CN207660618U CN201721475235.1U CN201721475235U CN207660618U CN 207660618 U CN207660618 U CN 207660618U CN 201721475235 U CN201721475235 U CN 201721475235U CN 207660618 U CN207660618 U CN 207660618U
Authority
CN
China
Prior art keywords
steel
support structure
steel bracket
moveable support
constructing tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721475235.1U
Other languages
Chinese (zh)
Inventor
种旻
周艳平
权亚波
唐家春
魏恒生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201721475235.1U priority Critical patent/CN207660618U/en
Application granted granted Critical
Publication of CN207660618U publication Critical patent/CN207660618U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of constructing tunnel Moveable support structure, which includes rack body, and the rack body includes multiple rows of steel bracket with right angle inverted U-shaped structure made of shaped steel welds;Multiple rows of steel bracket is arranged at a certain pitch successively, and adjacent two steel bracket side and top surface are respectively welded to connect using more independent connection steel;Multiple castors, multiple castors are uniformly distributed in the rack body lower part, and are fixedly linked with the steel bracket.Its is simple and reasonable, allows cavern's lining cutting to transport installation with penstock and is carried out at the same time, solves duration collision problem, greatly shorten the part duration of a project;Stable entirety is formed after building welding, many places construction section can be moved to, need not be built repeatedly, and can realize to follow and badly repeatedly utilize, pacifies and tears open simply, saving resource favorably saves construction cost, to create economic benefit.

Description

A kind of constructing tunnel Moveable support structure
Technical field
The utility model is related to constructing tunnel equipment technical fields, are applied more particularly to a kind of tunnel reinforced concrete lining cutting Work Moveable support structure.
Background technology
Conventional diversion tunnel lining cutting uses full framing, and it is upright bar spacing that full hall scaffold, which builds specification, in diversion tunnel Spacing 1.5m is arranged in 0.5m, interlamellar spacing 0.8m, upright bar, per segment length 6m, scaffolding steel pipe 500m, cruciform fastening for falsework 300 is needed to need altogether Dismounting is repeatedly built, the transport of diversion tunnel penstock can not be carried out at the same time, cause installation that can not carry out, cause the duration Lag.Exist simultaneously following disadvantage:
(1) design of coupler scaffold support shuttering is used in cavern, is needed to wait for 28 days, could be removed after concreting Template and scaffold, during which impassable in tunnel, penstock can not carry out transport and installation;
(2), due to cavern bottom camber, the upright bar of cavern both sides and central upright stanchion unbalance stress are led to, there are prestige after load-bearing The side of body;Cavern's surface irregularity, scaffold are built there are difficulty, and only once scaffold builds and remove that spend the time be 3 days;
(3) cavern is integrally rounded, and scaffolding steel pipe need to be cut according to actual conditions, scaffolding steel pipe is lost tight Weight, while being lost by pipe cutting and reusing value, significant wastage is generated, construction cost is caused to increase, control is constructed into This is unfavorable.
Utility model content
The utility model provides a kind of constructing tunnel Moveable support structure.
The utility model provides following scheme:
A kind of constructing tunnel Moveable support structure, including:
Rack body, the rack body include multiple rows of steel with right angle inverted U-shaped structure made of shaped steel welds Holder;Multiple rows of steel bracket is arranged at a certain pitch successively, and adjacent two steel bracket side and top surface respectively use more Independent connection steel is welded to connect;
Multiple castors, multiple castors are uniformly distributed in the rack body lower part, and are fixedly linked with the steel bracket;
Multiple adjustable jackings, multiple adjustable jackings are fixedly installed on the rack body top surface in certain sequence And outside two sides;Multiple adjustable jackings for realizing the rack body and steel form in tunnel close phase Even.
Preferably:The shaped steel is the common I-steel of 16 types.
Preferably:Multiple rows of steel bracket is arranged with 1.5 meters of spacing successively.
Preferably:The connection steel for being located at side between adjacent two steel bracket is one, and both ends are located at two steel brackets Longitudinal center point at;The connection steel for being located at top surface between adjacent two steel bracket is two, and every respective both ends are located at two Laterally 3 equally divided positions of steel bracket.
Preferably:Multiple adjustable jackings are connected with the steel bracket;Wherein, it often arranges and is set at the top of the steel bracket 4 adjustable jackings are equipped with, the two sides for often arranging the steel bracket are respectively arranged with 3 adjustable jackings.
Preferably:The adjustable jacking includes leading screw for building and top.
Preferably:The castor is provided with the key-operated brake for limiting its longitudinal movement.
Preferably:Bearing plate material is equipped on the top surface of the rack body.
Preferably:The load-bearing plank is plank or bamboo clappers.
Preferably:The steel bracket right angle joint is connected with the support element of shaped steel material making.
According to specific embodiment provided by the utility model, the utility model discloses following technique effects:
By the utility model, a kind of constructing tunnel Moveable support structure may be implemented, in a kind of realization method Under, which may include rack body, the rack body include it is multiple rows of using shaped steel welding made of have right angle inverted U The steel bracket of structure;Multiple rows of steel bracket is arranged at a certain pitch successively, and adjacent two steel bracket side and top surface are respectively It is welded to connect using more independent connection steel;Multiple castors, multiple castors are uniformly distributed in the rack body lower part, and It is fixedly linked with the steel bracket;Multiple adjustable jackings, multiple adjustable jackings are fixedly installed on institute in certain sequence It states outside rack body top surface and two sides;Multiple adjustable jackings are for realizing steel in the rack body and tunnel Template it is closely coupled.Its is simple and reasonable, allows cavern's lining cutting to transport installation with penstock and is carried out at the same time, solves Duration collision problem, greatly shortens the part duration of a project;Stable entirety is formed after building welding, many places can be moved to and applied Workshop section need not build repeatedly, and can realize and follow bad repeatedly utilization, and peace tears open simply, saves resource, favorably save construction cost, To create economic benefit.
Certainly, any product for implementing the utility model does not necessarily require achieving all the advantages described above at the same time.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is a kind of structural representation for constructing tunnel Moveable support structure that the utility model embodiment provides Figure;
Fig. 2 is the faces the A-A sectional view that the utility model embodiment provides;
Fig. 3 is the faces the B-B sectional view that the utility model embodiment provides;
Fig. 4 is enlarged drawing at the C of the utility model embodiment offer;
Fig. 5 is enlarged drawing at the D of the utility model embodiment offer.
In figure:Rack body 1, steel bracket 2, connection steel 3, castor 4, adjustable jacking 5, key-operated brake 6, support element 7, Tunnel inside lining concrete eight, steel form 9.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, the every other embodiment that those of ordinary skill in the art are obtained all belongs to In the range of the utility model protection.
Embodiment
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, used for a kind of constructing tunnel that the utility model embodiment provides removable Formula supporting structure, as shown in figure 1, figure 2, figure 3, figure 4 and figure 5, the structure include rack body 1, and the rack body 1 includes more Steel bracket 2 with right angle inverted U-shaped structure made of mining is welded with shaped steel;Multiple rows of steel bracket 2 is successively with a determining deviation Arrangement, adjacent two steel brackets, 2 side and top surface are respectively welded to connect using more independent connection steel 3;
Multiple castors 4, multiple castors 4 are uniformly distributed in 1 lower part of the rack body, and with 2 stationary phase of the steel bracket Even;
Multiple adjustable jackings 5, multiple adjustable jackings 5 are fixedly installed on the rack body 1 in certain sequence Outside top surface and two sides;Multiple adjustable jackings 5 are for realizing steel form 9 in the rack body 1 and tunnel It is closely coupled.
Further, the shaped steel is the common I-steel of 16 types.In practical applications, it can be set as needed steel bracket Between spacing, specifically, multiple rows of steel bracket is arranged with 1.5 meters of spacing successively.It is located at side between adjacent two steel bracket The connection steel in face is one, and both ends are located at the longitudinal center point of two steel brackets;It is located at top between adjacent two steel bracket The connection steel in face is two, and every respective both ends are located at laterally 3 equally divided positions of two steel brackets.Multiple adjustable jackings It is connected with the steel bracket;Wherein, it often arranges and is provided with 4 adjustable jackings at the top of the steel bracket, often arrange the steel The two sides of holder are respectively arranged with 3 adjustable jackings.Further, the adjustable jacking includes leading screw for building And top.The longitudinal movement that the structure occurs when in use in order to prevent, the castor is provided with longitudinally to be transported for limiting it Dynamic key-operated brake 6.In order to facilitate construction, bearing plate material is equipped on the top surface of the rack body.The load-bearing plank For plank or bamboo clappers.In order to increase the intensity of the structure, the steel bracket right angle joint is connected with the branch of shaped steel material making Support member 7.
Example of the constructing tunnel provided by the present application with Moveable support structure in practical applications.
The rivers Luo Zha level-one power station is located at the domestic Lancang River right bank level-one tributary rivers the Luo Zha downstream in Yunnan Province Yun County, away from cloud County county town 36km, to generate electricity as single task role, installed capacity is 2 × 15MW, 13,960,000 m of total reservoir storage3, project scale or rank of project III Deng.
Diversion tunnel is to have pressure circular holes, barrel segment length 895(0+003.65~0+895m), play bottom of slope elevation 992.725m, it is to draw 0+013.650 that diversion tunnel, which plays slope point pile No., draw 0+0748.261 section slope ratios of 0+003.650~draw for i= 2.547%, it is i=5.95% to draw 0+818.251 sections of Duan Po ratios of 0+748.261~draw;Plane is equipped with 4 turnaround sections, and II class surrounding rock is opened Cross section diameter 7.39m is dug, III class surrounding rock excavated section is diameter 7.35m, the IV a diameter of 7.95m of class surrounding rock excavated section, is used C25W6 is lining cutting concrete and element spray concrete, and C15 is to smear bottom concrete.Wherein draw 0+950.775 sections of 0+891.528~draw using 16mm~ 28mmQ345R plate-steel liners, pressure pipeline are made of supervisor, bifurcated pipe and branch pipe.
Construction Difficulties:(1) diversion tunnel overall length 895m, it is II, III, IV class surrounding rock to be related to surrounding rock category, wherein needing steel Reinforced concrete liner sections total length is 155m, accounts for the 17.4% of overall length, cavern is integrally rounded, and hole wall surface is coarse, is unfavorable for The installation of design of coupler scaffold.(2), since various aspects unfavorable factor early period influences, there is duration lag in diversion tunnel, according to most Newly built construction node plan, diversion tunnel concrete lining in August in 2017 5 days, December 19 end of day.Penstock is installed Start from August in 2017 15 days, November 17 end of day.Cause the current part duration to conflict, is timely completed engineering project As the difficult point solved is badly in need of, how not only to ensure that hole inside lining was carried out at the same time with penstock transport, installation, but also saves significantly The about duration reduces cost, is this scheme main problem to be solved.
To solve the above-mentioned problems, using constructing tunnel provided by the present application Moveable support structure, specifically, can Mobile steel bracket uses the mechanical property common I-steel 1.5t of moderate 16 type, adjustable jacking 50, self-locking trundle 8 to prevent Protecting wire net 11m2, upper surface is laid with plank or bamboo chip plate 24m2.It selects steel part that must not have crackle, stomata, should not have shrinkage porosite, sand holes, pour Riser remnants fash, burr, oxide skin etc..I-shaped steel surface should make antirust treatment, while be carried out with related mixed paint on surface It brushes.The rectangular inverted U of steel bracket every, both sides steelframe high 5m, wide 4.15m, right angle joint are welded with I-shaped bracing members and preapre for an unfavorable turn of events Self-locking wheel is welded in shape, both sides steelframe bottom, totally 5 row.Spacing 1.5m is arranged, connection steel is welded between row, connection steel both ends are welded respectively It is connected on both sides longitudinal direction steelframe central point, away from ground 2.4m, it is 3 equally divided positions for often arranging the horizontal steel of holder that top, which connects steel pad,.Steel After the completion of frame overall structure, plank or bamboo chip plate 24m are laid with and fix at top2, welded respectively in steel bracket both sides and top Top, the top spacing 1.25m of both sides 3, often arranges cradle top and welds 4 tops, spacing 0.83m.Steel bracket march into the arena after in side Open protection network 11m in face2
The constructing tunnel Moveable support structure made of above-mentioned specification, uses in the seepage tunnel of the rivers Luo Zha When, diversion tunnel diameter is averagely about 7.55m, concrete lining thickness 39cm, Moveable support high 5m, wide 4.15m, length 6m.Roping concrete tank overall height 3.78m, wide 2.48m, holder do not influence concrete tank passage.Outside penstock manifold portion Diameter 3.816m, stiffening ring extend outwardly 0.2m, and the high 0.4m of trolley, overall length 4.616m, branch pipe completely can be under holder by reaching To installation site.Penstock is responsible for a diameter of 6.036m of water-ring, the high 0.4m of trolley, and supervisor's semicircle is with trolley track height 3.418m can be grouped with semicircular arc-shaped by carrying out assembled welding after below holder, reaching installation designated position.Bifurcated pipe tube coupling is most Major diameter is 5.548m, without stiffening ring, because diameter is less than predominant tube diameter so can equally grouping be utilized to pass through by method Assembled welding and installation are carried out after below holder.All tube couplings utilize hoist engine and trolley by steel pipe transmission to installation site.
As it can be seen that constructing tunnel provided by the present application Moveable support structure when using, primary welding is built i.e. available It in multistage lining construction, can be recycled for multiple times, and penstock transport installation can be made to be carried out at the same time, greatly shorten the work It the journey duration, does not restrict mutually.Meanwhile there are adequate space 5m × 4.15m for steel bracket lower part, can meet penstock completely Space needed for transport, while can be transported for concrete horizontal and channel is provided.Removable steel bracket can in lining construction section and Intersegmental movement after once building welding, need not remove repeatedly, can start the portion by moving integrally to predetermined construction site Give work.The welding of building of removable steel bracket needs 3 days;It only need to once build, it can be achieved that recycling, overall movement uses The characteristics of the loss of material is greatly reduced compared with scaffold, improve construction efficiency and economic benefit.
In short, constructing tunnel provided by the present application Moveable support structure, simple and reasonable, allow cavern's lining cutting It is carried out at the same time with penstock transport installation, solves duration collision problem, greatly shorten the part duration of a project;It builds It is formed after welding and stablizes entirety, many places construction section can be moved to, need not be built repeatedly, and can realized to follow and badly repeatedly utilize, Peace is torn open simply, is saved resource, construction cost is favorably saved, to create economic benefit.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The above is only the preferred embodiment of the utility model only, is not intended to limit the protection model of the utility model It encloses.Any modification, equivalent substitution, improvement and etc. made within the spirit and principle of the present invention, are all contained in this reality With in novel protection domain.

Claims (10)

1. a kind of constructing tunnel Moveable support structure, which is characterized in that including:
Rack body, the rack body include multiple rows of steel bracket with right angle inverted U-shaped structure made of shaped steel welds; Multiple rows of steel bracket is arranged at a certain pitch successively, and adjacent two steel bracket side and top surface are respectively independent using more Connection steel is welded to connect;
Multiple castors, multiple castors are uniformly distributed in the rack body lower part, and are fixedly linked with the steel bracket;
Multiple adjustable jackings, multiple adjustable jackings be fixedly installed in certain sequence the rack body top surface and Outside two sides;Multiple adjustable jackings for realizing the rack body in tunnel steel form it is closely coupled.
2. constructing tunnel according to claim 1 Moveable support structure, which is characterized in that the shaped steel is 16 types Common I-steel.
3. constructing tunnel according to claim 1 Moveable support structure, which is characterized in that multiple rows of steel bracket It is arranged successively with 1.5 meters of spacing.
4. constructing tunnel according to claim 3 Moveable support structure, which is characterized in that adjacent two steel bracket it Between be located at side connection steel be one, both ends are located at the longitudinal center point of two steel brackets;Adjacent two steel bracket it Between be located at top surface connection steel be two, every respective both ends be located at two steel brackets transverse direction 3 equally divided positions.
5. constructing tunnel according to claim 1 Moveable support structure, which is characterized in that multiple described adjustable Jacking is connected with the steel bracket;Wherein, it often arranges and is provided with 4 adjustable jackings at the top of the steel bracket, often arrange institute The two sides for stating steel bracket are respectively arranged with 3 adjustable jackings.
6. constructing tunnel according to claim 5 Moveable support structure, which is characterized in that the adjustable jacking Including leading screw for building and top.
7. constructing tunnel according to claim 1 Moveable support structure, which is characterized in that the castor is provided with Key-operated brake for limiting its longitudinal movement.
8. constructing tunnel according to claim 1 Moveable support structure, which is characterized in that the rack body Bearing plate material is equipped on top surface.
9. constructing tunnel according to claim 8 Moveable support structure, which is characterized in that the load-bearing plank is Plank or bamboo clappers.
10. constructing tunnel according to claim 1 Moveable support structure, which is characterized in that the steel bracket is straight Angle junction is connected with the support element of shaped steel material making.
CN201721475235.1U 2017-11-08 2017-11-08 A kind of constructing tunnel Moveable support structure Active CN207660618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721475235.1U CN207660618U (en) 2017-11-08 2017-11-08 A kind of constructing tunnel Moveable support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721475235.1U CN207660618U (en) 2017-11-08 2017-11-08 A kind of constructing tunnel Moveable support structure

Publications (1)

Publication Number Publication Date
CN207660618U true CN207660618U (en) 2018-07-27

Family

ID=62937778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721475235.1U Active CN207660618U (en) 2017-11-08 2017-11-08 A kind of constructing tunnel Moveable support structure

Country Status (1)

Country Link
CN (1) CN207660618U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725074A (en) * 2017-11-08 2018-02-23 中国水利水电第四工程局有限公司 A kind of constructing tunnel Moveable support structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725074A (en) * 2017-11-08 2018-02-23 中国水利水电第四工程局有限公司 A kind of constructing tunnel Moveable support structure

Similar Documents

Publication Publication Date Title
CN103362119B (en) Large-size rebar cage exempt from the method that is welded to connect and syndeton
CN104264899B (en) Embedded outsourcing U-shaped steel-concrete composite beam
CN106149576B (en) On removed and construction method of installation across both wired bridge whole groups
CN103924520B (en) Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN201599040U (en) Prefabricated segments for shield tunneling
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN103410102A (en) H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN107905111A (en) A kind of rigid frame-continuous girder end bay construction technology
CN102979038A (en) Cast-in-place box beam mobile bracket with increased width
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN207660618U (en) A kind of constructing tunnel Moveable support structure
CN204112222U (en) The bracing or strutting arrangement of main rope of suspension bridge anchoring prestress pipeline
CN208778145U (en) A kind of novel fan pylon structure
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN106638268B (en) The method of construction of stretch-draw forming combining structure arch bridge
CN107725074A (en) A kind of constructing tunnel Moveable support structure
CN204850196U (en) Large -scale minute crutch and complicated curved surface spatial grid structure
CN205063965U (en) A die carrier for construction of railway tunnel inverted arch
CN208563944U (en) Double hose builder's jack structure
CN204753977U (en) Cement concrete pillar
CN210530872U (en) Assembled self-stabilizing template suitable for tunnel lining construction
CN211228134U (en) Large cantilever prestress bent cap support device
CN211815522U (en) External prestress steering structure

Legal Events