CN207631082U - A kind of Operation Van of safety fortune dress kerbstone - Google Patents
A kind of Operation Van of safety fortune dress kerbstone Download PDFInfo
- Publication number
- CN207631082U CN207631082U CN201721736071.3U CN201721736071U CN207631082U CN 207631082 U CN207631082 U CN 207631082U CN 201721736071 U CN201721736071 U CN 201721736071U CN 207631082 U CN207631082 U CN 207631082U
- Authority
- CN
- China
- Prior art keywords
- support column
- vertical support
- bracing piece
- warning lamp
- kerbstone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003351 stiffener Substances 0.000 claims abstract description 12
- 230000000916 dilatatory effect Effects 0.000 claims abstract description 10
- 230000000694 effects Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 241001310793 Podium Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Abstract
The utility model discloses a kind of Operation Vans of safety fortune dress kerbstone, which includes railway carriage and electronic headstock, is connected by dilatory bar between railway carriage and electronic headstock;The bottom of railway carriage is provided with auxiliary wheel;It is provided with storage box on electronic headstock, the first vertical support column and the second vertical support column are provided in storage box, the top of first vertical support column and the second vertical support column is connected with first level supporting rod, and the first L-shaped bracing piece, the second L-shaped bracing piece and intermediate stiffener are provided on the first level supporting rod;It is provided with the first warning lamp at the top of first vertical support column, the second warning lamp is provided at the top of intermediate stiffener, it is provided with third warning lamp at the top of second vertical support column, the bottom of electronic headstock is provided with the first adhesion wheel and the second adhesion wheel and accumulator, and accumulator is connect with the first adhesion wheel and the second adhesion wheel by power drive unit.
Description
Technical field
The utility model is related to kerbstones to transport dress technical field, and in particular to a kind of Operation Van of safety fortune dress kerbstone.
Background technology
Kerbstone (curb) refers to that the boundary stone for being located at pavement edge, abbreviation kerb are commonly called as road serratd edge.It is as setting
In the rectangular slab of stone of pavement edge and the boundary of other structural belts.General kerbstone is arranged between both sides of highway road surface and curb, because
Drop is formed, as steep cliff, so the strip-shaped configuration that kerbstone is formed also shouts precipice.The structure size of kerbstone is typically 99cm*
15cm*15cm is generally higher by road surface 10cm.
Kerbstone can be divided into vertical curb and flush curb.Vertical curb is preferably arranged on median, both sides dividing strip and road
Side band both sides.When being arranged in median and both sides dividing strip, exposed height is preferably 15cm-20cm;When setting is in trackside
When band both sides, exposed height is preferably 10cm-15cm.Flush curb is preferably arranged between pavement and greenbelt, and has accessible
It is required that crossing or crossing within the scope of.Between dividing strip and road surface, road will be generally set between pavement and road surface
Kerb, in addition in podium, safety island is also required for setting kerbstone.It is classified as cement-concrete road according to the material of kerbstone
Kerb, lithotome kerbstone.
Since kerbstone itself is heavier, single weight generally all in 100KG or so, needs during practice of construction
Dress kerbstone is transported using Operation Van.It is typically not only to need to occupy big using manpower trailer fortune dress kerbstone in the prior art
The labour of amount, and it is low to transport dress efficiency.In addition, city is due to traffic control at present, it usually needs just permit at night
Perhaps a large amount of kerbstones are transported to construction site, then position of mating formation is transported into kerbstone dispersion by Operation Van.Evening sight by
Resistance, Operation Van in the prior art are dangerous.
Invention content
The purpose of this utility model is to provide a kind of Operation Van of safety fortune dress kerbstone, technical problems to be solved
It is how to reduce labour's use, raising fortune dress efficiency is low, while improving the safety of Operation Van.
The Operation Van of fortune dress kerbstone described in the utility model includes railway carriage and electronic headstock, railway carriage and electronic headstock it
Between pass through dilatory bar connection;The bottom of railway carriage is provided with auxiliary wheel;It is provided with storage box on electronic headstock, is arranged in storage box
There are the first vertical support column and the second vertical support column, which connect with the first inclination bracing piece, and second is perpendicular
Allotment dagger is connect with the second inclination bracing piece, and the top of the first vertical support column and the second vertical support column is connected with first
Horizontal support bar is provided with the first L-shaped bracing piece, the second L-shaped bracing piece and intermediate stiffener on the first level supporting rod;The
The horizontal segment of one L-shaped bracing piece is connect with the first vertical support column, the horizontal segment of the second L-shaped bracing piece and the second vertical support column
The vertical section of connection, the vertical section of the first L-shaped bracing piece and the second L-shaped bracing piece passes through first level supporting rod and prolongs upwards
It stretches;It is connected with the second horizontal support bar between the vertical section of first L-shaped bracing piece and the vertical section of the second L-shaped bracing piece;It is intermediate
Bracing piece passes through the second horizontal support bar and upwardly extends;The first warning lamp is provided at the top of first vertical support column, it is intermediate
It is provided with the second warning lamp at the top of bracing piece, third warning lamp is provided at the top of the second vertical support column, electronic headstock
Bottom is provided with the first adhesion wheel and the second adhesion wheel and accumulator, and accumulator and the first adhesion wheel and second are actively
Wheel is connected by power drive unit.
The end set of the dilatory bar has connection ring, and dilatory bar is connect by connection ring with railway carriage.
The color for the light that first warning lamp, the second warning lamp are sent out with third warning lamp is different and with flicker
Effect.
First warning lamp is connect by the first buffer spring with the top of the first vertical support column, the second warning lamp
It is connected by the top of the second buffer spring and intermediate stiffener, third warning lamp passes through third buffer spring and the second vertical branch
The top of dagger connects.
It is provided with the first mud guard above first adhesion wheel, second gear mud is provided with above the second adhesion wheel
Plate.
The technical solution of the utility model has the following advantages that:
The Operation Van of fortune dress kerbstone described in the utility model is reasonable for structure, can reduce labour's use, improve
Fortune dress efficiency, while improving the safety of Operation Van.
Description of the drawings
Fig. 1 is the structural schematic diagram of the Operation Van of fortune dress kerbstone described in the utility model.
Specific implementation mode
The following examples illustrate the utility model, but is not intended to limit the scope of the present invention.
As shown in Figure 1, the Operation Van of fortune dress kerbstone described in the utility model includes railway carriage 36 and electronic headstock 10, vehicle
It is connected by dilatory bar 12 between case 36 and electronic headstock 10;The bottom of railway carriage is provided with auxiliary wheel;It is arranged on electronic headstock
There is storage box 30, the first vertical support column 40 and the second vertical support column 42 are provided in storage box, the first vertical support column
40 connect with the first inclination bracing piece 44, and the second vertical support column 42 is connect with the second inclination bracing piece 46, the first vertical branch
The top of dagger 40 and the second vertical support column 42 is connected with first level supporting rod 48, is arranged on the first level supporting rod 48
There are the first L-shaped bracing piece 50, the second L-shaped bracing piece 52 and intermediate stiffener 43;The horizontal segment and first of first L-shaped bracing piece 50
Vertical support column 40 connects, and the horizontal segment of the second L-shaped bracing piece 52 is connect with the second vertical support column 42, the first L-shaped bracing piece
50 vertical section and the vertical section of the second L-shaped bracing piece 52 pass through first level supporting rod 48 and upwardly extend;First L-shaped is reinforced
The second horizontal support bar 54 is connected between the vertical section of bar 50 and the vertical section of the second L-shaped bracing piece 52;Intermediate stiffener 43
Across the second horizontal support bar 54 and upwardly extend;The top of first vertical support column 40 is provided with the first warning lamp 54, intermediate
The top of bracing piece 43 is provided with the second warning lamp 55, and the top of the second vertical support column 42 is provided with third warning lamp 56, electricity
The bottom of motor-car head is provided with the first adhesion wheel 14 and the second adhesion wheel and accumulator, accumulator and the first adhesion wheel
14 are connected with the second adhesion wheel by power drive unit.
The end set of the dilatory bar has connection ring 37, and dilatory bar is connect by connection ring with railway carriage 36.
The color for the light that first warning lamp 54, the second warning lamp 55 are sent out with third warning lamp 56 is different and has
There is flicker effect.
First warning lamp 54 is connect by the first buffer spring 60 with the top of the first vertical support column 40, and second
Warning lamp 55 is connect by the second buffer spring 61 with the top of intermediate stiffener 43, and third warning lamp 56 passes through third buffering elastic
Spring 62 is connect with the top of the second vertical support column 42.
The top of first adhesion wheel 14 is provided with the first mud guard 15, and second gear is provided with above the second adhesion wheel
Mud plate 17.
The Operation Van of fortune dress kerbstone described in the utility model is moved by electric vehicle headband motor-car case, it is possible to reduce labor
The use of power improves fortune dress efficiency.Storage box on electronic headstock can also transport dress kerbstone, the first warning lamp 54,
The color for the light that two warning lamps 55 are sent out with third warning lamp 56 is different and has flicker effect, in far distance
Warning is sent out, safety is improved.The top that first warning lamp 54 passes through the first buffer spring 60 and the first vertical support column 40
Connection, the second warning lamp 55 are connect by the second buffer spring 61 with the top of intermediate stiffener 43, and third warning lamp 56 passes through
Third buffer spring 62 is connect with the top of the second vertical support column 42, avoids fortune dress process moderately gusty air impact to the first warning lamp
54, the second warning lamp 55 and third warning lamp 56 damage.
Although above having made detailed description to the utility model with generality explanation and specific embodiment,
On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art
's.Therefore, these modifications or improvements on the basis of without departing from the spirit of the present invention, belong to the utility model and want
Seek the range of protection.
Claims (5)
1. a kind of Operation Van of safety fortune dress kerbstone, which is characterized in that the Operation Van of the fortune dress kerbstone includes railway carriage
With electronic headstock, connected by dilatory bar between railway carriage and electronic headstock;The bottom of railway carriage is provided with auxiliary wheel;Electronic headstock
On be provided with storage box, the first vertical support column and the second vertical support column are provided in storage box, the first vertical support column
Connect with the first inclination bracing piece, the second vertical support column tilts bracing piece with second and connect, the first vertical support column and the
The top of two vertical support columns is connected with first level supporting rod, be provided on the first level supporting rod the first L-shaped bracing piece,
Second L-shaped bracing piece and intermediate stiffener;The horizontal segment of first L-shaped bracing piece is connect with the first vertical support column, and the second L-shaped adds
The horizontal segment of strong bar is connect with the second vertical support column, the vertical section of the vertical section of the first L-shaped bracing piece and the second L-shaped bracing piece
Across first level supporting rod and upwardly extend;Between the vertical section of first L-shaped bracing piece and the vertical section of the second L-shaped bracing piece
It is connected with the second horizontal support bar;Intermediate stiffener passes through the second horizontal support bar and upwardly extends;First vertical support column
Top is provided with the first warning lamp, and the second warning lamp is provided at the top of intermediate stiffener, is set at the top of the second vertical support column
It is equipped with third warning lamp, the bottom of electronic headstock is provided with the first adhesion wheel and the second adhesion wheel and accumulator, electric power storage
Pond is connect with the first adhesion wheel and the second adhesion wheel by power drive unit.
2. the Operation Van of fortune dress kerbstone as described in claim 1, which is characterized in that the end set of the dilatory bar has
Connection ring, dilatory bar are connect by connection ring with railway carriage.
3. the Operation Van of fortune dress kerbstone as described in claim 1, which is characterized in that first warning lamp, the second police
Show that the color for the light that lamp is sent out with third warning lamp is different and has flicker effect.
4. the Operation Van of fortune dress kerbstone as described in claim 1, which is characterized in that first warning lamp passes through first
Buffer spring is connect with the top of the first vertical support column, the top that the second warning lamp passes through the second buffer spring and intermediate stiffener
Portion connects, and third warning lamp is connect by third buffer spring with the top of the second vertical support column.
5. the Operation Van of fortune dress kerbstone as described in claim 1, which is characterized in that be provided with above the first adhesion wheel
First mud guard is provided with the second mud guard above the second adhesion wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721736071.3U CN207631082U (en) | 2017-12-13 | 2017-12-13 | A kind of Operation Van of safety fortune dress kerbstone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721736071.3U CN207631082U (en) | 2017-12-13 | 2017-12-13 | A kind of Operation Van of safety fortune dress kerbstone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207631082U true CN207631082U (en) | 2018-07-20 |
Family
ID=62863491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721736071.3U Expired - Fee Related CN207631082U (en) | 2017-12-13 | 2017-12-13 | A kind of Operation Van of safety fortune dress kerbstone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207631082U (en) |
-
2017
- 2017-12-13 CN CN201721736071.3U patent/CN207631082U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204611640U (en) | A kind of highway street lamp | |
CN102941854A (en) | Suspension type rail transit arranged below elevated road | |
CN107447694A (en) | Road and bridge height-limiting frame | |
US20140110968A1 (en) | Aerodynamic control system for trailers | |
CN207552969U (en) | Mobile solar energy road display screen | |
CN207631082U (en) | A kind of Operation Van of safety fortune dress kerbstone | |
CN207558200U (en) | A kind of temporary traffic instruction device | |
CN202440730U (en) | Crossroad building structure requiring no traffic light | |
CN204151717U (en) | A kind of street traffic street refuge | |
CN213203871U (en) | Traffic warning device | |
CN104088236A (en) | LED lighting intelligent control traffic guardrail | |
CN211075710U (en) | Vehicle-mounted lifting warning board based on STM32 | |
CN106906768A (en) | The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment | |
CN203007873U (en) | Novel road height limiting device | |
CN206245248U (en) | A kind of highway intervening guard column of new anti-high beam | |
CN207068259U (en) | The higher moving traffic light of degree of safety | |
CN104537853A (en) | Traffic signal lamp for mountainous area | |
CN201544842U (en) | Spraying car working platform | |
CN204125861U (en) | A kind of road kerb being installed on both sides, tunnel | |
CN202430648U (en) | Warning roadblock for road | |
CN202157283U (en) | Road luminescent guardrail | |
CN2871724Y (en) | Parking rack | |
CN104499441A (en) | Delineator | |
CN202626878U (en) | Road guardrail | |
CN203977330U (en) | Road protection hurdle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180720 |
|
CF01 | Termination of patent right due to non-payment of annual fee |