CN207669524U - A kind of concrete conveyer belt - Google Patents
A kind of concrete conveyer belt Download PDFInfo
- Publication number
- CN207669524U CN207669524U CN201721679204.8U CN201721679204U CN207669524U CN 207669524 U CN207669524 U CN 207669524U CN 201721679204 U CN201721679204 U CN 201721679204U CN 207669524 U CN207669524 U CN 207669524U
- Authority
- CN
- China
- Prior art keywords
- column
- conveyer belt
- baffle
- fixedly connected
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Structure Of Belt Conveyors (AREA)
Abstract
The utility model discloses a kind of concrete conveyer belts, including conveyer belt and pairs of idler wheel, the pairs of idler wheel offsets the inner ring of conveyer belt, the both ends of one of idler wheel are hinged with the first column, the both ends of another idler wheel are hinged with third column, it is fixedly connected with strut between first column and third column, the side of first column is fixedly connected with bearing, it is hinged with baffle on the bearing, the baffle is corresponding with conveyer belt, top side of the baffle far from bearing one end is fixedly connected with the first hanging block, the outside sliding sleeve of first hanging block is connected to the first sliding block, the threaded one end of first sliding block far from baffle is connected with two-way leading screw, the strut is fixedly connected with the second column close to the side of baffle.The utility model structure novel realizes concrete discharging width effect adjustable at any time, improves work efficiency using the cooperation of two-way leading screw and the first sliding block, easy to spread.
Description
Technical field
The utility model is related to Architectural Equipment field more particularly to a kind of concrete conveyer belts.
Background technology
Concrete, referred to as " concrete ":Refer to by cementitious material by the general designation of the cementing integral engineered composite material of aggregate.
One word of concrete usually said refers to making cementitious material, sand, masonry aggregate with cement;With water(Additive and admixture can be contained)It presses
Certain proportion coordinate, it is agitated obtained by cement concrete, also referred to as normal concrete, it is widely used in civil engineering.With
The step of the big construction in China is getting faster, and the application of concrete is more and more, wherein on the transmission device of concrete, it is existing
The structure overwhelming majority can not achieve the adjusting that concrete discharging is carried out in discharge outlet, and then elder generation is just needed when encountering groove
Concrete is held in a reservoir, then concrete is slowly led into groove by container, there is inefficiency in this way, is worked
Measure big defect.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of concrete transmission proposed
Band.
To achieve the goals above, the utility model uses following technical solution:A kind of concrete conveyer belt, including pass
Send band and pairs of idler wheel, the pairs of idler wheel that the inner ring of conveyer belt offsets, the both ends of one of idler wheel are hinged with first
The both ends of column, another idler wheel are hinged with third column, and strut is fixedly connected between first column and third column,
The side of first column is fixedly connected with bearing, and baffle is hinged on the bearing, and the baffle is corresponding with conveyer belt,
Top side of the baffle far from bearing one end is fixedly connected with the first hanging block, and the outside sliding sleeve of first hanging block is connected to first
Sliding block, the threaded one end of first sliding block far from baffle are connected with two-way leading screw, and the strut is fixed close to the side of baffle
It is connected with the second column, the both ends of the two-way leading screw are hinged on the second column, and one end of the two-way leading screw runs through second
Column simultaneously extends outwardly, and the two-way outwardly extending one end fixing sleeve of leading screw is connected to handle.
Preferably, the opposite face of the third column is fixedly connected with slide bar in pairs, and sliding sleeve is connected to two on the slide bar
A second sliding block, two one end sliding sleeves of second sliding block far from slide bar are connected to the second hanging block, and second hanging block is fixed
It is connected to the top side of baffle.
Preferably, the body contours profile of first hanging block and the second hanging block is spherical shape, first sliding block and second
Sliding block is corresponding with the first hanging block and the second hanging block respectively.
Preferably, the baffle is circular arc camber, the outer ring of the circular arc camber and conveyer belt close to the side of conveyer belt
Circular arc is corresponding.
Preferably, the bottom end of first column and third column has been fixedly connected with bottom plate.
Preferably, it is welded with reinforcing rib between first column and third column.
The utility model, easy to operate, principle is simple, can be by concrete when user needs to carry out the transhipment of concrete
On a moving belt, later on motor makes idler wheel drive conveyer belt rotation, and then completes concrete one from conveyer belt
End is transported to the other end of conveyer belt, but can encounter lead concrete into narrow groove in the actual use process,
Existing method is first to hold concrete in a reservoir, is then slowly led concrete into groove by container, and this dress
Width adjusting when can directly carry out concrete discharging according to the width of groove is set, i.e. user holds the two-way silk of handle rotation
Thick stick, the interval that two the first sliding blocks are moved on two-way leading screw, and then can be changed between baffle at this time, therefore realize coagulation
Width adjusting of the soil in discharging.The utility model structure novel is realized mixed using the cooperation of two-way leading screw and the first sliding block
Effect that solidifying soil discharging width is adjustable at any time, improves work efficiency, easy to spread.
Description of the drawings
Fig. 1 be the utility model proposes a kind of concrete conveyer belt vertical view;
Fig. 2 be the utility model proposes a kind of concrete conveyer belt front view;
Fig. 3 be the utility model proposes a kind of concrete conveyer belt the first hanging block and the second hanging block respectively with first slide
The installation diagram of block and the second sliding block.
In figure:It is 1 bottom plate, 2 transmission belts, 3 idler wheels, 4 first columns, 5 bearings, 6 baffles, 7 struts, 8 first sliding blocks, 9 two-way
Leading screw, 10 second columns, 11 third columns, 12 slide bars, 13 second sliding blocks, 14 handles, 15 first hanging blocks, 16 second hanging blocks, 17
Reinforcing rib.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
In the description of the present invention, it should be understood that term "upper", "lower", "front", "rear", "left", "right",
The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
The utility model and simplifying describes for ease of description, do not indicate or imply the indicated device or element must have it is specific
Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-3, a kind of concrete conveyer belt, including conveyer belt 2 and pairs of idler wheel 3, pairs of idler wheel 3 is by conveyer belt 2
Inner ring offset, for drive conveyer belt 2 rotate, the both ends of an idler wheel 3 are hinged with the first column 4, are used to support idler wheel
3, the both ends of another idler wheel 3 are hinged with third column 11, are used to support idler wheel 3, solid between the first column 4 and third column 11
Surely it is connected with strut 7, is used for reinforcement structure intensity, while for being fixedly connected with the second column 10, the side of the first column 4 is fixed
Be connected with bearing 5, baffle 6 be hinged on bearing 5, for by concrete bumping post, adjusting the width of concrete discharging, baffle 6 with
Conveyer belt 2 is corresponding, and top side of the baffle 6 far from 5 one end of bearing is fixedly connected with the first hanging block 15, for coordinating the first sliding block 8,
The outside sliding sleeve of first hanging block 15 is connected to the first sliding block 8, and the first threaded one end of the sliding block 8 far from baffle 6 is connected with two-way silk
Thick stick 9, for adjusting the spacing between two the first sliding blocks 8, strut 7 is fixedly connected with the second column 10 close to the side of baffle 6,
The both ends of two-way leading screw 9 are hinged on the second column 10, and one end of two-way leading screw 9 through the second column 10 and extends outwardly, double
It is connected to handle 14 to 9 outwardly extending one end fixing sleeve of leading screw, the labor intensity for reducing user.
In the utility model, the opposite face of pairs of third column 11 is fixedly connected with slide bar 12, is slidably socketed on slide bar 12
There are two the second sliding block 13, two one end sliding sleeves of second sliding block 13 far from slide bar 12 are connected to the second hanging block 16, the second hanging block
16 are fixedly connected on the top side of baffle 6, and in order to which pairs of baffle 6 to be supported on bearing 5 and slide bar 12, baffle 6 is close to conveyer belt 2
Side be circular arc camber, circular arc camber is corresponding with the outer ring arc of conveyer belt 2, prevents transmission belt 2 by the weight of concrete
The gear of baffle 6 leads to concrete side leakage, the main body of the first hanging block 15 and the second hanging block 16 less than concrete when power influence is bent downwardly
Appearance profile be spherical shape, the first sliding block 8 and the second sliding block 13 are corresponding with the first hanging block 15 and the second hanging block 16 respectively, in order at
More smooth when adjusting to baffle 6, the bottom end of the first column 4 and third column 11 has been fixedly connected with bottom plate 1, in order to incite somebody to action this
Device is fixed, and is welded with reinforcing rib 17 between the first column 4 and third column 11, in order to reinforce the structural strength of the present apparatus, is prolonged
Long life.
The utility model, easy to operate, principle is simple, can be by concrete when user needs to carry out the transhipment of concrete
On conveyor belt 2, later on motor makes idler wheel 3 that conveyer belt 2 be driven to rotate, and then completes concrete from conveyer belt 2
One end be transported to the other end of conveyer belt 2, but can encounter lead concrete into narrow ditch in the actual use process
In slot, existing method is first to hold concrete in a reservoir, is then slowly led concrete into groove by container, and
The present apparatus can directly carry out width adjusting when concrete discharging according to the width of groove, i.e., user hold handle 14 rotate it is double
To leading screw 9, the interval that two the first sliding blocks 8 are moved on two-way leading screw 9, and then can be changed between baffle 7 at this time, thus it is real
Width adjusting of the concrete in discharging is showed.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not
Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of concrete conveyer belt, including conveyer belt(2)With pairs of idler wheel(3), which is characterized in that the pairs of idler wheel(3)
By conveyer belt(2)Inner ring offset, one of idler wheel(3)Both ends be hinged with the first column(4), another idler wheel(3)'s
Both ends are hinged with third column(11), first column(4)With third column(11)Between be fixedly connected with strut(7),
First column(4)Side be fixedly connected with bearing(5), the bearing(5)On be hinged with baffle(6), the baffle(6)
With conveyer belt(2)It is corresponding, the baffle(6)Far from bearing(5)The top side of one end is fixedly connected with the first hanging block(15), described
First hanging block(15)Outside sliding sleeve be connected to the first sliding block(8), first sliding block(8)Far from baffle(6)Threaded one end
It is connected with two-way leading screw(9), the strut(7)Close to baffle(6)Side be fixedly connected with the second column(10), described two-way
Leading screw(9)Both ends be hinged on the second column(10)On, the two-way leading screw(9)One end run through the second column(10)And outward
Extend, the two-way leading screw(9)Outwardly extending one end fixing sleeve is connected to handle(14).
2. a kind of concrete conveyer belt according to claim 1, which is characterized in that the third column(11)Opposite face
It is fixedly connected with slide bar(12), the slide bar(12)On be slidably socketed there are two the second sliding block(13), two the second sliding blocks(13)
Far from slide bar(12)One end sliding sleeve be connected to the second hanging block(16), second hanging block(16)It is fixedly connected on baffle(6)'s
Top side.
3. a kind of concrete conveyer belt according to claim 2, which is characterized in that first hanging block(15)It is hung with second
Block(16)Body contours profile be spherical shape, first sliding block(8)With the second sliding block(13)Respectively with the first hanging block(15)With
Second hanging block(16)It is corresponding.
4. a kind of concrete conveyer belt according to claim 1, which is characterized in that the baffle(6)Close to conveyer belt(2)
Side be circular arc camber, the circular arc camber and conveyer belt(2)Outer ring arc it is corresponding.
5. a kind of concrete conveyer belt according to claim 1, which is characterized in that first column(4)It is vertical with third
Column(11)Bottom end be fixedly connected with bottom plate(1).
6. a kind of concrete conveyer belt according to claim 1, which is characterized in that first column(4)It is vertical with third
Column(11)Between be welded with reinforcing rib(17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721679204.8U CN207669524U (en) | 2017-12-06 | 2017-12-06 | A kind of concrete conveyer belt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721679204.8U CN207669524U (en) | 2017-12-06 | 2017-12-06 | A kind of concrete conveyer belt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207669524U true CN207669524U (en) | 2018-07-31 |
Family
ID=62965600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721679204.8U Active CN207669524U (en) | 2017-12-06 | 2017-12-06 | A kind of concrete conveyer belt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207669524U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112605737A (en) * | 2020-12-10 | 2021-04-06 | 博峰汽配科技(芜湖)有限公司 | Centerless grinding machine for grinding outer surface of pile component |
-
2017
- 2017-12-06 CN CN201721679204.8U patent/CN207669524U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112605737A (en) * | 2020-12-10 | 2021-04-06 | 博峰汽配科技(芜湖)有限公司 | Centerless grinding machine for grinding outer surface of pile component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108118871A (en) | A kind of cement paving device of architectural engineering | |
CN107201823A (en) | A kind of building wall is with exempting from type plastering machine of plastering | |
CN205521949U (en) | Novel pony mixer for civil engineering | |
CN207669524U (en) | A kind of concrete conveyer belt | |
CN113021638A (en) | Coaxial reverse rotation's cement paste anti-solidification agitating unit for construction | |
CN207402990U (en) | A kind of two-way stirring formula cement stirring device | |
CN203919387U (en) | A kind of from stirring type concrete go-cart | |
CN207988455U (en) | A kind of cement paving device of architectural engineering | |
CN208072935U (en) | A kind of whole interlock type template steel joist of construction | |
CN207310231U (en) | A kind of construction concrete central mix plant | |
CN212053791U (en) | Automatic watering device of construction concrete | |
CN208020498U (en) | A kind of constructing tunnel concrete central mix plant | |
CN206335712U (en) | A kind of cement mixing and stirring equipment | |
CN211541791U (en) | Concrete production device | |
CN204699636U (en) | A kind of building coating mixing arrangement | |
CN106965320A (en) | A kind of architectural engineering agitation mixer that efficiently adds water | |
CN209755673U (en) | Construction is with multi-functional slip casting bucket that can stir cement | |
CN204640528U (en) | A kind of Portable movable concrete central mix plant | |
CN207077623U (en) | Pony mixer | |
CN203921866U (en) | A kind of convenient driving band that American leather is installed | |
CN207736510U (en) | A kind of small-sized mixed mud Anti-solidification agitating device | |
CN107932737B (en) | A kind of sub- mixing apparatus of road equipment sole silt | |
CN208032463U (en) | A kind of buildings waterproof construction paint mixing arrangement | |
CN216296457U (en) | Environment-friendly waste concrete processing equipment in building field | |
CN213732593U (en) | Building cement agitating unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |