CN207641730U - A kind of steel pipe corrosion-proof application double-station construction operation platform - Google Patents

A kind of steel pipe corrosion-proof application double-station construction operation platform Download PDF

Info

Publication number
CN207641730U
CN207641730U CN201721727755.7U CN201721727755U CN207641730U CN 207641730 U CN207641730 U CN 207641730U CN 201721727755 U CN201721727755 U CN 201721727755U CN 207641730 U CN207641730 U CN 207641730U
Authority
CN
China
Prior art keywords
supporting leg
group
bar
steel pipe
articulation piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721727755.7U
Other languages
Chinese (zh)
Inventor
杨联东
陈忠伟
屈刚
廖钧
杨建军
胡昌春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN201721727755.7U priority Critical patent/CN207641730U/en
Application granted granted Critical
Publication of CN207641730U publication Critical patent/CN207641730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of steel pipe corrosion-proof application double-station construction operation platforms, including operating platform and turning rolls, the operating platform includes bearing bar, passage mechanism, first station mechanism and second station mechanism, first station mechanism includes head rod, first support platform, first group of supporting leg and second group of supporting leg, the second station mechanism includes the second connecting rod, second support platform, third group supporting leg and the 4th group of supporting leg, the passage mechanism includes intermediate support, inclined support bar and access platform, the both sides of the access platform are provided with winding stair, it is all provided with multiple mounting holes on the inclined support bar length direction.The utility model is simple in structure, the anticorrosive coating of different-diameter steel pipe, different shape steel pipe and steel pipe different height is can apply to, realizes that two steel pipes are constructed simultaneously and assembly line is worked continuously, steel pipe corrosion-proof construction is greatly facilitated, anticorrosive coating quality and efficiency are improved.

Description

A kind of steel pipe corrosion-proof application double-station construction operation platform
Technical field
The utility model belongs to steel pipe corrosion-proof application operating platform technical field, more particularly, to a kind of steel pipe corrosion-proof application Double-station construction operation platform.
Background technology
Existing steel pipe needs interim erection construction job platform, putting up platform to expire when anti-corrosion interior finishing is constructed It is enough lower needs:1, easy for construction, safety;2, it needs to carry out height adjustment according to different-diameter steel pipe application;3, due to steel pipe Shape is different, needs to carry out platform removal according to production and set up again;Therefore in actual production, set up platform and remove past It is past time-consuming and laborious, construction efficiency is influenced, in addition anticorrosive coating platform is mostly fixed, should not highly adjust, influence construction personnel Operation, and then influence construction quality, in being made in hydroelectric penstock, pipelining faces that production task is tight, anti-corrosion Application is the important link for influencing penstock production efficiency not in time, in addition, when constructing simultaneously for multiple steel pipes, it is how real It now continuously constructs and mutual construction is not interfere with each other and a realistic problem, therefore nowadays lack a kind of simple in structure, design Rational steel pipe corrosion-proof application double-station construction operation platform, can apply to different-diameter steel pipe, different shape steel pipe and steel pipe The anticorrosive coating of different height, and realize that two steel pipes are constructed simultaneously and assembly line is worked continuously, pole by double-station mechanism Big facilitates steel pipe corrosion-proof construction, improves anticorrosive coating quality and efficiency, reduces labor intensity and production cost.
Utility model content
The technical problem to be solved by the utility model is to the deficiencies in for the above-mentioned prior art, provide a kind of steel pipe Anticorrosive coating double-station construction operation platform, simple structure and reasonable design and application are easy, can apply to different-diameter steel The anticorrosive coating of pipe, different shape steel pipe and steel pipe different height, and realize that two steel pipes are constructed simultaneously by double-station mechanism, And assembly line is worked continuously, and is greatly facilitated steel pipe corrosion-proof construction, is improved anticorrosive coating quality and efficiency, reduce work People's labor intensity and production cost, it is highly practical.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of steel pipe corrosion-proof application double-station Construction operation platform, it is characterised in that:Including the operating platform in anticorrosive coating workshop is arranged and for steel pipe placement and energy edge The turning rolls of the track movement of horizontal layout, the operating platform include two and are arranged in same level and in parallel The bearing bar of laying, the passage mechanism being arranged in the middle part of bearing bar and setting are laid on bearing bar and symmetrically the channel machine The first station mechanism and second station mechanism, first station mechanism at left and right sides of structure are connected to two supports including two Head rod between bar, the first support platform being arranged on two head rods and the hinged and position with supporting rod bottom First group of supporting leg and second group of supporting leg in the first support platform both ends, the second station mechanism are connected to two including two The second connecting rod between supporting rod, the second support platform being arranged in two the second connecting rods and hinged with supporting rod bottom And positioned at the third group supporting leg and the 4th group of supporting leg at the second support platform both ends, first group of supporting leg, second group of supporting leg, third Group supporting leg and the 4th group of supporting leg are height adjustable support leg, and the head rod and the second connecting rod can be along load-bearing pole lengths Direction into line slip, the passage mechanism include be mounted on bearing bar in the middle part of intermediate support, be arranged in intermediate support and load-bearing Inclined support bar between bar and it is arranged in intermediate support bottom and the access platform on bearing bar, the two of the access platform Side is provided with winding stair, and multiple mounting holes are all provided on the inclined support bar length direction.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:First group of supporting leg, Two groups of supporting legs, third group supporting leg and the 4th group of supporting leg include respectively the first leg hinged with two bearing bar bottoms and Second supporting leg, is provided with bracing piece between the first leg and second supporting leg, the first leg and second described Leg includes casing, is arranged and passes through adjusting nut on the adjusting nut of sleeve bottom and top and stretch into the adjusting rod in casing, And with hinged hinge bar in the middle part of casing, the both ends of the hinge bar are respectively arranged with the first ears seat and the second ears seat, The top and middle part of described sleeve pipe are respectively arranged with third ears seat and first otic placode hinged with the first ears seat, and described second Ears seat and third ears seat are hinged with bearing bar bottom.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:It is set on the bearing bar There are first articulation piece and second articulation piece hinged with first group of supporting leg, is set on the bearing bar hinged with second group of supporting leg Third articulation piece and the 4th articulation piece, be set with fiveth articulation piece and sixth hinged with third group supporting leg on the bearing bar Articulation piece is set with seventh articulation piece and eightth articulation piece hinged with the 4th group of supporting leg on the bearing bar.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:First articulation piece, Two articulation pieces, third articulation piece, the 6th articulation piece, the 7th articulation piece and the 8th articulation piece include being sleeved on two bearing bars Supporting leg sliding sleeve, the supporting leg connecting plate that is connected between two supporting leg sliding sleeves and the second otic placode in supporting leg sliding sleeve bottom is set, 4th articulation piece and the 5th articulation piece are respectively the third otic placode being arranged at intermediate support bottom both ends, first group of branch Leg and the second ears seat in the 4th group of supporting leg and third ears seat are hinged with the second otic placode, second group of supporting leg and third The second ears seat and third ears seat in group supporting leg is hinged with the second otic placode and the third otic placode respectively.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:The intermediate support includes Four be vertically arranged and with the upright bar of the perpendicular laying of the bearing bar, the cross bar being connected between two columns and two difference The holder sliding set being fixedly connected on two bearing bars and with bottom of upright rod, and setting are sleeved in two holder slidings The top of connecting rod of support between set, the upright bar is provided with the first support ears seat hinged with inclined support bar one end, institute It states and is provided with the brace articulation piece hinged with the inclined support bar other end on bearing bar, the winding stair is located at the side of holder sliding set Face, and the winding stair covers perpendicular laying with holder sliding.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:The head rod Both ends and the both ends of second connecting rod are respectively arranged with connecting rod sliding sleeve, are arranged on the connecting rod sliding sleeve by connecting rod sliding sleeve and branch The connecting bar locking bolt locked between strut.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:It is set in the supporting leg sliding sleeve Set the supporting leg clamping screw that will be locked between supporting leg sliding sleeve and supporting rod.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:The brace articulation piece packet Two brace sliding sleeves being set on bearing bar, the brace connecting rod being connected between two brace sliding sleeves and setting is included to exist Brace sliding sleeve upper side and the brace ears seat hinged with inclined support bar are provided with brace sliding sleeve and branch on the brace sliding sleeve The brace clamping screw locked between strut.
A kind of above-mentioned steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:First support platform Both sides be provided with the first guardrail, the both sides of second support platform are provided with the second guardrail, first guardrail and second Guardrail is fixedly connected with supporting rod.
The utility model has the following advantages compared with prior art:
1, used construction operation platform is simple in structure, and reasonable design has a wide range of application.
2, the first station mechanism and second station mechanism is arranged in used construction operation platform, passes through double-station mechanism reality The anticorrosive coating construction simultaneously of existing two steel pipes and assembly line are worked continuously, and production efficiency is substantially increased.
3, used first station mechanism includes first group of supporting leg and second group of supporting leg, and second station mechanism includes Third group supporting leg and the 4th group of supporting leg, first group of supporting leg, second group of supporting leg, third group supporting leg and the 4th group of supporting leg are height Adjustable support leg is spent, by adjusting the height of first group of supporting leg, second group of supporting leg, third group supporting leg and the 4th group of supporting leg, realization the One station mechanism is adjusted with second station mechanism height, to meet different-diameter steel pipe corrosion-proof needs.
4, multiple mounting holes are all provided on used inclined support bar length direction, by adjusting on bearing bar and inclined support bar Different mounting holes are fixedly connected, to meet steel pipe different height construction needs.
5, used passage mechanism facilitates staff to enter the first station mechanism and carries out anti-corrosion with second station mechanism Application.
In conclusion the utility model simple structure and reasonable design and application are easy, using effect is good, can apply to not Two steel pipes are realized with diameter steel pipe, the anticorrosive coating of different shape steel pipe and steel pipe different height, and by double-station mechanism It constructs simultaneously and assembly line is worked continuously, greatly facilitate steel pipe corrosion-proof construction, improve anticorrosive coating quality and effect Rate reduces labor intensity and production cost, highly practical.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the left view for (removing anticorrosive coating workshop) in Fig. 1.
Fig. 3 is the structural schematic diagram of first leg and the second supporting leg in the utility model.
Fig. 4 is the structural schematic diagram of hinge bar in the utility model.
Fig. 5 is hinged for the first articulation piece, the second articulation piece, third articulation piece, the 6th articulation piece, the 7th in the utility model The structural schematic diagram of part and the 8th articulation piece.
Fig. 6 is the connection relation of supporting rod, the first station mechanism, second station mechanism and passage mechanism in the utility model Schematic diagram.
Fig. 7 is the vertical view of Fig. 6.
Fig. 8 is the structural schematic diagram of intermediate support in the utility model.
Fig. 9 is the usage state diagram of the utility model.
Reference sign:
1-passage mechanism;1-1-intermediate support;1-1-1-holder sliding set;
1-1-2-cross bar;1-1-3-first support ears seat;1-1-4-upright bar;
1-1-5-connecting rod of support;1-2-supporting leg clamping screw;1-3-inclined support bar;
1-3-1-mounting hole;1-4-bearing bar;1-5-1-supporting leg sliding sleeve;
The second otic placodes of 1-5-2-;1-5-3-supporting leg connecting plate;1-7-brace articulation piece;
1-7-1-brace connecting rod;1-7-2-brace clamping screw;
1-7-3-brace sliding sleeve;1-7-4-brace ears seat;1-8-access platform;
2-the second guardrail;3-the second support platform;The second connecting rods of 3-1-;
3-1-1-connecting rod sliding sleeve;3-2-connecting bar locking bolt;The 7th articulation pieces of 4-1-;
The 8th articulation pieces of 4-2-;4-3-adjusting nut;4-4-hinge bar;
4-4-1-the first ears seats;4-4-2-the second ears seats;
4-5-casing;4-6-adjusting rod;4-7-third ears seat;
4-8-the first otic placode articulation pieces of 5-1-the 5th;The 6th articulation pieces of 5-2-;
4-the four group of supporting leg;5-third group supporting legs;
6-1-third articulation piece;The 4th articulation pieces of 6-2-;6-the second group supporting leg;
7-the first group supporting leg;The first articulation pieces of 7-1-;The second articulation pieces of 7-2-;
8-tracks;9-the first support platform;9-1-head rod;
10-the first guardrail;11-winding stairs;
12-the first turning rolls;13-the second turning rolls;14-the second steel pipe;
15-the first steel pipe;16-anticorrosive coating workshops.
Specific implementation mode
As shown in figs. 1,2 and 6, the utility model includes the operating platform being arranged in anticorrosive coating workshop 16 and confession The turning rolls that steel pipe is placed and can be moved along the track 8 of horizontal layout, the operating platform include two and are arranged same On horizontal plane and in the bearing bar 1-4 of parallel laying, the passage mechanism 1 being arranged in the middle part of bearing bar 1-4 and it is arranged in bearing bar 1-4 is upper and is symmetrically laid in the first station mechanism and second station mechanism of 1 left and right sides of the passage mechanism, first work Position mechanism includes two head rod 9-1 being connected between two bearing bar 1-4, is arranged in two head rod 9-1 On the first support platform 9 and hinged with the bottoms bearing bar 1-4 and first group of supporting leg 7 positioned at 9 both ends of the first support platform with Second group of supporting leg 6, the second station mechanism include two the second connecting rod 3-1 being connected between two bearing bar 1-4, set It sets the second support platform 3 on two the second connecting rod 3-1 and is hinged with the bottoms bearing bar 1-4 and is located at the second support platform The third group supporting leg 5 at 3 both ends and the 4th group of supporting leg 4, first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and the 4th Group supporting leg 4 is height adjustable support leg, and the head rod 9-1 and the second connecting rod 3-1 can be along the length sides bearing bar 1-4 To into line slip, the passage mechanism 1 includes being mounted on intermediate support 1-1 in the middle part of bearing bar 1-4, being arranged in intermediate support 1- Inclined support bar 1-3 between 1 and bearing bar 1-4 and the channel being arranged in the bottoms intermediate support 1-1 and on bearing bar 1-4 are flat The both sides of platform 1-8, the access platform 1-8 are provided with winding stair 11, and multiple installations are all provided on the inclined support bar 1-3 length directions Hole 1-3-1.
In the present embodiment, the turning rolls includes the first turning rolls positioned at first station mechanism bottom 12 and positioned at the second station actuator base the second turning rolls 13, be provided with the first steel in first station mechanism Pipe 15 is provided with the second steel pipe 14 in the second station mechanism, passes through and first station mechanism and second work is arranged Position mechanism realizes that two steel pipes are constructed simultaneously and assembly line is worked continuously by double-station mechanism, substantially increases production effect Rate.
In the present embodiment, it is by the way that first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and the 4th group of supporting leg 4 is arranged Height adjustable support leg, by adjusting the height of first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and the 4th group of supporting leg 4, Realize that the first station mechanism is adjusted with second station mechanism height, to meet different-diameter steel pipe corrosion-proof needs.
In the present embodiment, multiple mounting hole 1-3-1 are all provided on inclined support bar 1-3 length directions, by adjusting bearing bar 1-4 It is fixedly connected with the mounting hole 1-3-1 of different location on inclined support bar 1-3, to meet steel pipe different height construction needs.
It is equal by the way that first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and the 4th group of supporting leg 4 is arranged in the present embodiment It is hinged with the bottoms bearing bar 1-4, first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and the 4th group of 4 folding and unfolding of supporting leg can be made, So that the first station mechanism and second station mechanism can be located in the first steel pipe 15 and the second steel pipe 14 respectively, convenient for in steel pipe Wall carries out anticorrosive coating.
In the present embodiment, by the way that intermediate support 1-1 is arranged, intermediate support 1-1 is main stressed member, for undertaking first Weight when support platform 9 and hanging the second support platform 3, and convenient for the laying of access platform 1-8.
In the present embodiment, inclined support bar 1-3 is force transferring part, by the weight of the first support platform 3 and the second support platform 9 It is transferred to intermediate support 1-1, reduces bearing bar 1-4 jib-lengths, increases stability.
As shown in Figure 3 and Figure 4, in the present embodiment, first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and Four groups of supporting legs 4 include the first leg and second supporting leg hinged with two bottoms the bearing bar 1-4 respectively, described first Bracing piece is provided between leg and second supporting leg, the first leg and second supporting leg include casing 4-5, setting Adjusting nut 4-3 is passed through in the adjusting nut 4-3 of the bottoms casing 4-5 and top and stretches into the adjusting rod 4-6 in casing 4-5, with And with the both ends of hinge bar 4-4, the hinge bar 4-4 hinged in the middle part of casing 4-5 be respectively arranged with the first ears seat 4-4-1 and The top and middle part of second ears seat 4-4-2, described sleeve pipe 4-5 be respectively arranged with third ears seat 4-7 and with the first ears seat The first otic placode 4-8, the second ears seat 4-4-2 and third ears seat 4-7 hinged 4-4-1 is cut with scissors with the bottoms bearing bar 1-4 It connects.
In the present embodiment, it is threadedly coupled with adjusting nut 4-3 by the way that adjusting rod 4-6 is arranged, by screwing adjusting rod 4-6 energy The length stretched into casing 4-5 is adjusted, first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 and the 4th are adjusted to realize The height of group supporting leg 4.
As shown in Figure 6 and Figure 7, in the present embodiment, hinged with first group of supporting leg 7 is set on the bearing bar 1-4 It is set with the third articulation piece hinged with second group of supporting leg 6 on one articulation piece 7-1 and the second articulation piece 7-2, the bearing bar 1-4 The fiveth articulation piece 5-1 hinged with third group supporting leg 5 and are set on 6-1 and the 4th articulation piece 6-2, the bearing bar 1-4 It is set with the seventh articulation piece 4-1 and eightth articulation piece hinged with the 4th group of supporting leg 4 on six articulation piece 5-2, the bearing bar 1-4 4-2。
As shown in figure 5, in the present embodiment, the first articulation piece 7-1, the second articulation piece 7-2, third articulation piece 6-1, Six articulation piece 5-2, the 7th articulation piece 4-1 and the 8th articulation piece 4-2 include the supporting leg sliding sleeve being sleeved on two bearing bar 1-4 1-5-1, the supporting leg connecting plate 1-5-3 being connected between two supporting leg sliding sleeve 1-5-1 and it is arranged in the bottoms supporting leg sliding sleeve 1-5-1 Second otic placode 1-5-2, the 4th articulation piece 6-2 and the 5th articulation piece 5-1 is respectively to be arranged at the bottoms intermediate support 1-1 both ends Third otic placode, first group of supporting leg 7 and the second ears seat 4-4-2 in the 4th group of supporting leg 4 and third ears seat 4-7 with Second otic placode 1-5-2 is hinged, the second ears seat 4-4-2 in second group of supporting leg 6 and third group supporting leg 5 and third ears seat 4-7 is hinged with the second otic placode 1-5-2 and the third otic placode respectively.
In the present embodiment, it is sleeved on bearing bar 1-4 by the way that supporting leg sliding sleeve 1-5-1 is arranged, enables the edges supporting leg sliding sleeve 1-5-1 Supporting rod 1-4 length directions are moved, and the adjusting of leg location is convenient for.
As shown in Fig. 6, Fig. 7 and Fig. 8, in the present embodiment, the intermediate support 1-1 be vertically arranged including four and with it is described The upright bar 1-1-4 of the perpendicular layings of bearing bar 1-4, the cross bar 1-1-2 being connected between two column 1-1-4 and two cover respectively The holder sliding set 1-1-1 being fixedly connected on two bearing bar 1-4 and with the bottoms upright bar 1-1-4, and be arranged at two Connecting rod of support 1-1-5 between the holder sliding set 1-1-1, the top of the upright bar 1-1-4 is provided with and inclined support bar It is provided on the one end 1-3 hinged first support ears seat 1-1-3, the bearing bar 1-4 hinged with the inclined support bar 1-3 other ends Brace articulation piece 1-7, the winding stair 11 is located at the side of holder sliding set 1-1-1, and the sliding of the winding stair 11 and holder covers The perpendicular layings of 1-1-1.
In the present embodiment, it is sleeved on bearing bar 1-4 by the way that holder sliding set 1-1-1 is arranged, makes holder sliding set 1-1-1 It can be moved along supporting rod 1-4 length directions, be adjusted convenient for the positions intermediate support 1-1.
In the present embodiment, the both ends of the both ends of the head rod 9-1 and the second connecting rod 3-1 are respectively arranged with The connecting rod that will be locked between connecting rod sliding sleeve 3-1-1 and bearing bar 1-4 is set on connecting rod sliding sleeve 3-1-1, the connecting rod sliding sleeve 3-1-1 Clamping screw 3-2.
Being arranged in the present embodiment, on the supporting leg sliding sleeve 1-5-1 will lock between supporting leg sliding sleeve 1-5-1 and bearing bar 1-4 Supporting leg clamping screw 1-2.
As shown in fig. 7, in the present embodiment, the brace articulation piece 1-7 includes two and is set on bearing bar 1-4 Brace sliding sleeve 1-7-3, the brace connecting rod 1-7-1 being connected between two brace sliding sleeve 1-7-3 and setting are in brace sliding sleeve 1- It is provided with brace on 7-3 upper sides and brace ears the seat 1-7-4, the brace sliding sleeve 1-7-3 hinged with inclined support bar 1-3 The brace clamping screw 1-7-2 locked between sliding sleeve 1-7-3 and bearing bar 1-4.
As shown in Figure 1, in the present embodiment, the both sides of first support platform 9 are provided with the first guardrail 10, described second The both sides of support platform 3 are provided with the second guardrail 2, and first guardrail, 10 and second guardrail 2, which is fixed with bearing bar 1-4, to be connected It connects.
As shown in figure 9, when the utility model is specifically used, it will wait for that the second steel pipe 14 of anticorrosive coating is placed on the second welding On turning rolls 13, when the second turning rolls 13 moves close to the first station mechanism along track 8, operating personnel are by first group of supporting leg 7 rotate around the hinge joint of the first articulation piece 7-1 and the second articulation piece 7-2, to packing up first group of supporting leg 7, and by third group Supporting leg 5 is rotated around the hinge joint of the 5th articulation piece 5-1 and the 6th articulation piece 5-2, to which third group supporting leg 5 be packed up, and second Group supporting leg 6 and the 4th group of supporting leg 4 put down and are supported to bearing bar 1-4, the first station mechanism and second station mechanism, the second weldering When connecing turning rolls 13 and being moved at the passage mechanism 1 along track 8, operating personnel put down first group of supporting leg 7, and by second group Supporting leg 6 is rotated around the hinge joint of third articulation piece 6-1 and the 4th articulation piece 6-2, to which second group of supporting leg 6 be packed up, until the Two turning rolls 13 are moved to second station mechanism along track 8, and when second station mechanism being made to be located in the second steel pipe 14, will Third group supporting leg 6 is put down, and first group of supporting leg 7 is packed up;Then, it will wait for that the first steel pipe 15 of anticorrosive coating is placed on the first weldering It connects on turning rolls 12, when the first turning rolls 12 is moved to the first station mechanism along track 8, operating personnel are by first group of supporting leg 7 and second group of supporting leg 6 put down, and the first station mechanism is made to be located in the first steel pipe 15;First steel pipe 15 and the second steel pipe 14 move After moving in place, construction personnel stands in the first support platform 9 and the second support platform 3 respectively to the first steel pipe 15 and the second steel The inner wall of pipe 14 carries out application, realizes that two steel pipes are constructed simultaneously and assembly line is worked continuously by double-station mechanism, significantly Production efficiency is improved, and need not be dismounted, it is only necessary to by adjusting first group of supporting leg, 7, second groups of supporting legs 6, third group supporting leg 5 With the height of the 4th group of supporting leg 4, realize that the first station mechanism is adjusted with second station mechanism height, to meet different-diameter steel Pipe anticorrosion needs can apply to the anticorrosive coating of different-diameter steel pipe, different shape steel pipe and steel pipe different height, greatly side Steel pipe corrosion-proof construction, improve anticorrosive coating quality and efficiency, reduce labor intensity and production cost, practicability By force.
The above is only the preferred embodiment of the utility model, not imposed any restrictions to the utility model, every Any simple modification, change and equivalent structure made by above example are changed according to the utility model technical spirit, still Belong in the protection domain of technical solutions of the utility model.

Claims (9)

1. a kind of steel pipe corrosion-proof application double-station construction operation platform, it is characterised in that:Including being arranged in anticorrosive coating workshop (16) it operating platform in and is placed for steel pipe and can be along the mobile turning rolls of the track (8) of horizontal layout, the operation Platform includes two and is arranged in same level and in the bearing bar (1-4) of parallel laying, setting in the middle part of bearing bar (1-4) Passage mechanism (1) and be arranged on bearing bar (1-4) and the first work for being symmetrically laid at left and right sides of the passage mechanism (1) Position mechanism and second station mechanism, first station mechanism include two be connected between two bearing bars (1-4) first Connecting rod (9-1) is arranged the first support platform (9) on two head rods (9-1) and is cut with scissors with the bottom bearing bar (1-4) It connects and positioned at first group of supporting leg (7) and second group of supporting leg (6) at the first support platform (9) both ends, second station mechanism packet It includes two the second connecting rods (3-1) being connected between two bearing bars (1-4), be arranged on two the second connecting rods (3-1) The second support platform (3) and third group supporting leg hinged with the bottom bearing bar (1-4) and positioned at the second support platform (3) both ends (5) with the 4th group of supporting leg (4), first group of supporting leg (7), second group of supporting leg (6), third group supporting leg (5) and the 4th group of supporting leg (4) it is height adjustable support leg, the head rod (9-1) can be along bearing bar (1-4) length with the second connecting rod (3-1) Direction into line slip, the passage mechanism (1) include be mounted on bearing bar (1-4) in the middle part of intermediate support (1-1), be arranged in Between inclined support bar (1-3) between holder (1-1) and bearing bar (1-4) and setting in the intermediate support bottom (1-1) and positioned at holding Access platform (1-8) on weight bar (1-4), the both sides of the access platform (1-8) are provided with winding stair (11), the inclined support bar Multiple mounting holes (1-3-1) are all provided on (1-3) length direction.
2. a kind of steel pipe corrosion-proof application double-station construction operation platform described in accordance with the claim 1, it is characterised in that:Described One group of supporting leg (7), second group of supporting leg (6), third group supporting leg (5) and the 4th group of supporting leg (4) include respectively with held described in two Weight bottom bar (1-4) hinged first leg and the second supporting leg, are provided between the first leg and second supporting leg and add Strong bar, the first leg and second supporting leg include casing (4-5), the adjusting nut in the bottom casing (4-5) are arranged (4-3) and top pass through adjusting nut (4-3) and stretch into the adjusting rod (4-6) in casing (4-5), and in casing (4-5) The both ends of the hinged hinge bar in portion (4-4), the hinge bar (4-4) are respectively arranged with the first ears seat (4-4-1) and second pair Ear mount (4-4-2), the top and middle part of described sleeve pipe (4-5) be respectively arranged with third ears seat (4-7) and with the first ears seat (4-4-1) hinged the first otic placode (4-8), the second ears seat (4-4-2) and third ears seat (4-7) are and bearing bar The bottom (1-4) is hinged.
3. a kind of steel pipe corrosion-proof application double-station construction operation platform according to claim 2, it is characterised in that:It is described to hold It is set with first articulation piece (7-1) hinged with first group of supporting leg (7) and the second articulation piece (7-2) on weight bar (1-4), it is described to hold It is set with the third articulation piece (6-1) and fourth articulation piece (6-2) hinged with second group of supporting leg (6) on weight bar (1-4), it is described to hold It is set with fiveth articulation piece (5-1) and sixth articulation piece (5-2) hinged with third group supporting leg (5) on weight bar (1-4), it is described to hold It is set with seventh articulation piece (4-1) and eightth articulation piece (4-2) hinged with the 4th group of supporting leg (4) on weight bar (1-4).
4. a kind of steel pipe corrosion-proof application double-station construction operation platform described in accordance with the claim 3, it is characterised in that:Described One articulation piece (7-1), the second articulation piece (7-2), third articulation piece (6-1), the 6th articulation piece (5-2), the 7th articulation piece (4-1) Include the supporting leg sliding sleeve (1-5-1) being sleeved on two bearing bars (1-4) with the 8th articulation piece (4-2), be connected to two branch The the second otic placode (1- of supporting leg connecting plate (1-5-3) between leg sliding sleeve (1-5-1) and setting in the bottom supporting leg sliding sleeve (1-5-1) 5-2), the 4th articulation piece (6-2) and the 5th articulation piece (5-1) are respectively to be arranged at the bottom both ends intermediate support (1-1) Third otic placode, the second ears seat (4-4-2) in first group of supporting leg (7) and the 4th group of supporting leg (4) and third ears seat (4- 7) hinged with the second otic placode (1-5-2), the second ears seat (4-4- in second group of supporting leg (6) and third group supporting leg (5) 2) and third ears seat (4-7) is hinged with the second otic placode (1-5-2) and the third otic placode respectively.
5. according to a kind of steel pipe corrosion-proof application double-station construction operation platform as claimed in claim 1 or 2, it is characterised in that:Institute State intermediate support (1-1) be vertically arranged including four and with the upright bar (1-1-4) of the bearing bar (1-4) perpendicular laying, even The cross bar (1-1-2) being connected between two columns (1-1-4) and two are set on two bearing bars (1-4) and and upright bar Holder that the bottom (1-1-4) is fixedly connected sliding set (1-1-1), and setting two holders sliding sets (1-1-1) it Between connecting rod of support (1-1-5), the top of the upright bar (1-1-4) is provided with the hinged with the one end inclined support bar (1-3) One holder ears seat (1-1-3) is provided on the bearing bar (1-4) and is cut with scissors with the hinged brace of inclined support bar (1-3) other end Fitting (1-7), the winding stair (11) is located at the side of holder sliding set (1-1-1), and the winding stair (11) is covered with holder sliding (1-1-1) perpendicular laying.
6. according to a kind of steel pipe corrosion-proof application double-station construction operation platform as claimed in claim 1 or 2, it is characterised in that:Institute The both ends at the both ends and second connecting rod (3-1) of stating head rod (9-1) are respectively arranged with connecting rod sliding sleeve (3-1-1), The connecting bar locking bolt that will be locked between connecting rod sliding sleeve (3-1-1) and bearing bar (1-4) is set on the connecting rod sliding sleeve (3-1-1) (3-2)。
7. a kind of steel pipe corrosion-proof application double-station construction operation platform according to claim 4, it is characterised in that:The branch The supporting leg clamping screw (1-2) that will be locked between supporting leg sliding sleeve (1-5-1) and bearing bar (1-4) is set on leg sliding sleeve (1-5-1).
8. a kind of steel pipe corrosion-proof application double-station construction operation platform according to claim 5, it is characterised in that:It is described oblique Bar articulation piece (1-7) includes two brace sliding sleeves (1-7-3) being set on bearing bar (1-4), is connected to two braces Brace connecting rod (1-7-1) and setting between sliding sleeve (1-7-3) is in brace sliding sleeve (1-7-3) upper side and and inclined support bar (1-3) hinged brace ears seat (1-7-4), be provided on the brace sliding sleeve (1-7-3) by brace sliding sleeve (1-7-3) with hold The brace clamping screw (1-7-2) locked between weight bar (1-4).
9. according to a kind of steel pipe corrosion-proof application double-station construction operation platform as claimed in claim 1 or 2, it is characterised in that:Institute The both sides for stating the first support platform (9) are provided with the first guardrail (10), and the both sides of second support platform (3) are provided with second Guardrail (2), first guardrail (10) and the second guardrail (2) are fixedly connected with bearing bar (1-4).
CN201721727755.7U 2017-12-12 2017-12-12 A kind of steel pipe corrosion-proof application double-station construction operation platform Active CN207641730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721727755.7U CN207641730U (en) 2017-12-12 2017-12-12 A kind of steel pipe corrosion-proof application double-station construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721727755.7U CN207641730U (en) 2017-12-12 2017-12-12 A kind of steel pipe corrosion-proof application double-station construction operation platform

Publications (1)

Publication Number Publication Date
CN207641730U true CN207641730U (en) 2018-07-24

Family

ID=62880641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721727755.7U Active CN207641730U (en) 2017-12-12 2017-12-12 A kind of steel pipe corrosion-proof application double-station construction operation platform

Country Status (1)

Country Link
CN (1) CN207641730U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110665695A (en) * 2019-11-08 2020-01-10 徐州恒永电子科技有限公司 Hardware spraying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110665695A (en) * 2019-11-08 2020-01-10 徐州恒永电子科技有限公司 Hardware spraying device
CN110665695B (en) * 2019-11-08 2021-07-09 徐州恒永电子科技有限公司 Hardware spraying device

Similar Documents

Publication Publication Date Title
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN204826589U (en) Folding suspension type operation platform
CN207641730U (en) A kind of steel pipe corrosion-proof application double-station construction operation platform
CN203701543U (en) Stable scaffold
CN203147030U (en) Mobile under-hanging operating platform for construction of laying gas pipeline along bridge
CN112796921A (en) Vertical water turbine guide vane overhauling rapid assembling and disassembling platform and assembling method thereof
CN207469717U (en) A kind of architectural engineering scaffold bracing means
CN207959880U (en) A kind of scaffold that part is not easy to lose
CN203334642U (en) Movable scaffold with foldable truckles
CN211597633U (en) Scaffold for building engineering that can install fast
CN204118541U (en) A kind of field work service kit
CN211475089U (en) Pipeline strutting arrangement for municipal construction
CN211687995U (en) Foldable building wallboard hoisting machine
CN204290174U (en) Specific purpose tool when installing for conducting rod
CN207633733U (en) The scaffold of finishing foldable
CN208702127U (en) A kind of large-span steel construction scaffold integral slide device
CN207131116U (en) A kind of novel building ergonomic support device
CN213896818U (en) Combined type station frame for bridge maintenance
CN212562393U (en) Strutting arrangement is used in civil engineering construction
CN220719300U (en) Civil engineering pipeline puts frame
CN216109614U (en) Foldable scaffold
CN218933758U (en) Scaffold triangle force-bearing frame
CN220500769U (en) Material conveying device for building engineering materials
CN220389146U (en) Fire bucket is with fixed auxiliary fixtures
CN204937326U (en) Wushu battery-driven car motor bike opens an umbrella canopy support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant