CN207619981U CN201721677166.2U CN201721677166U CN207619981U CN 207619981 U CN207619981 U CN 207619981U CN 201721677166 U CN201721677166 U CN 201721677166U CN 207619981 U CN207619981 U CN 207619981U
Authority
CN
China
Prior art keywords
anchor
cable
pier
anchorage
ruggedized construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721677166.2U
Other languages
Chinese (zh)
Inventor
杨鹏
罗光其
李晓彬
骆世威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Huaneng Group Technology Innovation Center Co Ltd
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201721677166.2U priority Critical patent/CN207619981U/en
Application granted granted Critical
Publication of CN207619981U publication Critical patent/CN207619981U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of ruggedized constructions of embedded prestress anchorage cable, including provide the anchor cable of reinforcement edge(4);Anchor cable(4)Through anchorage(2)The anchor pier of support force is provided with early period(5)Connection, in anchorage(2)With anchor pier(5)Between be lined with anchor plate(3), in anchor pier(5)Second stage concrete is poured outside(1);Second stage concrete(1)With anchor pier(5)Between connection poured using dabbing.The utility model is simple in structure, easy for construction, not only plays anchoring effect, but also does not influence construction appearance and function use.Anchor cable reinforcement measure can effectively be combined arrangement with fabric structure, to save anchor cable arrangement space, while play respective function again and not interfering.

Description

A kind of ruggedized construction of embedded prestress anchorage cable
Technical field
The utility model is related to a kind of ruggedized constructions of embedded prestress anchorage cable, belong to hydraulic and hydroelectric engineering technology neck Domain.
Background technology
In hydraulic and hydroelectric engineering process of construction, can usually encounter a large amount of, complicated rock mass engineering project structure, as side slope, Lower cavern, road(Dam)Base, deep basal pit etc..The stability of this part Rock And Soil, it is most important for the safety of construction, because This is generally required in the case that Rock-soil Mass Structure stability is unsatisfactory for requiring or security and stability deposit is not high by adding Gu to improve stability.Common reinforcement means mainly has:Retaining structure, anchor cable(Bar), anchor caverns etc..However, if adding It cannot accomplish adaptation to local conditions in fixed meter and construction, then can cause because reinforcement technique itself is there are many insufficient or misapplications Consolidation effect is undesirable, even results in the generation of engineering accident.Presently, how under the conditions of space is limited, reasonably Reinforcement measure is set, not only can guarantee enough reinforcement edges, but also does not influence arrangement or the function use of other buildings, is urgently A problem to be solved.
Utility model content
The purpose of the utility model is to provide a kind of embedded prestress anchorage cables simple in structure, easy for construction Ruggedized construction, can effectively provide anchor force under the conditions of arrangement space is limited, it is ensured that stable structure, while not shadow again It rings building arrangement and function uses, to overcome the deficiencies in the prior art.
What the technical solution of the utility model was realized in:
A kind of ruggedized construction of the embedded prestress anchorage cable of the utility model, including the anchor cable of reinforcement edge is provided;Anchor cable The anchor pier for providing support force with early period through anchorage is connect, and anchor plate is lined between anchorage and anchor pier, two have been poured outside anchor pier Phase concrete;Connection is poured using dabbing between second stage concrete and anchor pier.
In the ruggedized construction of aforementioned embedded prestress anchorage cable, the anchorage is OVM anchors.
In the ruggedized construction of aforementioned embedded prestress anchorage cable, the anchor plate is galvanized steel plain sheet, and thickness is not less than 20mm.
In the ruggedized construction of aforementioned embedded prestress anchorage cable, the anchor cable be high intensity, low-relaxation prestressed steel wire or Steel strand wires, surface galvanized anticorrosive.
In the ruggedized construction of aforementioned embedded prestress anchorage cable, the anchor pier is truncated rectangular pyramids shaped steel tendon concrete structure, by force Degree is not less than C30.
By adopting the above-described technical solution, the utility model is compared with prior art, the utility model is simple in structure, applies Work is convenient, by fist stage concrete anchor pier pressure-bearing, after carrying out anchorage cable stretching construction using anchorage, by second stage concrete with positioned at should The tensioning component at anchor pier position pours together, and anchor pier is made to melt as entirety with second stage concrete;Not only anchoring effect is played, but also is not influenced Construction appearance and function use.Anchor cable reinforcement measure can effectively be combined cloth by the utility model with fabric structure It sets, to save anchor cable arrangement space, while playing respective function again and not interfering.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
In figure:1- second stage concretes, 2- anchorages, 3- anchor plates, 4- anchor cables, 5- anchor piers.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and examples, but not as new to this practicality Any restrictions of type.
The utility model is constituted according to a kind of reinforcement means of following embedded prestress anchorage cables, and this method is such as Shown in Fig. 1, reinforced according to the following steps:
Step 1: according to structure arrangement and Design of Reinforcement requirement, anchor cable drilling is carried out first, is targetedly made before drilling Determine deviation controlling and corrective action;Hole wall cleaning is carried out after pore-forming in time;
Step 2: installation anchor cable;Anchor cable hole should be checked before installation, anchor cable lashing should use rubber cushion isolation, support Transient mode, it is ensured that anchor cable keeps smooth-going in anchor cable hole;
Step 3: duct grouting;Anchor cable grouting is in the milk using orifice closure, or using blind hole or with plasma resistance plug Method grouting;
Step 4: anchor pier makes;Armored concrete anchor pier is carried out according to design and code requirement to pour;
Step 5: anchorage cable stretching;Pre- tensioning is carried out by 20% design stretching force before formal tensioning, stretching force should be classified and apply Add, increases to ultra stretching load step by step;
Step 6: structural concrete pours;Wait for that anchor cable construction is completed, after carrying out dabbing processing to anchor pier outer surface, according to Structural Design Requirement carries out second stage concrete outside anchor pier and pours.Second stage concrete is reinforced concrete structure, second stage concrete Interior is configured by reinforcing bar by structural requirement.
According to a kind of ruggedized construction of embedded prestress anchorage cable of the utility model of above method composition, including provide The anchor cable 4 of reinforcement edge;The anchor pier 5 that anchor cable 4 provides support force through anchorage 2 with early period is connect, and is lined between anchorage 2 and anchor pier 5 Anchor plate 3 has poured second stage concrete 1 outside anchor pier 5;Connection is poured using dabbing between second stage concrete 1 and anchor pier 5.Anchor Tool 2 is OVM anchors.Anchor plate 3 is galvanized steel plain sheet, and thickness is not less than 20mm.Anchor cable 4 be high intensity, low-relaxation prestressed steel wire or Steel strand wires, surface galvanized anticorrosive.Anchor pier 5 is truncated rectangular pyramids shaped steel tendon concrete structure, and intensity is not less than C30.
Embodiment
This example is applied in the Shimen Hydropower Station engineering of Hutubi, Xinjiang river.Specific implementation step is following such as Fig. 1 institutes Show:1, it according to structure arrangement and Design of Reinforcement requirement, chooses suitable position and carries out anchor cable drilling, hole wall is carried out in time after pore-forming Cleaning, should formulate targetedly deviation controlling and corrective action before drilling;2, anchor cable is installed, anchor cable hole should be carried out before installation It checks, anchor cable lashing preferably uses modes, the anchor cables such as rubber cushion isolation, support transition that should keep smooth-going in hole;3, duct grouting, anchor Rope grouting preferably uses orifice closure to be in the milk, and blind hole or the grouting of the method with plasma resistance plug can also be used;4, anchor pier makes, Armored concrete anchor pier is carried out according to design and code requirement to pour;5, anchorage cable stretching presses 20% design tensioning before formal tensioning Power carries out pre- tensioning, and stretching force should be classified application, increase to ultra stretching load step by step;6, structural concrete pours, and waits for that anchor cable is applied Work is completed, and after carrying out dabbing processing to anchor pier outer surface, anchor pier external structure concreting is carried out according to Structural Design Requirement.
The embedded prestressed anchor reinforcement structure constituted as stated above, as shown in Figure 1, providing support force including early period Anchor pier 5, be cast on anchor pier 5 second stage concrete 1, provide reinforcement edge anchor cable 4, carry out 4 tensioning of anchor cable anchorage 2, pad Anchor plate 3 on anchor pier 5;It is handled using dabbing between the second stage concrete 1 and anchor pier 5.Second stage concrete 1 is reinforcing bar Concrete carries out arrangement of reinforcement by structural requirement.Anchorage 2 is OVM anchors.Anchor plate 3 is galvanized steel plain sheet, and thickness is not preferably less than 20mm.Anchor Rope 4 is high intensity, low-relaxation prestressed steel wire or steel strand wires, surface galvanized anticorrosive.Anchor pier 5 is truncated rectangular pyramids shaped steel reinforced concrete knot Structure, intensity are not less than C30.

Claims (5)

1. a kind of ruggedized construction of embedded prestress anchorage cable, including the anchor cable of reinforcement edge is provided(4);It is characterized in that:Anchor cable (4)Through anchorage(2)The anchor pier of support force is provided with early period(5)Connection, in anchorage(2)With anchor pier(5)Between be lined with anchor plate (3), in anchor pier(5)Second stage concrete is poured outside(1);Second stage concrete(1)With anchor pier(5)Between company poured using dabbing It connects.
2. the ruggedized construction of embedded prestress anchorage cable according to claim 1, it is characterised in that:The anchorage(2)For OVM Anchor.
3. the ruggedized construction of embedded prestress anchorage cable according to claim 1, it is characterised in that:The anchor plate(3)For Galvanized steel plain sheet, thickness are not less than 20mm.
4. the ruggedized construction of embedded prestress anchorage cable according to claim 1, it is characterised in that:The anchor cable(4)For height Intensity, low-relaxation prestressed steel wire or steel strand wires, surface galvanized anticorrosive.
5. the ruggedized construction of embedded prestress anchorage cable according to claim 1, it is characterised in that:The anchor pier(5)It is four Prismoid shaped reinforced concrete structure, intensity are not less than C30.
CN201721677166.2U 2017-12-05 2017-12-05 A kind of ruggedized construction of embedded prestress anchorage cable Active CN207619981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721677166.2U CN207619981U (en) 2017-12-05 2017-12-05 A kind of ruggedized construction of embedded prestress anchorage cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721677166.2U CN207619981U (en) 2017-12-05 2017-12-05 A kind of ruggedized construction of embedded prestress anchorage cable

Publications (1)

Publication Number Publication Date
CN207619981U true CN207619981U (en) 2018-07-17

Family

ID=62821440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721677166.2U Active CN207619981U (en) 2017-12-05 2017-12-05 A kind of ruggedized construction of embedded prestress anchorage cable

Country Status (1)

Country Link
CN (1) CN207619981U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811804A (en) * 2019-02-18 2019-05-28 深圳市工勘岩土技术有限公司 Anchoring type prestressed anti-floating anchor rod construction method after pretensioning

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811804A (en) * 2019-02-18 2019-05-28 深圳市工勘岩土技术有限公司 Anchoring type prestressed anti-floating anchor rod construction method after pretensioning

Similar Documents

Publication Publication Date Title
CN101634149B (en) Prestressed anchor foundation pit support and construction method
CN103912000A (en) Reusable composite-material soil nailing wall supporting face plate and construction method thereof
CN102787595B (en) Double-acting self-stressing combined uplift pile and pile forming method
CN107893418A (en) A kind of reinforcement means and structure of embedded prestress anchorage cable
CN105714819B (en) A kind of outer anchor head multi-protective device of prestress anchorage cable and its fixing means
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN207619981U (en) A kind of ruggedized construction of embedded prestress anchorage cable
CN213867798U (en) Pile-anchor rod mixed foundation
CN201713950U (en) Medium-burying rubber waterstop fixing device
CN206279561U (en) A kind of poured band of outer wall of basement prefab-form system
CN205917662U (en) Prevent concrete face rockfill dam that ftractures
CN209538214U (en) A kind of late poured band structure of outer wall of basement
CN204676607U (en) Poured band of outer wall of basement plugging structure
CN208201658U (en) A kind of steel trestle rapid construction device
CN107587476B (en) Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN202416316U (en) Permanent anchor cable pier head model for quick supporting
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN202247914U (en) Fitting-slope foundation structure for rocky slope
CN206503114U (en) A kind of assembled protection dike
CN205399499U (en) Waterproofing membrane basic unit
CN201635073U (en) Pre-stressed anchorage system with three layers of protection and double anchoring sections
CN203393616U (en) Shrinkage-free cement mortar sealing anchor head applied to water conservancy box beam
CN209011152U (en) Tower crane based on bonded prestressed concrete
CN207672612U (en) A kind of prestressed anchor Cable Structure suitable for crane beam on rock wall for underground power house position

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190527

Address after: 550081 Xingshan Lake District, Guiyang, Guizhou Province, No. 16

Co-patentee after: Huaneng Group Lancang River hydropower limited company

Patentee after: China Kweiyang survey and design research institute company limited of electricity Jian group

Co-patentee after: Huaneng Group Technology Innovation Center Co., Ltd.

Address before: 550081 Xingshan Lake District, Guiyang, Guizhou Province, No. 16

Patentee before: China Kweiyang survey and design research institute company limited of electricity Jian group

TR01 Transfer of patent right