CN207664569U - A kind of bareing bus bridge being installed between wall and transformer - Google Patents
A kind of bareing bus bridge being installed between wall and transformer Download PDFInfo
- Publication number
- CN207664569U CN207664569U CN201820073132.0U CN201820073132U CN207664569U CN 207664569 U CN207664569 U CN 207664569U CN 201820073132 U CN201820073132 U CN 201820073132U CN 207664569 U CN207664569 U CN 207664569U
- Authority
- CN
- China
- Prior art keywords
- wall
- transformer
- flanges
- plate
- soft connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000012212 insulator Substances 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 4
- 229910052782 aluminium Inorganic materials 0.000 claims description 4
- 238000009434 installation Methods 0.000 abstract description 9
- 230000003796 beauty Effects 0.000 abstract description 2
- 238000009826 distribution Methods 0.000 description 4
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 229910052802 copper Inorganic materials 0.000 description 3
- 239000010949 copper Substances 0.000 description 3
- 241000271566 Aves Species 0.000 description 2
- 241001465754 Metazoa Species 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Insulators (AREA)
Abstract
本实用新型公开一种安装于墙体和变压器之间的裸露式母线桥,包括母线排、穿墙套管、软连接Ⅰ、软连接Ⅱ、绝缘子、支撑、立柱、横担和连接金具,软连接Ⅰ的第一端与变压器的输出端连接,软连接Ⅰ的第二端与对应的母线排的第一端连接,母线排的第二端对应连接软连接Ⅱ的第一端,软连接Ⅱ的第二端与穿墙套管的第一端连接,母线排通过连接金具固定连接绝缘子,支撑架两端架设在变压器和立柱上,本装置具有结构简单、安全美观和安装方便快捷等优点。
The utility model discloses an exposed busbar bridge installed between a wall and a transformer, comprising a busbar, a wall bushing, a soft connection I, a soft connection II, an insulator, a support, a column, a cross arm and connecting fittings, a soft The first end of the connection I is connected to the output end of the transformer, the second end of the soft connection I is connected to the first end of the corresponding busbar, and the second end of the busbar corresponds to the first end of the soft connection II, and the soft connection II The second end of the busbar is connected to the first end of the wall bushing, the bus bar is fixedly connected to the insulator through the connecting hardware, and the two ends of the support frame are erected on the transformer and the column. This device has the advantages of simple structure, safety and beauty, and convenient and quick installation.
Description
技术领域technical field
本实用新型属于供电设备技术领域,具体涉及一种安装于墙体和变压器之间的裸露式母线桥。The utility model belongs to the technical field of power supply equipment, in particular to an exposed busbar bridge installed between a wall and a transformer.
背景技术Background technique
随着发电及输配电装机容量的不断扩大,而供电部门输送电能全部采用铜母排输送,在变压器与配电房墙壁之间,配电房墙壁和高压开关柜之间,高压开关柜和高压开关柜之间,都需要架设悬空的母线桥来作为电力输送通道。母线桥在发生短路故障时要承受短路电流造成的发热和电动力作用,是作为高、低压成套电器中重要的一次元件。传统的母线桥存在较多的问题,随着开关柜的用量越来越多,铜排的数量也越来越多,现有的裸露式母线桥设计结构多不太合理,需要对其进行改进,以满足安全用电的需要。With the continuous expansion of the installed capacity of power generation and transmission and distribution, the power transmission department of the power supply department uses copper busbars to transmit all the electric energy. Between the transformer and the wall of the power distribution room, between the wall of the power distribution room and the high-voltage switch cabinet, the high-voltage switch cabinet and Between the high-voltage switch cabinets, it is necessary to erect a suspended bus bridge as a power transmission channel. When a short-circuit fault occurs, the bus bridge must bear the heating and electromotive force caused by the short-circuit current, and it is an important primary component in the high-voltage and low-voltage complete sets of electrical appliances. There are many problems in the traditional bus bridge. With the increasing use of switch cabinets, the number of copper bars is also increasing. The existing exposed bus bridge design structure is unreasonable and needs to be improved. , to meet the needs of safe electricity use.
实用新型内容Utility model content
本实用新型的目的是为了解决上述现有技术上存在的问题,提供一种安装于墙体和变压器之间的裸露式母线桥。本装置具有结构简单、安全美观和安装方便快捷等优点。The purpose of the utility model is to solve the above-mentioned problems in the prior art, and provide an exposed busbar bridge installed between the wall and the transformer. The device has the advantages of simple structure, safety and beauty, convenient and fast installation and the like.
为实现上述目的,本实用新型采用如下技术方案:一种安装于墙体和变压器之间的裸露式母线桥,包括母线排、穿墙套管、软连接Ⅰ、软连接Ⅱ、绝缘子、支撑、立柱、横担和连接金具,软连接Ⅰ的第一端与变压器的输出端连接,软连接Ⅰ的第二端与对应的母线排的第一端连接,母线排的第二端对应连接软连接Ⅱ的第一端,软连接Ⅱ的第二端与穿墙套管的第一端连接,母线排通过连接金具固定连接绝缘子,支撑的两端分别架设在变压器和立柱上,支撑设置有两根且相互平行,支撑的一端与立柱的上端固定连接,另一端通过槽钢支撑在变压器上方,多根平行设置的横担的两端架设在两根支撑上,横担的上端面固定设置有固定板,绝缘子的下端固定安装在所述固定板上。In order to achieve the above purpose, the utility model adopts the following technical scheme: an exposed busbar bridge installed between the wall and the transformer, including busbar, wall bushing, soft connection I, soft connection II, insulators, supports, Column, cross arm and connecting fittings, the first end of the soft connection I is connected to the output end of the transformer, the second end of the soft connection I is connected to the first end of the corresponding busbar, and the second end of the busbar is connected to the corresponding soft connection The first end of Ⅱ, the second end of soft connection Ⅱ is connected to the first end of the wall bushing, the bus bar is fixedly connected to the insulator through the connecting fittings, and the two ends of the support are erected on the transformer and the column respectively, and the support is provided with two And parallel to each other, one end of the support is fixedly connected to the upper end of the column, and the other end is supported above the transformer through channel steel. plate, and the lower end of the insulator is fixedly installed on the fixed plate.
作为本实用新型裸露式母线桥的进一步改进,所述穿墙套管包括固定架、安装板和三个穿墙管,固定架包括两个平行设置的法兰、连接筋板和支撑固定板,所述法兰均为由角钢依次连接组成的矩形框架,两个法兰的尺寸相同且相对设置在墙体的两侧,法兰的上边框和下边框的第一直平面板的两端相对设置有缺口,法兰的两个竖直边框的两端固定连接在上边框和下边框的缺口处,以使得法兰的第二直平面板围成一个与墙体外壁贴合的凸起边缘,两个法兰的边角处通过四根连接筋板固定连接,连接筋板采用角钢,四根连接筋板平行并相对设置,以使四根连接筋板的开口围成一个可容纳安装板的矩形空间,安装板设置在两个法兰之间并与法兰相平行,两个法兰的上边框和下边框分别通过两个支撑固定板对应连接,安装板上设置有三个用于安装穿墙管的固定孔,三个固定孔沿横向排布,且三个穿墙管通过中段的法兰板安装在固定孔内,相邻两个穿墙管之间的安装板上还固定设置有用于防止涡流的铝板。As a further improvement of the exposed busbar bridge of the present invention, the wall-piercing sleeve includes a fixing frame, a mounting plate and three wall-piercing pipes, and the fixing frame includes two parallel flanges, a connecting rib plate and a supporting fixing plate, The flanges are all rectangular frames connected by angle steel in sequence. The two flanges have the same size and are oppositely arranged on both sides of the wall. The two ends of the first straight plane plate of the upper frame and the lower frame of the flange are opposite There is a gap, and the two ends of the two vertical frames of the flange are fixedly connected to the gaps of the upper frame and the lower frame, so that the second straight plane plate of the flange forms a raised edge that fits the outer wall of the wall , the corners of the two flanges are fixedly connected by four connecting ribs, the connecting ribs are made of angle steel, and the four connecting ribs are arranged in parallel and facing each other, so that the openings of the four connecting ribs form a mounting plate that can accommodate In a rectangular space, the mounting plate is set between the two flanges and parallel to the flanges. The upper frame and the lower frame of the two flanges are respectively connected by two supporting and fixing plates. There are three mounting plates for installation. For the fixing holes of the wall-piercing pipes, the three fixing holes are arranged horizontally, and the three wall-piercing pipes are installed in the fixing holes through the flange plate in the middle section, and the mounting plate between the adjacent two wall-piercing pipes is also fixedly arranged There are aluminum plates to prevent eddy currents.
作为本实用新型裸露式母线桥的进一步改进,所述绝缘子的下端通过螺栓固定安装在所述固定板上。As a further improvement of the exposed busbar bridge of the present invention, the lower end of the insulator is fixed on the fixing plate by bolts.
有益效果Beneficial effect
1、本实用新型的裸露式母线桥通过合理设计,安装牢固可靠,安全美观,解决了变压器和配电室的墙体之间母线桥的连接问题,通过支柱、支撑和变压器之间的配合连接,利用变压器本体作为一端的支柱,组成了母线桥的牢固支架,充分利用了有限的空间,利用软连接Ⅰ和软连接Ⅱ的母排在厚度方向容易折弯,在宽度方向具有高的刚性的特性进行连接,适用于任意的空间构型,特别适用于复杂线路的安装连接。1. The exposed busbar bridge of the utility model is reasonably designed, the installation is firm and reliable, safe and beautiful, and the connection problem of the busbar bridge between the transformer and the wall of the power distribution room is solved. , using the transformer body as a pillar at one end to form a firm support for the bus bridge, making full use of the limited space, using the flexible connection I and flexible connection II busbars are easy to bend in the thickness direction, and have high rigidity in the width direction It is suitable for any space configuration, especially for the installation and connection of complex lines.
2、本实用新型中的穿墙套管结构简单,安装牢固,通过用角钢焊接成法兰,长度与高度根据墙洞大小适当调整,并且所需要的原材料较少,不仅降低了生产的成本,而且可以根据现场实际情况进行快速安装。同时可提高施工效率和施工效果。能够有效与外界隔离,防止外部鸟类等小动物或灰尘的进入,尤其能够保证裸露式母线桥在运行过程中的安全,具有很强的实用性。2. The wall-piercing sleeve in the utility model has a simple structure and firm installation. The flange is welded with angle steel, and the length and height are properly adjusted according to the size of the wall hole, and less raw materials are required, which not only reduces the production cost, And it can be quickly installed according to the actual situation on site. At the same time, the construction efficiency and construction effect can be improved. It can be effectively isolated from the outside world and prevent the entry of small animals such as birds or dust from the outside. It can especially ensure the safety of the exposed busbar bridge during operation, and has strong practicability.
附图说明Description of drawings
图1为本实用新型裸露式母线桥的结构示意图;Fig. 1 is the structural representation of the exposed busbar bridge of the present invention;
图2为本实用新型裸露式母线桥中穿墙套管的结构示意图;Fig. 2 is the structural representation of the wall bushing in the exposed busbar bridge of the present invention;
图3为本实用新型裸露式母线桥中穿墙套管的固定架的结构示意图;Fig. 3 is a schematic structural view of the fixing frame of the wall bushing in the exposed busbar bridge of the present invention;
图4为本实用新型裸露式母线桥中穿墙套管的法兰的结构示意图;Fig. 4 is the structural schematic diagram of the flange of the wall bushing in the exposed busbar bridge of the present invention;
图5为本实用新型裸露式母线桥中穿墙套管的安装效果图;Fig. 5 is the installation effect diagram of the wall bushing in the exposed busbar bridge of the present invention;
图中标记:1、穿墙套管,2、软连接Ⅰ,3、绝缘子,4、母线排,5、支撑,6、立柱,7、横担,8、变压器,9、连接金具,10、软连接Ⅱ,101、法兰、102、铝板,103、连接筋板,104、支撑固定板,105、安装板,106、穿墙管,107、第一直平面板,108、第二直平面板,109、墙体。Marks in the figure: 1. Wall bushing, 2. Soft connection Ⅰ, 3. Insulator, 4. Bus bar, 5. Support, 6. Column, 7. Cross arm, 8. Transformer, 9. Connecting fittings, 10. Soft connection II, 101, flange, 102, aluminum plate, 103, connecting rib plate, 104, support and fixing plate, 105, installation plate, 106, wall pipe, 107, first straight plane plate, 108, second straight plane plate Panel, 109, body of wall.
具体实施方式Detailed ways
为了使本实用新型的技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。In order to make the technical solutions and advantages of the utility model more clear, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments.
如图所示:本实用新型实施例提供一种安装于墙体和变压器之间的裸露式母线桥,包括母线排4、穿墙套管1、软连接Ⅰ2、软连接Ⅱ10、绝缘子3、支撑5、立柱6、横担7和连接金具9,软连接Ⅰ2的第一端与变压器8的输出端连接,软连接Ⅰ2的第二端与对应的母线排4的第一端连接,母线排4的第二端对应连接软连接Ⅱ10的第一端,软连接Ⅱ10的第二端与穿墙套管1的第一端连接,母线排4通过连接金具9固定连接绝缘子3,支撑5的两端架设在变压器8和立柱6上,支撑5设置有两根且相互平行,支撑5的一端与立柱6的上端固定连接,另一端通过槽钢支撑在变压器8上方,多根平行设置的横担7的两端架设在两根支撑5上,横担7为槽钢,所述横担7的底板竖直设置,横担7的上端面安装有固定板,绝缘子3的下端通过螺栓固定安装在固定板上。本实用新型中的穿墙套管1包括固定架、安装板105和三个穿墙管106,固定架包括两个平行设置的法兰101、连接筋板103和支撑固定板104,所述法兰101均为由角钢依次连接组成的矩形框架,两个法兰101的尺寸相同且相对设置在墙体109两侧,法兰101的上边框和下边框的第一直平面板107的两端相对设置有缺口,法兰101的两个竖直边框的两端固定连接在上边框和下边框的缺口处,以使得法兰101的第二直平面板108围成一个与墙体109外壁贴合的凸起边缘,两个法兰101的边角处通过四根连接筋板103固定连接,连接筋板103采用角钢,四根连接筋板103平行并相对设置,以使四根连接筋板103的开口围成一个可容纳安装板105的矩形空间,安装板105设置在两个法兰101之间并与法兰101相平行,两个法兰101的上边框和下边框分别通过两个支撑固定板104对应连接,安装板105上设置有三个用于安装穿墙管106的固定孔,三个固定孔沿横向排布,且三个穿墙管106通过中段的法兰板安装在固定孔内,相邻两个穿墙管106之间的安装板105上还固定设置有用于防止涡流的铝板102。本实用新型的穿墙套管1能够有效与外界隔离,防止外部鸟类等小动物或灰尘的进入,尤其能够保证裸露式母线桥在运行过程中的安全,具有很强的实用性。As shown in the figure: the embodiment of the utility model provides an exposed busbar bridge installed between the wall and the transformer, including busbar 4, wall bushing 1, soft connection I2, soft connection II10, insulator 3, support 5. Upright column 6, cross arm 7 and connecting fitting 9, the first end of soft connection I2 is connected to the output end of transformer 8, the second end of soft connection I2 is connected to the first end of corresponding bus bar 4, bus bar 4 The second end of the flexible connection II10 corresponds to the first end of the connection, the second end of the soft connection II10 is connected to the first end of the wall bushing 1, the bus bar 4 is fixedly connected to the insulator 3 through the connecting fitting 9, and the two ends of the support 5 Erected on the transformer 8 and the column 6, two supports 5 are provided and are parallel to each other. One end of the support 5 is fixedly connected to the upper end of the column 6, and the other end is supported above the transformer 8 by channel steel. Multiple parallel arms 7 The two ends of the cross-arm 7 are erected on two supports 5, the cross-arm 7 is a channel steel, the bottom plate of the cross-arm 7 is vertically arranged, the upper end of the cross-arm 7 is equipped with a fixed plate, and the lower end of the insulator 3 is fixed by bolts on a fixed board. The wall-piercing casing 1 in the utility model comprises a fixed frame, a mounting plate 105 and three wall-penetrating pipes 106, and the fixed frame includes two parallel flanges 101, a connecting rib plate 103 and a supporting fixed plate 104. The flanges 101 are all rectangular frames formed by connecting angle steels in sequence. The two flanges 101 have the same size and are relatively arranged on both sides of the wall 109. The two ends of the first straight plane plate 107 of the upper frame and the lower frame of the flange 101 The two ends of the two vertical frames of the flange 101 are fixedly connected to the gaps of the upper frame and the lower frame, so that the second straight plane plate 108 of the flange 101 forms a wall that is attached to the outer wall of the wall 109. The raised edges of the joint, the corners of the two flanges 101 are fixedly connected by four connecting ribs 103, the connecting ribs 103 are made of angle steel, and the four connecting ribs 103 are arranged in parallel and opposite to each other, so that the four connecting ribs The opening of 103 forms a rectangular space that can accommodate the mounting plate 105. The mounting plate 105 is arranged between the two flanges 101 and is parallel to the flanges 101. The upper frame and the lower frame of the two flanges 101 respectively pass through two The supporting and fixing plates 104 are correspondingly connected, and the mounting plate 105 is provided with three fixing holes for installing the wall-piercing pipes 106. In the hole, an aluminum plate 102 for preventing eddy current is also fixedly arranged on the mounting plate 105 between two adjacent wall-through pipes 106 . The wall-piercing bushing 1 of the utility model can be effectively isolated from the outside world to prevent the entry of small animals such as birds or dust from the outside, especially to ensure the safety of the exposed busbar bridge during operation, and has strong practicability.
本实用新型中的软连接Ⅰ2和软连接Ⅱ10均指软母排,软母排又称叠片式绝缘软母排或柔性母排,是由多层防电晕的扁平薄铜片导体叠加,外层采用挤塑方式包覆绝缘层制作而成。可提高导电率,调整设备安装误差,同时起(减震)工作补偿作用、方便试验和设备检修等。The soft connection Ⅰ2 and the soft connection Ⅱ10 in this utility model both refer to soft busbars, which are also called laminated insulating soft busbars or flexible busbars, which are superimposed by multi-layer anti-corona flat thin copper conductors. The outer layer is made by covering the insulation layer by extrusion. It can improve the conductivity, adjust the installation error of equipment, and play the role of (shock absorption) work compensation at the same time, which is convenient for testing and equipment maintenance.
本实用新型中穿墙套管1的安装过程如下:用角钢焊接成法兰101,长度与高度据墙洞大小适当调整,墙洞的两面各设一个法兰101,用连接筋板103和支撑固定板104焊接到一起,连接筋板103和支撑固定板104的长度据墙洞深度适当调整,焊接牢固后,再把焊接好的安装板105焊接到墙洞中部合适的位置,安装板105的外围尺寸要略小于法兰101的内尺寸。焊接牢固后,把穿墙管106用螺栓固定到安装板105上。The installation process of the wall-piercing sleeve 1 in the utility model is as follows: weld the flange 101 with angle steel, adjust the length and height according to the size of the wall hole, set a flange 101 on each side of the wall hole, use the connecting rib 103 and support The fixed plate 104 is welded together, and the length of the connecting rib plate 103 and the supporting fixed plate 104 is properly adjusted according to the depth of the wall hole. The outer dimension is slightly smaller than the inner dimension of the flange 101 . After the welding is firm, the wall-piercing pipe 106 is fixed on the mounting plate 105 with bolts.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,虽然本实用新型已以较佳实施例揭露如上,然而并非用以限定本实用新型,任何熟悉本专业的技术人员,在不脱离本实用新型技术方案范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本实用新型技术方案内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。The above are only preferred embodiments of the present utility model, and do not limit the utility model in any form. Although the utility model has been disclosed as above with preferred embodiments, it is not intended to limit the utility model. Any Those who are familiar with this profession, without departing from the scope of the technical solution of the present utility model, can use the technical content disclosed above to make some changes or modify equivalent embodiments with equivalent changes, but all without departing from the technical solution of the utility model Content, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model still belong to the scope of the technical solution of the utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820073132.0U CN207664569U (en) | 2018-01-17 | 2018-01-17 | A kind of bareing bus bridge being installed between wall and transformer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820073132.0U CN207664569U (en) | 2018-01-17 | 2018-01-17 | A kind of bareing bus bridge being installed between wall and transformer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207664569U true CN207664569U (en) | 2018-07-27 |
Family
ID=62945502
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820073132.0U Expired - Fee Related CN207664569U (en) | 2018-01-17 | 2018-01-17 | A kind of bareing bus bridge being installed between wall and transformer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207664569U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114336325A (en) * | 2021-12-28 | 2022-04-12 | 青岛益和电气集团股份有限公司 | High-voltage switch cabinet bridge type wiring device and method and high-voltage switch cabinet |
| CN114825226A (en) * | 2022-06-07 | 2022-07-29 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Wall bushing structure of direct current valve hall |
-
2018
- 2018-01-17 CN CN201820073132.0U patent/CN207664569U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114336325A (en) * | 2021-12-28 | 2022-04-12 | 青岛益和电气集团股份有限公司 | High-voltage switch cabinet bridge type wiring device and method and high-voltage switch cabinet |
| CN114825226A (en) * | 2022-06-07 | 2022-07-29 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Wall bushing structure of direct current valve hall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106329356A (en) | Low voltage power distribution cabinet installation process | |
| CN205029277U (en) | High -voltage common -box bus | |
| CN104242202B (en) | High-voltage non-segregated phase bus and mounting method thereof | |
| CN202610358U (en) | Connection structure of rectifier cabinet direct current outlet buses and direct current distribution buses | |
| CN207368431U (en) | A kind of bus bridge of corner's commutation | |
| CN206948018U (en) | Direct current turns load terminal box | |
| CN208093966U (en) | A kind of air insulation switchgear cable cell structure | |
| CN205544094U (en) | Two high protection generating lines of side dress of wind energy | |
| CN211654506U (en) | Fixing device for mounting power converter | |
| CN202978001U (en) | Complete switch cabinet assembly type bus bridge stand | |
| CN217036348U (en) | Bus bridge box body assembly with two medium-voltage cabinet side bridge boxes vertically arranged | |
| CN209516383U (en) | A double voltage transformer cabinet | |
| CN209929214U (en) | Be used for open air post to hydraulic vacuum circuit breaker | |
| CN109586593B (en) | Valve hall and converter station | |
| CN223273675U (en) | A substation using a double-branch busbar arrangement structure | |
| CN201629873U (en) | Electric arc furnace short network system | |
| CN209217652U (en) | A kind of high intensity common box bus slot | |
| CN206195287U (en) | Flexible direct current transmission engineering current conversion station supports with female corner of pipe and overflows gold utensil | |
| CN200973006Y (en) | Air insulation bus-bar slot | |
| CN204360900U (en) | Horizontal iron core type saturable reactor | |
| CN107658701A (en) | Single-column double-bus is arranged vertically structure back-to-back | |
| CN209730617U (en) | A substation low-voltage busbar bridge support device | |
| CN201908141U (en) | Insulation and anti-creepage support structure for AC busbar incoming line of rectifier cabinet | |
| CN217036347U (en) | Bus bridge box body assembly for steel structure high-pressure chamber | |
| CN222301167U (en) | Novel looped netowrk cabinet |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20181218 Address after: Building No. 15 of Intelligent Equipment Science Park in Xiangcheng County Industrial Agglomeration Area, Xuchang City, Henan Province, 461000 Patentee after: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Address before: 461700 Electronics Industrial Park, Northern Section of Alishan Road, Xiangcheng County, Xuchang City, Henan Province Patentee before: HENAN YABANG ELECTRIC Co.,Ltd. |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Install exposed formula generating line bridge between wall body and transformer Effective date of registration: 20190911 Granted publication date: 20180727 Pledgee: Xiangcheng Branch of Bank of China Ltd. Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Registration number: Y2019980000144 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200710 Granted publication date: 20180727 Pledgee: Xiangcheng Branch of Bank of China Ltd. Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Registration number: Y2019980000144 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Install exposed formula generating line bridge between wall body and transformer Effective date of registration: 20200713 Granted publication date: 20180727 Pledgee: Xiangcheng Branch of Bank of China Ltd. Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Registration number: Y2020980004014 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210510 Granted publication date: 20180727 Pledgee: Xiangcheng Branch of Bank of China Ltd. Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Registration number: Y2020980004014 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: An exposed bus bridge installed between the wall and the transformer Effective date of registration: 20210517 Granted publication date: 20180727 Pledgee: Bank of China Limited by Share Ltd. Xuchang branch Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Registration number: Y2021980003677 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220722 Granted publication date: 20180727 Pledgee: Bank of China Limited by Share Ltd. Xuchang branch Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd. Registration number: Y2021980003677 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180727 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |