CN207609078U - Big panel Integral ceiling - Google Patents

Big panel Integral ceiling Download PDF

Info

Publication number
CN207609078U
CN207609078U CN201721786190.XU CN201721786190U CN207609078U CN 207609078 U CN207609078 U CN 207609078U CN 201721786190 U CN201721786190 U CN 201721786190U CN 207609078 U CN207609078 U CN 207609078U
Authority
CN
China
Prior art keywords
integral ceiling
longeron
crossbeam
big panel
ceiling according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721786190.XU
Other languages
Chinese (zh)
Inventor
沈明
肖鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aupu Home Style Corp Ltd
Original Assignee
Aupu Home Style Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aupu Home Style Corp Ltd filed Critical Aupu Home Style Corp Ltd
Priority to CN201721786190.XU priority Critical patent/CN207609078U/en
Application granted granted Critical
Publication of CN207609078U publication Critical patent/CN207609078U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model discloses a kind of big panel Integral ceilings, belong to fitting-up technology, existing aluminum-pinch, plaster tablet suspended ceiling are difficult to take into account that appearance is clean and tidy, electrical maintenance is convenient simultaneously, installation period is shorter, crossbeam and longeron are perpendicularly constituted mounting bracket by the utility model with the main connector assembly, decoration top surface is mounted holder and is divided into several panel installation regions, and panel is mounted on panel installation region, and electric mounting position is set on crossbeam or/and longeron for installing electric appliance;Aluminum-pinch compared with the existing technology or plasterboard, the panel have the area of bigger, and the structure of mounting bracket is more simple so that entire Integral ceiling simple installation, quick, the period is short;The appearance of entire Integral ceiling is clean and tidy, air;Electrical maintenance is convenient.

Description

Big panel Integral ceiling
Technical field
The utility model belongs to fitting-up technology, and in particular to a kind of big panel Integral ceiling.
Background technology
Two kinds of installation sides of the aluminum-pinch of Integral ceiling generally use size module or the plasterboard of overall performance at present Method.The first aluminum-pinch installation method:Triangular keel is installed at top, then aluminum-pinch is tipped upside down on triangular keel, aluminum-pinch It is also these specifications accordingly generally to have 30cm × 30cm, 45cm × 45cm, 60cm × 60cm equal-specifications, appliance panel, and one A complete furred ceiling face needs many pieces of aluminum-pinch or appliance panel to form, therefore furred ceiling face overall appearance is scrappy;Second Gypsum method of plate installation:Several block gypsum plates successively install, and then stitching portion carries out U.S. seam processing, and reflected is monoblock Furred ceiling, since furred ceiling is an entirety, the electric appliance inside furred ceiling when repair to just occur difficulty.Above two knot The furred ceiling of configuration formula generally will install keel when installation according to the dimensions of buckle, when the aluminum-pinch of the first is such as installed, It needs to keep the spacing corresponding to aluminum-pinch dimensions between triangular keel, so that aluminum-pinch can be buckled to mounted on delta queue On bone, being squeezed deformation if there are errors for spacing, then after being installed in the presence of installation buckle difficulty or buckle makes entire furred ceiling face It is not smooth enough, and when installing plasterboard, it needs that wooden keel are installed for fixed plasterboard to be consolidated plasterboard with fastener It is scheduled on wooden keel, in other words, the furred ceiling of existing structure is to install keel according to the dimensions of buckle, for shape Irregular decoration top surface, there are bigger difficulties for installation.Therefore, can show furred ceiling entirety cleaning can facilitate electrical maintenance again Installation of ceiling method is our problem to be solved.
Utility model content
The technical problems to be solved in the utility model and the technical assignment of proposition are to overcome existing aluminum-pinch, plaster tablet suspended ceiling It is difficult to take into account that appearance is clean and tidy, electrical maintenance is convenient simultaneously, while ensureing the shorter defect of installation period, a kind of big panel collection is provided At furred ceiling.
In order to achieve the above objectives, the big panel Integral ceiling of the utility model, it is characterized in that including:
Crossbeam sets the first carrying side thereon;
Longeron sets the second carrying side thereon;
Main connector, the crossbeam perpendicularly constitutes mounting bracket with longeron with the main connector assembly, described First carrying is generally aligned in the same plane in, the second carrying, and decoration top surface is divided into several panels by the mounting bracket and installs Region;
Sunpender is connect with the main connector for lifting the main connector;
Auxiliary connector is assemblied in the crossbeam, the end of longeron is used to fix the end of the crossbeam, the end of longeron Portion;
Linea angulata is used to be mounted on the edge of decoration top surface;
Panel, is mounted on the panel installation region, edge by described first carrying in, the second carrying, At least two carryings in linea angulata;
Electric mounting position is set on the crossbeam or/and longeron.
As optimization technique means:The crossbeam or/and longeron is made of two parallel beam bodies, and described two parallel Beam body by the main connector, auxiliary connector keep spacing constitute the first electric mounting position.
As optimization technique means:The electric appliance of the first electric mounting position installation includes tuyere assembly, LED light board group At least one of part, grid.
As optimization technique means:The electric appliance of the first electric mounting position installation passes through the electric appliance card on electric appliance Edge fit is connected in the beam body.
As optimization technique means:The beam body is made of triangular keel and the assembly of the first proximate matter, first type Set the first carrying side on material, triangular keel tool there are one top surface and bends out from the edge of the top surface Two symmetrical gripper edges, electric appliance clamping checkpost are connected between described two symmetrical gripper edges.
As optimization technique means:The first link slot is set on first proximate matter, first link slot is built-in with spiral shell Bolt, the bolt are fastenedly connected with the main connector, auxiliary connector.
As optimization technique means:The first proximate matter clamping side is set on first proximate matter and helps slot, described first Proximate matter clamping checkpost is connected between two symmetrical gripper edges of the triangular keel, and the top surface of the triangular keel is positioned at described Support slot in.
As optimization technique means:The crossbeam or/and longeron is made of the second proximate matter, and is set on second proximate matter Two electric mounting positions.
As optimization technique means:The electric appliance of the second electric mounting position installation is for light bar or lamp string and for being provide with The translucent cover of the light bar or lamp string.
As optimization technique means:The translucent cover is clamped checkpost by cover body and is connected on second electric mounting Position.
As optimization technique means:The second electric mounting position is card slot.
As optimization technique means:The second link slot is set on second proximate matter, second link slot is built-in with spiral shell Bolt, the bolt are fastenedly connected with the main connector, auxiliary connector.
As optimization technique means:The crossbeam is made of two parallel beam bodies, two parallel beam bodies by The main connector, auxiliary connector keep spacing to constitute the first electric mounting position;The longeron is made of the second proximate matter, institute It states and sets the second electric mounting position on the second proximate matter.
As optimization technique means:The main connector is made of connecting plate and lifting portion, is set on the connecting plate There are bolt penetration hole, the lifting portion to be fixed on the upside of the connecting plate.
As optimization technique means:The auxiliary connector is angle connector.
As optimization technique means:The crossbeam, longeron be " T " shape or "+" shape arrangement.
Crossbeam and longeron are perpendicularly constituted mounting bracket by the utility model with the main connector assembly, decorate top surface quilt Mounting bracket is divided into several panel installation regions, and panel is mounted on panel installation region, and electric appliance peace is set on crossbeam or/and longeron Dress position is for installing electric appliance;Aluminum-pinch compared with the existing technology or plasterboard, the panel have the area of bigger, installation branch The structure of frame is more simple so that entire Integral ceiling simple installation, quick, the period is short;The appearance of entire Integral ceiling is clean and tidy, Air;Electrical maintenance is convenient.
Moreover, the big panel Integral ceiling of the utility model, when installation, first presses assembling mounting bracket, and mounting bracket is installed Panel is installed again after good, thus be the size of panel is determined by mounting bracket, and each panel installation region be it is independent, Only one piece of panel of installation need to be cut respectively in each independent panel installation region, shape, the specification of panel are easily tailored And be easy to correct, be not in the situation of extrusion after installation.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the big panel Integral ceiling of the utility model;
Fig. 2 is the schematic diagram of mounting bracket shown in installation diagram 1;
Fig. 3 is the installation condition schematic diagram of the big panel Integral ceiling of the utility model;
Fig. 4 is the structural schematic diagram of the crossbeam of the utility model;
Fig. 5 is the structural schematic diagram of the longeron of the utility model;
Fig. 6 is the structural schematic diagram of the main connector of the utility model;
Fig. 7 is a kind of structural schematic diagram of the auxiliary connector of the utility model;
Fig. 8 is another structural schematic diagram of the auxiliary connector of the utility model;
Fig. 9 is the structural schematic diagram of the tuyere assembly of the utility model;
Figure 10 is the structural schematic diagram of the LED lamp panel component of the utility model;
Figure 11 is the structural schematic diagram of the grid of the utility model;
Figure 12 is the schematic diagram of the auxiliary connector and longeron assembly of the utility model;
Figure 13 is the sectional schematic diagram of the crossbeam of the utility model;
Figure 14 is the main connector of the utility model by the vertically-mounted schematic diagram of crossbeam, longeron;
Figure 15 is the schematic diagram of auxiliary connector, grid and the crossbeam assembly of the utility model;
Figure 16 is the schematic diagram for second of mounting bracket that the crossbeam, longeron of the utility model are assembled into;
Figure 17 is the schematic diagram for the third big panel Integral ceiling that installation panel is constituted in mounting bracket shown in Figure 16;
Figure 18 is the schematic diagram of the 4th kind big panel Integral ceiling of the utility model;
Figure 19 is the schematic diagram of the 5th kind big panel Integral ceiling of the utility model;
Figure 20 is the schematic diagram of the 6th kind big panel Integral ceiling of the utility model;
Figure 21 is the schematic diagram of the 7th kind big panel Integral ceiling of the utility model;
Figure label explanation:
100- crossbeams, 101- first carry side, 102- beam bodies, the first electric mountings of 103- position, 104- triangular keels, 105- Top surface, 106- gripper edges, the first proximate matters of 107-, the first link slots of 108-, the first proximate matters of 109- are clamped side, and 110- helps slot;
200- longerons, 201- second carry side, the second electric mountings of 202- position, the second link slots of 203-;
The main connectors of 300-, 301- connecting plates, 302- liftings portion, 303- bolt penetration holes;
400- sunpenders;
501, the auxiliary connectors of 502-;
600- linea angulatas;
700- panels;
801- tuyere assemblies, 802-LED lamp plate components, 803- grids, 804- electric appliances clamping side, 805- light bar, 806- are saturating Bright cover, 807- cover bodies are clamped side;
900- bolts;
WL- walls.
Specific implementation mode
The utility model is described further below in conjunction with Figure of description.
As shown in Fig. 1-3, Figure 16-17, Figure 18-21, the big panel Integral ceiling of the utility model, it is characterized in that including:
Crossbeam 100 sets the first carrying side 101 thereon(Referring to Fig. 4, Figure 13);
Longeron 200 sets the second carrying side 201 thereon(Referring to Fig. 5, Figure 12);
Main connector 300(Referring to Fig. 6), crossbeam 100 and longeron 200 are perpendicularly assembled with the main connector 300 and are constituted Mounting bracket(Referring to Figure 14), the first carrying 201 is generally aligned in the same plane when 101, second carries, and decoration top surface is mounted holder It is divided into several panel installation regions;Specific crossbeam, longeron are " T " shape or "+" shape is assembled with main connector, thus may be used To constitute the mounting bracket of multiple structural forms, shown in " # " shape, Figure 18 shown in "+" shape as shown in Figs. 1-3, Figure 16-17 "T"-shaped, Figure 19 shown in double "+" shapes, symmetrical double "T"-shaped etc. shown in double "T"-shaped, Figure 21 shown in Figure 20;Such as Shown in Fig. 6, main connector is made of connecting plate and lifting portion, and connecting plate is equipped with bolt penetration hole for wearing bolts assemblies cross Beam, longeron, lifting portion be fixed on the upside of connecting plate for connecting sunpender, and connecting plate therein is as assembling crossbeam, longeron Benchmark so that the assembling of crossbeam and longeron is more convenient accurate so that entire furred ceiling face is neatly smooth;
Sunpender 400(Referring to Fig. 6), it is connect with main connector 300 for lifting main connector, sunpender is generally fixed to On the roof of side;Sunpender can be connected through a screw thread with main connector, to adjust;
Auxiliary connector 501,502 is assemblied in crossbeam 100, the end of longeron 200 is used for the end of fixed cross beam, longeron End, auxiliary connector is generally fixed on wall WL;Auxiliary connector is angle connector, and specific there are two types of structure types, one is The larger structure of width shown in Fig. 7, this to be suitable for installing the larger crossbeam of cross-sectional width, another kind is that width shown in Fig. 8 is smaller Structure, it is this to be suitable for that the smaller longeron of cross-sectional width is installed;
Linea angulata 600 is used to be mounted on the edge of decoration top surface, for support panel, blocks gap, therefore its section can To be various shapes;
Panel 700, is mounted on panel installation region, edge by the first carrying in, the second carrying, in linea angulata extremely Few two kinds of carryings;It, can according to demand just since panel installation region is to be split to form by mounting bracket by top surface is decorated Ratio between the size and each region of setting each region of profit, and compared with the existing technology, panel installation region is more than Aluminum-pinch, the plasterboard of the prior art, "+" shape mounting bracket as shown in Figs. 1-3 are divided into four panels to pacify by top surface is decorated " # " shape mounting bracket shown in dress region, Figure 16-17 is divided into top surface is decorated shown in nine panel installation regions, Figure 18 "T"-shaped mounting bracket will decorate top surface and be divided into double "+" shape mounting brackets shown in three panel installation regions, Figure 19 that will fill Decorations top surface is divided into double "T"-shaped mounting brackets shown in six panel installation regions, Figure 20 to be divided into four faces by top surface is decorated Symmetrical double "T"-shaped mounting brackets shown in plate installation region, Figure 21 are divided into five panel installing zones by top surface is decorated Domain;The panel, however it is not limited to which pure decorative panel, when specific implementation may be other shapes or the plate with certain function Shape device(Such as LED lamp panel);When selecting decorative panel, can the preferably aluminum cellular board etc. of lightweight can also be in panel for beauty Decorative coveringn etc. is added on surface;
Electric mounting position is set on crossbeam or/and longeron for installing electric appliance.
The crossbeam, longeron of the utility model are only opposite definition, when determining that the beam in a direction is crossbeam, then vertically In crossbeam beam be longeron.
The big panel Integral ceiling, the parts constituted after to decompose in the form of packing and selling, implement assembling at the scene Installation.
Specifically, referring to Fig. 4, Figure 15, it is illustrated that crossbeam 100 be made of two parallel beam bodies 102, two parallel beams Body keeps spacing to constitute the first electric mounting position 103 by main connector 300, auxiliary connector 501.
The electric appliance of first electric mounting position 103 installation includes tuyere assembly 801(Referring to Fig. 9), LED lamp panel component 802(Ginseng See Figure 10), grid 803(Referring to Figure 11, Figure 15)At least one of, it, can be by tuyere assembly, LED lamp panel for neat appearance Component, grid group, which close, fills up electric mounting position.
The electric appliance of first electric mounting position 103 installation is clamped side 804 by the electric appliance on electric appliance and is connected in beam body. Referring to Figure 13, in order to realize clamping, beam body 102 is made of triangular keel 104 and the assembly of the first proximate matter 107, on the first proximate matter 107 If the first carrying side 101, there are one top surface 105 and bend out from the edge of top surface two are symmetrical for the tool of triangular keel 104 Gripper edge 106, electric appliance clamping checkpost are connected between two symmetrical gripper edges.
It is installed for the ease of assembly, sets the first link slot 108 on the first proximate matter 107, the first link slot 108 is built-in with bolt 900, bolt 900 is fastenedly connected with main connector 300, auxiliary connector 501.When Assembling, by the head of bolt 900(Such as six Angle head)It is placed in the first link slot 108, the bar portion of bolt is fastenedly connected with main connector, auxiliary connector, it is convenient and efficient.
Referring to Figure 13, in order to enable triangular keel 104 and the first proximate matter 107 assemble reliable assembling, the is set on the first proximate matter 107 One proximate matter is clamped side 109 and helps slot 110, and the first proximate matter clamping side 109 is connected to two symmetrical gripper edges of triangular keel Between 106, the top surface 105 of triangular keel, which is located at, to be helped in slot 110, so that triangular keel and the first proximate matter formation one are whole Body.
Referring to Fig. 5, Figure 12, it is illustrated that longeron 200 be made of the second proximate matter, the second electric mounting position is set on the second proximate matter 201.The electric appliance of second electric mounting position 201 installation is light bar 805 or lamp string and the translucent cover for being provide with light bar or lamp string 806.Translucent cover 806 is clamped side 807 by cover body and is connected to the second electric mounting position.For the ease of installation light bar or lamp string and Translucent cover, the second electric mounting position are card slot.
The second connection is set on the second proximate matter for the ease of being linked and packed with main connector, auxiliary connector referring to Fig. 5, Figure 12 Slot 203, the second link slot are built-in with bolt 900, and bolt is fastenedly connected with main connector, auxiliary connector.When Assembling, by spiral shell The head of bolt(Such as turret head)It is placed in the second link slot, the bar portion of bolt is fastenedly connected with main connector, auxiliary connector, It is convenient and efficient.
Crossbeam is explained above, longeron uses the situation of different structure form, when it is implemented, crossbeam and longeron can be by Two parallel beam body compositions, two parallel beam bodies keep spacing to constitute the first electric mounting by main connector, auxiliary connector Position or crossbeam, longeron are made of the second proximate matter, and the second electric mounting position is set on the second proximate matter.
Moreover, according to demand, only electric appliance also can be installed on crossbeam or longeron.
When the big panel Integral ceiling is installed:Crossbeam, longeron are vertically first assembled into mounting bracket with main connector;It connects It, the electric appliance such as components such as tuyere assembly, LED lamp panel component and grid is buckled in the triangular keel of crossbeam successively according to design requirement On;Auxiliary connector is separately fixed to the end of crossbeam, longeron by bolt again;Then main connector is lifted on by sunpender Roof fixes auxiliary connector on the wall, that is, completes the installation to mounting bracket;It, can be successively after mounting bracket installation fixes Panel is installed;Then light bar or lamp string and translucent cover are packed into longeron;Finally install linea angulata successively again;Entire big surface plate collection It is completed at installation of ceiling.Therebetween, to the installation of electric appliance such as tuyere assembly, LED lamp panel component and grid etc., installation branch can be completed After the assembling of frame, install in real time;Further, since crossbeam, longeron intersect vertically at main connector, therefore one of needs are cut It is disconnected, crossbeam or longeron specifically can be blocked according to demand when installation, if longeron is not truncated, then whole can be installed in longeron Light bar can install a light bar respectively if longeron is truncated in the longeron blocked, the crossbeam or longeron not being truncated, The rigidity and intensity of mounting bracket can be increased.The installation process is only a kind of installation of the big panel Integral ceiling of the utility model Mode is not construed as the limitation to scope of protection of the utility model.

Claims (16)

1. big panel Integral ceiling, it is characterized in that including:
Crossbeam(100), the first carrying side is set thereon(101);
Longeron(200), the second carrying side is set thereon(201);
Main connector(300), the crossbeam perpendicularly constitutes mounting bracket with longeron with the main connector assembly, described First carrying is generally aligned in the same plane in, the second carrying, and decoration top surface is divided into several panels by the mounting bracket and installs Region;
Sunpender(400), it is connect with the main connector for lifting the main connector;
Auxiliary connector(501、502), it is assemblied in end, longeron of the end of the crossbeam, longeron for fixing the crossbeam End;
Linea angulata(600), it is used to be mounted on the edge of decoration top surface;
Panel(700), be mounted on the panel installation region, edge by described first carrying in, the second carrying, At least two carryings in linea angulata;
Electric mounting position is set on the crossbeam or/and longeron.
2. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam or/and longeron is flat by two Capable beam body(102)Composition, two parallel beam bodies keep spacing to constitute first by the main connector, auxiliary connector Electric mounting position(103).
3. big panel Integral ceiling according to claim 2, it is characterized in that:The first electric mounting position(103)Peace The electric appliance of dress includes tuyere assembly(801), LED lamp panel component(802), grid(803)At least one of.
4. big panel Integral ceiling according to claim 3, it is characterized in that:The first electric mounting position(103)Peace The electric appliance of dress is clamped side by the electric appliance on electric appliance(804)It is connected in the beam body.
5. big panel Integral ceiling according to claim 4, it is characterized in that:The beam body(102)By triangular keel (104)With the first proximate matter(107)Assembly is constituted, first proximate matter(107)On set the first carrying side(101), institute The triangular keel stated(104)There are one top surfaces for tool(105)And two symmetrical clampings for bending out from the edge of the top surface Side(106), the electric appliance is clamped side(804)It is connected to described two symmetrical gripper edges(106)Between.
6. big panel Integral ceiling according to claim 5, it is characterized in that:The first link slot is set on first proximate matter (108), first link slot(108)It is built-in with bolt, the bolt connects with the main connector, the fastening of auxiliary connector It connects.
7. big panel Integral ceiling according to claim 5, it is characterized in that:The first proximate matter card is set on first proximate matter Edge fit(109)And help slot(110), first proximate matter is clamped side(109)Be connected to the triangular keel two are symmetrical Gripper edge(106)Between, the top surface of the triangular keel(105)Positioned at the support slot(110)It is interior.
8. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam or/and longeron is by second type Material is constituted, and the second electric mounting position is set on second proximate matter(202).
9. big panel Integral ceiling according to claim 8, it is characterized in that:The second electric mounting position(202)Peace The electric appliance of dress is light bar(805)Or lamp string and the translucent cover for being provide with the light bar or lamp string(806).
10. big panel Integral ceiling according to claim 9, it is characterized in that:The translucent cover(806)Pass through cover body card Edge fit(807)It is connected to the second electric mounting position(202).
11. big panel Integral ceiling according to claim 8, it is characterized in that:The second electric mounting position(202)For Card slot.
12. big panel Integral ceiling according to claim 8, it is characterized in that:The second connection is set on second proximate matter Slot(203), second link slot is built-in with bolt, and the bolt is fastenedly connected with the main connector, auxiliary connector.
13. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam is by two parallel beam bodies Composition, two parallel beam bodies keep spacing to constitute the first electric mounting position by the main connector, auxiliary connector;Institute The longeron stated is made of the second proximate matter, and the second electric mounting position is set on second proximate matter.
14. big panel Integral ceiling according to claim 1, it is characterized in that:The main connector(300)By connecting plate (301)And lifting portion(302)It constitutes, the connecting plate is equipped with bolt penetration hole(303), the lifting portion is fixed on described The upside of connecting plate.
15. big panel Integral ceiling according to claim 1, it is characterized in that:The auxiliary connector is angle connector.
16. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam, longeron it is " T " shape or "+" shape is arranged.
CN201721786190.XU 2017-12-19 2017-12-19 Big panel Integral ceiling Active CN207609078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721786190.XU CN207609078U (en) 2017-12-19 2017-12-19 Big panel Integral ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721786190.XU CN207609078U (en) 2017-12-19 2017-12-19 Big panel Integral ceiling

Publications (1)

Publication Number Publication Date
CN207609078U true CN207609078U (en) 2018-07-13

Family

ID=62798248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721786190.XU Active CN207609078U (en) 2017-12-19 2017-12-19 Big panel Integral ceiling

Country Status (1)

Country Link
CN (1) CN207609078U (en)

Similar Documents

Publication Publication Date Title
WO2015073907A2 (en) Light art seam effects and hardware background
CN110000524A (en) A kind of universal Sheet-metal machine box and its processing technology
CN207609078U (en) Big panel Integral ceiling
CN109629736A (en) A kind of portable connection structure of light gage steel joist
CN112554470A (en) Modular-assembly decorative surface decorative plate structure and mounting method thereof
CN101190071A (en) Outer skeleton furniture
CN112814303A (en) Assembled wall hanging plate system
CN108130973A (en) Big panel Integral ceiling
CN201474134U (en) keel and suspended ceiling
CN214696566U (en) Modular assembly's veneer decorative board structure
CN214461713U (en) Connecting component and furred ceiling system of furred ceiling decorative board
CN209990004U (en) Light and shade joint formula smallpox system
CN212129634U (en) Ceiling mounting structure
CN202542643U (en) Decoration suspended ceiling of elevator car
CN107116950B (en) A kind of the socket connection structure and its installation method of three-dimensional art ornament
CN201817950U (en) Hung ceiling structure
CN207406225U (en) A kind of hollow glass interior decoration structure
CN216952730U (en) Curtain wall lamp
CN209990005U (en) Joint formula keel structure
CN203734027U (en) Panel structure
CN211172796U (en) Veneer device
CN213359214U (en) Conveniently-disassembled built-in plate
CN104481098B (en) The structural member of assembly type furred ceiling
CN213774077U (en) Novel section bar convenient to use for ceiling decoration
CN210378206U (en) Magic cube screen

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant