CN207633348U - A kind of anchored agitation pile supporting construction - Google Patents

A kind of anchored agitation pile supporting construction Download PDF

Info

Publication number
CN207633348U
CN207633348U CN201721738297.7U CN201721738297U CN207633348U CN 207633348 U CN207633348 U CN 207633348U CN 201721738297 U CN201721738297 U CN 201721738297U CN 207633348 U CN207633348 U CN 207633348U
Authority
CN
China
Prior art keywords
anchor pole
anchored
mixing pile
supporting construction
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721738297.7U
Other languages
Chinese (zh)
Inventor
邵锦周
吴连祥
龚海斌
杨雷荣
施建兵
江胜平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qidong Architectural Design Institute Co Ltd
Original Assignee
Qidong Architectural Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qidong Architectural Design Institute Co Ltd filed Critical Qidong Architectural Design Institute Co Ltd
Priority to CN201721738297.7U priority Critical patent/CN207633348U/en
Application granted granted Critical
Publication of CN207633348U publication Critical patent/CN207633348U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to the foundation pit supporting constructions in a kind of construction, specially a kind of anchored agitation pile supporting construction, including mixing pile, further include the anchor pole for being anchored the mixing pile, described anchor pole one end is inserted in the crater wall of the mixing pile side, and the other end is connect with the mixing pile.The utility model uses above-mentioned technical proposal, apply pulling force to mixing pile using anchor pole, crowded thrust of the peripheral soil layer to mixing pile is resisted with this, mixing pile becomes vertical stress structure, to, increase the stability of mixing pile, it is avoided to only rely on gravity to offset crowded thrust, in this way, for the foundation pit of same depth, due to increasing the anchor pulling force of anchor pole, the thickness of mixing pile can effectively reduce.

Description

A kind of anchored agitation pile supporting construction
Technical field
The utility model is related to the foundation pit supporting construction in a kind of construction, more particularly to a kind of anchored agitation pile supporting Structure.
Background technology
For in the method for pattern foundation pit supporting structure, soil nailing and composite soil nailing using commonplace, expense also than cheap, but if because For soil property reason or foundation depth it is larger and can not use soil nailing or composite soil nailing when, generally use mixing pile supporting construction.It is existing Some mixing pile supporting construction is that row's mixing pile is arranged on foundation pit periphery, on the one hand can prevent foundation pit peripheral edge soil in this way It collapses, is on the other hand also possible to prevent crater wall and seeps water into hole.
The patent of invention that Authorization Notice No. is CN103266597B discloses a kind of soil cement retaining dado cast-in-place row pile and its applies Work method, including several mixing piles arranged according to soil cement retaining wall bored concrete pile supporting construction extending direction, it is any by making Mixing pile is partially submerged into another mixing pile adjacent thereto so that each mixing pile intersects each other, to enhancing entire row perfusion The whole water-retaining capacity of stake.
The technical solution in implementation process, be inserted into foundation pit soil layer, is consolidated to mixing pile by mixing pile bottom end;Stirring Stake side wall is bonded with the crater wall on foundation pit periphery, to be supported to crater wall.Pit body is deeper, and the soil body close to bottom of foundation ditch is to stirring The horizontal thrust of stake is bigger, therefore, in the technical solution mixing pile only rely on bottom end be inserted into it is fixed in foundation pit soil layer, when pit body compared with When deep, it be easy to cause the phenomenon that mixing pile is extruded inclination.
Utility model content
The purpose of this utility model is to provide a kind of anchored agitation pile supporting construction, can more easily adjust anchor pole phase To the angle of inclination on ground, to preferably meet requirement.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of anchored agitation pile supporting construction, including mixing pile further include the anchor pole for being anchored the mixing pile, described Anchor pole one end is inserted in the crater wall of the mixing pile side, and the other end is connect with the mixing pile.
By using above-mentioned technical proposal, since foundation pit is deeper, the thickness of required mixing pile is bigger, and is given using anchor pole Mixing pile applies pulling force, and crowded thrust of the peripheral soil layer to mixing pile is resisted with this, and mixing pile becomes vertical stress structure, from And increase the stability of mixing pile, avoid it from only relying on gravity to offset crowded thrust, in this way, for the foundation pit of same depth, by It can be effectively reduced in the thickness of the anchor pulling force for increasing anchor pole, mixing pile.
Further, channel steel is fixedly connected on the mixing pile, in the channel steel activity be embedded an angle ball, the anchor Bar is hinged through the angle ball with the channel steel shape balling-up.
By using above-mentioned technical proposal, anchor pole is embedded the angle ball in channel steel with channel steel shape into flexural pivot by an activity Connection, the angle of inclination so as to more optionally adjustment anchor pole with respect to ground, and then use can be met in wide range It is required that.
Further, one end sliding of the anchor pole far from the angle ball is equipped with holding arm, and the holding arm is along vertical The rock-bolt length direction sliding.
By using above-mentioned technical proposal, after anchor pole is inserted into bolthole, by driving holding arm sliding out of anchor pole Move and stretch out, and then holding arm is made to be fastened in bolthole, backward bolthole in grout injection or concrete, make holding arm, Anchor pole and bolthole solidification are integrated, and then increase the pulling capacity of anchor pole by holding arm.
Further, the anchor pole close to one end of the holding arm be equipped with elastic portion, the lowermost end of the elastic portion with The holding arm is connected by elastic piece.
It by using above-mentioned technical proposal, after anchor pole is inserted into bolthole, squeezes and pushes away anchor pole, and then elastic portion is to holding Arm direction generates deformation, to which holding arm is pushed out anchor pole by elastic piece.
Further, it is parallel to the holding arm in the anchor pole and is equipped with guide plate.
By using above-mentioned technical proposal, guide plate can be oriented to the sliding of holding arm, make it more smoothly, accurately Ground is stretched out out of anchor pole.
Further, the anchor pole is in hollow setting, and its surface is provided with several extravasating holes along its length.
By using above-mentioned technical proposal, concrete perfusion or cement into anchor pole, into the concrete or water in anchor pole Mud is overflowed from extravasating hole and is flowed into bolthole, is waited for concrete or is theed cement solidifies, and anchor pole is integrated with bolthole solidification, Jin Erneng It is enough that more firmly channel steel is pulled and supported.
Further, the anchor pole is connected with anchor head close to the threaded one end of the angle ball, and the anchor head is in butterfly.
By using above-mentioned technical proposal, into anchor pole after concrete perfusion or cement, anchor head is connect with anchor pole, it can It is flowed out from anchor pole close to the end of angle ball before enough avoiding concrete or theing cement solidifies, and angle ball and anchor can be further strengthened The connection of bar, avoids in Bracing Process, and slope soil squeezes when pushing away mixing pile, causes the disengaging of anchor pole and angle ball, and then lose Anchoring effect;Anchor head is in butterfly, can be conveniently operated personnel and exert a force to anchor head, and then smoothly turn anchor head, it is made to connect with anchor pole It connects.
Further, the end face that the anchor head is bonded with the angle ball is arc-shaped.
By using above-mentioned technical proposal, camber is designed in the end face that anchor head is bonded with angle ball, preferably with angle ball Radian it is identical, the contact area of anchor head and angle ball can be increased in this way, script anchor head and the point contact of angle ball are changed to Face contacts, and the stability that enhancing anchor head is connect with angle ball increases the anchoring effect of anchor pole.
Further, it is provided with the caulking groove coordinated with the anchor head on the angle ball.
By using above-mentioned technical proposal, opened up on angle ball it is same as the caulking groove that anchor head coordinates can be by script anchor Head is changed to face with the point contact of angle ball and contacts, and the stability that enhancing anchor head is connect with angle ball increases the anchoring effect of anchor pole.
In conclusion the utility model has the advantages that:
1. giving mixing pile to apply pulling force using anchor pole, crowded thrust of the peripheral soil layer to mixing pile, mixing pile are resisted with this Become vertical stress structure, to, increase the stability of mixing pile, avoids it from only relying on gravity to offset crowded thrust, in this way, For the foundation pit of same depth, due to increasing the anchor pulling force of anchor pole, the thickness of mixing pile can effectively reduce;
2. anchor pole is embedded the angle ball in channel steel by an activity and is hinged with channel steel shape balling-up, so as to relatively arbitrarily Ground adjusts angle of inclination of the anchor pole with respect to ground, and then can meet requirement in wide range;
3. by setting anchor pole to hollow structure, and extravasating hole is opened up in its shaft, and then coagulation is perfused into anchor pole Soil or cement, into anchor pole concrete or cement overflows and is flowed into bolthole from extravasating hole, wait for that concrete or cement coagulate Gu anchor pole is integrated with bolthole solidification, more firmly channel steel can be pulled and supported;
4. by the way that the holding arm that can be stretched out out of anchor pole is arranged in one end far from angle ball of anchor pole, in turn, by anchor After bar is inserted into bolthole, stretching is slid out of anchor pole by driving holding arm, holding arm is made to be fastened in bolthole, it is backward Grout injection or concrete in bolthole make holding arm, anchor pole and bolthole solidification be integrated, and then are increased by holding arm The pulling capacity of anchor pole.
Description of the drawings
Fig. 1 is a kind of anchored agitation pile supporting construction overall structure diagram;
Fig. 2 is a kind of anchored agitation pile supporting construction partial structural diagram, is mainly used for showing the position of anchor pole and channel steel Set relationship;
Fig. 3 is a kind of anchored agitation pile supporting construction partial structurtes explosive view, is mainly used for showing the shape of anchor head;
Fig. 4 is a kind of anchored agitation pile supporting construction partial structurtes explosive view, is mainly used for showing the structure of caulking groove;
Fig. 5 is the lateral partial structurtes sectional view of anchor pole, is mainly used for showing the structure of elastic portion and holding arm.
In figure:1, foundation pit;11, side slope;2, mixing pile;3, anchor pole;31, extravasating hole;32, anchor head;4, channel steel;5, angle Ball;6, holding arm;61, guide plate;7, elastic portion;71, elastic piece;8, caulking groove.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:
A kind of anchored agitation pile supporting construction referring to Fig.1, including is fixedly mounted on the mixing pile 2 on 1 periphery of foundation pit vertically, Mixing pile 2 is evenly arranged several along 1 periphery of foundation pit, and adjacent mixing pile 2 is bonded each other, forms water blocking curtain, to both may be used The soil body to avoid the side slope 11 of foundation pit 1 collapses, and can stop that surrounding body flows into foundation pit, influences in foundation pit 1 Normal work.
Referring to Figures 1 and 2, in order to avoid the soil body of 1 side slope 11 of foundation pit squeezes mixing pile 2, mixing pile 2 is caused to tilt, this Deviate from the side of side slope 11 in embodiment in mixing pile 2, level is fixedly connected with a channel steel 4, which stirs with more simultaneously Stake 2 connects, and 4 both ends of channel steel are connected separately with anchor pole 3, and the inclination of anchor pole 3 is stretched into the soil body of side slope 11.By anchor pole 3 to slot Steel 4 pulls and supports, and to which mixing pile 2 to be tightly fixed in the side slope 11 of foundation pit 1, avoids 11 soil body of side slope from squeezing mixing pile 2, makes It is tilted at mixing pile 2.
With reference to Fig. 2 and Fig. 3, activity is embedded with an angle ball 5 in channel steel 4, and the diameter of angle ball 5 is more than the thickness of channel steel 4 Degree, part is protruded outside channel steel 4 respectively for the both sides of angle ball 5.Through-hole is radially offered in angle ball 5, anchor pole 3 is logical across this Hole is connect with 4 flexural pivot of channel steel, and the both ends of anchor pole 3 are located at the both sides of channel steel 4.Since anchor pole 3 is embedded by activity in channel steel 4 Interior angle ball 5 is connect with channel steel 4, so as to more easily adjust angle of inclination of the anchor pole 3 with respect to ground, with preferably full Sufficient requirement.
With reference to Fig. 2 and Fig. 3, anchor pole 3 is in hollow setting in the present embodiment, and its surface is provided with extravasating hole 31, extravasating hole 31 Several are offered along 3 length direction of anchor pole.Anchor pole 3 is connected with anchor head 32 close to the threaded one end of angle ball 5, right for convenience Anchor head 32 exerts a force, and anchor head 32 is arranged in butterfly.The one side that anchor head 32 is bonded with angle ball 5 is arc-shaped, so as to increase anchor head 32 with the contact area of angle ball 5, keep anchoring more stable, the shape of 32 end of anchor head can not also be changed in certain other embodiment Shape, and the caulking groove 8 coordinated with 32 end of anchor head is opened up on angle ball 5(See Fig. 4)As long as anchor head 32 and angle can be increased The contact area of ball 5.When carrying out the fixation of anchor pole 3, bolthole is drilled out in side slope 11 first with boring bar tool, later will Anchor pole 3 inserts in the hole, from anchor pole 3 close to one end of angle ball 5 concrete perfusion into anchor pole 3, by anchor head 32 after the completion of perfusion It is connect with anchor pole 3.It overflows and is flowed into bolthole into the concrete in anchor pole 3 from extravasating hole 31, wait for concrete setting, anchor pole 3 are integrated with the solidification of 11 soil body of side slope, and then can more firmly be pulled and supported to channel steel 4.
With reference to Fig. 5, in order to further strengthen anchor pole 3 and the pulling capacity after the solidification of 11 soil body of side slope, in anchor in the present embodiment There are two holding arm 6, two holding arms 6 slide along 3 length direction of normal bolting for one end sliding connection of the bar 3 far from angle ball 5, and It is parallel to holding arm 6 in anchor pole 3 and is fixed with guide plate 61, under normality, two holding arms 6 are located in anchor pole 3.Anchor pole 3 is close to be embraced One end of tight arm 6 is equipped with elastic portion 7, and elastic portion 7 is arranged in hollow hemispherical, and yielding, and the lowermost end of elastic portion 7 leads to respectively It crosses the one end close to each other with two holding arms 6 of elastic piece 71 to connect, two elastic pieces 71 are arc-shaped, and setting of supporting or opposing, in " people " font.It after anchor pole 3 is inserted into bolthole, squeezes and pushes away anchor pole 3, elastic portion 7 is made to generate deformation to 6 direction of holding arm, into And squeeze elastic piece 71, to which two holding arms 6 are stretched out from 3 both sides of anchor pole respectively under the guiding of guide plate 61, and with from anchor The concrete setting overflowed in bar 3 is integrated, and then increases pulling capacity when anchor pole 3 is pulled out out of bolthole, improves anchor pole 3 Anchoring effect.
Operation principle:When being anchored to mixing pile 2, anchor pole 3 is passed through out of through-hole on angle ball 5, and be inserted into anchor pole In hole, the concrete perfusion into anchor pole 3, and the crowded anchor pole 3 that pushes away makes holding arm 6 be stretched out out of anchor pole 3, holding arm 6 and anchor pole 3 and anchor Rod aperture solidification is integrated, and anchor head 32 is connect with anchor pole 3, to which anchor pole 3 is connect by angle ball 5 with channel steel 4, and then to stirring Stake 2 is anchored.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (9)

1. a kind of anchored agitation pile supporting construction, including mixing pile(2), it is characterised in that:Further include for being anchored the stirring Stake(2)Anchor pole(3), the anchor pole(3)One end is inserted in the mixing pile(2)In the crater wall of side, the other end is stirred with described Mix stake(2)Connection.
2. a kind of anchored agitation pile supporting construction according to claim 1, it is characterised in that:The mixing pile(2)It is upper solid Surely it is connected with channel steel(4), the channel steel(4)Interior activity is embedded an angle ball(5), the anchor pole(3)Through the angle ball(5) With the channel steel(4)Form flexural pivot connection.
3. a kind of anchored agitation pile supporting construction according to claim 2, it is characterised in that:The anchor pole(3)Far from institute State angle ball(5)One end wall slip be equipped with holding arm(6), the holding arm(6)Along the vertical anchor pole(3)Length direction Sliding.
4. a kind of anchored agitation pile supporting construction according to claim 3, it is characterised in that:The anchor pole(3)Close to institute State holding arm(6)One end end be equipped with elastic portion(7), the elastic portion(7)With the holding arm(6)Pass through elastic piece(71) Connection, the elastic piece(71)One end is connected to the elastic portion(7)Interior top, the other end are connected to the holding arm(6) Positioned at the anchor pole(3)Interior one end end.
5. a kind of anchored agitation pile supporting construction according to claim 4, it is characterised in that:The anchor pole(3)It is interior parallel In the holding arm(6)Equipped with guide plate(61).
6. a kind of anchored agitation pile supporting construction according to claim 1, it is characterised in that:The anchor pole(3)In hollow Setting, and its surface is provided with several extravasating holes along its length(31).
7. a kind of anchored agitation pile supporting construction according to claim 2, it is characterised in that:The anchor pole(3)Close to institute State angle ball(5)Threaded one end be connected with anchor head(32), the anchor head(32)In butterfly.
8. a kind of anchored agitation pile supporting construction according to claim 7, it is characterised in that:The anchor head(32)With it is described Angle ball(5)The end face of fitting is arc-shaped.
9. a kind of anchored agitation pile supporting construction according to claim 7, it is characterised in that:The angle ball(5)On open Have and the anchor head(32)The caulking groove of cooperation(8).
CN201721738297.7U 2017-12-12 2017-12-12 A kind of anchored agitation pile supporting construction Active CN207633348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721738297.7U CN207633348U (en) 2017-12-12 2017-12-12 A kind of anchored agitation pile supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721738297.7U CN207633348U (en) 2017-12-12 2017-12-12 A kind of anchored agitation pile supporting construction

Publications (1)

Publication Number Publication Date
CN207633348U true CN207633348U (en) 2018-07-20

Family

ID=62863275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721738297.7U Active CN207633348U (en) 2017-12-12 2017-12-12 A kind of anchored agitation pile supporting construction

Country Status (1)

Country Link
CN (1) CN207633348U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112576283A (en) * 2020-12-24 2021-03-30 河南理工大学 Gangue blocking column outward-swinging preventing structure based on gob-side entry retaining and construction method thereof
CN113668552A (en) * 2021-08-04 2021-11-19 深圳宏业基岩土科技股份有限公司 Reinforced structure of transition platform between silty geological condition slopes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112576283A (en) * 2020-12-24 2021-03-30 河南理工大学 Gangue blocking column outward-swinging preventing structure based on gob-side entry retaining and construction method thereof
CN113668552A (en) * 2021-08-04 2021-11-19 深圳宏业基岩土科技股份有限公司 Reinforced structure of transition platform between silty geological condition slopes
CN113668552B (en) * 2021-08-04 2022-07-12 深圳宏业基岩土科技股份有限公司 Reinforced structure of transition platform between silty geological condition slopes

Similar Documents

Publication Publication Date Title
CN207633348U (en) A kind of anchored agitation pile supporting construction
WO2004035942A1 (en) Internal excavation method through pile, and foundation pile structure
CN206346205U (en) A kind of sawtooth anchor formula miniature steel pipe concrete-pile for slope treatment
CN207878441U (en) A kind of ruggedized construction of soft soil foundation
CN215888272U (en) Deep foundation pit composite supporting structure
CN207878458U (en) Interim steel trestle with resistance to plucking auxiliary pile
CN203113324U (en) Grouting stirring type anchor pile
CN209144799U (en) Reaming slip casting screw pile and pile foundation
CN215053066U (en) Geotechnical engineering side slope reinforcing apparatus
CN216339603U (en) Foundation ditch slope prevents stock that collapses for construction
JP2003105757A (en) Tapered pile with anchor and pile foundation using it
CN210684709U (en) Structure for improving bearing capacity of formed pile by external drilling grouting
CN209723230U (en) The connecting node of steel plate combined shear wall and not equal higher baselines
CN110106891B (en) Anchor net cable-profile steel support coupling supporting structure
CN210315493U (en) Foundation structure
CN208379597U (en) Outer anchor head fixed structure and foundation pit support system
CN206902971U (en) Wall location adjusting device and wall body structure
CN106065596A (en) A kind of oblique steel pipe combines soil cement and forms the construction method of beaer
CN218263856U (en) Soil anchor rod for constructional engineering
CN213417838U (en) Foundation pit protection structure
CN207714325U (en) A kind of vibration sinking tube equipment
CN219386273U (en) Foundation reinforcing structure
CN217325416U (en) Municipal administration side slope anchor
CN203113321U (en) Powder-spraying stirring type anchor pile
CN219586767U (en) Pile foundation reinforcing device for highway bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant