CN207368431U - A kind of bus bridge of corner's commutation - Google Patents

A kind of bus bridge of corner's commutation Download PDF

Info

Publication number
CN207368431U
CN207368431U CN201721513966.0U CN201721513966U CN207368431U CN 207368431 U CN207368431 U CN 207368431U CN 201721513966 U CN201721513966 U CN 201721513966U CN 207368431 U CN207368431 U CN 207368431U
Authority
CN
China
Prior art keywords
cabinet top
busbar
phase busbars
crane span
span structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721513966.0U
Other languages
Chinese (zh)
Inventor
王晓垒
杨晓鸽
陈亚东
王军志
樊陆飞
杨进华
贾广甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Zhongxin Jingke Electrical Co ltd
Original Assignee
Henan Yabang Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Yabang Electric Co Ltd filed Critical Henan Yabang Electric Co Ltd
Priority to CN201721513966.0U priority Critical patent/CN207368431U/en
Application granted granted Critical
Publication of CN207368431U publication Critical patent/CN207368431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of bus bridge of corner's commutation, including respectively with switchgear A phase busbars, switchgear B phases busbar and switchgear C phases busbar correspond to the cabinet top A phase busbars of connection, cabinet top B phases busbar and cabinet top C phase busbars, the cabinet top A phase busbars, the L-shaped structure that cabinet top B phases busbar and cabinet top C phase busbars are horizontal arm and vertical arm is formed, the vertical arm equal length of the cabinet top A phases busbar and cabinet top B phase busbars, and more than the vertical arm lengths of cabinet top C phase busbars, the cabinet top A phase busbars, the horizontal arm lengths of cabinet top B phases busbar and cabinet top C phase busbars are successively decreased successively, the utility model is on the premise of insulation distance requirement between meeting each busbar, space needed for commutation can not only be saved using such a busbar commutation structure, the busbar arrangement of commutation structure can also be made more regular in order.

Description

A kind of bus bridge of corner's commutation
Technical field
The utility model belongs to technical field of electric equipment, and in particular to a kind of bus bridge of corner's commutation.
Background technology
At present, in for distribution transforming power station, the low-pressure side of main transformer is electrically connected in substation between switchgear When connecing, particularly indoor coupling part, generally uses metal-enclosed bus crane span structure.Metal-enclosed bus crane span structure is to use metal shell The assembly that conductor is closed together with electric components such as insulating materials.Mother is called because it is suspended on beam or framework Line crane span structure.Busbar material is generally copper, the aluminium bus array that can undertake corresponding current class, and crane span structure shell is made of steel plate, and inside adds The components such as dress support, insulation.According to the requirement of national standard and professional standard, the busbar phase sequence of switchgear is seen before cabinet from left It is A-B-C to the right side, so, the situation busbar phase sequence of two switchgear connections needs the commutation in bus bridge bridge case.Bus bridge bridge Case or bus bridge bridge pier could be installed at user scene, rather than installed in the manufacturer of switchgear, bus bridge Designing scheme, size arrangement be also to be determined according to user scene, rather than standardized designs.That is, for opening For Guan Gui producers, above-mentioned settling mode is clearly that contradiction is stayed in curstomer's site to solve temporarily, the arrangement of each busbar in bridge case It is required that safe and reasonable, in actual process of deployment, usual bus bridge can change direction according to laying condition, therefore how turn Rationally arranged at angle, be frequently problem.
Utility model content
The purpose of this utility model is to solve the problems, such as present on the above-mentioned prior art, there is provided a kind of corner's commutation Bus bridge, the utility model is on the premise of insulation distance requirement between meeting each busbar, using such a busbar commutation structure not The space needed for commutation can be only saved, the busbar arrangement of commutation structure can also be made more regular in order.
To achieve the above object, the utility model adopts the following technical solution:A kind of bus bridge of corner's commutation, including The cabinet top A phases busbar of connection corresponding with switchgear A phases busbar, switchgear B phases busbar and switchgear C phase busbars, cabinet top B phases respectively Busbar and cabinet top C phase busbars, the cabinet top A phases busbar, cabinet top B phases busbar and cabinet top C phase busbars are horizontal arm and vertical arm The L-shaped structure of formation, the vertical arm equal length of the cabinet top A phases busbar and cabinet top B phase busbars, and it is more than cabinet top C phase busbars Vertical arm lengths, the horizontal arm lengths of the cabinet top A phases busbar, cabinet top B phases busbar and cabinet top C phase busbars successively decrease successively, cabinet The vertical arm of top A phase busbars is connected with switchgear A phase busbar upstream ends, and the horizontal arm support of cabinet top A phase busbars is located at crane span structure busbar Top, and be connected by crane span structure A phases busbar of transferring with crane span structure A phase busbars, the cabinet top A phases directly over crane span structure B phase busbars are female The horizontal arm lower face of row is provided with insulator, and the horizontal arm support of cabinet top B phase busbars is located above crane span structure busbar, and passes through crane span structure B phases busbar of transferring is connected with crane span structure B phase busbars, the cabinet top B phase bus-bar horizontal arms lower face peace directly over crane span structure C phase busbars Equipped with insulator, crane span structure A phases busbar and crane span structure B phases busbar of transferring of transferring is " Contraband " shape structure, " Contraband " the shape structure Including upper arm, underarm and linking arm, upper arm and underarm are horizontally set on the upper and lower ends of linking arm, and upper arm connects with cabinet top busbar Connect, underarm is connected with crane span structure busbar, and cabinet top C phases busbar is directly connected to crane span structure C phase busbars.
The further of bus bridge as the commutation of the utility model corner is improved, the cabinet top A phases busbar, cabinet top B phases The horizontal arm and vertical arm corner of busbar and cabinet top C phase busbars are provided with chamfering.
The further of bus bridge as the commutation of the utility model corner is improved, the crane span structure A phases busbar, crane span structure B phases The lower face of busbar and crane span structure C phase busbars is mounted on multiple insulators.
Beneficial effect
The bus bridge of corner's commutation of the utility model is female with cabinet top B phases by the improvement to structure, cabinet top A phases busbar The vertical arm equal length of row, and more than the vertical arm lengths of cabinet top C phase busbars, cabinet top A phases busbar, cabinet top B phases busbar and cabinet The difference in height for pushing up C phase busbars ensures safe distance between busbar, and insulator is firm to link together busbar by fixing, real Existing commutation.The utility model is on the premise of insulation distance requirement between meeting each busbar, using such a busbar commutation structure not only The space needed for commutation can be saved, the busbar arrangement of commutation structure can also be made more regular in order.
Brief description of the drawings
Fig. 1 is the structure diagram A of the bus bridge of the utility model corner commutation;
Fig. 2 is the planar structure schematic diagram using the switchgear house of the bus bridge of the utility model corner commutation;
Fig. 3 is the floor map of Fig. 2 median generatrix bridges;
Fig. 4 is the enlarged diagram at A-A in Fig. 3 figures;
Marked in figure:1st, cabinet top A phases busbar, 2, cabinet top B phase busbars, 3, cabinet top C phase busbars, 4, insulator, 5, bus bridge Frame babinet one, 6, bus bridge frame babinet two, 7, switchgear, before 7-1, switch cabinet, after 7-2, switch cabinet, 8, switchgear set Pipe, 11, crane span structure A phases transfer busbar, 12, crane span structure B phases transfer busbar, 101, crane span structure A phase busbars, 102, crane span structure B phase busbars, 103, Crane span structure C phase busbars.
Embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the technical solution of the utility model and advantage is more clearly understood The utility model is further elaborated.
As shown in the figure:The utility model embodiment provides a kind of bus bridge of corner's commutation, including respectively with switchgear A Phase busbar, switchgear B phases busbar and switchgear C phases busbar correspond to cabinet top A phases busbar 1, cabinet top B phases busbar 2 and the cabinet top C of connection Phase busbar 3, the top of switchgear 7 are provided with switchgear casing 8, and switchgear A phases busbar, switchgear B phases busbar and switchgear C phases are female Row is arranged in switchgear casing 8, and the cabinet top A phases busbar 1, cabinet top B phases busbar 2 and cabinet top C phases busbar 3 are L-shaped knot Structure, L-shaped structure include horizontal arm and vertical arm, and the horizontal arm of the L-shaped structure and vertical arm corner are provided with chamfering.It is described The vertical arm equal length of cabinet top A phases busbar 1 and cabinet top B phases busbar 2, and more than the vertical arm lengths of cabinet top C phases busbar 3, institute The horizontal arm lengths for stating cabinet top A phases busbar 1, cabinet top B phases busbar 2 and cabinet top C phases busbar 3 are successively decreased successively, cabinet top A phases busbar 1 Vertical arm is connected with switchgear A phase busbar upstream ends, and the horizontal arm support of cabinet top A phases busbar 1 is located above crane span structure busbar, and is passed through Crane span structure A phases busbar 11 of transferring is connected with crane span structure A phases busbar 101, the cabinet top A phases busbar 1 directly over crane span structure B phases busbar 102 Horizontal arm lower face insulator 4 is installed, the horizontal arm support of cabinet top B phases busbar 2 is located above crane span structure busbar and by crane span structure B Mutually switching busbar 12 is connected with crane span structure B phases busbar 102,2 horizontal arm of cabinet top B phases busbar directly over crane span structure C phases busbar 103 Lower face is provided with insulator 4, and crane span structure A phases busbar 11 and crane span structure B phases busbar 12 of transferring of transferring is " Contraband " shape structure, institute Stating " Contraband " shape structure includes upper arm, underarm and linking arm, and upper arm and underarm are horizontally set on the upper and lower ends of linking arm, upper arm with Cabinet top busbar connects, and underarm is connected with crane span structure busbar, and cabinet top C phases busbar 3 is directly connected to crane span structure C phases busbar 103.Crane span structure A phases The lower face of busbar 101, crane span structure B phases busbar 102 and crane span structure C phases busbar 103 is mounted on multiple insulators 4.
Fig. 2 be to the structure connected by bus bridge before cabinet, the B of two sides switchgear 7 in Fig. 3 before 7 cabinet of two sides switchgear Phase center bias span is larger, bus bridge include bus bridge frame babinet 1, bus bridge frame babinet 26, crane span structure A phases busbar 101, Crane span structure B phases busbar 102 and crane span structure C phases busbar 103.The busbar phase sequence of switchgear 7 is seen before switch cabinet at 7-1 is from left to right A-B-C, so, the situation busbar phase sequence that two switchgears 7 connect needs the commutation in bus bridge box.Specifically, cabinet top A phases are female Row 1 and 2 height of cabinet top B phases busbar are higher than cabinet top C phases busbar 3, cabinet top A phases busbar 1, cabinet top B phases busbar 2 and cabinet top C phases busbar 3 Difference in height ensure busbar between safe distance, then crane span structure C phases busbar 103 be directly connected to cabinet top C phases busbar 3, crane span structure B phases Busbar 102 and cabinet top B phases busbar 2 are attached by crane span structure B phases busbar 12 of transferring, and crane span structure A phases busbar 101 and cabinet top A phases are female Row 1 is attached by crane span structure A phases busbar 11 of transferring.Insulator 4 is firm to link together by fixing between each busbar, real Existing commutation.On the premise of insulation distance requirement between meeting each busbar, commutation can not only be saved using such a busbar commutation structure Required space, can also make the busbar arrangement of commutation structure more regular in order.
The above descriptions are merely preferred embodiments of the present invention, and not the utility model is made in any form Limitation, although the utility model has been disclosed with preferred embodiment as above, but be not limited to the utility model, it is any ripe Professional and technical personnel is known, is not being departed from the range of technical solutions of the utility model, when in the technology using the disclosure above Hold the equivalent embodiment made a little change or be modified to equivalent variations, as long as being without departing from technical solutions of the utility model Hold, any simple modification, equivalent change and modification made according to the technical essence of the utility model to above example, still Belong in the range of technical solutions of the utility model.

Claims (3)

1. a kind of bus bridge of corner's commutation, including respectively with switchgear A phases busbar, switchgear B phases busbar and switchgear C phases Busbar corresponds to the cabinet top A phase busbars of connection(1), cabinet top B phase busbars(2)With cabinet top C phase busbars(3), it is characterised in that:The cabinet Push up A phase busbars(1), cabinet top B phase busbars(2)With cabinet top C phase busbars(3)It is the L-shaped structure that horizontal arm and vertical arm are formed, institute State cabinet top A phase busbars(1)With cabinet top B phase busbars(2)Vertical arm equal length, and be more than cabinet top C phase busbars(3)Vertical arm Length, the cabinet top A phase busbars(1), cabinet top B phase busbars(2)With cabinet top C phase busbars(3)Horizontal arm lengths successively decrease successively, cabinet Push up A phase busbars(1)Vertical arm be connected with switchgear A phase busbar upstream ends, cabinet top A phase busbars(1)Horizontal arm support be located at bridge Above frame busbar, and transferred busbar by crane span structure A phases(11)With crane span structure A phase busbars(101)Connection, positioned at crane span structure B phase busbars (102)The cabinet top A phase busbars of surface(1)Horizontal arm lower face insulator is installed(4), cabinet top B phase busbars(2)Level Arm support is located above crane span structure busbar, and is transferred busbar by crane span structure B phases(12)With crane span structure B phase busbars(102)Connection, positioned at crane span structure C phase busbars(103)The cabinet top B phase busbars of surface(2)Horizontal arm lower face is provided with insulator(4), the crane span structure A phases transfer Busbar(11)Transfer busbar with crane span structure B phases(12)It is " Contraband " shape structure, " Contraband " the shape structure includes upper arm, underarm and connection Arm, upper arm and underarm are horizontally set on the upper and lower ends of linking arm, and upper arm is connected with cabinet top busbar, and underarm connects with crane span structure busbar Connect, cabinet top C phase busbars(3)With crane span structure C phase busbars(103)It is directly connected to.
A kind of 2. bus bridge of corner's commutation as claimed in claim 1, it is characterised in that:The cabinet top A phase busbars(1)、 Cabinet top B phase busbars(2)With cabinet top C phase busbars(3)Horizontal arm and vertical arm corner be provided with chamfering.
A kind of 3. bus bridge of corner's commutation as claimed in claim 1, it is characterised in that:The crane span structure A phase busbars (101), crane span structure B phase busbars(102)With crane span structure C phase busbars(103)Lower face be mounted on multiple insulators(4).
CN201721513966.0U 2017-11-14 2017-11-14 A kind of bus bridge of corner's commutation Active CN207368431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721513966.0U CN207368431U (en) 2017-11-14 2017-11-14 A kind of bus bridge of corner's commutation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721513966.0U CN207368431U (en) 2017-11-14 2017-11-14 A kind of bus bridge of corner's commutation

Publications (1)

Publication Number Publication Date
CN207368431U true CN207368431U (en) 2018-05-15

Family

ID=62344125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721513966.0U Active CN207368431U (en) 2017-11-14 2017-11-14 A kind of bus bridge of corner's commutation

Country Status (1)

Country Link
CN (1) CN207368431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112636190A (en) * 2019-10-08 2021-04-09 河南森源电气股份有限公司 Bus bridge and bus phase modulation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112636190A (en) * 2019-10-08 2021-04-09 河南森源电气股份有限公司 Bus bridge and bus phase modulation method

Similar Documents

Publication Publication Date Title
CN202019137U (en) Bus bridge frame with commutation function
CN103368081A (en) Main electrical connection of double-bus disconnecting link section
CN203839722U (en) 220kV transformer station of indoor GIS overhear outlet cable
CN105445567B (en) The nuclear-phase method of totally enclosed type generalized information system
WO2013026253A1 (en) Power transmission line de-icing system and method thereof implemented using back braking operation during the whole process
CN105162016A (en) Connecting method and connecting structure of valve reactor and voltage source transverter in flexible direct current power transmission
CN207368431U (en) A kind of bus bridge of corner's commutation
TW200906018A (en) Gas insulation switching apparatus
CN202721351U (en) A double-layer outgoing line structure of a 220kV HGIS power distribution unit
CN203839791U (en) Connecting structure of valve reactor and voltage source converter in flexible DC power transmission system
CN107317226A (en) A kind of transformer station's general electric arrangement structure
CN109301740B (en) Double-layer framework double-outgoing-line structure for outgoing line interval of transformer substation
CN208923563U (en) A kind of HGIS segmentation, the integrated apparatus arrangement structure in mother interval
CN210985219U (en) High-voltage bus corner cabinet
CN103701045A (en) Arrangement method of dual-bus and dual-row arranged type AIS (air insulated switchgear) power distribution device of substation
CN208939337U (en) A kind of high-tension switch gear
CN103066545B (en) A kind of Novel high-voltage overhead intensive type busbar distribution system
CN203289034U (en) Semi-insulating copper pipe bus bridge
CN206992496U (en) A kind of transformer station's general electric arrangement structure
CN208939446U (en) A kind of HGIS equipment
CN209730616U (en) A kind of buried outgoing line interval arragement construction of substation
CN103715617A (en) Arrangement mode of transformer substation double-bus and single-row arrangement AIS power distribution device
CN217087302U (en) Outgoing line arrangement structure for switching outgoing line intervals in substation
CN206116040U (en) Second third of ten heavenly stems of waterproof heavy current isolated bus
CN203536842U (en) Miniaturized structure for KYN28 built-in switch cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181217

Address after: Building No. 15 of Intelligent Equipment Science Park in Xiangcheng County Industrial Agglomeration Area, Xuchang City, Henan Province, 461000

Patentee after: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Address before: 461700 Electronics Industrial Park, Northern Section of Alishan Road, Xiangcheng County, Xuchang City, Henan Province

Patentee before: HENAN YABANG ELECTRIC Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Generating line bridge of corner's commutation

Effective date of registration: 20190911

Granted publication date: 20180515

Pledgee: Xiangcheng Branch of Bank of China Ltd.

Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Registration number: Y2019980000144

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200710

Granted publication date: 20180515

Pledgee: Xiangcheng Branch of Bank of China Ltd.

Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Registration number: Y2019980000144

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Generating line bridge of corner's commutation

Effective date of registration: 20200713

Granted publication date: 20180515

Pledgee: Xiangcheng Branch of Bank of China Ltd.

Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Registration number: Y2020980004014

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210510

Granted publication date: 20180515

Pledgee: Xiangcheng Branch of Bank of China Ltd.

Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Registration number: Y2020980004014

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A bus bridge with commutation at the corner

Effective date of registration: 20210517

Granted publication date: 20180515

Pledgee: Bank of China Limited by Share Ltd. Xuchang branch

Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Registration number: Y2021980003677

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220722

Granted publication date: 20180515

Pledgee: Bank of China Limited by Share Ltd. Xuchang branch

Pledgor: XUCHANG ZHONGXIN JINGKE ELECTRICAL Co.,Ltd.

Registration number: Y2021980003677

PC01 Cancellation of the registration of the contract for pledge of patent right