CN106906768A - The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment - Google Patents
The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment Download PDFInfo
- Publication number
- CN106906768A CN106906768A CN201710256347.6A CN201710256347A CN106906768A CN 106906768 A CN106906768 A CN 106906768A CN 201710256347 A CN201710256347 A CN 201710256347A CN 106906768 A CN106906768 A CN 106906768A
- Authority
- CN
- China
- Prior art keywords
- cable
- sand
- area
- reflective
- guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004576 sand Substances 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000002955 isolation Methods 0.000 claims description 9
- 230000004888 barrier function Effects 0.000 abstract description 4
- 238000011161 development Methods 0.000 abstract description 3
- 239000012528 membrane Substances 0.000 abstract 2
- 210000000988 bone and bone Anatomy 0.000 abstract 1
- 230000007547 defect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 5
- 238000009825 accumulation Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 3
- 206010039203 Road traffic accident Diseases 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 206010035148 Plague Diseases 0.000 description 1
- 241000607479 Yersinia pestis Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F15/00—Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
- E01F15/02—Continuous barriers extending along roads or between traffic lanes
- E01F15/06—Continuous barriers extending along roads or between traffic lanes essentially made of cables, nettings or the like
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F7/00—Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
- E01F7/02—Snow fences or similar devices, e.g. devices affording protection against sand drifts or side-wind effects
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
Description
技术领域technical field
本发明涉及公路安全设施优化,具体涉及一种基于护栏结构调整的沙区高等级公路路面积沙的治理方法。The invention relates to the optimization of road safety facilities, in particular to a method for controlling road area sand of high-grade roads in sandy areas based on guardrail structure adjustment.
背景技术Background technique
沙区公路一般都配套建有防沙体系,但防沙体系并不能全部拦截过境风沙流挟沙,总有少量风沙要仍会搬运至路面。由于一般公路的路面较光滑,风沙流可以顺利通过,路面上不会形成大量积沙。但对目前我国沙区已建多条一级公路以及高速公路调查发现,虽然路面光滑,但路面上却仍形成不同程度的积沙,对快速行驶车辆造成极大危害,出现轮胎打滑,甚至引发侧翻等交通事故,严重影响交通安全;强沙尘天气时路面大量积沙,交通中断,须用大型机械才能抢通。路面积沙已成为当前困扰沙区高等级公路运行和维护的重要难题。Roads in sandy areas are generally equipped with a sand control system, but the sand control system cannot completely intercept the sand carried by the passing wind and sand flow, and there will always be a small amount of wind and sand that will still be transported to the road surface. Because the surface of general roads is relatively smooth, wind and sand flows can pass through smoothly, and a large amount of sand will not form on the road surface. However, according to the investigation of many first-class roads and expressways that have been built in my country's sandy areas, it is found that although the road surface is smooth, there are still different degrees of sand accumulation on the road surface, which will cause great harm to fast-moving vehicles, tire slippage, and even cause serious accidents. Traffic accidents such as rollovers seriously affect traffic safety; in strong sand and dust weather, a large amount of sand accumulates on the road surface, and traffic is interrupted, requiring large machinery to rush through. Road area sand has become an important problem that plagues the operation and maintenance of high-grade highways in sandy areas.
经全面分析表明,高等级公路的路面积沙问题除与防沙体系建设不完备、路面宽度较大等因素有关外,还与道路的附属设施有很大关系。一级公路和高速公路路基上设置了护栏(包括路侧护栏和中央隔离带护栏,而我国多用波形板式护栏)以及防眩遮光片等附属设施。风洞实验分析表明,护栏使路基近地表流场因强烈扰动而减速,风沙流挟沙在路面卸载堆积。可见,在其他地区正常使用的公路附属设施形式并不完全适于沙区公路。A comprehensive analysis shows that the road area sand problem of high-grade highways is not only related to factors such as incomplete sand control system construction and large road width, but also has a lot to do with road ancillary facilities. Guardrails (including roadside guardrails and central barrier guardrails, and corrugated plate guardrails are often used in my country) and ancillary facilities such as anti-glare shading sheets are set up on the roadbed of first-class roads and expressways. The analysis of wind tunnel experiments shows that the guardrail decelerates the flow field near the surface of the subgrade due to strong disturbance, and the wind-sand flow carries sand and unloads and accumulates on the road surface. It can be seen that the road ancillary facilities normally used in other areas are not completely suitable for roads in sandy areas.
安全附属设施也是沙区公路不可或缺的重要组成部分,但其形式须与沙区地表风沙活动相适应。因此,沙区高等级公路路面沙害防治的关键是改变安全设施形式,最大可能减小对风沙流场的扰动和阻滞。Ancillary safety facilities are also an indispensable and important part of roads in sandy areas, but their form must be compatible with surface wind and sand activities in sandy areas. Therefore, the key to the prevention and control of sand damage on high-grade highway pavement in sandy areas is to change the form of safety facilities to minimize the disturbance and blockage of the wind-sand flow field.
波形板护栏是一种用支柱固定的梁式构造半刚性护栏,具有一定的刚度和韧性,通过护栏横梁的曲折变形和张拉力来接收冲撞能量,以抵御车辆的碰撞,能减少交通事故,降低事故严重程度。横梁的变形破坏部件容易更换,且波形板护栏外形比较美观,具有较好的视线引导作用。因此,波形板护栏使用非常普遍,既可用作路侧护栏,也可用作中央隔离带护栏。波形板宽度达到31cm(双波)和50.6cm(三波),密实不透风,对气流阻滞很大,易造成路面积雪和积沙。The corrugated plate guardrail is a semi-rigid guardrail with a beam structure fixed by pillars. It has a certain rigidity and toughness. It receives the impact energy through the bending deformation and tension of the guardrail beam to resist the collision of vehicles and reduce traffic accidents. the severity of the accident. The deformed and damaged parts of the beam are easy to replace, and the corrugated plate guardrail has a beautiful appearance and a good line of sight guidance. Therefore, the use of corrugated plate guardrails is very common, both as roadside guardrails and as central barrier guardrails. The corrugated plate has a width of 31cm (double wave) and 50.6cm (three waves). It is dense and airtight, and it greatly blocks the airflow, which is easy to cause snow and sand on the road.
混凝土护栏是一种具有一定断面形状的墙式构造刚性护栏,依靠汽车爬高、变形和摩擦来接收碰撞能量。水泥混凝土护栏在碰撞时不变形,几乎不会被破坏,维修费用很低,一般用于严格阻止车辆超越的环境,如高架桥、深沟等场合,既用作路侧护栏,也用作中央隔离带护栏。混凝土护栏一般高度大于1m,上下密实不透风,对气流阻滞很大,极易造成路面积雪和积沙,此外也造成车辆行驶有压迫感。The concrete guardrail is a rigid guardrail with a wall-like structure with a certain cross-sectional shape, which relies on the car's climbing, deformation and friction to receive the collision energy. Cement concrete guardrails are not deformed during collisions, are hardly damaged, and have low maintenance costs. They are generally used in environments that strictly prevent vehicles from overtaking, such as viaducts, deep ditches, etc., and are used as both roadside guardrails and central isolation With guardrail. Concrete guardrails are generally higher than 1m in height, dense and airtight up and down, and greatly hinder airflow, which can easily cause snow and sand accumulation on the road, and also cause oppressive feeling for vehicles.
缆索护栏是一种用立柱固定的数根施加了初张力的缆索构造柔性护栏,主要依靠缆索的拉应力来吸收碰撞能量,以抵抗车辆的碰撞。由于缆索护栏可以产生较大变形,吸收碰撞能量大,能大幅度减小对碰撞体的伤害。缆索碰撞变形后可自我修复,无需更换,与景观协调性好,但视线引导作用差,施工较复杂,目前应用范围很有限,多用于风景区公路。相关文献研究表明,由于缆索护栏对气流阻滞小,在积雪地区应用,风雪流不易在路面堆积,可减轻积雪清扫工作量,有利于提高风雪天气车辆的通行能力。The cable guardrail is a kind of flexible guardrail constructed by several cables with initial tension applied to the columns. It mainly relies on the tensile stress of the cables to absorb the collision energy and resist the collision of the vehicle. Since the cable guardrail can produce large deformation and absorb a large amount of collision energy, it can greatly reduce the damage to the collision body. The cable can be self-repaired after collision and deformation without replacement, and has good coordination with the landscape, but it has poor line of sight guidance and complicated construction. At present, the scope of application is very limited, and it is mostly used for scenic roads. Relevant literature research shows that because the cable guardrail has little blockage to airflow, it is not easy to accumulate wind and snow flow on the road surface when it is used in snowy areas, which can reduce the workload of snow cleaning and improve the traffic capacity of vehicles in snowy weather.
针对以上问题,本发明主要通过改变公路护栏的结构形式,以减小对风沙流场的扰动,并在保障道路安全性的前提下,有效防止路面积沙,可促进沙区高速公路建设技术优化提升。In view of the above problems, the present invention mainly reduces the disturbance to the wind-sand flow field by changing the structure of the highway guardrail, and effectively prevents the road from accumulating sand on the premise of ensuring road safety, which can promote the optimization of expressway construction technology in sandy areas promote.
发明内容Contents of the invention
本发明目的在于,针对当前沙区高等级公路路面积沙的成因,提供一种基于护栏结构调整的沙区高等级公路路面积沙的治理方法,该方法涉及的装置是由固定立柱、反光膜、缆索和反射轮廓标组成。经风洞实验结果表明,本发明所述方法中缆索护栏对气流扰动小,地面不产生积沙。缆索呈彩色或具有夜间发光功能、在缆索固定立柱上贴反光膜、在缆索上按间距固定反光或太阳能发光轮廓标,这些措施弥补了常用缆索护栏视线引导性差的缺陷,也具有改善和美化道路景观的作用。该发明能解决当前沙区高等级公路的路面积沙难题,促进沙区交通建设发展,不仅可应用与风沙地区,也可用于风雪地区及风景区。The purpose of the present invention is to provide a method for controlling sand on high-grade roads in sandy areas based on guardrail structure adjustment for the cause of sand formation in the current high-grade road area in sandy areas. , cables and reflective contour markers. The wind tunnel test results show that the cable guardrail in the method of the present invention has little disturbance to the air flow, and no sand accumulation occurs on the ground. The cables are colored or have the function of lighting at night, the reflective film is pasted on the cable fixing column, and the reflective or solar luminous outline markers are fixed on the cable at intervals. The role of landscape. The invention can solve the road area problem of high-grade highways in sandy areas and promote the development of traffic construction in sandy areas. It can be used not only in sandy areas, but also in snowy areas and scenic spots.
本发明所述的一种基于护栏结构调整的沙区高等级公路路面积沙的治理方法,该方法涉及的装置是由固定立柱、反光膜、缆索和反射轮廓标组成,具体操作按下列步骤进行:According to the invention, a method for controlling sand in the high-grade highway road area in sandy areas based on guardrail structure adjustment, the device involved in the method is composed of fixed columns, reflective film, cables and reflective contour markers, and the specific operations are carried out according to the following steps :
a、在沙区高等级公路路面两侧沿线和公路中央隔离带分别等距离设置护栏固定立柱(1),固定立柱(1)上等距离粘贴反光膜(2),在固定立柱(1)之间采用缆索(3)上下等距离排列固定;a. Set guardrail fixed columns (1) equidistantly along both sides of the high-grade road surface in the sandy area and along the central isolation belt of the highway, and paste reflective film (2) on the fixed columns (1) equidistantly, between the fixed columns (1) Cables (3) are arranged equidistantly up and down between them;
b、在缆索(3)上安装有反射轮廓标(4),轮廓标间距4-12m。b. A reflective delineator (4) is installed on the cable (3), and the delineator distance is 4-12m.
缆索(3)表面呈彩色,反射轮廓标(4)为太阳能发光轮廓标(4)。The surface of the cable (3) is colored, and the reflective delineator (4) is a solar luminous delineator (4).
本发明所述的基于护栏结构调整的沙区高等级公路路面积沙的治理方法,所涉及的传统缆索护栏的规格及布设方法参照中华人民共和国行业标准JTJ074-94《高速公路交通安全设施设计及施工技术规范》执行。According to the control method of the high-grade highway road area sand in the sandy area based on the adjustment of the guardrail structure of the present invention, the specifications and layout methods of the traditional cable guardrails involved refer to the industry standard JTJ074-94 of the People's Republic of China "Design and Design of Highway Traffic Safety Facilities". Implementation of Construction Technical Specifications.
本发明所述的一种基于护栏结构调整的沙区高等级公路路面积沙的治理方法,该方法充分利用现有各种护栏的优点,并克服不足,形成沙区高等级公路路面积沙防治方法。本发明所述方法中固定立柱(1)一侧贴反光膜(2),使立柱夜间起到轮廓标的作用;缆索(3)表面呈彩色,且具有夜光功能,可以增加缆索白天和夜间的视线引导作用,能极大改善和美化沙区路况,提高行车安全性;护栏缆索(3)上安装反射轮廓标(4),可以增加缆索视线引导作用(尤其是夜间)。A method for controlling road area sand in high-grade highways in sandy areas based on guardrail structure adjustment according to the present invention, the method makes full use of the advantages of various existing guardrails and overcomes deficiencies to form sand control in high-grade road areas in sandy areas method. In the method of the present invention, a reflective film (2) is pasted on one side of the fixed column (1), so that the column acts as a contour mark at night; the surface of the cable (3) is colored and has a luminous function, which can increase the line of sight of the cable during the day and at night The guiding function can greatly improve and beautify the road conditions in the sandy area, and improve driving safety; the reflective delineator (4) is installed on the guardrail cable (3), which can increase the guiding function of the cable sight (especially at night).
本发明所述方法适用于公路路侧护栏和中央隔离带护栏。The method of the invention is applicable to roadside guardrails and central isolation belt guardrails.
本发明用缆索(3)护栏替换高等级公路的常用护栏(混凝土护栏和波形板护栏),并形成了护栏视线引导功能加强方案,解决了路面积沙问题,不仅满足了防撞等级,还改善和美化了路况。The present invention replaces the commonly used guardrails (concrete guardrails and corrugated plate guardrails) of high-grade highways with cable (3) guardrails, and forms a strengthening scheme for guardrail line-of-sight guiding functions, solves the problem of road area sand, not only meets the anti-collision level, but also improves And beautify the road conditions.
附图说明Description of drawings
图1为本发明示意图。Fig. 1 is a schematic diagram of the present invention.
具体实施方式detailed description
实施例1Example 1
a、在沙区高等级公路路面两侧沿线和公路中央隔离带分别等距离设置护栏固定立柱1,固定立柱1上等距离粘贴反光膜2,在固定立柱1之间采用缆索3上下等距离排列固定,其中缆索3表面呈彩色,在夜间发光时,一段为橙色,一段为绿色,一段为黄色,循环变化;a. Set guardrail fixed columns 1 at equal distances along both sides of the high-grade road surface in the sandy area and along the central isolation belt of the road, and paste reflective film 2 on the fixed columns 1 at equal distances, and use cables 3 to be arranged equidistantly up and down between the fixed columns 1 Fixed, the surface of the cable 3 is colored, and when it glows at night, one section is orange, one section is green, and one section is yellow, and the cycle changes;
b、在缆索3上安装有反射轮廓标4为太阳能发光轮廓标,反射轮廓标4的间距为4m。b. The reflective contour markers 4 installed on the cable 3 are solar luminous contour markers, and the distance between the reflective contour markers 4 is 4m.
实施例2Example 2
a、在沙区高等级公路路面两侧沿线和公路中央隔离带分别等距离设置护栏固定立柱1,固定立柱1上等距离贴反光膜2,在固定立柱1之间采用缆索3上下等距离排列固定,其中缆索3表面呈彩色,在夜间发光时,一段为橙色,一段为绿色,一段为黄色,循环变化;a. Set guardrail fixed columns 1 equidistantly along both sides of the high-grade road surface in the sandy area and along the central isolation zone of the highway, and put reflective film 2 on the fixed columns 1 equidistantly, and use cables 3 to arrange equidistantly up and down between the fixed columns 1 Fixed, the surface of the cable 3 is colored, and when it glows at night, one section is orange, one section is green, and one section is yellow, and the cycle changes;
b、在缆索3上安装有反射轮廓标4为太阳能发光轮廓标,反射轮廓标4的间距5m。b. The reflective contour markers 4 installed on the cable 3 are solar luminous contour markers, and the distance between the reflective contour markers 4 is 5m.
实施例3Example 3
a、在沙区高等级公路路面两侧沿线和公路中央隔离带分别等距离设置护栏固定立柱1,固定立柱1上等距离贴反光膜2,在固定立柱1之间采用缆索3上下等距离排列固定,其中缆索3表面呈彩色,在夜间发光时,一段为橙色,一段为绿色,一段为黄色,循环变化;a. Set guardrail fixed columns 1 equidistantly along both sides of the high-grade road surface in the sandy area and along the central isolation zone of the highway, and put reflective film 2 on the fixed columns 1 equidistantly, and use cables 3 to arrange equidistantly up and down between the fixed columns 1 Fixed, the surface of the cable 3 is colored, and when it glows at night, one section is orange, one section is green, and one section is yellow, and the cycle changes;
b、在缆索3上安装有反射轮廓标4为太阳能发光轮廓标,反射轮廓标4的间距为6m。b. The reflective contour markers 4 installed on the cable 3 are solar luminous contour markers, and the distance between the reflective contour markers 4 is 6m.
实施例4Example 4
a、在沙区高等级公路路面两侧沿线和公路中央隔离带分别等距离设置护栏固定立柱1,固定立柱1上等距离贴反光膜2,在固定立柱1之间采用缆索3上下等距离排列固定,在夜间发光时,缆索3表面呈绿色;a. Set guardrail fixed columns 1 equidistantly along both sides of the high-grade road surface in the sandy area and along the central isolation zone of the highway, and put reflective film 2 on the fixed columns 1 equidistantly, and use cables 3 to arrange equidistantly up and down between the fixed columns 1 Fixed, when glowing at night, the surface of cable 3 is green;
b、在缆索3上安装有反射轮廓标4,反射轮廓标4的间距为10m。b. Reflective contour markers 4 are installed on the cable 3, and the distance between the reflective contour markers 4 is 10m.
实施例5Example 5
a、在沙区高等级公路路面两侧沿线和公路中央隔离带分别等距离设置护栏固定立柱1,固定立柱1上等距离贴反光膜2,在固定立柱1之间采用缆索3上下等距离排列固定,其中缆索3表面呈彩色,在夜间发光时,一段为橙色,一段为绿色,一段为黄色,循环变化;a. Set guardrail fixed columns 1 equidistantly along both sides of the high-grade road surface in the sandy area and along the central isolation zone of the highway, and put reflective film 2 on the fixed columns 1 equidistantly, and use cables 3 to arrange equidistantly up and down between the fixed columns 1 Fixed, the surface of the cable 3 is colored, and when it glows at night, one section is orange, one section is green, and one section is yellow, and the cycle changes;
b、在缆索3上安装有反射轮廓标4为太阳能发光轮廓标,反射轮廓标4的间距为12m。以上实施例,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此。b. The reflective contour markers 4 installed on the cable 3 are solar luminous contour markers, and the distance between the reflective contour markers 4 is 12m. The above examples are only specific implementation methods of the present invention, but the protection scope of the present invention is not limited thereto.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710256347.6A CN106906768A (en) | 2017-04-19 | 2017-04-19 | The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710256347.6A CN106906768A (en) | 2017-04-19 | 2017-04-19 | The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106906768A true CN106906768A (en) | 2017-06-30 |
Family
ID=59210888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710256347.6A Pending CN106906768A (en) | 2017-04-19 | 2017-04-19 | The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106906768A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108103870A (en) * | 2018-02-06 | 2018-06-01 | 中国科学院寒区旱区环境与工程研究所 | Suitable for the High-Grade Highway Subgrade system and its construction method of windy and sandy area |
CN113646485A (en) * | 2019-04-15 | 2021-11-12 | 福美化学工业株式会社 | Sight line induction mark with light guide rod and steel cable guardrail |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003313828A (en) * | 2002-04-19 | 2003-11-06 | Yoshida Kouzou Design:Kk | Cushioning fitting and cushioning device for rope |
WO2010081655A1 (en) * | 2009-01-13 | 2010-07-22 | Geobrugg Ag | Roll-out safety system |
CN102322030A (en) * | 2011-06-13 | 2012-01-18 | 徐继根 | Anti-colliding and buffering luminous safety barrier of road |
CN202865756U (en) * | 2012-10-22 | 2013-04-10 | 中铁西北科学研究院有限公司 | Vertical type sand-blocking net |
CN203129121U (en) * | 2013-03-29 | 2013-08-14 | 中国科学院寒区旱区环境与工程研究所 | Windproof sand resistance sand barrier |
CN204738257U (en) * | 2015-07-01 | 2015-11-04 | 衢州市政园林股份有限公司 | Novel municipal garden steel cable cable guardrail |
-
2017
- 2017-04-19 CN CN201710256347.6A patent/CN106906768A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003313828A (en) * | 2002-04-19 | 2003-11-06 | Yoshida Kouzou Design:Kk | Cushioning fitting and cushioning device for rope |
WO2010081655A1 (en) * | 2009-01-13 | 2010-07-22 | Geobrugg Ag | Roll-out safety system |
CN102322030A (en) * | 2011-06-13 | 2012-01-18 | 徐继根 | Anti-colliding and buffering luminous safety barrier of road |
CN202865756U (en) * | 2012-10-22 | 2013-04-10 | 中铁西北科学研究院有限公司 | Vertical type sand-blocking net |
CN203129121U (en) * | 2013-03-29 | 2013-08-14 | 中国科学院寒区旱区环境与工程研究所 | Windproof sand resistance sand barrier |
CN204738257U (en) * | 2015-07-01 | 2015-11-04 | 衢州市政园林股份有限公司 | Novel municipal garden steel cable cable guardrail |
Non-Patent Citations (1)
Title |
---|
李生宇等: "315国道策勒恰哈桥段风沙灾害成因初步分析与治理对策", 《干旱区地理》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108103870A (en) * | 2018-02-06 | 2018-06-01 | 中国科学院寒区旱区环境与工程研究所 | Suitable for the High-Grade Highway Subgrade system and its construction method of windy and sandy area |
CN113646485A (en) * | 2019-04-15 | 2021-11-12 | 福美化学工业株式会社 | Sight line induction mark with light guide rod and steel cable guardrail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107387113B (en) | A kind of design method of low-grade highway tunnel bend inducible system | |
CN105019916B (en) | Mountainous area highway bridge tunnel linkage section visual environment improves design method | |
CN102912700B (en) | A Method for Improving Accident Black Spots on Exit Ramps of Expressway | |
CN103437255B (en) | A kind of mountain area arterial highway " T "-intersection Design of Traffic Safety method | |
CN109024344B (en) | A multi-level asymmetric line-of-sight guidance system for curved road sections in urban tunnels | |
CN202440773U (en) | Visual illusion vibration deceleration marked line suitable for sharp turn road section of highway | |
CN107620266B (en) | A traffic safety improvement facility at a waterfront bend | |
CN104404899B (en) | A road vibration deceleration facility | |
CN110863446A (en) | A low-level lighting line-of-sight guidance system for extra-large bridges on urban expressways in foggy areas | |
CN106906768A (en) | The administering method of the husky area's high grade highway pavement sand based on guard bar structure adjustment | |
CN105088984A (en) | Integrated visual illusion tag system for expressway bridge | |
CN103898850A (en) | Lifting type movable separation fence with dustproof separation plate | |
CN103422409B (en) | A kind of long and steep downgrade energy dissipating deceleration road surface and construction technology thereof | |
CN202416210U (en) | Road deceleration distribution skid-proof marking applicable to level crossing | |
CN207079456U (en) | A kind of pedestrian overpass | |
CN202466452U (en) | Compulsive speed reducing equipment for highway | |
CN210288211U (en) | HA-level concrete anti-collision guardrail | |
CN109518631A (en) | Environment-friendly and economical traffic diversion and reconstruction method for highway reconstruction and extension | |
CN203878490U (en) | Caution pavement with traffic safety auxiliary function | |
CN110863452B (en) | A line of sight guidance system for pedestrian bridges on urban expressways | |
CN202164518U (en) | Cross directional barrier-free overpass | |
CN209025021U (en) | A rapid installation of anti-collision device for urban bridge piers | |
CN202672071U (en) | Light-reflecting post cap structure | |
CN206245248U (en) | A kind of highway intervening guard column of new anti-high beam | |
CN201649004U (en) | Traffic segregation facilities and traffic directional lanes using the traffic segregation facilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170630 |