CN207647523U - Separate tunnel steel arch-shelf mounting device - Google Patents

Separate tunnel steel arch-shelf mounting device Download PDF

Info

Publication number
CN207647523U
CN207647523U CN201721784358.3U CN201721784358U CN207647523U CN 207647523 U CN207647523 U CN 207647523U CN 201721784358 U CN201721784358 U CN 201721784358U CN 207647523 U CN207647523 U CN 207647523U
Authority
CN
China
Prior art keywords
arch
trolley
translating trolleys
mounting device
jacking part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721784358.3U
Other languages
Chinese (zh)
Inventor
龚岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUTE INTELLIGENT EQUIPMENT (CHONGQING) Co.,Ltd.
Original Assignee
龚岗
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 龚岗 filed Critical 龚岗
Priority to CN201721784358.3U priority Critical patent/CN207647523U/en
Application granted granted Critical
Publication of CN207647523U publication Critical patent/CN207647523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of separate tunnel steel arch-shelf mounting device, including excavate trolley, be located at excavate trolley by the anchor pole mesh sheet elevator at hole end, arch hoisting mechanism, be located at the arch translation mechanism excavated under the flank of trolley top layer both sides, be located at and excavate trolley top layer platform both sides and perpendicular to lifting body at the top of the arch of top layer platform and be located at the arch side lifting body excavated under the flank of trolley both sides.The present apparatus, which can be directly mounted at, to be excavated on trolley top layer platform, and apparatus cost is low, by arch in the present apparatus around, up and down, the movements such as tilt, it is accurately in place to realize arch.

Description

Separate tunnel steel arch-shelf mounting device
Technical field
The utility model is related to constructing tunnel apparatus fields.
Background technology
With the development of national basis construction, a piece of prosperity in infrastructure market, highway, railway are just realizing that great-leap-forward is sent out Exhibition, wherein constructing tunnel is component part important in highway, railway construction.During constructing tunnel, be frequently encountered by In not firm base support, thus there is foundation bearing capacity deficiency in new stress forming process and accordingly lead to tunnel The practical problems such as unstability landslide, have seriously affected the person and equipment safety, have hindered the progress of construction.Practice of construction process In, to solve the practical problems such as above-mentioned tunnel instability landslide, it is necessary to during tunnel excavation, be carried out in time to excavated section fast Speed and effectively supporting.
But currently, mainly being carried out in the following manner when practice of construction, first, arch installs three arm trolleys, equipment price Height, effect is single, can only once carry out the installation of a Pin tunnel steel arch frames, and comprehensive construction cannot be carried out to arch;The Second is that the monoblock type tunnel steel arch frame mounting device of my company's production being arranged on excavation trolley, generally excavates trolley If both sides are all designed with flank of the dried layer for construction respectively, and monoblock type tunnel steel arch frame mounting device, structure are more complex, fortune It is dynamic secondary too many, have an impact to excavating operation and digging measure, other arch installation methods are generally manually installed, the position of arch It sets and usually requires manually to be adjusted, once can only also carry out the installation of a Pin tunnel steel arch frames, labor intensity is big, recruitment number More, installation effectiveness is low and safety coefficient is low.
Utility model content
The utility model is intended to provide a kind of separate tunnel steel arch-shelf mounting device, to solve existing arch installation dress Set with when excavating trolley and integrally configuring, the problem of influencing the work such as measurement, drilling, the rockbolt installation in digging process.
Base case:Separate tunnel steel arch-shelf mounting device, including excavate trolley, be located at and excavate trolley by hole end Anchor pole mesh sheet elevator, is located at the arch translation mechanism excavated under the flank of trolley top layer both sides, is located at excavation arch hoisting mechanism Trolley top layer platform both sides and lifting body and being located at excavates under the flank of trolley both sides at the top of the arch of top layer platform Arch side lifting body, the arch hoisting mechanism include being located at the first arch for excavating trolley on two heel post of hole end Jack part, lever, bottom plate, first hoist and several first fixed pulleys with first hoist cooperation;The arch translates machine Structure includes the pipe track for arch anterior-posterior translation, the first translating trolleys walked on pipe track, drives the first translation small The second hoist that vehicle moves back and forth and several second fixed pulleys with second hoist cooperation;Lifting body at the top of the arch Including being respectively provided at the second arch jacking part for excavating trolley by face one end both sides and being hinged on the second arch jacking part The first arch knock-pin at end, slidably connect on the first arch knock-pin it is several can be before and after the first arch knock-pin Second translating trolleys of translation;Arch side lifting body, which is respectively provided at, excavates the both sides that trolley leans on face one end, institute It includes third arch jacking part and the second arch ejection for being hinged on third arch jacking part upper end to state arch side lifting body Bar, the second arch knock-pin slidably connect it is several can along the third of the second arch knock-pin anterior-posterior translation translate it is small Vehicle.
The principle of above-mentioned technical proposal is:When carrying out the arch installation in tunnel, first excavation trolley is moved to and is abutted Then hole end is leaned on excavating trolley in face position, by full section face, the difference of two step construction methods and drilling depth length, Excavate arch (arch pre-splicing hop count=when secondary installation total hop count -2) of the trolley by the pre-splicing appropriate Pin numbers in hole end.
Do not start the first arch jacking part first, only start first hoist, the first hoist of both sides is released steel wire rope, used Fixture is stuck in the appropriate location of arch on steel wire rope, is then promoted arch to the fixed pulley on lever by first hoist Position starts the first arch jacking part, arch is further promoted to lever and excavates trolley top layer platform upright position at this time. Start the second hoist of the first translating trolleys of driving, the first translating trolleys of driving are moved to its bearing bar and are located at immediately below arch When, arch is down on bearing bar using first hoist and is limited with bolt, the card in first hoist is taken down from arch Tool.
When the first arch jacking part further jacks, lever top position reduces, and concedes arch translational shifting and postpones, first is flat It moves trolley and arch is moved into excavation trolley on the first arch lifting pin of face one end under the driving of second hoist Appropriate location some second translating trolleys on.The arch that first translating trolleys are brought after first front and back in the way of put respectively It sets on multiple second translating trolleys on the first arch lifting pin, (arch on the first translating trolleys moves to the second translation When the surface of trolley, the second arch jacks part and rises, and the second translating trolleys jacking arch simultaneously makes its rising, reserves appropriate space The first translating trolleys are made to translate back into hole end, the second arch jacking part minimizes position, repeats above-mentioned action, more Pin are encircleed Frame is moved to respectively on several second translating trolleys).
When arch moves on the second translating trolleys, elevating movement and the first knock-pin of part are jacked by the second arch On multiple second translating trolleys back-and-forth motion, adjust each arch keystone (arch centering) and its each other between Away from loading onto mesh sheet and connection reinforcing bar (only fixed one end, the other end is movable end) between arch.Second arch jacks part jacking, Arch is jacked to installation site, locks the connection bolt between every section of arch connecting plate, then by both sides arch side lifting body On third arch jacking part jacked, by the second knock-pin level eject, third translating trolleys are moved into arch and correspond to position It sets, arch bottom is jacked to installation site, manually bottom section arch is locked between ground and upper end arch, mesh sheet, weldering are installed Reinforcing bar is connect in succession, and so far installation is complete for more Pin arches.
The effect of above-mentioned technical proposal is:
1, the present apparatus, which can be directly mounted at, excavates on trolley top layer platform, and apparatus cost is low, by arch in this dress Around setting, up and down, tilt etc. movements, it is accurately in place to realize arch.
2, the present apparatus can be achieved at the same time two Pin, three Pin even more Pin arches after welding dowel and expanded metal lath while pacify Dress.
3, the present apparatus realizes the in place of arch and installation by mechanical structure, is installed instead of the manual elevation of arch, pole Big reduces labor intensity, reduces recruitment number, improves the fixed and positioned efficiency of arch.
4, it is not take up and excavates trolley drilling construction platform, translating trolleys avoid locking first translating trolleys of stone when walking With the traveling wheel of the second translating trolleys.
5, spacing between two bearing bar of the first translating trolleys when amplification arch translates as possible, when reducing the translation of the first translating trolleys Arch deflection avoids arch touching from excavating trolley flank.
6, arch installation personnel can be kept to 7-8 people by 12-13 people, and installation personnel is only in the pre-splicing and assembled bottom section arch in ground It need to manually be lifted when frame and move single hop arch, reduced arch and number is installed, substantially reduce labor intensity.
7, the arch set-up time is reduced, reduces arch installation risk.
Scheme two, advanced optimizes as to base case, and the first arch jacking part and lever are hinged, the first arch Frame jacks part and lever and is hinged respectively with bottom plate, and lever top and bottom plate are equipped with fixed pulley.The liter of part is jacked by the first arch Drop, lever circles along bottom plate upper link point, and when the first arch jacking part is contracted in shortest length, lever is to hole end Slant range longest, promotes arch at this time, and collision in arch hoisting process can be avoided to excavate trolley most possibly;When the first arch Frame jack part jacking to lever perpendicular to excavate trolley top layer platform when, arch be in the extreme higher position of lifting process, is convenient for the One translating trolleys take over arch;When the first arch jacking part jacking to longest distance when, lever top be in extreme lower position, be Arch on first translating trolleys moves to face and reserves sufficient space.
Scheme three, advanced optimizes as to base case, and arch side lifting body is respectively provided at excavation platform Vehicle is under the first layer flank or second layer flank of face one end both sides.
Scheme four, advanced optimizes as to base case, and the second hoist is cellular-type drum hoister.The The other end of one the fixed steel wire rope in translating trolleys rear and front end is turned to by fixed pulley, and clockwise and wrapped anti-clockwise exists respectively The horizontal along pipe track of the first translating trolleys can be realized using a hoist engine in the side of cellular-type drum hoister reel It moves back and forth, and will not mutually be tangled between steel wire rope, translation is at the uniform velocity.
Scheme five, advanced optimizes as to base case, first arch jacking part, the second arch jacking part and It is two that third arch, which jacks part,.First arch jacks part and is excavating trolley by hole end both sides each one, is carried for arch For two suspension centres, it can steadily promote arch while reduce the deformation in arch lifting process;Second arch jacks part and third arch Frame jacking part is two, and two arch jacking parts are hinged with an arch knock-pin, and knock-pin can be parallel to excavation trolley Ejection, also can relative tilt, position can opposite adjustment when realizing arch ejection.
Scheme six, as advanced optimizing to scheme five, first arch jacking part, the second arch jacking part and the Three arches jack part and are driven by hydraulic cylinder or cylinder.All jacking parts provide power, liquid by same hydraulic station or gas station The power that pressure station or gas station provide realizes the actions such as the lifting of jacking part by the control of various hydraulic pressure (or pneumatic) valve.
Scheme seven, advanced optimizes as to base case, which is characterized in that first translating trolleys, second flat It is three-dimensional wheel translating trolleys to move trolley and third translating trolleys.Trundle is set as three-dimensional wheel, it is ensured that trolley will not when moving Phenomena such as derailing, offset, interim card occurs.
Scheme eight, advanced optimizes as to base case, which is characterized in that second translating trolleys and third are flat The contact position for moving trolley and arch is equipped with scroll wheel.When jacking arch, arch can freely be made relatively on scroll wheel When vault centering adjustment is made in movement, especially arch, by lifting body both sides knock-pin OQ t at the top of arch, arch can It is slided rapidly on scroll wheel, achievees the purpose that vault quick centring.
Description of the drawings
Fig. 1 is the structural representation that the utility model embodiment separate tunnel steel arch-shelf mounting device leans on Tunnel wall end Figure;
Fig. 2 is the structural representation that the utility model embodiment separate tunnel steel arch-shelf mounting device leans on tunnel portal end Figure;
Fig. 3 is the structural representation that the utility model embodiment separate tunnel steel arch-shelf mounting device leans on tunnel tunnel face end Figure.
Specific implementation mode
Below by the further details of explanation of specific implementation mode:
Reference numeral in Figure of description includes:Excavate trolley 1, the first arch jacking part 2, lever 3, first hoist 4, pipe track 5, the first translating trolleys 6, second hoist 7, the second arch jacking part 8, the first arch knock-pin 9, second are flat Move trolley 10, third arch jacking part 11, the second arch knock-pin 12, third translating trolleys 13, arch 14, the first fixed pulley 15, the second fixed pulley 16.
Embodiment is basic as shown in attached drawing 1, attached drawing 2 and attached drawing 3:
Separate tunnel steel arch-shelf mounting device, including excavate trolley 1, be located at and excavate the anchor pole net that trolley 1 leans on hole end Piece elevator, arch hoisting mechanism are located at the arch translation mechanism excavated under 1 top layer both sides flank of trolley, are located at and excavate trolley 1 Top layer platform both sides and lifting body and the arch excavated under 1 both sides flank of trolley is located at the top of the arch of top layer platform Side lifting body, arch hoisting mechanism include being located to excavate trolley 1 by two first arch jackings on two heel post of hole end Part 2, lever 3, bottom plate, first hoist 4 and several first fixed pulleys 15 being equipped with first hoist 4.
Two first arch jacking parts 2 and lever 3 are hinged, and two first arch jacking parts 2 and lever 3 are cut with scissors with bottom plate respectively It connects, the first arch jacks part 2 and excavating trolley 1 by hole end both sides each one, provides two suspension centres for arch, can steadily carry It rises arch while reducing the deformation in arch lifting process.3 top of lever and bottom plate are equipped with fixed pulley, are jacked by the first arch The lifting of part 2, lever 3 are circled along bottom plate upper link point, when the first arch jacking part 2 is contracted in shortest length, thick stick Bar 3 promotes arch at this time to hole end slant range longest, and collision in arch hoisting process can be avoided to excavate platform most possibly Vehicle 1;When the first arch jacking part 2 jacking to lever 3 is perpendicular to excavation 1 top layer platform of trolley, arch is in lifting process Arch is taken in extreme higher position convenient for the first translating trolleys 6;When the jacking jacking of part 2 of the first arch is to longest distance, lever 3 pushes up End is in extreme lower position, and moving to face for the arch on the first translating trolleys 6 reserves sufficient space.
Arch translation mechanism include for arch anterior-posterior translation pipe track 5, walking on pipe track 5 first translation Second hoist 7 that trolley 6, the first translating trolleys 6 of driving move back and forth and be equipped with second hoist 7 several the Two fixed pulleys 16, second hoist 7 are cellular-type drum hoister, the fixed steel wire rope in 6 rear and front end of the first translating trolleys The other end is turned to by fixed pulley, and clockwise and wrapped anti-clockwise is used in the side of cellular-type drum hoister reel respectively One hoist engine can be realized the first translating trolleys 6 along 5 horizontal reciprocating movement of pipe track, and will not mutually be entangled between steel wire rope It twines, translation is at the uniform velocity.
Lifting body includes being respectively provided to excavate two second arch tops that trolley 1 leans on face one end both sides at the top of arch It rises part 8 and is hinged on the first arch knock-pin 9 of two second arch jacking part, 8 upper ends, it is sliding on the first arch knock-pin 9 It is dynamic be connected with it is several can be along the second translating trolleys 10 of 9 anterior-posterior translation of the first arch knock-pin.
Arch side lifting body, which is respectively provided at, excavates first layer flank or the second layer that trolley 1 leans on face one end both sides Under flank, arch side lifting body includes that two third arches jack part 11 and are hinged on two third arch jacking parts 11 End the second arch knock-pin 12, the second arch knock-pin 12 slidably connect it is several can be before and after the second arch knock-pin 12 The third translating trolleys 13 of translation.It is two that second arch, which jacks part 8 and third arch jacking part 11, and two arches jack part Be hinged with an arch knock-pin, knock-pin, which can be parallel to, to be excavated trolley 1 and ejects, also can relative tilt, to realize arch top Position can opposite adjustment when going out.
First arch jacks part 2, the second arch jacking part 8 and third arch jacking part 11 and is driven by hydraulic cylinder or cylinder It is dynamic.All jacking parts provide power by same hydraulic station or gas station, and the power that hydraulic station or gas station provide passes through various hydraulic pressure The actions such as the lifting of jacking part are realized in the control of (or pneumatic) valve.First translating trolleys 6, the second translating trolleys 10 and third translation Trolley 13 is three-dimensional wheel translating trolleys, and the second translating trolleys 10 and third translating trolleys 13 and the contact position of arch are all provided with There is scroll wheel.When jacking arch, arch can be performed relative motion freely on scroll wheel, and especially arch makees vault centering tune When whole, it can rapidly be slided on scroll wheel by lifting body both sides knock-pin OQ t, arch 14 at the top of arch, reach arch Push up the purpose of quick centring.
When carrying out the installation of arch 14 in tunnel, it will first excavate trolley 1 and be moved to against face position, then opening Digging stillage truck 1 leans on hole end, pre- by hole end excavating trolley 1 by full section face, the difference of two step construction methods and drilling depth length Spell the arch 14 (the pre-splicing hop count of arch=when the total hop count of secondary installation -2) of appropriate Pin numbers.The first arch jacking part 2 is not started first, only Start first hoist 4, the first hoist 4 of both sides releases steel wire rope, the appropriate position of arch 14 is stuck in fixture on steel wire rope It sets, then arch 14 is promoted to the fixed pulley position on lever 3 by first hoist 4, starts the first arch top at this time Part 2 is risen, arch 14 is further promoted to lever 3 and excavates 1 top layer platform upright position of trolley.
Start the second hoist 7 of the first translating trolleys 6 of driving, the first translating trolleys 6 of driving are moved to its bearing bar position When 14 underface of arch, arch 14 is down on bearing bar using first hoist 4 and is limited with bolt, is taken from arch 14 Fall the fixture in first hoist 4.When the first arch jacking part 2 further jacks, 3 top position of lever reduces, and concedes arch 14 translational shiftings postpone, and arch 14 is moved under the driving of second hoist 7 and excavates trolley 1 by area by the first translating trolleys 6 On some second translating trolleys 10 of appropriate location on the first arch lifting pin of face one end.
The arch 14 that first translating trolleys 6 are brought after first front and back in the way of be individually positioned on the first arch lifting pin Multiple second translating trolleys 10 on, (arch 14 on the first translating trolleys 6 moves to the surface of the second translating trolleys 10 When, the second arch jacks part 8 and rises, and the second translating trolleys 10 jacking arch 14 simultaneously makes its rising, and reserving appropriate space makes first Translating trolleys 6 translate back into hole end, and the second arch jacking part 8 minimizes position, above-mentioned action repeated, by more Pin arches 14 It moves to respectively on several second translating trolleys 10).When arch 14 moves on the second translating trolleys 10, pass through the second arch top The elevating movement of part 8 and the back-and-forth motion of multiple second translating trolleys 10 on the first knock-pin are risen, each arch 14 is adjusted Keystone (14 centering of arch) and its mutual spacing, load onto mesh sheet between arch 14 and connection reinforcing bar (only fixes one end, separately One end is movable end).
Second arch jacks part 8 and jacks, and by the jacking of arch 14 to installation site, locks the company between every section of 14 connecting plate of arch Connecting bolt, then the third arch jacking part 11 on the lifting body of both sides arch side is jacked, by the second knock-pin level Third translating trolleys 13 are moved to 14 corresponding position of arch, 14 bottom of arch are jacked to installation site by ejection, manually by bottom section Arch 14 is locked between ground and upper end arch 14, is installed mesh sheet, is welded to connect reinforcing bar, so far installation is complete for more Pin arches 14.
Through experiment:
Arch installation personnel can be kept to 7-8 people by 12-13 people, installation personnel only in pre-splicing A, B, C section of arch in ground and It need to manually be lifted when mobile D sections of arches and move single hop arch.
The first step:4-5 people is in ground 3 Pin of assembly (often Pin include A, B, C sections) arch simultaneously, about 12-15 minutes used time, this When, remaining 3 people is lifted mesh sheet, reinforcing bar, advance anchor bolt to top layer flat bed with anchor pole mesh sheet elevator.
Second step:It is pre-splicing it is complete after stay two people to block arch with fixture on 4 steel wire rope of first hoist on ground, on remaining people Corresponding position on trolley 1 is excavated, single Pin arches lift time 2-3 minute, translate 2-3 minutes arch used time, and the two, which synchronizes, to be carried out, Total used time 10-15 minute.
Third walks:3 Pin arch centerings, used time 4-5 minute.
4th step:Mesh sheet and 20-25 minutes reinforcing bar used time of connection between installation, binding, welding arch
5th step:The jacking of at the top of arch and both sides, both sides D sections of arch installation, used time 20-25 minute
6th step:Mesh sheet and the binding of connection reinforcing bar, welding, used time about 25-30 point between D sections and new peace arch and former arch Clock.
The used time is 91-125 minutes in the case of not considering the time for owing digging, cleaning float stone and other influence arch installations, In addition lock foot, advance anchor bolt drilling installation used time 1.5-2 hour, total used time 3-4 hours.
Above-described is only the embodiments of the present invention, and the common sense such as well known concrete structure and characteristic are herein in scheme It does not describe excessively.It should be pointed out that for those skilled in the art, in the premise for not departing from the utility model structure Under, several modifications and improvements can also be made, these should also be considered as the scope of protection of the utility model, these are not all interfered with The effect and patent practicability that the utility model is implemented.This application claims protection domain should be with the content of its claim Subject to, the records such as specific implementation mode in specification can be used for explaining the content of claim.

Claims (8)

1. separate tunnel steel arch-shelf mounting device, it is characterised in that:Including excavating trolley, being located at and excavate trolley by hole end Anchor pole mesh sheet elevator, is located at the arch translation mechanism excavated under the flank of trolley top layer both sides, is located at excavation arch hoisting mechanism Trolley top layer platform both sides and lifting body and being located at excavates under the flank of trolley both sides at the top of the arch of top layer platform Arch side lifting body, the arch hoisting mechanism include being located at the first arch for excavating trolley on two heel post of hole end Jack part, lever, bottom plate, first hoist and several first fixed pulleys with first hoist cooperation;The arch translates machine Structure includes the pipe track for arch anterior-posterior translation, the first translating trolleys walked on pipe track, drives the first translation small The second hoist that vehicle moves back and forth and several second fixed pulleys with second hoist cooperation;Lifting body at the top of the arch Including being respectively provided at the second arch jacking part for excavating trolley by face one end both sides and being hinged on the second arch jacking part The first arch knock-pin at end, slidably connect on the first arch knock-pin it is several can be before and after the first arch knock-pin Second translating trolleys of translation;Arch side lifting body, which is respectively provided at, excavates the both sides that trolley leans on face one end, institute It includes third arch jacking part and the second arch ejection for being hinged on third arch jacking part upper end to state arch side lifting body Bar, the second arch knock-pin slidably connect it is several can along the third of the second arch knock-pin anterior-posterior translation translate it is small Vehicle.
2. separate tunnel steel arch-shelf mounting device according to claim 1, it is characterised in that:The first arch jacking Part is hinged with lever, and the first arch jacks part and lever and is hinged respectively with bottom plate, and lever top and bottom plate are equipped with fixed pulley.
3. separate tunnel steel arch-shelf mounting device according to claim 1, it is characterised in that:The arch side jacking Mechanism, which is respectively provided at, excavates trolley under the first layer flank or second layer flank of face one end both sides.
4. separate tunnel steel arch-shelf mounting device according to claim 1, it is characterised in that:The second hoist is Cellular-type drum hoister.
5. separate tunnel steel arch-shelf mounting device according to claim 1, it is characterised in that:The first arch jacking Part, the second arch jacking part and third arch jacking part are at least two.
6. separate tunnel steel arch-shelf mounting device according to claim 5, it is characterised in that:The first arch jacking Part, the second arch jacking part and third arch jacking part are driven by hydraulic cylinder or cylinder.
7. separate tunnel steel arch-shelf mounting device according to claim 1, it is characterised in that:First translation is small Vehicle, the second translating trolleys and third translating trolleys are three-dimensional wheel translating trolleys.
8. separate tunnel steel arch-shelf mounting device according to claim 1, it is characterised in that:Second translating trolleys It is equipped with scroll wheel with the contact position of third translating trolleys and arch.
CN201721784358.3U 2017-12-19 2017-12-19 Separate tunnel steel arch-shelf mounting device Active CN207647523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721784358.3U CN207647523U (en) 2017-12-19 2017-12-19 Separate tunnel steel arch-shelf mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721784358.3U CN207647523U (en) 2017-12-19 2017-12-19 Separate tunnel steel arch-shelf mounting device

Publications (1)

Publication Number Publication Date
CN207647523U true CN207647523U (en) 2018-07-24

Family

ID=62877536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721784358.3U Active CN207647523U (en) 2017-12-19 2017-12-19 Separate tunnel steel arch-shelf mounting device

Country Status (1)

Country Link
CN (1) CN207647523U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005687A (en) * 2017-12-19 2018-05-08 龚岗 Separate tunnel steel arch-shelf erecting device
CN114961802A (en) * 2022-06-15 2022-08-30 山东龙泰节能技术有限责任公司 Feeding mechanism, conveying mechanism and automatic lifting arch frame trolley

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005687A (en) * 2017-12-19 2018-05-08 龚岗 Separate tunnel steel arch-shelf erecting device
CN108005687B (en) * 2017-12-19 2024-01-26 龚岗 Separated tunnel steel arch installing device
CN114961802A (en) * 2022-06-15 2022-08-30 山东龙泰节能技术有限责任公司 Feeding mechanism, conveying mechanism and automatic lifting arch frame trolley
CN114961802B (en) * 2022-06-15 2023-08-29 山东龙泰节能技术有限责任公司 Feeding mechanism, conveying mechanism and automatic lifting arch frame trolley

Similar Documents

Publication Publication Date Title
CN108005687A (en) Separate tunnel steel arch-shelf erecting device
CA2689866C (en) Pipe support system and method for use in underground pipe ramming
KR101432360B1 (en) Apparatus for welding automation of steel pipe pile assembly
CN207647523U (en) Separate tunnel steel arch-shelf mounting device
CN105673048B (en) A kind of self-propelled hydraulic box culvert chassis
CN106869947B (en) Preliminary bracing stand operates trolley after a kind of tunnel tunnel face excavates
CN206128080U (en) A support system for subway foundation pit
JP2016199345A (en) Boom attaching/detaching device and attaching/detaching method
CN109236331A (en) A kind of steel arch rack trolley suitable for the micro- bench cut method in tunnel
CN207144965U (en) Tunnel arch erecting device
JP5634779B2 (en) Lifting method and lifting device for work floor
CN108643941A (en) Gantry type arch installs trolley
KR200423750Y1 (en) Device for lifting temporary stand
JP2011226255A (en) Super-low overhead clearance excavator, kelly rod employed therewith, and excavating reaction securing method and its mobile device
CN104718328B (en) Multi-stage expansion arm assembly and there is the deep excavator of multi-stage expansion arm assembly
CN115749896A (en) Temporary surrounding rock top supporting equipment in roadway excavation and using method thereof
CN108978663A (en) A kind of fixed device of inclined piling machine of anti-pile
CN207880310U (en) A kind of counterweight frame of roller type and Elevator weight sensor using the counterweight frame
CN207685881U (en) A kind of bracing members support moving device suitable for narrow place
CN208870036U (en) A kind of fixed device of inclined piling machine of anti-pile
CN102587350B (en) Spile device of spile machine
KR20110019806A (en) Movable ladder
JP5851774B2 (en) Low head drilling rig with variable feed stroke
JP3372618B2 (en) Mobile transport equipment for tunnel construction materials
CN217421240U (en) Subway tunnel reinforcing equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220117

Address after: 404100 Gaoqiao Pioneer Park, Changlong Town, Dianjiang County, Chongqing

Patentee after: FUTE INTELLIGENT EQUIPMENT (CHONGQING) Co.,Ltd.

Address before: 401120 12-2-3-3, Luneng Xingcheng fifth block, Yubei District, Chongqing

Patentee before: Gong Gang