CN207647189U - A kind of construction discharging platform - Google Patents
A kind of construction discharging platform Download PDFInfo
- Publication number
- CN207647189U CN207647189U CN201721447318.XU CN201721447318U CN207647189U CN 207647189 U CN207647189 U CN 207647189U CN 201721447318 U CN201721447318 U CN 201721447318U CN 207647189 U CN207647189 U CN 207647189U
- Authority
- CN
- China
- Prior art keywords
- wall
- crossbeam
- reinforcing bar
- fixed
- drag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of construction discharging platforms, the right side of the civil engineering structure is equipped with crossbeam, the left side outer wall of the crossbeam is connected with the outer right wall of civil engineering structure, the inner wall of the crossbeam is equipped with sliding slot, the outer wall of the sliding slot is connected with the inner wall of crossbeam, the inside of the sliding slot is equipped with pulley, and the outer wall of the pulley is connected with the inner wall of sliding slot, and the left side of the crossbeam is equipped with fixed lateral reinforcing bar.The construction discharging platform, under the action of fixed square steel and triangular steel plate, crossbeam and civil engineering structure are linked together, so that crossbeam is formed an entirety with civil engineering structure, keeps the discharging platform that civil engineering structure is built with crossbeam more firm, springboard is enable to be taken out out of crossbeam, to overcome traditional discharging platform lack in the case where road is uneven or miriness can not discharging the shortcomings that, the work fatigue for reducing stevedore, saves construction cost, is suitble to promote and apply.
Description
Technical field
The utility model is related to construction engineering technical field, specially a kind of construction discharging platform.
Background technology
Discharging platform is that various provisional operation consoles are often set up in construction site, can carry out various building finishing and painting etc. by laying bricks or stones
Operation in general can be within certain duration for carrying material, and carries out the framework type platform of various operations wherein, claims
Be operating platform, it is a variety of that operating platform is divided into movable operation platform, console mode and overhanging type operating platform, also referred to as
Transfer platform in the prior art, such as application No. is 201520710363.4 utility model patent includes platform, described flat
The side of platform is equipped with supporting rod, and the other side of the platform is equipped with safe fence, and the platform includes fixed frame and is fixed on
Loading deck on the fixed frame, the supporting rod is detachable connection with the platform, although the utility model is tied
Structure is simple, but there are many deficiencies and defect, in existing equipment, the design existing defects of discharging platform, and pedestal and side plate
Connection can not carry pressure caused by a large amount of placing of material when discharging, and be not provided with the facilities such as springboard improve it is anti-
Setting of the muddy road surface to discharging inconvenience, in view of these situations, to avoid above-mentioned technical problem, it is necessory to provide a kind of building
Construction discharging platform is to overcome the defect in the prior art.
Utility model content
The purpose of this utility model is to provide a kind of construction discharging platforms, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the utility model provides the following technical solutions:A kind of construction discharging platform, packet
It includes:The right side of civil engineering structure, the civil engineering structure is equipped with crossbeam, the left side outer wall of the crossbeam and the outer right wall of civil engineering structure
It is connected, the inner wall of the crossbeam is equipped with sliding slot, and the outer wall of the sliding slot is connected with the inner wall of crossbeam, and the inside of the sliding slot is equipped with
Pulley, the outer wall of the pulley are connected with the inner wall of sliding slot, and the left side of the crossbeam is equipped with fixed lateral reinforcing bar, described fixed horizontal
The left side outer wall of outer right wall and crossbeam to reinforcing bar is connected, and the top of the fixed lateral reinforcing bar is equipped with fixed vertical reinforcement,
The outer wall of the fixed vertical reinforcement is connected with the inner wall of fixed lateral reinforcing bar, and the top of the pulley is equipped with springboard, the jump
The inner wall overlap joint of the outer wall of plate and sliding slot is connected, and the outer wall of the springboard is overlapped with the outer wall of pulley to be connected, the crossbeam it is upper
Surface is equipped with guardrail, and the lower surface of the guardrail is connected with the upper surface of crossbeam, and the inside of the guardrail is equipped with steel wire, described
The outer wall of steel wire is connected with the inner wall of guardrail, and the outside of the crossbeam is equipped with the first drag-line, the inner wall of first drag-line with
The outer wall of crossbeam is connected, and the right side of first drag-line is equipped with the second drag-line, the outer wall of the outer wall and crossbeam of second drag-line
It is connected, the top of second drag-line is equipped with fixed pull ring, and the inner wall of the fixed pull ring is connected with the outer wall of the second drag-line, institute
The inner wall for stating fixed pull ring is connected by the second drag-line with the outer wall of crossbeam, the outer wall of the fixed pull ring and civil engineering structure it is interior
Wall is connected, and the junction of the fixed lateral reinforcing bar and crossbeam is equipped with fixed square steel, the outer wall of the fixed square steel respectively with it is solid
Determine transverse steel with the inner wall of crossbeam to be connected, the right side of the fixed square steel is equipped with triangular steel plate, the left side of the triangular steel plate
Outer wall is connected with the outer right wall of fixed square steel, and the left end of the crossbeam is equipped with guiding gutter, the outer wall and crossbeam of the guiding gutter
Inner wall be connected, the bottom end of the fixed vertical reinforcement is equipped with hollow reinforcing bar, the upper surface of the hollow reinforcing bar with it is fixed perpendicular
To the lower surface of reinforcing bar be connected, between the outer wall of the hollow reinforcing bar be equipped with hook-type reinforcing bar, the inner wall of the hook-type reinforcing bar with return
The outer wall of steel bar is connected, and the outer wall of the fixed lateral reinforcing bar is equipped with connection reinforcing bar, the outer wall of the connection reinforcing bar and fixation
The inner wall of transverse steel is connected, and the connection reinforcing bar runs through fixed lateral reinforcing bar, the outer wall and civil engineering structure of the connection reinforcing bar
Inner wall be connected.
Preferably, the right side of the civil engineering structure is equipped with prefabricated embedded part, left side outer wall and the civil engineering knot of the prefabricated embedded part
The outer right wall of structure is connected, and the right side of the prefabricated embedded part is equipped with bearing diagonal, left side outer wall and the prefabricated embedded part of the bearing diagonal
Outer right wall be connected, the top of the bearing diagonal is equipped with horizontally-supported, and the horizontally-supported top is equipped with side plate, the side
The inner wall of plate is connected with horizontally-supported outer wall, and the top of the side plate is equipped with rain visor, the lower surface and side of the rain visor
The outer wall of plate is connected.
Preferably, the outer wall of first drag-line is equipped with fixed rope, the outer wall of the inner wall and the first drag-line of the fixed rope
It is connected.
Preferably, the right end of the fixed lateral reinforcing bar is equipped with bail, outer wall and the fixed lateral steel of the bail
The inner wall of muscle is connected.
Preferably, the top of first drag-line is equipped with cushion block, the lower surface of the cushion block and the upper surface of civil engineering structure
It is connected.
Compared with prior art, the utility model has the beneficial effects that:The construction discharging platform, passes through civil engineering knot
Cooperation between structure, crossbeam, fixed lateral reinforcing bar and fixed vertical reinforcement will under the action of fixed square steel and triangular steel plate
Crossbeam links together with civil engineering structure, and crossbeam is made to form an entirety with civil engineering structure, and whole bearing capacity is added
By force, can place more construction materials, fixed square steel links together fixed lateral reinforcing bar with crossbeam, make civil engineering structure and
Connection between fixed lateral reinforcing bar is more stablized, and set square is used to add the connection of fixed square steel and fixed lateral reinforcing bar
Gu keeping the discharging platform that civil engineering structure is built with crossbeam more firm, to overcome lacking for traditional discharging platform stability difference
Point makes civil engineering structure and crossbeam by the cooperation between the first drag-line, the second drag-line and fixed pull ring under the action of cushion block
The discharging platform built is more firm, and cushion block can effectively reduce rubbing between the first drag-line, the second drag-line and civil engineering structure
Power is wiped, extends the service life of the first drag-line and the second drag-line, by the cooperation between sliding slot, pulley and bail, in springboard
Under the action of, so that springboard is taken out out of crossbeam, to overcome traditional discharging platform lack road it is uneven or
In the case of miriness can not discharging the shortcomings that, reduce the work fatigue of stevedore, save construction cost, suitable popularization is answered
With.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the structural schematic diagram of the utility model bail;
Fig. 3 is the structural schematic diagram of the utility model side plate.
In figure:1, civil engineering structure, 2, sliding slot, 3, crossbeam, 4, pulley, 5, fixed lateral reinforcing bar, 6, fixed vertical reinforcement,
7, guardrail, 8, fixed rope, 9, steel wire, the 10, first drag-line, 11, fixed pull ring, the 12, second drag-line, 13, bail, 14, solid
Determine square steel, 15, triangular steel plate, 16, guiding gutter, 17, springboard, 18, hollow reinforcing bar, 19, connection reinforcing bar, 20, hook-type reinforcing bar, 21,
Prefabricated embedded part, 22, rain visor, 23, bearing diagonal, 24, horizontally-supported, 25, side plate, 26, cushion block.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of construction discharging platform, including soil
Structure 1 is built, civil engineering structure 1 is construction wall, and for installing crossbeam 3, the right side of civil engineering structure 1 is equipped with prefabricated embedded part 21, prefabricated
Embedded part 21 is stainless steel, for bearing diagonal 23, the right side of the left side outer wall and civil engineering structure 1 of prefabricated embedded part 21 to be mounted and connected
Side outer wall is connected, and the right side of prefabricated embedded part 21 is equipped with bearing diagonal 23, and bearing diagonal 23 is stainless steel, for connection and affixed side
The left side outer wall of plate 25, bearing diagonal 23 is connected with the outer right wall of prefabricated embedded part 21, and the top of bearing diagonal 23 is equipped with horizontally-supported
24, horizontally-supported 24 be stainless steel, and for installing and fixing rain visor 22, horizontally-supported 24 top is equipped with side plate 25,
Side plate 25 is stainless steel, and for installing and fixing rain visor 22, the inner wall of side plate 25 is connected with horizontally-supported 24 outer wall,
The top of side plate 25 is equipped with rain visor 22, and rain visor 22 is PVC material, pours material for preventing rainwater from falling on discharging platform
Wet, the lower surface of rain visor 22 is connected with the outer wall of side plate 25, and the right side of civil engineering structure 1 is equipped with crossbeam 3, and crossbeam 3 is stainless steel
Material, for placing construction material, the left side outer wall of crossbeam 3 is connected with the outer right wall of civil engineering structure 1, and the inner wall of crossbeam 3 is set
There is sliding slot 2, for placing springboard 17, the outer wall of sliding slot 2 is connected sliding slot 2 with the inner wall of crossbeam 3, and the inside of sliding slot 2 is equipped with pulley
4, pulley 4 is slided for springboard 17 on pulley 4, and convenient for taking out springboard 17, the outer wall of pulley 4 is connected with the inner wall of sliding slot 2,
The left side of crossbeam 3 is equipped with fixed lateral reinforcing bar 5, and fixed lateral reinforcing bar 5 is stainless steel, for being reinforced to crossbeam 3, Gu
The right end for determining transverse steel 5 is equipped with bail 13, and bail 13 is stainless steel, for being drawn when materials hauling, bail
13 outer wall is connected with the inner wall of fixed lateral reinforcing bar 5, the outer right wall of fixed lateral reinforcing bar 5 and the left side outer wall phase of crossbeam 3
Even, the top of fixed lateral reinforcing bar 5 is equipped with fixed vertical reinforcement 6, and fixed vertical reinforcement 6 is fixed for being reinforced to crossbeam 3
The outer wall of vertical reinforcement 6 is connected with the inner wall of fixed lateral reinforcing bar 5, and the top of pulley 4 is equipped with springboard 17, and springboard 17 is stainless steel
Material, for leveling up road, the outer wall of springboard 17 is connected with the inner wall of sliding slot 2 overlap joint, the outer wall of the outer wall and pulley 4 of springboard 17
Overlap joint is connected, and the upper surface of crossbeam 3 is equipped with guardrail 7, and guardrail 7 is stainless steel, the safety for protecting stevedore, guardrail
7 lower surface is connected with the upper surface of crossbeam 3, and the inside of guardrail 7 is equipped with steel wire 9, and steel wire 9 is used to protect stevedore,
The outer wall of steel wire 9 is connected with the inner wall of guardrail 7, and the outside of crossbeam 3 is equipped with the first drag-line 10, and the first drag-line 10 is steel wire rope,
For being reinforced to crossbeam 3, the outer wall of the first drag-line 10 is equipped with fixed rope 8, and fixed rope 8 is for preventing the first drag-line 10 loose
Dynamic, the inner wall of fixed rope 8 is connected with the outer wall of the first drag-line 10, and the top of the first drag-line 10 is equipped with cushion block 26, and cushion block 26 is wood
Side extends the service life of the first drag-line 10 for reducing the friction between the first drag-line 10 and civil engineering structure 1, under cushion block 26
Surface is connected with the upper surface of civil engineering structure 1, and the inner wall of the first drag-line 10 is connected with the outer wall of crossbeam 3, the right side of the first drag-line 10
Side is equipped with the second drag-line 12, and the second drag-line 12 is steel wire rope for connecting simultaneously fixed cross beam 3, the outer wall and crossbeam of the second drag-line 12
3 outer wall is connected, and the top of the second drag-line 12 is equipped with fixed pull ring 11, and fixed pull ring 11 is stainless steel, for reinforcing steel
White silk grade between cord and crossbeam 3, the inner wall of fixed pull ring 11 are connected with the outer wall of the second drag-line 12, the inner wall of fixed pull ring 11
It is connected with the outer wall of crossbeam 3 by the second drag-line 12, the outer wall of fixed pull ring 11 is connected with the inner wall of civil engineering structure 1, for making
The connection of fixed pull ring 11 is more stablized, and the junction of fixed lateral reinforcing bar 5 and crossbeam 3 is equipped with fixed square steel 14, fixed square steel
14 outer wall is connected with the inner wall of fixed lateral reinforcing bar 5 and crossbeam 3 respectively, the connection for making fixed lateral reinforcing bar 5 and crossbeam 3
More stablize, the right side of fixed square steel 14 is equipped with triangular steel plate 15, and triangular steel plate 15 is stainless steel, for being connected and fixed cross
To reinforcing bar 5, the left side outer wall of triangular steel plate 15 is connected with the outer right wall of fixed square steel 14, and the left end of crossbeam 3 is equipped with guiding gutter
16, for exporting ponding, the outer wall of guiding gutter 16 is connected guiding gutter 16 with the inner wall of crossbeam 3, the bottom end of fixed vertical reinforcement 6
Hollow reinforcing bar 18 is installed, hollow reinforcing bar 18 is stainless steel, for reinforcing fixed vertical reinforcement 6, hollow reinforcing bar 18 it is upper
Surface is connected with the lower surface of fixed vertical reinforcement 6, for making the connection of hollow reinforcing bar 18 more stablize, hollow reinforcing bar 18
Hook-type reinforcing bar 20 is equipped between outer wall, hook-type reinforcing bar 20 is for reinforcing hollow reinforcing bar 18, inner wall and the hollow steel of hook-type reinforcing bar 20
The outer wall of muscle 18 is connected, and for making the connection of hook-type reinforcing bar 20 more stablize, the outer wall of fixed lateral reinforcing bar 5 is equipped with connection reinforcing bar
19, connection reinforcing bar 19 is used to that fixed lateral reinforcing bar 5 to be connect and be fixed with the fixed mesh that fixed vertical reinforcement 6 forms, and connects
The outer wall of reinforcing bar 19 is connected with the inner wall of fixed lateral reinforcing bar 5, for making the connection of connection reinforcing bar 19 more stablize, connects reinforcing bar
19 run through fixed lateral reinforcing bar 5, and the outer wall of connection reinforcing bar 19 is connected with the inner wall of civil engineering structure 1, for making connection reinforcing bar 19
Connection is more firm.
In building engineering construction, a large amount of construction material is often transported in construction site, however construction site
Road conditions cannot all meet handling and require substantially, and the road pavement of architectural engineering is all that the last one of whole building engineering is applied
Work step is rapid, and unloading work all suffers from this various problems before this, needs to use construction discharging platform, the construction
It is drawn by civil engineering structure 1, crossbeam 3, fixed lateral reinforcing bar 5, fixed vertical reinforcement 6, guardrail 7, steel wire 9, first with discharging platform
Compositions, the haul vehicles such as rope 10, the second drag-line 12, springboard 17 rest in the side of crossbeam 3, by stevedore by material from vehicle
Led on construction discharging platform, from construction with being transported to construction site on discharging platform, this process
A large amount of construction material is deposited on construction discharging platform, and guardrail 9 and steel wire 9 can effectively prevent loader
People inadvertently falls off in the groove other than civil engineering structure 1, causes the personal injury to stevedore, crossbeam 3 big due to needing to place
The construction material of amount, bearing capacity allow for satisfying the use demand, and are drawn in the first drag-line 10 and second that the both sides of crossbeam 3 are installed
Rope 12 is connect with fixed rope 8, increases the bearing capacity of crossbeam 3, fixed square steel 14 and triangular steel plate 15 are to crossbeam 3 and civil engineering
The junction of structure 1 is reinforced, and crossbeam 3 is prevented to be broken in junction, and fixed lateral reinforcing bar 5, connects fixed vertical reinforcement 6
Reinforcing bar 19 and hook-type reinforcing bar 20 are connect, composition is reinforced grid, reinforced to the connection of crossbeam 3, springboard 17 can be out of crossbeam 3
It taking out, springboard 17 is ridden on the container of vehicle, stevedore can onboard slide construction material along springboard 17 from vehicle,
Save stevedore's handling time.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ", " in
The orientation of the instructions such as portion ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " or position are closed
System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than
Indicate or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot
It is construed as a limitation of the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu
Calmly ", the terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;
It can be mechanical connection, can also be electrical connection;It can be directly connected, can also indirectly connected through an intermediary, it can be with
It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly, for this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of construction discharging platform, including civil engineering structure (1), it is characterised in that:The right side of the civil engineering structure (1)
Equipped with crossbeam (3), the left side outer wall of the crossbeam (3) is connected with the outer right wall of civil engineering structure (1), the crossbeam (3) it is interior
Wall is equipped with sliding slot (2), and the outer wall of the sliding slot (2) is connected with the inner wall of crossbeam (3), and the inside of the sliding slot (2) is equipped with pulley
(4), the outer wall of the pulley (4) is connected with the inner wall of sliding slot (2), and the left side of the crossbeam (3) is equipped with fixed lateral reinforcing bar
(5), the outer right wall of the fixed lateral reinforcing bar (5) is connected with the left side outer wall of crossbeam (3), the fixed lateral reinforcing bar (5)
Top be equipped with fixed vertical reinforcement (6), the inner wall phase of the outer wall and fixed lateral reinforcing bar (5) of the fixed vertical reinforcement (6)
Even, the top of the pulley (4) is equipped with springboard (17), and the outer wall of the springboard (17) is connected with the inner wall of sliding slot (2) overlap joint, institute
The outer wall for stating springboard (17) is connected with the outer wall of pulley (4) overlap joint, and the upper surface of the crossbeam (3) is equipped with guardrail (7), the shield
The lower surface on column (7) is connected with the upper surface of crossbeam (3), and the inside of the guardrail (7) is equipped with steel wire (9), the steel wire
(9) outer wall is connected with the inner wall of guardrail (7), and the outside of the crossbeam (3) is equipped with the first drag-line (10), first drag-line
(10) inner wall is connected with the outer wall of crossbeam (3), and the right side of first drag-line (10) is equipped with the second drag-line (12), and described second
The outer wall of drag-line (12) is connected with the outer wall of crossbeam (3), and the top of second drag-line (12) is equipped with fixed pull ring (11), described
The inner wall of fixed pull ring (11) is connected with the outer wall of the second drag-line (12), and the inner wall of the fixed pull ring (11) passes through the second drag-line
(12) it is connected with the outer wall of crossbeam (3), the outer wall of the fixed pull ring (11) is connected with the inner wall of civil engineering structure (1), described solid
The junction for determining transverse steel (5) and crossbeam (3) is equipped with fixed square steel (14), the outer wall of the fixed square steel (14) respectively with it is solid
Determine transverse steel (5) with the inner wall of crossbeam (3) to be connected, the right side of the fixed square steel (14) is equipped with triangular steel plate (15), described
The left side outer wall of triangular steel plate (15) is connected with the outer right wall of fixed square steel (14), and the left end of the crossbeam (3) is equipped with water guide
The outer wall of slot (16), the guiding gutter (16) is connected with the inner wall of crossbeam (3), the bottom end installation of the fixed vertical reinforcement (6)
There are hollow reinforcing bar (18), the upper surface of the hollow reinforcing bar (18) to be connected with the lower surface of fixed vertical reinforcement (6), the hollow
Hook-type reinforcing bar (20) is equipped between the outer wall of reinforcing bar (18), the inner wall of the hook-type reinforcing bar (20) is outer with hollow reinforcing bar (18)
Wall is connected, and the outer wall of the fixed lateral reinforcing bar (5) is equipped with connection reinforcing bar (19), the outer wall of the connection reinforcing bar (19) and fixation
The inner wall of transverse steel (5) is connected, and the connection reinforcing bar (19) runs through fixed lateral reinforcing bar (5), the connection reinforcing bar (19)
Outer wall is connected with the inner wall of civil engineering structure (1).
2. a kind of construction discharging platform according to claim 1, it is characterised in that:The civil engineering structure (1)
Right side is equipped with prefabricated embedded part (21), and the left side outer wall of the prefabricated embedded part (21) is connected with the outer right wall of civil engineering structure (1), institute
The right side for stating prefabricated embedded part (21) is equipped with bearing diagonal (23), the right side of the left side outer wall and prefabricated embedded part (21) of the bearing diagonal (23)
Side outer wall is connected, and the top of the bearing diagonal (23) is equipped with horizontally-supported (24), and the top of horizontally-supported (24) is equipped with side
The inner wall of plate (25), the side plate (25) is connected with the outer wall of horizontally-supported (24), and the top of the side plate (25) is equipped with rain cover
The lower surface of plate (22), the rain visor (22) is connected with the outer wall of side plate (25).
3. a kind of construction discharging platform according to claim 1, it is characterised in that:First drag-line (10)
Outer wall is equipped with fixed rope (8), and the inner wall of the fixed rope (8) is connected with the outer wall of the first drag-line (10).
4. a kind of construction discharging platform according to claim 1, it is characterised in that:The fixed lateral reinforcing bar
(5) right end is equipped with bail (13), and the outer wall of the bail (13) is connected with the inner wall of fixed lateral reinforcing bar (5).
5. a kind of construction discharging platform according to claim 1, it is characterised in that:First drag-line (10)
Top is equipped with cushion block (26), and the lower surface of the cushion block (26) is connected with the upper surface of civil engineering structure (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721447318.XU CN207647189U (en) | 2017-11-02 | 2017-11-02 | A kind of construction discharging platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721447318.XU CN207647189U (en) | 2017-11-02 | 2017-11-02 | A kind of construction discharging platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207647189U true CN207647189U (en) | 2018-07-24 |
Family
ID=62885028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721447318.XU Expired - Fee Related CN207647189U (en) | 2017-11-02 | 2017-11-02 | A kind of construction discharging platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207647189U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555302A (en) * | 2019-01-04 | 2019-04-02 | 万华节能科技集团股份有限公司 | A kind of the hanging basket bracket and its construction technology of thermal-insulating leakage-resistant crossed construction |
-
2017
- 2017-11-02 CN CN201721447318.XU patent/CN207647189U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555302A (en) * | 2019-01-04 | 2019-04-02 | 万华节能科技集团股份有限公司 | A kind of the hanging basket bracket and its construction technology of thermal-insulating leakage-resistant crossed construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631333B (en) | Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method | |
CN102019998B (en) | Erection embarking method of upper and lower water side cabins | |
CN203441073U (en) | Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column | |
CN105386411A (en) | Multifunctional portal device of suspension bridge pillar top | |
CN109811633A (en) | A kind of corrugated steel and Combined concrete double curvature arched bridge and preparation method thereof | |
CN108252504A (en) | Tube shear wall concrete structure large form hoisting type construction method and constructing device | |
CN109989348A (en) | A kind of concrete construction cantilever form and its construction method | |
CN103074871B (en) | Arc-shaped slope concrete sliding and lifting template | |
CN207647189U (en) | A kind of construction discharging platform | |
CN205604080U (en) | Building construction platform | |
CN205874987U (en) | Simply put up bridge crane | |
CN205205685U (en) | Span wire pier is function portal device at most | |
CN104495653A (en) | Multifunctional large-tonnage beam erecting crane and beam erecting method | |
CN209585684U (en) | A kind of top plate exempts from bracing reinforcement component | |
CN102535344A (en) | Concrete transportation method for bridge body of high-pier bridge in gully region | |
CN205171343U (en) | Combination beam self anchored suspension bridge | |
CN205653055U (en) | Take waterproof type over -and -under type hoist that keeps off rain of canvas | |
CN206986736U (en) | A kind of box girder bridge transverse prestress construction mobile closed formula platform | |
CN105220609A (en) | Compound beam self-anchored suspension bridge and construction technology thereof | |
CN208594493U (en) | A kind of bridge floor widened structure | |
CN209523123U (en) | A kind of working job platform | |
CN204386449U (en) | A kind of photovoltaic green-house electrification component promotes ladder | |
CN208378287U (en) | A kind of simple vertical transport equipment of architecture construction | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN208517814U (en) | A kind of detachable railing of overflow bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180724 Termination date: 20201102 |