CN207659974U - A kind of steel boxed cofferdam integral elevating equipment - Google Patents

A kind of steel boxed cofferdam integral elevating equipment Download PDF

Info

Publication number
CN207659974U
CN207659974U CN201720719998.XU CN201720719998U CN207659974U CN 207659974 U CN207659974 U CN 207659974U CN 201720719998 U CN201720719998 U CN 201720719998U CN 207659974 U CN207659974 U CN 207659974U
Authority
CN
China
Prior art keywords
steel
platform
fixed pulley
pedestal
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720719998.XU
Other languages
Chinese (zh)
Inventor
冯龙
江发达
童智道
王陈君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201720719998.XU priority Critical patent/CN207659974U/en
Application granted granted Critical
Publication of CN207659974U publication Critical patent/CN207659974U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of steel boxed cofferdam integral elevating equipment, including lifting gear, hoisting platform, platform for lining and steel boxed cofferdam ontology;Steel boxed cofferdam ontology is located on platform for lining, and hoisting platform is located at platform for lining both sides, and lifting gear, which is evenly distributed, to be fixed on hoisting platform;The lifting gear includes a L bracket, and frame bottom is pedestal, and pedestal rear is equipped with hoist engine, and pedestal front end is equipped with two steel pipe posts, is connected by crossbeam at the top of steel pipe post, also connected by tie-beam between steel pipe post top and pedestal rear;Pedestal front end is equipped with a fixed pulley, and crossbeam center is equipped with fixed pulley group, running block is equipped with below fixed pulley group, and the steel wire rope of hoist engine is protruded horizontally up from hoist engine, and the fixed pulley by pedestal front end is upwards about being located on fixed pulley group and running block;Running block bottom is equipped with suspension hook.The beneficial effects of the utility model are that the cofferdam of the utility model integrally promotes decentralization using hoist engine after the completion of assembly, and constructing operation is simple, and construction is flexible, and Meteorological is low.

Description

A kind of steel boxed cofferdam integral elevating equipment
Technical field
The utility model cofferdam construction field, specially a kind of steel boxed cofferdam integral elevating equipment.
Background technology
Cofferdam refers in engineering construction, to build facility in permanent water, the provisional building enclosure built.It is acted on It is to prevent water and soil from building position into building, so that in cofferdam internal drainage, excavation pit builds building.It is general main It is used in waterwork, in addition to the part as formal building, cofferdam is generally removed after being finished.Cofferdam height is higher than The peak level being likely to occur in construction time.
Existing form of construction work mostly uses large-scale lifting station or large-scale floating crane is promoted and transferred after cofferdam assembly is good, and two Kind construction method is complicated for operation, construction cost input is big;Floating-crane lifting Construction control difficulty is big, and crane barge lease expenses is high.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and propose that a kind of steel boxed cofferdam is whole Body lifting device.
To achieve the goals above, the utility model uses following technical solution:
A kind of steel boxed cofferdam integral elevating equipment, including lifting gear, hoisting platform, platform for lining and steel jacket box enclose Weir ontology;Steel boxed cofferdam ontology is located on platform for lining, and hoisting platform is located at platform for lining both sides, and lifting gear is evenly distributed It is fixed on hoisting platform;The lifting gear includes a L bracket, and frame bottom is pedestal, and pedestal rear is equipped with hoist engine, Pedestal front end is equipped with two steel pipe posts, is connected by crossbeam at the top of steel pipe post, between steel pipe post top and pedestal rear Also connected by tie-beam;Pedestal front end is equipped with a fixed pulley, and crossbeam center is equipped with fixed pulley group, is equipped with below fixed pulley group dynamic The steel wire rope of pulley blocks, hoist engine is protruded horizontally up from hoist engine, and the fixed pulley by pedestal front end is upwards about being located at fixed pulley In group and running block;Running block bottom is equipped with suspension hook.
The beneficial effects of the utility model are that the cofferdam of the utility model is after the completion of assembly, using hoist engine entirety Decentralization is promoted, constructing operation is simple, and construction is flexible, and Meteorological is low.
Description of the drawings
Fig. 1 is the side schematic view of lifting gear.
Fig. 2 is the front schematic view of lifting gear.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Figures 1 and 2, steel boxed cofferdam integral elevating equipment, including lifting gear, hoisting platform, platform for lining with And steel boxed cofferdam ontology;Steel boxed cofferdam ontology is located on platform for lining, and hoisting platform is located at platform for lining both sides, lifting dress It sets to be evenly distributed and be fixed on hoisting platform;The lifting gear includes a L bracket 1, and frame bottom is pedestal 2, after pedestal Side is equipped with hoist engine 3, and pedestal front end is equipped with two steel pipe posts 4, is connected by crossbeam 5 at the top of steel pipe post, steel pipe post top It is also connected by tie-beam 6 between end and pedestal rear;Pedestal front end is equipped with a fixed pulley 7, and crossbeam center is equipped with fixed pulley group 8, fixed pulley group lower section is equipped with running block 9, and the steel wire rope 10 of hoist engine is protruded horizontally up from hoist engine, passes through pedestal front end Fixed pulley is upwards about being located on fixed pulley group and running block;Running block bottom is equipped with suspension hook 11.
Your it is applied at present in this equipment in the remaining construction for believing Bridge Main Pier cushion cap of Yingtan, steel boxed cofferdam ontology is single wall Without bottom structure, the box structure being mainly made of side plate and inner support, effect is blocked water temporarily together with bottom concrete, Anhydrous dry construction condition is provided for cushion cap and pier construction.Since casing size is larger, for convenience of constructing, steel jacket box, which uses, to be divided Block makes, on-site consolidation, and hoist engine promotes the thinking of decentralization.
Main pier (11#, 12#) cofferdam height 14.5m, points three restrainings are made, from bottom to top the high 2.5m of first segment successively, the second section High 6.0m, the high 6.0m of third section.It tears open and transports for convenience of peace, side plate is mainly the calibrated bolck of width 3.0m, remaining is adjusting block, Connecting flange is done using 180 × 110 × 12 angle steel of ∠ between block and block, 2 holes row spacing 20cm φ 20mm are set on flange, by plum blossom Shape arranges that φ 18mm are bolted.
Single steel jacket box weight is 360t.
(1) side plate
Side plate uses single-wall structure, is made of siding and ribbed stiffener.The section of siding first and third is using 6mm steel plates, second section Using 8mm panels, ribbed stiffener is using [[18 channel steels erect rib, erect rib spacing 60cm, cross rib spacing 40cm for 10 channel steel cross ribs, Two bors d's oeuveres 2. Cofferdam siding surrounding sets 180 × 110 × 12 angle steel flanges of ∠.
(2) steel jacket box inner support
Set 5 inner supports on the inside of cofferdam, first of inner support is located at away from the base opening 5.7m height of cofferdam, then upward inner support Spacing is successively:2.3m、2.3m、2.5m、1.5m.2 are all made of at support, and [25a makees outer waistband, and with 2, [30b makees interior waistband;Cofferdam First and second layer of lateral inner bracing piece uses φ 820mm × 8mm steel pipes, third and fourth, five layers use φ 630mm × 8mm steel pipes, steel Pipe end sets 2 [25a diagonal braces;First and second layer of cofferdam vertical supporting bar uses φ 630mm × 8mm steel pipes, third and fourth, five layers adopt With φ 402mm × 6mm steel pipes;Cofferdam transverse ends are supported using shape steel bracket, and it is 2I45b, diagonal brace 2 that holder, which directly supports, [25a.2 [18 channel steel power transmissions of φ 820mm steel pipes outsourcing are used at longitudinal and transverse inner support lateral.
Steel cofferdam is in assembly, using drilling platform transformation as the platform for lining in cofferdam.Steel jacket box assembly utilizes periphery Steel pile casting steel corbel supports, and is unified in a plane according to casing size using shaped steel and carries out piecemeal assembly, first segment is assembled Steel corbel support platform is removed by 10 hoist engine Synchronous liftings to be transferred to the water surface, then carry out the spelling of two, three segments after the completion Dress and sinking.
Cofferdam, which is saved, to be bolted between section using φ 18, and bolt hole uses the quincunx spacing 20cm of 2 rows, and seam is using double The ripe glue of face glue+18mm (width) × 4mm (thickness) is clogged, it is ensured that seam is waterproof.
When transferring cofferdam, since hanging device limits in water, hoisting platform is set up using steel jacket box periphery and places 10 The double group Synchronous lifting decentralizations of 10 ton of 6 pulley blocks, pulley blocks select 80 ton of 6 wheel pulley blocks, by 22 import steel wire ropes of theoretical calculation φ Every crane capacity of bidirectional slide wheel group reaches 80t, and 80t × 10=800t ﹥ 360t can meet lifting requirements.Hoist engine rotating speed 22m/ Min, 22 ÷ 12=1.83m/min of lowering velocity.
Since this steel jacket box is single-wall structure, inside dimension is larger, to ensure uniformly to sink in sinking watching, ensures flat Face height difference is no more than 20cm.
Since casing is bulky, certain guider is must be provided in sinking, steel shield is corresponded on the siding of cofferdam 8 bearing arrangements are arranged in the position of cylinder, resist steel pile casting, prevent decentralization hour offset, ensure after sinking in place, meet setting for cushion cap Count size.
Remaining your bottomless steel boxed cofferdam of Bridge Main Pier single wall of letter, structure construction is easy to process, spells and tears open conveniently, can repeatedly have enough to meet the need It uses, subsidence process is simple, saves the time, achieves remarkable effect.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (1)

1. a kind of steel boxed cofferdam integral elevating equipment, which is characterized in that including lifting gear, hoisting platform, platform for lining with And steel boxed cofferdam ontology;Steel boxed cofferdam ontology is located on platform for lining, and hoisting platform is located at platform for lining both sides, lifting dress It sets to be evenly distributed and be fixed on hoisting platform;The lifting gear includes a L bracket, and frame bottom is pedestal, pedestal rear Equipped with hoist engine, pedestal front end is equipped with two steel pipe posts, is connected by crossbeam at the top of steel pipe post, steel pipe post top and base Seat is also connected by tie-beam between rear;Pedestal front end is equipped with a fixed pulley, and crossbeam center is equipped with fixed pulley group, fixed pulley group Lower section is equipped with running block, and the steel wire rope of hoist engine protrudes horizontally up from hoist engine, by the fixed pulley of pedestal front end upwards about It is located on fixed pulley group and running block;Running block bottom is equipped with suspension hook.
CN201720719998.XU 2017-06-20 2017-06-20 A kind of steel boxed cofferdam integral elevating equipment Active CN207659974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720719998.XU CN207659974U (en) 2017-06-20 2017-06-20 A kind of steel boxed cofferdam integral elevating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720719998.XU CN207659974U (en) 2017-06-20 2017-06-20 A kind of steel boxed cofferdam integral elevating equipment

Publications (1)

Publication Number Publication Date
CN207659974U true CN207659974U (en) 2018-07-27

Family

ID=62935398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720719998.XU Active CN207659974U (en) 2017-06-20 2017-06-20 A kind of steel boxed cofferdam integral elevating equipment

Country Status (1)

Country Link
CN (1) CN207659974U (en)

Similar Documents

Publication Publication Date Title
CN102191777B (en) Steel sheet pile coefferdam structure and topdown construction method thereof
CN204343301U (en) A kind of Metro station excavation excavation supporting structure
CN205776347U (en) Novel cover for subway station digs against making structural system
CN106948353B (en) A kind of deep water combined steel plate pile cofferdam construction method
CN206916751U (en) Horizontal bracing members have bad luck peace and tear constructing structure open below a kind of half base hole cover-digging cover plate
CN103603358A (en) Multi-platform retaining structure and construction method
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN105178329A (en) Wall supporting type supporting structure and construction method of foundation pit underground continuous wall
CN102888848A (en) Supporting structure for controlling stability of foundation ditch
CN211172000U (en) Foundation pit enclosure system with combination of support piles and concrete main structure
CN202530464U (en) Road drainage foundation-pit supporting structure for auxiliary steel sheet pile construction of dewatering wells
CN107227741B (en) Basement supporting construction
CN207659974U (en) A kind of steel boxed cofferdam integral elevating equipment
CN204000905U (en) A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction
CN107034908A (en) A kind of steel boxed cofferdam integral elevating equipment
CN204715364U (en) A kind of foundation pit support device
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN202131602U (en) Steel sheet pile cofferdam structure
CN207943803U (en) Diaphram wall steel reinforcement cage lifting device under overpass
CN206956752U (en) The assembly of steel cofferdam coxopodite and suspension system
CN203821399U (en) Deep foundation pit supporting structure
CN202925552U (en) Foundation pit steel pipe brace replacing and construction structure for ramp
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN213358679U (en) Water buoyancy balance system of subway upper cover structure
CN102747747B (en) Construction method for installing underground lattice column

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210414

Address after: No.1, building 8, No.58, Huasheng Road, Longtan street, Chenghua District, Chengdu, Sichuan 610000

Patentee after: China Railway 24th Bureau Group southwest Construction Co.,Ltd.

Address before: No.216 tiexing Road, Yushui District, Xinyu City, Jiangxi Province 338000

Patentee before: CHINA RAILWAY 24TH BUREAU GROUP XINYU ENGINEERING Co.,Ltd.

Patentee before: China Railway 24th Bureau Group Co.,Ltd.