixer 409, finish case sample tap 410, settling tank 411, oil slick collection 412, middle force (forcing) pump 413, float switch 2 423, one-level water separation tank 414, secondary water separation tank 415, ultraviolet sterilizer 416, sediment collecting box 417, blowdown triple valve 1, blowdown triple valve 2 419, blowdown triple valve 3 420, blowdown main 421, device switch board 425.Flocculation blending bin 402, elementary flocculation tanks 405, flocculation are finished case 408 designs together, inner UNICOM, and design the agitator that different rotating speeds is arranged separately; Float switch 1 and float switch 2 423 designs are on settling tank 411 tops; Sediment collecting box 417 designs in the bottom of settling tank 411, and by blowdown triple valve 3 420 control blowdowns automatically; Sewage draining exit has all been designed in one-level water separation tank 414 and secondary water separation tank 415 bottoms, and respectively by blowdown triple valve 1 and blowdown triple valve 2 419 control blowdown automatically; Above-mentioned all members are all installed design on a device pedestal 424.
The working procedure of sewage Integrated Processing Unit is as follows:
1. sewage enters flocculation blending bin 402 after 401 pressurizations of sewage feed pump, and mixes with the soup of dosing pump 304 outputs under the stirring of blending bin agitator 403.
2. the mixed sewage of dosing enters elementary flocculation tanks 405, and under the stirring of flocculation tanks agitator 406 preliminary flocculation reaction takes place.
3. the sewage after the preliminary flocculation enters flocculation and finishes case 408, and finishes the flocculation reaction of sewage under the stirring of finishing box mixer 409.
4. use transparent vessel from blending bin sample tap 404, flocculation tanks sample tap 407, finish case sample tap 410 sampling, can check and monitor the situation of the mixing situation of sewage dosing, elementary flocculation reaction, the situation of final flocculation reaction respectively.
5. the sewage after the flocculation enters settling tank 411, solid sediment progressively precipitates and enters sediment collecting box 417 in settling tank 411, little oil droplet in the sewage progressively is gathered into larger oil droplet and rises to water surface formation oil slick, and by 412 collections of oil slick collection, force (forcing) pump 413 in the middle of the settling tank 411 tops later sewage of clarification enters.
6. through the clarification sewage after middle force (forcing) pump 413 pressurizations, through one-level water separation tank 414 and secondary water separation tank 415, a small amount of oil content residual in the sewage is adsorbed fixing, pass through the online sterilizing of ultraviolet ray disinfector 416 again, the water quality after the processing can reach the requirement of state sewage emission standard and the requirement that recycles.
7. blowdown triple valve 3 420 blowdown of control sediment collecting box 417 automatically, blowdown triple valve 1 is the blowdown of control one-level water separation tank 414 automatically, blowdown triple valve 2 419 is the blowdown of control secondary water separation tank 415 automatically, and all blowdowns are returned mud collecting precipitation pond through blowdown main 421.
8. the liquid level in settling tank 411 is higher than the high water level that float switch 1 is set, and when perhaps the dosing pond lacked the medicine warning, sewage feed pump 401 and dosing pump 304 were out of service automatically.
9. when the liquid level in the settling tank 411 was lower than the low water level of float switch 2 423 settings, middle force (forcing) pump 413 was out of service automatically.
Between the efficient cleaning Vehicle of environment-friendly and energy-efficient according to the utility model design, the technological process between whole cleaning Vehicle is as follows:
1. the water source that utilizes cold water storage bin and hot water heating storage bin to provide adopts the hot and cold water wiper mechanism, and the equipment and the parts that between cleaning Vehicle needs are cleaned carry out the high-pressure wash operation.
2. the sewage that produces behind the washing and cleaning operation flows into sewage sludge sedimentation basin 501, sewage second-level settling pond 502 and three grades of sedimentation basins 503 of sewage in sewage and Treatment of Sludge pond successively, and sewage is progressively precipitated.
3. utilize the integrated integrated treatment of oil-polluted water mechanism, extract sewage from three grades of sedimentation basins of sewage 503, water enters the cold water storage bin in forming after the integrated treatment, and the sludge liquid that produces in the sewage disposal process enters sewage sludge sedimentation basin 501.
4. utilize the sludge liquid suction sewage sludge sedimentation basin 501 that sludge pump accumulates the sedimentation basin bottom under the liquid as required at any time.
5. utilize the overhead base centrifugal sludge treating system of spiral shell that crouches, sludge pump 1 under the primer fluid, extract sludge liquid and enter sludge treatment equipment, handle the isolated sewage in back through sludge treatment equipment and return sewage sludge sedimentation basin 501, isolated mud enters diesel dumper, unifies to handle as solid waste.
Between the efficient cleaning Vehicle of environment-friendly and energy-efficient according to the utility model design, realized following target:
1, on any one washing station between cleaning Vehicle, all can independently realize cold water washing and cleaning operation or the hot water washing and cleaning operation of highly effective and safe.
2, all recycle sewage zero-discharge, energy-conserving and environment-protective after the sewage process integrated treatment that washing and cleaning operation produces.
3, with sewage sludge sedimentation basin and the overhead base centrifugal sludge treating system optimum organization of spiral shell for sleeping in, can fully phase out the clear pond operation of a large amount of human and material resources of frequent consumption and financial resources.
4, with between conventional cleaning Vehicle compare, the comprehensive cleaning cost between the efficient cleaning Vehicle of environment-friendly and energy-efficient reduces 30-40%.
Between the efficient cleaning Vehicle of this environment-friendly and energy-efficient, the design of hot and cold water wiper mechanism has realized that each washing station independently carries out start and stop function and the time-delay shutdown function of the selection function of cold water and hot water, scavenging pump unit, has improved efficient and the effect of washing and cleaning operation; The design in sewage and Treatment of Sludge pond, be conducive to the collection of precipitation and the sludge liquid of sewage, be conducive to the I﹠M of sewage disposal relevant device in the treatment pond, the design of having saved mud settlement on storage pond has simultaneously significantly prolonged the time of sedimentation basin clear pond operation; The design of chemicals dosing plant of making up a prescription continuously can adapt to the intermittence of all kinds medicament or automated dispensing feeding operations continuously, and caking does not influence normally carrying out that it makes up a prescription yet even medicament is clamminess; The integrated design of sewage Integrated Processing Unit has solved the problems that existing similar sewage-treatment plant exists, and is simple to operate, stable and reliable operation, intermittently and continuously processing all can, have a very strong applicability.
The above only is preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (10)

1. between the efficient cleaning Vehicle of environment-friendly and energy-efficient, comprise hot and cold water wiper mechanism, sewage and the Treatment of Sludge pond, the integrated integrated treatment of the oil-polluted water mechanism that are arranged in order, it is characterized in that: described hot and cold water wiper mechanism comprises
A plurality of cleaning platforms that are positioned at differing heights, each described cleaning platform is provided with a plurality of washing stations, is equipped with cleaning spray gun on each described washing station, and all washing stations that are positioned at same upright position are formed a rinsing table position;
Corresponding one by one between a plurality of scavenging pump units, described scavenging pump unit and described rinsing table position;
The cold feed house steward, each described scavenging pump unit is connected with described cold feed house steward by the cold water magnetic valve, and described cold feed house steward is communicated with the cold water storage bin by the cold water stop valve;
The hot water supply main, each described scavenging pump unit is connected with described hot water supply main by the hot water electromagnetic valve, and described hot water supply main is communicated with hot water heating storage bin by the hot water stop valve.
2. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 1, it is characterized in that: described scavenging pump unit comprises scavenging pump and connected drive motors;
All cleaning spray guns of described rinsing table position are communicated on the corresponding scavenging pump by water pump outlet pipe, and described water pump outlet pipe is provided with pressure switch and safety valve;
Be equipped with the execute-in-place case on all washing stations of described rinsing table position, described execute-in-place case is the control box that line traffic control or controlled in wireless are arranged, the execute-in-place case state consistency on all washing stations of described same rinsing table position;
Be equipped with the time-delay that is electrically connected with described execute-in-place case on each described rinsing table position and shut down controlling organization.
3. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 2, it is characterized in that: described hot and cold water wiper mechanism also comprises the return main who is connected with described cold water storage bin;
Be equipped with overflow valve on the water pump outlet pipe of described scavenging pump, described overflow valve is communicated on the described return main by return duct.
4. as between the efficient cleaning Vehicle of each described environment-friendly and energy-efficient of claim 1 to 3, it is characterized in that: described sewage and Treatment of Sludge pond comprise
The sewage sludge sedimentation basin that is arranged in order, sewage second-level settling pond, three grades of sedimentation basins of sewage, have on the described sewage sludge sedimentation basin for the sewage inlet that flows into sewage, described sewage sludge sedimentation basin and described sewage second-level settling pond are provided with overfall one, be provided with overfall two between three grades of sedimentation basins of described sewage second-level settling pond and described sewage, the bottom surface height of described sewage inlet, described overfall one, described overfall two reduces successively.
5. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 4, it is characterized in that: in the described sewage sludge sedimentation basin, in the described sewage second-level settling pond, be equipped with sludge pump under the liquid in three grades of sedimentation basins of described sewage.
6. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 4, it is characterized in that: the integrated integrated treatment of described oil-polluted water mechanism comprises interconnective chemicals dosing plant and the sewage Integrated Processing Unit of making up a prescription continuously;
The described chemicals dosing plant that makes up a prescription continuously comprises
Two dosing ponds that isolate mutually, described dosing is equipped with Scatula in the pond, all has some outages on the sidewall of described Scatula, is equipped with agitator in the described Scatula;
The water inlet manifold that makes up a prescription is equipped with the water intaking valve that makes up a prescription on it, the described water intaking valve that makes up a prescription makes up a prescription into by two that the water arm is communicated with described Scatula respectively, and described making up a prescription into is equipped with the magnetic valve that makes up a prescription on the water arm;
Dosing pump, its import department is provided with feed liquor electricity triple valve, and its exit is communicated with the pump discharging tube, and described feed liquor electricity triple valve is provided with the pump feed tube that stretches into respectively in the described dosing pond, and described pump discharging tube stretches in the described sewage Integrated Processing Unit;
Described sewage Integrated Processing Unit comprises the sewage feed pump that extracts sewage in three grades of sedimentation basins of described sewage.
7. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 6, it is characterized in that: the exit of described dosing pump also is provided with back liquid electricity triple valve, and described time liquid electricity triple valve is provided with the pump liquid back pipe that stretches into respectively in two described Scatulas;
Be provided with blowback liquid valve between described dosing pump and described time liquid electricity triple valve, described pump discharging tube is provided with the pump tapping valve.
8. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 7, it is characterized in that: be equipped with make up a prescription ball float and scarce medicine ball float in the described dosing pond;
The described ball float that makes up a prescription is electrically connected between the magnetic valve with corresponding making up a prescription, and is electrically connected between described scarce medicine ball float and described feed liquor electricity triple valve, described time liquid electricity triple valve.
9. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 6, it is characterized in that: described sewage Integrated Processing Unit comprises
Case is finished in the flocculation blending bin of Lian Tonging, elementary flocculation tanks and flocculation successively, is provided with the blending bin agitator in the described flocculation blending bin, is provided with the flocculation tanks agitator in the described elementary flocculation tanks, and described flocculation is finished to be provided with in the case and finished box mixer;
Settling tank, being arranged at described flocculation finishes the downstream of case and is communicated with it, the lower space of described settling tank is the sediment collecting box, the upper space of described settling tank is provided with the oil slick collection and is communicated with middle force (forcing) pump for sewage effluent, described in the middle of the downstream of force (forcing) pump be provided with a plurality of water separation tank successively;
Blowdown main is equipped with the blowdown triple valve between described blowdown main and described sediment collecting box, the described water separation tank;
Described flocculation blending bin is connected with described sewage feed pump, and described flocculation blending bin also is communicated with described pump discharging tube.
10. between the efficient cleaning Vehicle of environment-friendly and energy-efficient as claimed in claim 9, it is characterized in that: described flocculation blending bin is provided with the blending bin sample tap, and described elementary flocculation tanks is provided with the flocculation tanks sample tap, and described flocculation is finished case and is provided with and finishes the case sample tap;
Be provided with up and down float switch one and the float switch two arranged in the described settling tank, be electrically connected between described float switch one and the described sewage feed pump, be electrically connected between described float switch two and the described centre force (forcing) pump.
CN 201320172581 2013-04-08 2013-04-08 Environment-protecting and energy-saving efficient cleaning workshop Expired - Fee Related CN203170621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320172581 CN203170621U (en) 2013-04-08 2013-04-08 Environment-protecting and energy-saving efficient cleaning workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320172581 CN203170621U (en) 2013-04-08 2013-04-08 Environment-protecting and energy-saving efficient cleaning workshop

Publications (1)

Publication Number Publication Date
CN203170621U true CN203170621U (en) 2013-09-04

Family

ID=49067376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320172581 Expired - Fee Related CN203170621U (en) 2013-04-08 2013-04-08 Environment-protecting and energy-saving efficient cleaning workshop

Country Status (1)

Country Link
CN (1) CN203170621U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105060563A (en) * 2015-08-17 2015-11-18 福建盈浩工艺制品有限公司 Sedimentation tank for paint spraying wastewater treatment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105060563A (en) * 2015-08-17 2015-11-18 福建盈浩工艺制品有限公司 Sedimentation tank for paint spraying wastewater treatment

Similar Documents

Publication Publication Date Title
CN104695513B (en) The comprehensive recovery of bathroom sewage and Automatic Cycle utilize system
CN204510376U (en) The comprehensive recovery of bathroom sewage and automatic cycle utilize device
CN205635187U (en) Aquaculture sewage pretreatment equipment
CN105712583A (en) Sewage purification and filtration device
CN108002639A (en) Integrated form integration ecological water factory
CN109748419A (en) A kind of sewage-treating reactor
CN207596525U (en) A kind of oily water separating equipment of industrial wastewater
CN203170621U (en) Environment-protecting and energy-saving efficient cleaning workshop
CN202569672U (en) Sloping panel sedimentation device
CN200971529Y (en) Device for reusing domestic waste water
CN203173921U (en) Oily sewage integrated comprehensive treatment device
CN207091228U (en) Food wastewater processing equipment
CN206090805U (en) No deposit formula sewage lifting pump station
CN201999819U (en) Circulatory reuse treatment system for jet weaving wastewater
CN114671537B (en) Urban sewage treatment equipment
CN215756753U (en) Online circulation recovery system of silicon wafer cutting fluid
CN209989107U (en) Automatic oil gathering device in oil-water separation treatment system
CN107840536A (en) Integrated form integration ecological water factory
CN202988884U (en) Sewage treatment depth-type filtration device
CN208632260U (en) A kind of sewage disposal system of mixing plant automatic spraying flocculant
CN105727598A (en) Method and device for separating liquid with different densities based on hydraulic pushing and pressing
CN202415272U (en) Sewage scum and sludge treatment device
CN113060872A (en) Sewage treatment device and sewage treatment method
CN110606601A (en) Electronic flocculation desulfurization wastewater treatment device and desulfurization method
CN200988787Y (en) Automatic physiochemical treating device for oil containing waste water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130904